2 Ensure all visible exterior surfaces of unit are clean. If necessary, clean exterior surfaces as follows:
1. Remove dust and loose dirt with a clean, soft cloth.
2. Remove dust or dirt from plugs and jacks with a soft brush.
3. Remove grease, fungus, and ground-in dirt using a cloth dampened (not wet) with general purpose
detergent.
3 Ensure that all cables and wiring are not frayed, damaged, loose, corroded, split or cracked.
4 Inspect all securing hardware, screws, self-locking retainers, for stripped threads, bent or broken
threaded shafts.
(a) Severe corrosion on the exterior (a) Severe corrosion on the interior or
surfaces of the main support bar shall require that the bar exterior surfaces of the round support tubes shall require
be returned to a depot facility for refurbishing. that the tubes be returned to Raytheon Systems Co. for
refurbishing.
(b) Light and moderate corrosion on the
exterior surfaces of the main support bar shall be treated (b) Light and moderate corrosion on the
as follows: exterior surfaces of the round support tubes shall be
treated as follows:
• Removal per TM 1-1500-344-23, Section 8-12
• Washprime per MIL-C-8514 • Removal per TM 1-1500-344-23, Section 8-12
• Prime per MIL-P-53022 • Solid film lubricant per MIL-L-23398
• Paint per MIL-C-46168, CC 36231 (Gray)
(c) Light and moderate corrosion on the
(c) Light and moderate corrosion on the interior surfaces of the round support tubes shall be
interior surfaces of the two .625 diameter holes shall be treated as follows:
treated as follows:
• Removal per TM-1500-344-23, Section 8-12
• Removal per TM 1-1500-344-23, Section 8-12 • Washprime per MIL-C-8514
• CPC per MIL-C-81309, Type II and MIL-C- • Prime per MIL-P-53022
16173, Grade 4 apply per TM 1-1500-344-23 and
appropriate MIL-SPEC
16-1-4
TM 1-1520-237-23 (SUP)
(3) Release Mechanism and Other Ferrous of the metal is characterized by discoloration and pitting
Material. to a depth of approximately one MIL (.001 inch)
maximum. This type of damage is normally removed by
(a) Severe corrosion on the surfaces of the light hand sanding.
release mechanism and other ferrous material shall
require that those parts be returned to Raytheon Systems (b) Moderate Corrosion: This looks like
Co. for refurbishing. corrosion except that there may be some blisters or
evidence of scaling and flaking of the coating or paint
(b) Light and moderate corrosion on the system, and the pitting depths may be as deep as 10 MILS
release mechanism and other ferrous material shall be (0.10 inch). This type of damage is normally removed by
treated as follows: extensive hand sanding or light mechanical sanding.
• Removal per TM-1500-344-23, Section 8-12 (c) Severe Corrosion: Its general
• Washprime per MIL-C-8514 appearance may be similar to moderate corrosion with
severe inter-granular corrosion, blistering exfoliation,
• Prime per MIL-P-53022
scaling or flaking. The pitting depths are deeper than 10
• Paint per MIL-C-46168, CC 36231 (Gray) MILS (0.010 inch). This damage must be removed by
extensive mechanical sanding or grinding.
(4) General Definitions (TM 1-1500-344-23).
16-1-5
TM 1-1520-237-23 (SUP)
16-1C-1. Replace FRIES Bar Assembly (Figure c. Remove FRIES bar and spacers.
16-1C-1).
16-1C-1.2. Install.
16-1C-1.1. Remove.
a. Install spacers and FRIES bar with at least three
assistants supporting FRIES bar.
WARNING
NOTE
Injury to personnel or damage to
equipment will result if FRIES bar is not Bolts and barrel nuts must be replaced after
supported during removal. Use at least 15 installations or removals.
three assistants to support FRIES bar
during removal/installation. Do not b. Install bolts, thin washers, and thick washers with
remove bolts without three assistants three assistants supporting FRIES bar.
supporting FRIES bar.
c. ALTERNATELY TORQUE BOLTS TO 1100
a. Remove cable assemblies (Paragraph 16-1C-4). - 1300 INCH-POUNDS.
b. Remove bolts, thin washers, and thick washers d. Install cable assemblies (Paragraph 16-1C-4).
with three assistants supporting FRIES bar.
16-1-6
TM 1-1520-237-23 (SUP)
16-1-7
TM 1-1520-237-23 (SUP)
16-1C-2. Replace FRIES Bar Support Assembly c. Remove retainer screw, compression spring, and
(Figure 16-1C-2). shoulder pin from body (Figure 16-1C-2, Sheet 2, Detail
D).
16-1C-2.1. Remove.
16-1C-2.3. Assemble.
NOTE
a. Install shoulder pin, compression spring, and
Right and left FRIES bar support assembly retainer screw in body. TIGHTEN RETAINER
removal procedures are the same. SCREW UNTIL FLUSH WITH BODY (Figure 16-2C-
2, Sheet 2, Detail D).
a. Remove cable assemblies (Paragraph 16-1C-4).
b. Install release arm in body using spring pin.
b. Remove mount assembly as follows: PRESS SPRING PIN INTO BODY UNTIL FLUSH
WITH SURFACE.
(1) Remove bolt, washers, and nut securing
release bar assembly (Figure 16-1C-2, Sheet 2, Detail C). c. Install cable anchor on release arm with screw,
washers, and self locking nut.
(2) Remove quick release pin from mount
assembly. 16-1C-2.4. Install.
16-1-8
TM 1-1520-237-23 (SUP)
16-1-9
TM 1-1520-237-23 (SUP)
16-1-10
TM 1-1520-237-23 (SUP)
Right and left cap assembly removal a. Install cap assembly onto support assembly tube
procedures are the same. until rivet hole in cap assembly and support assembly tube
line up.
a. Remove cable assemblies (Paragraph 16-1C-4).
b. Install rivet (TM 1-1500-204-23).
b. Remove quick release pins if installed (Figure 16-
1C-3). c. Install support assembly through FRIES bar
(Figure 16-1C-3).
c. Remove support assembly from FRIES bar
(Paragraph 16-1C-2). d. Install support assembly on FRIES bar (Paragraph
16-1C-2).
d. Remove rivet securing cap assembly to support
assembly tube (TM 1-1500-204-23). e. Install quick release pins if required (Figure 16-
1C-3).
e. Remove cap assembly from support assembly
tube. f. Install cable assemblies (Paragraph 16-1C-4).
16-1-11
TM 1-1520-237-23 (SUP)
16-1-12
TM 1-1520-237-23 (SUP)
a. Remove all clamps and hardware securing cable (1) Route cable and loosely install cable into
(Figure 16-1C-4). existing clamps.
b. Remove bolt release cable. (2) Slide cable through end plate.
(1) Remove nut, three washers and bolt securing (3) Loosely install nut on inside of end plate.
cable latch to arm.
(4) Place ball end of cable into latch and secure
(2) Cut safety wire and remove nut securing latch to arm with bolt, threw washers and nut. Place
cable to end plate. three washers under head of bolt with head on side of
release adaptor.
(3) Remove cable assembly by sliding cable up
through top of end plate. (5) Run cable through top of bracket assembly.
(4) Remove nut from bolt on release handle (6) Place nut on end of cable to loosely secure to
pulley. bracket.
(5) Remove bolt and unwind cable to back of (7) Run cable around pulley and secure to pulley
handle. with bolt and nut.
(6) Cut safety wire, loosen nut securing cable to (8) Check quick release mechanism for proper
bracket assembly and remove nut. operation.
(7) Slide cable up through hole in bracket and (9) Adjust cable by changing position of nuts to
remove cable. alter cable length.
c. Remove Safety Release Cable. (10) Tighten all nuts to standard torque.
(1) Remove nut, washer and bolt securing cable (11) Safety wire two cable end nuts to end plate
to safety release mechanism. and to bracket.
(2) Cut safety wire and remove nut securing b. Install Safety Release Cable.
cable to release adaptor.
(1) Route cable and loosely install cable into
(3) Remove cable assembly by sliding cable up existing clamps.
through top of release adaptor.
(2) Slide cable through end of release adaptor.
(4) Cut safety wire and remove nut from cable
assembly on bracket attached to release handle. (3) Loosely install nut on inside of release
adaptor.
(5) Remove screw and nut securing ball to safety
release handle attaching point (4) Place ball end of cable into safety release
mechanism.
(6) Pull cable up through hole in bracket.
(5) Secure ball end with screw and nut.
(7) Remove safety release cable from aircraft.
16-1-13
TM 1-1520-237-23 (SUP)
(6) Run cable down through top of safety release 16-1C-5. Replace Crew Chief’s Release Handle
bracket on the side of the release handle. Assembly.
(12) Safety wire two cable end nuts to release 16-1C-5.2. Install.
adaptor and to bracket on release handle.
a. Position crew chief’s release handle assembly in
bracket and secure with bolt and nut. Use standard
torque.
16-1-14
TM 1-1520-237-23 (SUP)
NOT APPLICABLE
16-1-15
TM 1-1520-237-23 (SUP)
16-1E-1. Parts Listing. reflected in Figures and Tables 16-1E-1-1 through 16-1E-
1-3.
The parts listing for the Fast Rope installation, crew
chief release assembly and FRIES bar assembly are
16-1-16
TM 1-1520-237-23 (SUP)
16-1-17
TM 1-1520-237-23 (SUP)
16-1-18
TM 1-1520-237-23 (SUP)
16-1-19
TM 1-1520-237-23 (SUP)
16-1-20
TM 1-1520-237-23 (SUP)
16-1-21
TM 1-1520-237-23 (SUP)
16-1-22
TM 1-1520-237-23 (SUP)
16-1-23