You are on page 1of 1

Answers

Total Landed Cost Analysis - Gentle Electric Respuesta 2 EOQ 23 240 working days per yer 1. Reorder point is a technique to determine when to order; it does not address how much to order when an order is made. So $500 was not the ROP as he was planning for a discount.

Number of Orders
Demand 1200 (N) = RQ 50 Esperaban a tener 2 unidades para pedir
Holding cost 20% Entonces al pedir, se asume que pedian 298 unidades
Cost of unloading/unit $0.50 Professor, the problem says .10 cwt T= 5 149000 lbs
Fixed cost $25 Total Cost = 25450 1490
Outside warehousing cost $12/unit/year 149 Cost of laoding into the warehouse
daily demand 5 149,000.00 $$
1490
L= 0.25 8940 Transportation Cost Calculo con 24 units
12000
Cost of units with incremental
discount ROP 1.25 (2 units) 12 Transportation cost
upto 100 500 Q 12 Cost of loading into warehouse
upto 200 50000 + 490x(Q-100) 4950000
over 200 50000+49000+475x(Q-200) 99
49500
Cost/unit with incremental
discount i.e.C(Q)/Q 297000
upto 100 500
upto 200 (1000/Q) + 490
over 200 (4000/Q) + 475 Transportation rates
Full car load $6 per 100lbs $30/unit and $3000 per car load
LCL $10 per 100lbs $50 per unit

Holiding cost estimated on average inventory i.e. Q/2 @ 20% of cost of inventory (estimate it at 20% of the cost of half the order quantity)

Additional
Cost of warehousing Number of Transportati Unloading
Q C(Q)/Q Requisitions per year material Ordering cost Holding cost cost car loads Full Loads LCL(Units) on cost cost Total Cost
198 50.00 99,000.00 7,575.76 9,900.00 99 99.00 0.00 297,000.00 4,950.00 418,425.76

Total Costs

450,000.00
400,000.00
350,000.00
300,000.00
250,000.00
200,000.00
150,000.00
100,000.00
50,000.00
0.00
150 200 250 300 350 400
Total
Costs