F. Retail Mall Extension (Blank)
F. Retail Mall Extension (Blank)
located at
NOTES
SAR -
A As part of the Lump Sum Fixed Price for the Works, the Note SAR -
Contractor shall include in this section for all items deemed
necessary to complete the Works.
SAR -
B Attention is drawn to the following drawings and Note SAR -
specifications, including but not limited to Architects
Specification - Division 3 Concrete & Structural
Specifications.
SAR -
C The rates / prices in this section shall take cognizance of and Note SAR -
shall be deemed to include but may not be limited to the
following:
SAR -
D All Concrete Works to foundations, beds, pits, soft spots, Note SAR -
walls, columns, beams, slabs, stairs, upstands.
SAR -
E Any / all necessary special concrete finishes to conform with Note SAR -
the Specifications, including; fair faced finishes to exposed
surfaces, touching up finishes, repairs to finishes etc.
SAR -
F Contractor is responsible for temporary stability during Note SAR -
construction and for all temporary works design
SAR -
G All necessary steel reinforcements, treaded couplers, chairs, Note SAR -
spacers, tying wire, accessories and all necessary cutting and
bending.
SAR -
H All necessary, tamping, vibrating, surface treatments (power Note SAR -
floating, trowelling etc.), curing, protection etc.
SAR -
J All / any necessary construction joints (Transverse, Note SAR -
Longitudinal, contraction, isolation etc.), joint filler, mastics.
SAR -
K Integration/forming of all necessary service openings. Note SAR -
SAR -
L All necessary platforms for Mechanical and Electrical Note SAR -
Equipment/Plant, incl any base hardeners or slab thickening
for plant and equipment.
SAR -
M All necessary lifting, hoisting, cranage etc. Note SAR -
SAR -
N The layout for all construction joints must be submitted to the Note SAR -
Engineer prior to commencement. Construction joints are not
measured separately and are deemed to be included within
the rates.
SAR -
P Allow for liaising with the Steel Contractor as required; note Note SAR -
the Cast-In Fixing Inserts for the Steel Frame are to be
installed by the Steel Contractor as part of the steel works.
The below is deemed to include all costs associated with
progress on same.
To Collection SAR -
SAR -
NOTES (Cont'n) SAR -
SAR -
A The contractor shall note the requirement for noise and Note SAR -
vibration monitoring throughout the Excavation Works. The
Contractor is deemed to have included all costs associated
with same within their tender.
SAR -
B The Contractor is requested to insert quantities for items of Note SAR -
work where he thinks applicable and appropriate; hence, no
claim for additional quantities will be entertained
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
To Collection SAR -
Shuttering SAR -
SAR -
Concrete formwork, comprising of fabrication and SAR -
manufacture, construction and erection, shoring together
with associated removal; all in accordance with the
drawings and Specification
SAR -
A To soffits of suspended slab 30,562 m2 SAR -
SAR -
B To soffits of drop panel 2,047 m2 SAR -
SAR -
D To sides & soffits of transfer girder beam 2,175 m2 SAR -
E To sides & soffits of storey deep transfer girder beam 1,855 m2 SAR -
SAR -
F To soffits of ramp 258 m2 SAR -
SAR -
G To sides of suspended slab 847 m2 SAR -
SAR -
H To sides of drop panel 1,936 m2 SAR -
SAR -
L To sides and soffits of beam 8,164 m2 SAR -
To Collection SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
To Collection SAR -
SAR -
N to BOH Lower Ground Level 2,006 m2 SAR -
SAR -
P to BOH Ground Level 548 m2 SAR -
To Collection SAR -
SAR -
A to BOH Level 02 768 m2 SAR -
SAR -
B to BOH Level 02 Mezzanine 572 m2 SAR -
SAR -
C to BOH Level 03 2,186 m2 SAR -
SAR -
D to FOH Lower Ground Level 336 m2 SAR -
SAR -
E to FOH Ground Level 1,343 m2 SAR -
SAR -
F to FOH Level 01 3,828 m2 SAR -
SAR -
G to FOH Level 02 707 m2 SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
To Collection SAR -
SAR -
SAR -
A _______________________________________________ SAR -
SAR -
B _______________________________________________ SAR -
SAR -
C _______________________________________________ SAR -
SAR -
D _______________________________________________ SAR -
SAR -
E _______________________________________________ SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
To Collection SAR -
COLLECTION
Page: 3 SAR -
Page: 4 SAR -
Page: 5 SAR -
Page: 6 SAR -
Page: 7 SAR -
Page: 8 SAR -
Page: 9 SAR -