These tests are performed as a Routine Monthly test for the EATC TIER-
3 Data Center in Riyadh.
We have tested
UPS
ATS
Diesel Generator
As a routine monthly maintenance activity.
The details test are enclosed, and all the results showed that the EATC
Data Center could successfully switch between the SCECO and Backup
Generators successfully.