DATA REQUIREMENT FOR RIVER T

Sno. Description of Work


1 X-section data

a.
b.
c.
d.
e.
f.

2 GPS points at the points where there are existing structures of canal.
3 GPS points at the points where there are existing River Training Structures and their dimension and types.
4 Photos of all the existing Structures and BM
5 If bridges incountered, mention in the TS description and mark with GPS

6 Social Data
a.
b.
c.
d.
DATA REQUIREMENT FOR RIVER TRAININ
Description of Work
X-section data

Center Line points (CL as Description In TS)


Water Surface (WSL and WSR as Description In TS)
Bank Line Points (Left and Right) (BLL and BLR as Description In TS)
HFL (HFLL and HFLR as Description In TS)
one point as the spot height (SH as Description In TS)
Bench mark (co-ordinates) at every 200m with its photo

GPS points at the points where there are existing structures of canal.
GPS points at the points where there are existing River Training Structures and their dimension and types.
Photos of all the existing Structures and BM
If bridges incountered, mention in the TS description and mark with GPS

Social Data
Name of the Gaupalika, its wards that touches the river chainage wise.
Land area affected due to the river
Current Uses of water from the river
Current value of Land
R RIVER TRAINING WORKS
Remarks
To be taken in 50m difference longitudinally and less than 50m for meandering sections

At the center of the current river


Left and Right Points of Water Surface
upto where most times the water seems to run
the maximum point to where the river has reached in the past
far from the river area