CIVIL ENGINEERING

FOUNDATION ANALYSIS/DESIGN REPORT

Horizontal Vessel: 1

PROJECT NO. : VO170

PROJECT NAME : CURSO FOUNDATION3D

PROJECT LOCATION : CARACAS

CLIENT : DEPARTAMENTO

PROJECT TYPE :

REFERENCE DOCUMENTS : _____________________________________________

_____________________________________________

_____________________________________________

By: _______________ Checked: _______________ Approved: _______________

Date: _______________ Date: _______________ Date: _______________

INELECTRA
CARACAS
DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 2
OPTIONS D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HVS
Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Units:

Input Units: Metric Output Units: Metric Code: ACI 318 - 2005

Concrete Parameters:

Compressive Strength : (kgf/sq cm) 210 Unit Weight : (kgf/cu m) 2403


Pier Concrete Cover: Allowable Concrete Stress increase:
E-W Direction : (mm) 50 Wind 0.00%
N-S Direction : (mm) 50 Earthquake 0.00%
Footing Concrete Cover: Test 0.00%
E-W Direction : (mm) 75
N-S Direction : (mm) 75
Top Steel to Top of footing : (mm) 75
Bot Steel to Bot of footing/ Top of Pile : (mm) 75

Reinforcing Steel Parameters:

Yield Strength : (kgf/sq cm) 4200 Unit Weight of Steel: (kgf/cu m) 7850
Modulus of Elasticity of Steel: (kgf/sq cm) 2038426 Footing Bar Spacing:
Pier Bars and Spacing: Min Rebar spacing: (mm) 50
Min Rebar spacing: (mm) 75 Max Rebar spacing: (mm) 300
Max no. of bars per Pier 500 Max Footing Rebar Size (mm) 25
Temperature and Shrinkage Steel Ratio: 0.0018 Min Footing Rebar Size (mm) 10

Soil/Pile Parameters:

Foundation Type : Soil-Supported Soil Unit Weight : (kgf/cu m) 1800


Allowable Bearing Pressure : (kgf/sq cm) 2.5 Allowable Soil Pressure increase
Stability Ratios/Safety Factor: Wind 0.00%
Minimum Stability Ratio for Erection 1.5 Earthquake 0.00%
Minimum Stability Ratio for Operation 2 Test 0.00%
Minimum Stability Ratio for Test 2 Type of Soil: Granular
Safety Factor against Lateral Forces 1.5 Passive Pressure Coeff Kp 5
Soil To Conc. Friction f: 0.5
DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 3
HOR. VESSEL DATA D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HV
Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Hor Vessel Number: 1


Longitudinal Direction of Horiz Vessel: NS
Geometry & Loads:
Vess 1

Diameter (mm): 6000


Length (mm): 13400
Material: Alloy Steel
C.L. Elevation (mm): 23200
Shell Design Temp (deg C): 131
Shipping Weight (kgf): 74550
Operating Weight (kgf): 131230
Test Weight (kgf): 516730
Eff Diameter De for wind (mm): 7200
Eff Length Le for wind (mm): 13400

Percent Wt to Fixed Pier: 50.00%


Percent Shipping wt added to Operating wt: 0.00%
Saddle Length (mm): 6000
Coefficient of Friction: 0.3
Basic Wind Pressure (kgf/sq cm): 0
Earthquake Load Factor: 1

L = 13400 mm

D = 6000 mm C.L. Elev = 23200 mm

Dp = 3200 mm

Sw = 700 mm

Ds = 8200 mm
DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 4
FOOTING PARAMETERS D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-
Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Pier Parameters:

Shape: Rectangular
Min. Reinft. Ratio: 0.005

Footing Parameters:

Min. Footing or Cap Thickness Tf (mm): 400


Depth of Footing or Cap below grade Df (mm): 1500
Min. Soil cover above Footing or Cap Sc (mm): 1100
Depth of Water table below grade (mm): 0
Consider Buoyancy: No

Wind Design Criteria:

Wind Code ASCE 02


Basic Wind Speed (mph) 70
Exposure Category C
Importance Factor 1
Force Coefficient 0.72
Gust Factor Program
Height Factor 1
Height above grade (Ft) 25.74472
DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 5

Applied Loads Pier - P1 D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HVS

Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Load Load case Axial Shear E-W Mom N-S Shear N-S Mom E-W

No. KGF KGF KGF M KGF KGF M

1 Oper 65615.00 0.00 0.00 0.00 0.00

2 Erec 37275.00 0.00 0.00 0.00 0.00

3 Test 258365.00 0.00 0.00 0.00 0.00

4 Ther / Fric 0.00 0.00 0.00 -19684.50 0.00

5 Op Trans EQ 0.00 65615.00 209968.00 0.00 0.00

6 Op Long EQ 51211.71 0.00 0.00 -131230.00 0.00

7 Er Trans EQ 0.00 37275.00 119280.00 0.00 0.00

8 Er Long EQ -29092.68 0.00 0.00 74550.00 0.00


DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 6

Allowable Strength Load Combinations Pier - P1 D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HVS

Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Load Load Combination Axial Shear E-W Mom N-S Shear N-S Mom E-W

No. KGF KGF KGF M KGF KGF M

1 Oper + Ther / Fric 65615.00 0.00 0.00 -19684.50 0.00

2 Oper + Ther / Fric + Op Trans EQ 65615.00 65615.00 209968.00 -19684.50 0.00

3 Oper + Ther / Fric + Op Long EQ 116826.70 0.00 0.00 -150914.50 0.00

4 Erec 37275.00 0.00 0.00 0.00 0.00

5 Erec + Er Trans EQ 37275.00 37275.00 119280.00 0.00 0.00

6 Erec + Er Long EQ 8182.32 0.00 0.00 74550.00 0.00

7 Test 258365.00 0.00 0.00 0.00 0.00


DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 7

Ultimate Strength Load Combinations Pier - P1 D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HVS

Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Load Load Combination Axial Shear E-W Mom N-S Shear N-S Mom E-W

No. KGF KGF KGF M KGF KGF M

1 1.4Oper + 1.4Ther / Fric 91861.00 0.00 0.00 -27558.30 0.00

2 1.2Oper + 1.2Ther / Fric + Op Trans EQ 78738.00 65615.00 209968.00 -23621.40 0.00

3 0.9Oper + 0.9Ther / Fric + Op Trans EQ 59053.50 65615.00 209968.00 -17716.05 0.00

4 1.2Oper + 1.2Ther / Fric + Op Long EQ 129949.70 0.00 0.00 -154851.40 0.00

5 0.9Oper + 0.9Ther / Fric + Op Long EQ 110265.20 0.00 0.00 -148946.00 0.00

6 1.4Erec 52185.00 0.00 0.00 0.00 0.00

7 1.2Erec + Er Trans EQ 44730.00 37275.00 119280.00 0.00 0.00

8 0.9Erec + Er Trans EQ 33547.50 37275.00 119280.00 0.00 0.00

9 1.2Erec + Er Long EQ 15637.32 0.00 0.00 74550.00 0.00

10 0.9Erec + Er Long EQ 4454.82 0.00 0.00 74550.00 0.00

11 1.4Test 361711.00 0.00 0.00 0.00 0.00


DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 8
BEARING CAPACITY D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HVS
Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Load Load Gross Allow S.R. in S.R. in Allow Ecc. in Ecc. in Moment @ Moment @
Comb Soil Pres Soil Pres N/S Dir E/W Dir Min S.R. N/S Dir E/W Dir N/S axis E/W axis
No. KGF/SQ CM KGF/SQ CM CM CM KGF M KGF M

1 Oper + Ther / Fric 0.62 2.80 13.99 100.00 2.00 25.21 0.00 0.00 64595.73

2 Oper + Ther / Fric + Op Trans EQ 1.44 2.80 13.99 2.13 2.00 25.21 165.99 425287.08 64595.73

3 Oper + Ther / Fric + Op Long EQ 1.52 2.80 2.19 100.00 2.00 161.09 0.00 0.00 495233.93

4 Erec 0.46 2.80 100.00 100.00 1.50 0.00 0.00 0.00 0.00

5 Erec + Er Trans EQ 0.87 2.80 100.00 3.33 1.50 0.00 106.03 241599.87 0.00

6 Erec + Er Long EQ 0.82 2.80 2.87 100.00 1.50 123.07 0.00 0.00 244639.77

7 Test 0.90 2.80 100.00 100.00 2.00 0.00 0.00 0.00 0.00
DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 9
PIER - P1 Rebar Layout D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1
Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Pier Data:

Pier Size in N/S Direction (mm) 900


Pier Size in E/W Direction (mm) 6300

Rebar Size: 25

Number of Rebars:
E/W Direction: 20
N/S Direction: 11

Total No. of bars: 58

Rebar Spacing: (mm)


E/W Direction: 300
N/S Direction: 50

Area Requested: (sq cm) 280.00

Area Provided: (sq cm) 284.71

Percent Steel Provided: 0.51%

Tie-bars:
Total No. of Ties: 8
Tie bar size: (mm) 35
Major Tie bar spacing: (mm) 390
DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 10
PIER - P1 Ultimate Loads D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HVS
Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Load Load Axial Axial App Mom All Mom App Mom All Mom Remarks
Case Combination App Load All Load @ N/S axis @ N/S axis @ E/W axis @ E/W axis
KGF KGF KGF M KGF M KGF M KGF M

1 1.4Oper + 1.4Ther / Fric 143972.80 1458506.00 29401.56 297878.30 75234.15 761478.90

2 1.2Oper + 1.2Ther / Fric + Op Trans EQ 123405.30 897922.00 389096.90 2830384.00 64486.41 469034.10

3 0.9Oper + 0.9Ther / Fric + Op Trans EQ 92553.93 866606.60 389096.90 3643715.00 48364.81 452915.00

4 1.2Oper + 1.2Ther / Fric + Op Long EQ 174616.90 182752.60 35659.59 37279.98 422744.30 442123.00

5 0.9Oper + 0.9Ther / Fric + Op Long EQ 143765.60 152494.90 29359.25 31053.93 406622.70 431017.70

6 1.4Erec 104296.80 5861791.00 21299.08 3710515.00 4371.08 764758.00

7 1.2Erec + Er Trans EQ 89397.25 2537134.00 221040.70 6274042.00 3746.64 106346.60

8 0.9Erec + Er Trans EQ 67047.93 1701148.00 221040.70 5608385.00 2809.98 70952.81

9 1.2Erec + Er Long EQ 60304.58 124652.40 12315.17 25422.58 203521.50 420748.20

10 0.9Erec + Er Long EQ 37955.26 74985.85 7751.08 15470.11 203521.50 402133.00

11 1.4Test 413822.80 5861791.00 84509.26 3710515.00 17343.32 764758.00


DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 11
FOOTING REBARS D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HVS
Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Footing Data:

Footing/Pile Cap Size in N/S Direction (mm) 7060

Footing/Pile Cap Size in E/W Direction (mm) 7060

Footing/Pile Cap Thickness (mm) 550

Top Steel:

Tot Bars Bar Size Rebar Sp Area Prov Area Req Ult Mom Controlling Load Case
(mm) (mm) (sq cm/m) (sq cm/m) (kgf m/m)

E/W Dir 24 10 300 2.67 0.2 -262 1.2Oper + 1.2Ther / Fric + Op Trans EQ

N/S Dir 93 10 75 10.35 8.79 -11991 1.2Oper + 1.2Ther / Fric + Op Long EQ

Bottom Steel:

Tot Bars Bar Size Rebar Sp Area Prov Area Req Ult Mom Controlling Load Case
(mm) (mm) (sq cm/m) (sq cm/m) (kgf m/m)

E/W Dir 93 10 75 10.35 9.94 697 0.9Oper + 0.9Ther / Fric + Op Trans EQ

N/S Dir 139 14 50 30.32 25.65 46196 1.2Oper + 1.2Ther / Fric + Op Long EQ
DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 12
PUNCHING SHEAR D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HVS
Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Pier Load Max. Load Applied Punch. Allowed Punch. Pier Size Pier Shape Remarks
No. Combination Shear Str Shear Str
KGF KGF/SQ M KGF/SQ M MM

P1 1.4Test 297972.700 40144.750 74091.180 6310.00 X 900.00 Rectangular


DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 13

MAXIMUM FOOTING SHEAR D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HVS

Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Load Load Dist. From Max. Shear Applied Max. Allowed Max. Remarks
No. Combination Left Edge E-W Dir Shear Str Shear Str
M KGF KGF/SQ M KGF/SQ M

1 1.4Oper + 1.4Ther / Fric 7.056 -0.003 0.001 57636.820

2 1.2Oper + 1.2Ther / Fric + Op Trans EQ 7.056 3861.920 1197.134 57636.820

3 0.9Oper + 0.9Ther / Fric + Op Trans EQ 7.056 3689.687 1143.744 57636.820

4 1.2Oper + 1.2Ther / Fric + Op Long EQ 7.056 -0.010 0.003 57636.820

5 0.9Oper + 0.9Ther / Fric + Op Long EQ 7.056 0.006 0.002 57636.820

6 1.4Erec 7.056 0.004 0.001 57636.820

7 1.2Erec + Er Trans EQ 7.056 -0.038 0.012 57636.820

8 0.9Erec + Er Trans EQ 7.056 180.665 56.003 57636.820

9 1.2Erec + Er Long EQ 7.056 0.017 0.005 57636.820

10 0.9Erec + Er Long EQ 7.056 0.006 0.002 57636.820

11 1.4Test 7.056 0.052 0.016 57636.820


DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 14

MAXIMUM FOOTING SHEAR D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HVS

Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

Load Load Dist. From Max. Shear Applied Max. Allowed Max. Remarks
No. Combination Bottom Edge N-S Dir Shear Str Shear Str
M KGF KGF/SQ M KGF/SQ M

1 1.4Oper + 1.4Ther / Fric 2.621 71418.290 22138.530 57636.820

2 1.2Oper + 1.2Ther / Fric + Op Trans EQ 2.621 61215.680 18975.880 57636.820

3 0.9Oper + 0.9Ther / Fric + Op Trans EQ 2.621 45911.750 14231.910 57636.820

4 1.2Oper + 1.2Ther / Fric + Op Long EQ 2.621 167046.600 51781.790 57636.820

5 0.9Oper + 0.9Ther / Fric + Op Long EQ 2.621 156390.100 48478.430 57636.820

6 1.4Erec 2.621 38726.500 12004.590 57636.820

7 1.2Erec + Er Trans EQ 2.621 33194.140 10289.650 57636.820

8 0.9Erec + Er Trans EQ 4.435 -24895.610 7717.240 57636.820

9 1.2Erec + Er Long EQ 4.435 -70957.150 21995.580 57636.820

10 0.9Erec + Er Long EQ 4.435 -63164.170 19579.880 57636.820

11 1.4Test 2.621 153699.000 47644.230 57636.820


DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 15

FOUNDATION PLAN AND ELEVATION D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO HORIZONTAL-1.HVS

Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

POS/TOG EL. 20000 mm N


C.L.

7 - 35 mm

Ties @

390 mm
900 7060
C.L.
o.c.
GR. EL
18370 mm

A A

Use Slide Plate


1110 mm
6300

7060

PLAN (2 REQD.) (All dimensions in mm)

550 mm 58 - 25 mm bars

SECT A-A 20 ea in E-W Dir


MATERIAL QUANTITIES
@ 300 mm o.c.
11 ea in N-S Dir CONCRETE 85.9 (CM)
139 - 14 mm bars @ 50 mm o.c. (bot)
@ 50 mm o.c.
93 - 10 mm bars @ 75 mm o.c. (top) FORMWORK 109.8 (SM)

REINF. STEEL 7325.6 (KG)


93 - 10 mm bars @ 75 mm o.c. (bot)
EXCAVATION 313.7 (CM)
24 - 10 mm bars @ 300 mm o.c. (top)

FOUNDATION PLAN & ELEV FOR


ELEVATION LOOKING NORTH
EQUIPO HORIZONTAL
DIMENSIONAL SOLUTIONS FOUNDATION3D Version 4.0.0 Date: 05/06/2009 Page 16
FOUNDATION MATERIAL QUANTITIES D:\USERS\ALUIS17628\DESKTOP\FOUNDATION3D\EQUIPOS HORIZONTALES\EQUIPO H
Proj. No.: VO170 Engr: ______________ Date: ________ Checker: __________ Date: ________

FOUNDATION MATERIAL QUANTITIES

EQUIPMENT TYPE EQUIPMENT NAME/NUMBER


Horizontal Vessel 1

Concrete Volume: Cubic Meters (CM) 85.85

Formwork Area: Square Meters (SM) 109.84

Reinforcing Steel Weight: Kilograms (KG) 7325.6

Excavation Volume: Cubic Meters (CM) 313.72