Calculation of Hydropower Generation (ENG)
Calculation of Hydropower Generation (ENG)
Tgl Mei Jun Jul Agus Sept Okt Nov Des Jan
1 50.02 47.69 27.73 21.54 16.72 29.33 17.13 36.44
2 52.43 37.21 27.73 20.36 12.27 27.73 14.62 42.41
3 50.34 36.75 28.27 20.36 12.27 17.95 13.99 52.24
4 50.34 36.75 26.09 17.95 20.36 16.09 13.99 46.99
5 53.53 36.29 26.09 17.95 12.92 14.2 13.35 41.86
6 56.2 35.34 23.85 17.95 12.27 12.27 13.35 40.17
7 53.53 34.38 23.85 17.95 22.13 11.62 11.62 38.42
8 51.85 33.41 22.71 17.95 22.13 10.96 11.18 35.97
9 52.71 32.91 22.71 17.33 20.36 16.3 10.3 33.74
10 52.99 31.91 22.71 16.72 11.62 14.2 11.4 31.74
11 52.99 36.29 22.71 16.72 11.62 21.74 10.52 31.57
12 51.56 32.41 22.13 16.72 11.62 30.38 20.56 43.21
13 53.53 33.41 22.13 16.09 14.2 20.95 36.44 49.27
14 52.14 33.41 22.13 16.09 14.2 21.74 38.12 41.86
15 56.42 32.41 23.85 16.09 17.95 15.26 29.16 38.12
16 54.81 32.41 22.13 16.09 25.54 13.77 34.87 36.29
17 51.26 27.19 22.13 16.09 17.95 12.7 36.6 35.19
18 50.34 29.86 22.13 16.09 16.09 11.62 35.5 34.06
19 49.7 29.86 22.13 16.09 12.92 13.35 31.06 33.08
20 49.38 29.33 22.71 16.09 11.62 17.13 28.63 50.34
21 50.34 48.38 29.33 22.71 17.95 10.96 16.3 25.35 46.39
22 50.34 48.04 29.33 22.13 23.85 10.3 17.54 28.63 43.48
23 49.38 50.95 28.8 22.13 23.85 10.3 16.3 29.16 43.87
24 48.72 50.65 28.27 22.13 23.28 9.63 18.76 27.55 44.13
25 48.04 50.02 28.8 23.85 23.28 10.3 20.36 23.47 56.85
26 48.04 50.02 28.27 22.13 23.28 10.3 18.96 29.33 47.58
27 50.02 49.7 28.27 22.13 23.28 10.3 19.16 31.06 43.87
28 48.38 49.38 28.27 22.13 16.72 10.3 20.36 28.63 41.02
29 48.04 49.38 28.27 22.13 16.72 10.3 22.9 37.52 50.85
30 46.99 48.38 28.27 22.13 16.72 10.96 20.36 28.98 43.74
31 51.85 28.27 21.54 16.72 43.61 42.54
From Sequence Table 2, the daily average flow rate (probability 50%, equivalent to 128 days) for 256 days is 26.09 m3 / s, and the probability flow
rate 60% (equivalent to 159 days) is 22.13 m3 / s, probability 90% The flow rate (equivalent to 230 days in a sequence) is 12.70 m3 / s, and the
probability of 95% (equivalent to 243 days in a sequence) is 11.18 m3 / s. The daily flow data is less than a hydrological year, and there is a lack of
daily flow data for 109 days from February 1, 2020 to May 20, 2020. However, February to May is the rainy season, and the daily flow of the river is
much larger than the cited flow of power generation. The hydropower station will also generate water abandonment after power diversion, and the
hydropower station can fully send 10mw from February to May. Therefore, as long as the complete dry season flow data (daily flow is less than the
power diversion flow), the annual power generation of the hydropower station can be accurately calculated .
According to the parameters of the hydropower equipment provided by Zhejiang Jinhua Water Turbine Factory, China: the efficiency of the turbine is
93.5%, and the efficiency of the generator is 96%
According to the parameters of the hydropower equipment provided by Hangzhou Generator Plant in Zhejiang, China: the efficiency of the turbine is
92.7%, and the efficiency of the generator is 96%.
The power station's calculated turbine efficiency is 92.5%, and the generator efficiency is 96%.
A = 9.8 * 0.925 * 0.96 = 8.7
N = A * H * Q = 8.7 * 71.00 * Q = 617.7Q,
When N = 10000KW, the corresponding design flow Q = 10000 / 617.7 = 16.19m3 / s
When generating power from a hydropower station, the ecological flow at the downstream of the dam should maintain 2.691m3 / s (this data needs
to provide a basis). Therefore, when the flow of the river is greater than 16.19 + 2.691 = 18.881m3 / s, the hydropower station can reach full 10mw.