Save trees use e-Question Paper Go green
DOWNLOAD THIS FREE AT www.vturesource.com
CBCSISCHENE
us I 18cS§
Fifth Semester B.E. Degree Examination, June/July 2019
Introduction to Software Testing
Time: 3 hes, Max, Marks:
Note: Answer any FIVE full questions, choosing ONE full question from ne
Modute-1
Esplin (esting and debugging lie cycle with a neat diagram,
1 List and explain differen software quality atlbuts in detail, "
oR
2 a Explain funcional testing and structural testing osntans)
'. Explain differen iypes of software test metisin detail, (osntans)
sl C
2
q
i Module-2
45 34 rohan toni ve amis, Wie Day for Newate function
é ‘santers)
Jeb, Wiitea pred code for sruured pogrammingyersion MNgganer problem. Ge Mars)
is
Fp 4 & Listand expla equivalence clas esis equivalence clas test cases
en cen
$2 by Eapininthe base decison able tems tal fringe probit
i rule count, (8 Marks)
5 Ie
EES a Esplin MoCobe's bss paint ih an example anany,
heft Cee eo aS
: ‘onan
+ OR
G2 oe pats fr variables locks, socks , bare sles and
B onan)
oa a eaphineeno oantens
id bExplainghe follo
AA 5 DpMedandancy i) Patton 1) Vie. donstnis
# or
EL ooo aig eepecbiltyproertics wih examples onstanny
BE Rent rate proce ond goat mnagament ‘ott
2 Moduite-s
gS teen integration esting seis formar)
i ° Regression teting? What re the dient egessontesing segs? wh Mars)
: on
;t 2 Whae is Catt ~ graph based integration testing? Explain the strategies under call based
integration tesing (estar
Define M4 pa graph. Explain with an example (ars
BRANCHES | ALL SEMESTERS | NOTES | QUESTON PAPERS | LAB MANUALS
A Viuresource Go Green initiative