ID Task Name Start Finish Duration Complete Task Level Dependency

Left Label Right Label


1 CABLING 2019-11-29 08:00 2019-12-09 15:30 7.0 d. 95% 0
2 IP ADDRESSING 2019-12-10 08:00 2019-12-12 15:30 3.0 d. 66.7%
0 2
3 ROUTER CONFIGURATION 2019-12-13 08:00 2019-12-13 15:30 1.0 d.
90% 0 3
4 SWITCH CONFIGURATION 2019-12-02 08:00 2019-12-03 15:30 2.0 d. 95%
0
5 AP CONFIGURATION 2019-12-18 08:00 2019-12-18 15:30 1.0 d. 100% 0
7
6 SERVER CONFIGURATION 2019-12-18 08:00 2019-12-20 15:30 3.0 d. 95%
0 7
7 TESTING 2019-12-25 08:00 2019-12-26 15:30 2.0 d. 95% 0 8;10