site survey

site cleaning

bore well digging


temporary shed construction for
material storage

preparation of site / site marking

foundation digging

preparation of foundation base

foundation construction

foosting/column construction

plinth beam

filling of soil
gound slab

ground floor column

beams and slab for first floor

staircase

infill wall - ground floor

door - window-lintel sill construction/


ground floor

terrace beam and slab

first floor infill wall

door - window-lintel sill


construction/first floor

electric works
plumbing works

plastering of inner walls

floor fininshing

wall tile/ skirting

plastering of outer walls

door window frame and shutter

paint
time
sub works
duration
1. Analysis of site 7 days
2. Marking surrounding and context and existing infrastructure
works

1. Cleaning of site 7 days


2. Leveling of site

digging of borewell for water supply 7 days


1. Temporary shed construction
2. Material procurement

1. Site markings
2. Plot boundary marking
3. Setting out plan

1. Earth work
2. Ground digging

1. Leveling the foundation base


2. Preparing base for the foundation
3. Preparation formwork to hold the soil

1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering

1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering

1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering

filling of earth
1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering

1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering

1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering

1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering

1. Marking
2. Laying of bricks/masonry
3. pointing

1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering

1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering

1. Marking
2. Laying of bricks/masonry
3. pointing

1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering

1. Laying of copper pipes


2. Making of electric boxes
1. Laying of pvc pipes
2. Placing valves and traps
3. Placing water closets

1. Plastering
2. Smoothing

1. Plastering
2. Smoothing

1. Opening frame preparation and fixing


2. Opening shutter fixing

1. Apply primer
2. Apply wall putty
3. Apply wall putty — second coat
4. Apply selected paint coat
5. Apply selected paint coat — final one
materials and machineries

Backhoe Loader, chainsaw, lorry truck (carry earth


& plants away), bulldozer

Nails, wooden pegs, planks, stakes,chalk


Hammer, measuring tape, theodolite, Dummy level,

Backhoe Loader, chainsaw, lorry truck (carry earth


& plants away), bulldozer

Timber formwork, bbcc, pcc


Compactor

Concrete, steel reinforcement, timber formwork


Concrete Mixer, Concrete vibrator, bar bending
machine, table saw

Concrete, steel reinforcement, timber formwork


Concrete Mixer, Concrete vibrator, bar bending
machine, table saw

Concrete, steel reinforcement, timber formwork


Concrete Mixer, Concrete vibrator, bar bending
machine, table saw
Concrete, steel reinforcement, timber formwork
Concrete Mixer, Concrete vibrator, bar bending
machine, table saw

Concrete, steel reinforcement, timber formwork


Concrete Mixer, Concrete vibrator, bar bending
machine, table saw

Concrete, steel reinforcement, timber formwork


Concrete Mixer, Concrete vibrator, bar bending
machine, table saw

Concrete, steel reinforcement, timber formwork


Concrete Mixer, Concrete vibrator, bar bending
machine, table saw

Brick, mortar
Plum bob, lining, mortar mixer

Concrete, steel reinforcement, timber formwork


Concrete Mixer, Concrete vibrator, bar bending
machine, table saw

Concrete, steel reinforcement, timber formwork


Concrete Mixer, Concrete vibrator, bar bending
machine, table saw

Brick, mortar
Plum bob, lining, mortar mixer

Concrete, steel reinforcement, timber formwork


Concrete Mixer, Concrete vibrator, bar bending
machine, table saw

Copper Cables (different sizes), PVC pipes, socket


box
Voltmeter, Ammeter, Plyers, Screws and nuts,
pvc pipes, traps, valves, water closet

Cement plaster, skim coat


Buckets, cement spatula trowels, groovers, edgers,
planks, sponges, scaffolding, plaster spray

Ceramic tiles, Cement mortar, Silicone sealant


Spirit level, Groovers, Tile cutter,

Ceramic tiles, Cement mortar, Silicone sealant


Spirit level, Groovers, Tile cutter,

Cement plaster, skim coat


Buckets, cement spatula trowels, groovers, edgers,
planks, sponges, scaffolding, plaster spray

Openings wooden frame (for door and windows)


Spirit level, measuring tape

Paint
Paint brush, Point roller
number and typology of
workers required
site surveyor, architect , civil engineer ,
contractor

contractor, site suvyor, engoneer


Backhoe Loader Operator, General workers,
Lorry driver

site surveyor, architect, engineer, general


worker

contractor, site suvyor, engoneer


Backhoe Loader Operator, General workers,
Lorry driver
General worker

Engineer, Carpenter, bar bender, general


worker

Engineer, Carpenter, bar bender, general


worker

Engineer, Carpenter, bar bender, general


worker

General worker
Engineer, Carpenter, bar bender, general
worker

Engineer, Carpenter, bar bender, general


worker

Engineer, Carpenter, bar bender, general


worker

Engineer, Carpenter, bar bender, general


worker

Mason, general worker

Engineer, Carpenter, bar bender, general


worker

Engineer, Carpenter, bar bender, general


worker

Mason, general worker

Engineer, Carpenter, bar bender, general


worker

Electrician,General workers
Plumber,General workers

General workers

General workers

General workers

General workers

Carpenter, general worker

Painter
details week 1

• Removal of unfavorable soil and substances such as stones, trees, plants.


• Initial leveling is done for the preparation of earthwork

temporary shed or structure is construted for material storage and for site
management

• Site marking is one of the starting point of your construction.


• In this activity your architect and Engineer will identify pillar placements.
• Once pillars placement is identified based on soil condition earth work will
start

Soil is digged till the hard soil is found or as prescribed by the engineer.
The digged pit is then prepared for the foundation base preparation

the

Formworks is constructed for foundation with steel rebar reinforcement and


starter bar. Thereafter a mixture of concrete with aggregates and cement is
then pour into the casting form and left for curing around a week time.

Formworks is constructed for column with steel rebar reinforcement and


starter bar. Thereafter a mixture of concrete with aggregates and cement is
then pour into the casting form and left for curing around a week time.

Formworks is constructed for column with steel rebar reinforcement and


starter bar. Thereafter a mixture of concrete with aggregates and cement is
then pour into the casting form and left for curing around a week time.

The digged grond is fill with soil upto the plinth level and compacted and
levelled well for geround slb construction
Formworks is constructed for column with steel rebar reinforcement and
starter bar. Thereafter a mixture of concrete with aggregates and cement is
then pour into the casting form and left for curing around a week time.

Formworks is constructed for column with steel rebar reinforcement and


starter bar. Thereafter a mixture of concrete with aggregates and cement is
then pour into the casting form and left for curing around a week time.

Formworks is constructed for column with steel rebar reinforcement and


starter bar. Thereafter a mixture of concrete with aggregates and cement is
then pour into the casting form and left for curing around a week time.

Formworks is constructed for column with steel rebar reinforcement and


starter bar. Thereafter a mixture of concrete with aggregates and cement is
then pour into the casting form and left for curing around a week time.

Infill wall is constructed with brick as material and courses are done as per
the masonary with brick and mortar and 4-5 corses are laid at a time.

Formworks is constructed for column with steel rebar reinforcement and


starter bar. Thereafter a mixture of concrete with aggregates and cement is
then pour into the casting form and left for curing around a week time.

Formworks is constructed for column with steel rebar reinforcement and


starter bar. Thereafter a mixture of concrete with aggregates and cement is
then pour into the casting form and left for curing around a week time.

Infill wall is constructed with brick as material and courses are done as per
the masonary with brick and mortar and 4-5 corses are laid at a time.

Formworks is constructed for column with steel rebar reinforcement and


starter bar. Thereafter a mixture of concrete with aggregates and cement is
then pour into the casting form and left for curing around a week time.

Eletrician will determine the location of the sockets according to the


engineering blue print. The brick wall is hacked to accommodate the wiring
pipe from the top to the ground according UBBL requirements. The wall
sockets will be installed after the wiring is done.
Setup water pipes and sewage pipes till outside of the wall preparing of
water closet and Water proofing for bathrooms .Close all water and sewage
pipes with temporary caps

The plaster layer is not more than half inches, and left for drying about 7
days before the finishing is applied. The first coating thickness is around
1/2 to 3/4 inches while the finishing Coat will be around 3/16 inches thick.
The surface of the rendering preferably wetted before application of
plastering. . Smooth surface plastering with pores and easily defected
characteristic is preferably used indoor.
Tiles are precisely measured according to the application area of the b
uilding. This can help to save number of tiles and as well able to maximize
the applying area. The tile will be cut into varies sizes and shapes to fit
those with smaller surface area.
Tiles are precisely measured according to the application area of the b
uilding. This can help to save number of tiles and as well able to maximize
the applying area. The tile will be cut into varies sizes and shapes to fit
those with smaller surface area.
The plaster layer is not more than half inches, and left for drying about 7
days before the finishing is applied. The first coating thickness is around
1/2 to 3/4 inches while the finishing Coat will be around 3/16 inches thick.
The surface of the rendering preferably wetted before application of
plastering. Rough surface plastering is usually used outdoor to resist harsh
weathering
The opening frames are constructed in position and align after the brick
wall is done. The door/shutter are then fixed with the frames.

Painting for finishing should be done after the plastering and undercoating
are completely dried up to prevent bubbling of the wall due to the
moisture. Painting requires few layers for better surface finishes.
week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1
week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1
week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1
week 1 week 1 week 1 week 1 week 1