Professional Documents
Culture Documents
a.
b.
c.
d.
e.
f.
2 GPS points at the points where there are existing structures of canal.
3 GPS points at the points where there are existing River Training Structures and their dimension and types.
4 Photos of all the existing Structures and BM
5 If bridges incountered, mention in the TS description and mark with GPS
6 Social Data
a.
b.
c.
d.
DATA REQUIREMENT FOR RIVER TRAININ
Description of Work
X-section data
GPS points at the points where there are existing structures of canal.
GPS points at the points where there are existing River Training Structures and their dimension and types.
Photos of all the existing Structures and BM
If bridges incountered, mention in the TS description and mark with GPS
Social Data
Name of the Gaupalika, its wards that touches the river chainage wise.
Land area affected due to the river
Current Uses of water from the river
Current value of Land
R RIVER TRAINING WORKS
Remarks
To be taken in 50m difference longitudinally and less than 50m for meandering sections