You are on page 1of 18

Approximate Bill of Quantities - Phase 1B

March 2019 | 100% DD Update

Extended Retail Construction


(Provisional Lump Sum Price)

in connection with the

Faisaliah Redevelopment Upgrade Project

located at

Riyadh, Kingdom of Saudi Arabia


Date : March 2019
###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

NOTES
SAR -
A As part of the Lump Sum Fixed Price for the Works, the Note SAR -
Contractor shall include in this section for all items deemed
necessary to complete the Works.
SAR -
B Attention is drawn to the following drawings and Note SAR -
specifications, including but not limited to Architects
Specification - Division 3 Concrete & Structural
Specifications.
SAR -
C The rates / prices in this section shall take cognizance of and Note SAR -
shall be deemed to include but may not be limited to the
following:
SAR -
D All Concrete Works to foundations, beds, pits, soft spots, Note SAR -
walls, columns, beams, slabs, stairs, upstands.
SAR -
E Any / all necessary special concrete finishes to conform with Note SAR -
the Specifications, including; fair faced finishes to exposed
surfaces, touching up finishes, repairs to finishes etc.

SAR -
F Contractor is responsible for temporary stability during Note SAR -
construction and for all temporary works design
SAR -
G All necessary steel reinforcements, treaded couplers, chairs, Note SAR -
spacers, tying wire, accessories and all necessary cutting and
bending.
SAR -
H All necessary, tamping, vibrating, surface treatments (power Note SAR -
floating, trowelling etc.), curing, protection etc.
SAR -
J All / any necessary construction joints (Transverse, Note SAR -
Longitudinal, contraction, isolation etc.), joint filler, mastics.

SAR -
K Integration/forming of all necessary service openings. Note SAR -
SAR -
L All necessary platforms for Mechanical and Electrical Note SAR -
Equipment/Plant, incl any base hardeners or slab thickening
for plant and equipment.
SAR -
M All necessary lifting, hoisting, cranage etc. Note SAR -
SAR -
N The layout for all construction joints must be submitted to the Note SAR -
Engineer prior to commencement. Construction joints are not
measured separately and are deemed to be included within
the rates.
SAR -
P Allow for liaising with the Steel Contractor as required; note Note SAR -
the Cast-In Fixing Inserts for the Steel Frame are to be
installed by the Steel Contractor as part of the steel works.
The below is deemed to include all costs associated with
progress on same.

05/12/2020 - DIVISION 03 - CONCRETE Page 3 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete
SAR -
Q All BOQ Items shall be priced by the Contractor on a Lump Note SAR -
Sum Basis. As such, the Contractor shall satisfy himself as to
the adequacy of all BOQ Quantities.
SAR -
SAR -

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 4 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

SAR -
NOTES (Cont'n) SAR -
SAR -
A The contractor shall note the requirement for noise and Note SAR -
vibration monitoring throughout the Excavation Works. The
Contractor is deemed to have included all costs associated
with same within their tender.
SAR -
B The Contractor is requested to insert quantities for items of Note SAR -
work where he thinks applicable and appropriate; hence, no
claim for additional quantities will be entertained
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 5 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 6 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

Section 03 10 00 Concrete Formwork

Shuttering SAR -
SAR -
Concrete formwork, comprising of fabrication and SAR -
manufacture, construction and erection, shoring together
with associated removal; all in accordance with the
drawings and Specification

SAR -
A To soffits of suspended slab 30,562 m2 SAR -
SAR -
B To soffits of drop panel 2,047 m2 SAR -
SAR -
D To sides & soffits of transfer girder beam 2,175 m2 SAR -

E To sides & soffits of storey deep transfer girder beam 1,855 m2 SAR -
SAR -
F To soffits of ramp 258 m2 SAR -
SAR -
G To sides of suspended slab 847 m2 SAR -
SAR -
H To sides of drop panel 1,936 m2 SAR -
SAR -
L To sides and soffits of beam 8,164 m2 SAR -

M To sides of shear wall 7,387 m2 SAR -


SAR -
N To sides of columns 7,974 m2 SAR -
SAR -
P To sides of hanger columns 662 m2 SAR -
SAR -
Q To sides of upstand wall 92 m2 SAR -
SAR -
R To sides of mechanical bases 6 m2 SAR -

S Section 03 20 00 Concrete Reinforcement and Embedded SAR -


Assemblies

Steel Reinforcement SAR -


SAR -
Deformed Bars; ASTM A615 Grade 60 with minimum SAR -
yield strength of 420 Mpa (60 ksi); all in accordance with
the Drawings and Specification

T In suspended slab 1,190 t SAR -

U In beam 523 t SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 7 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 8 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

Section 03 20 00 Concrete Reinforcement and Embedded


Assemblies

Steel Reinforcement SAR -


SAR -
Deformed Bars; ASTM A615 Grade 60 with minimum SAR -
yield strength of 420 Mpa (60 ksi); all in accordance with
the Drawings and Specification
SAR -
A In drop panel 53 t SAR -
SAR -
B In knockout slab 1 t SAR -
SAR -
C In ramps 11 t SAR -
SAR -
D In transfer girder beam 409 t SAR -

E In storey deep transfer girder beam 228 t SAR -


SAR -
F In shear wall 134 t SAR -
SAR -
G In columns 418 t SAR -
SAR -
H In hanger columns 19 t SAR -
SAR -
J In upstand wall 1 t SAR -
SAR -
K In mechanical bases 1 t SAR -
SAR -
Section 03 30 00 Cast-In-Place Concrete SAR -
SAR -
Reinforced in situ concrete; 45MPA; portland cement SAR -
American Concrete Institute (ACI 318M-2008); include for
all construction joints as required; all in accordance with
the Drawings and Specification
SAR -
L Suspended Slab 8,803 m3 SAR -

M Beam 1,880 m3 SAR -

P Transfer Girder Beam 1,093 m3 SAR -


SAR -
Q Drop Panel 642 m3 SAR -
SAR -
R Knockout Slab 3 m3 SAR -
SAR -
S Ramps 82 m3 SAR -
SAR -
T Mechanical Bases 5 m3 SAR -

SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 9 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

SAR -
SAR -
SAR -
SAR -

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 10 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete
SAR -
Section 03 30 00 Cast-In-Place Concrete SAR -

Reinforced in situ concrete; 60MPA; portland cement SAR -


American Concrete Institute (ACI 318M-2008); include for
all construction joints as required; all in accordance with
the Drawings and Specification
SAR -
A Storey Deep Transfer Girder Beam 910 m3 SAR -
SAR -
B Shear Wall 1,107 m3 SAR -
SAR -
C Columns 1,895 m3 SAR -
SAR -
D Hanger Column 124 m3 SAR -
SAR -
E Upstand Wall 14 m3 SAR -
SAR -
Section 03 41 00 Precast Structural Concrete SAR -
SAR -
Precast Concrete SAR -
SAR -
Precast concrete; including reinforcement and all SAR -
necessary accessories; all in accordance with the
Drawings and Specification
SAR -
G To staircase flights 56 m3 SAR -
SAR -
H To staircase landing 85 m3 SAR -
SAR -
Precast concrete lintels; including reinforcement and all SAR -
necessary accessories; all in accordance with the
Drawings and Specification
SAR -
J 150 x 200mm size 70 m SAR -
SAR -
K 200 x 200mm size 116 m SAR -
SAR -
L 250 x 200mm size 8 m SAR -
SAR -
M To walls exceeding 3m height; 100 x 200mm 1 item SAR -
SAR -
Section 03 53 00 Concrete Topping (Screed) SAR -
SAR -
FLOOR FINISHES SAR -
SAR -
Proprietary quick drying bonded levelling screed; basis SAR -
of design: Topcem through Modern Expertise Est. or
approved equal; 100mm nominal thickness; including
fabric reinforcement and all necessary accessories; all in
accordance with the drawings and Specification Section
03 53 00

SAR -
N to BOH Lower Ground Level 2,006 m2 SAR -
SAR -
P to BOH Ground Level 548 m2 SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 11 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete
SAR -
Q to BOH Ground Mezzanine Level 539 m2 SAR -
SAR -
R to BOH Level 01 767 m2 SAR -
SAR -

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 12 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

Proprietary quick drying bonded levelling screed; basis SAR -


of design: Topcem through Modern Expertise Est. or
approved equal; 100mm nominal thickness; including
fabric reinforcement and all necessary accessories; all in
accordance with the drawings and Specification Section
03 53 00

SAR -
A to BOH Level 02 768 m2 SAR -
SAR -
B to BOH Level 02 Mezzanine 572 m2 SAR -
SAR -
C to BOH Level 03 2,186 m2 SAR -
SAR -
D to FOH Lower Ground Level 336 m2 SAR -
SAR -
E to FOH Ground Level 1,343 m2 SAR -
SAR -
F to FOH Level 01 3,828 m2 SAR -
SAR -
G to FOH Level 02 707 m2 SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 13 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 14 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

Additional Items SAR -


SAR -
SAR -
The Contractor shall describe and price below the items
necessary for the full and proper Completion of the
Works as described in the Specifications or shown on
the Drawings and for which either expressed or implied
provision is required and which are not covered by either
the items or the rates in the Bills of Quantities and
whether arising from the class of work, Conditions of
Contract or any other matter whatsoever. Anything not
so separately described shall be deemed to be covered
in the items and rates inserted in the Bills of Quantities.

SAR -
SAR -
A _______________________________________________ SAR -
SAR -
B _______________________________________________ SAR -
SAR -
C _______________________________________________ SAR -
SAR -
D _______________________________________________ SAR -
SAR -
E _______________________________________________ SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 15 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -
SAR -

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 16 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

COLLECTION

Page: 3 SAR -

Page: 4 SAR -

Page: 5 SAR -

Page: 6 SAR -

Page: 7 SAR -

Page: 8 SAR -

Page: 9 SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 17 of 18


###
Main Contract Works - Extended Retail Construction
Bill of Quantities ''F''
Code Description Quantity Unit Rate Total
Division 03 - Concrete

Carried to BOQ "F" General Summary SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 18 of 18

You might also like