site cleaning
foundation digging
foundation construction
foosting/column construction
plinth beam
filling of soil
gound slab
staircase
electric works
plumbing works
floor fininshing
paint
time
sub works
duration
1. Analysis of site 7 days
2. Marking surrounding and context and existing infrastructure
works
1. Site markings
2. Plot boundary marking
3. Setting out plan
1. Earth work
2. Ground digging
1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering
1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering
1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering
filling of earth
1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering
1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering
1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering
1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering
1. Marking
2. Laying of bricks/masonry
3. pointing
1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering
1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering
1. Marking
2. Laying of bricks/masonry
3. pointing
1. Preparation of formwork/shuttering
2. Rebaring and fabrication
3. Concrete preparation,laying and curing
4. Deshuttering
1. Plastering
2. Smoothing
1. Plastering
2. Smoothing
1. Apply primer
2. Apply wall putty
3. Apply wall putty — second coat
4. Apply selected paint coat
5. Apply selected paint coat — final one
materials and machineries
Brick, mortar
Plum bob, lining, mortar mixer
Brick, mortar
Plum bob, lining, mortar mixer
Paint
Paint brush, Point roller
number and typology of
workers required
site surveyor, architect , civil engineer ,
contractor
General worker
Engineer, Carpenter, bar bender, general
worker
Electrician,General workers
Plumber,General workers
General workers
General workers
General workers
General workers
Painter
details week 1
temporary shed or structure is construted for material storage and for site
management
Soil is digged till the hard soil is found or as prescribed by the engineer.
The digged pit is then prepared for the foundation base preparation
the
The digged grond is fill with soil upto the plinth level and compacted and
levelled well for geround slb construction
Formworks is constructed for column with steel rebar reinforcement and
starter bar. Thereafter a mixture of concrete with aggregates and cement is
then pour into the casting form and left for curing around a week time.
Infill wall is constructed with brick as material and courses are done as per
the masonary with brick and mortar and 4-5 corses are laid at a time.
Infill wall is constructed with brick as material and courses are done as per
the masonary with brick and mortar and 4-5 corses are laid at a time.
The plaster layer is not more than half inches, and left for drying about 7
days before the finishing is applied. The first coating thickness is around
1/2 to 3/4 inches while the finishing Coat will be around 3/16 inches thick.
The surface of the rendering preferably wetted before application of
plastering. . Smooth surface plastering with pores and easily defected
characteristic is preferably used indoor.
Tiles are precisely measured according to the application area of the b
uilding. This can help to save number of tiles and as well able to maximize
the applying area. The tile will be cut into varies sizes and shapes to fit
those with smaller surface area.
Tiles are precisely measured according to the application area of the b
uilding. This can help to save number of tiles and as well able to maximize
the applying area. The tile will be cut into varies sizes and shapes to fit
those with smaller surface area.
The plaster layer is not more than half inches, and left for drying about 7
days before the finishing is applied. The first coating thickness is around
1/2 to 3/4 inches while the finishing Coat will be around 3/16 inches thick.
The surface of the rendering preferably wetted before application of
plastering. Rough surface plastering is usually used outdoor to resist harsh
weathering
The opening frames are constructed in position and align after the brick
wall is done. The door/shutter are then fixed with the frames.
Painting for finishing should be done after the plastering and undercoating
are completely dried up to prevent bubbling of the wall due to the
moisture. Painting requires few layers for better surface finishes.
week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1
week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1
week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1 week 1
week 1 week 1 week 1 week 1 week 1