Tender for Earth Work Excavation & Minor Bridges in connection with Hazipur- Sauguli New BG Line

Application are invited from Contractors who are interested in the below mentioned scope of work
according the terms and conditions mentioned.

The entire work is divided into 3 packages. Each package has the earth work , minor bridges ( Balancing
culverts and RUB’s).

I. Earth Work Embankment from Ch:64.350 to Ch:69.597,Distance-5.247 Km

Name of Village/Land Mark : Deoria – Dahai Chapra


Approximate Qty of Earthwork : 2, 70,000 Cum.
No. of Minor Bridges : 8 No’s.
Bridge No. : 73 to 82
Size : 1 x 3.0 M
Description : Average length of Barrel 8.80 m

II. Embankment from Ch:69.597 to Ch:74.844, Distance- 5.247 Km


Name of Village/Land Mark : Vishnupurpartti
Approximate Qty of Earthwork : 2, 70,000 Cum.
No. of Minor Bridges : 8 No’s.
Bridge No. : 83 to 92
Size : 1 x 3.0 M
Description : Average length of Barrel 8.80 m
III. Embankment from Ch:74.844 to Ch:81.963, Distance-7.118 Km
Name of Village/Land Mark : Jagadeshwar/Sahebgunj
Approximate Qty of Earthwork : 2, 70,000 Cum.
No. of Minor Bridges : 7 No’s.
Bridge No. : 93 to 104
Size : 1 x 3.0 M
Description : Average length of Barrel 11.00 m
GUARANTEE TO BE PROVIDED BY SUB-CONTRACTOR

The following are the list of documents required to be submitted along with the quotation. EMD should
be paid separately for each package.

1. Experience certificates of similar works done during last 3 years should be submitted.
2. P A N card, voter identity card copies should be submitted.
3. List of machinery, equipment and man power should be submitted.
4. E M D. of 2% of the total value of the work should be submitted in favour of M/s. KSR Infratech
India Pvt Ltd. in the form of D.D / B.G / cash.
5. EMD shall be returned to the contractor after 6 months from the date of completion of the
work.
6. If the work is stopped/ discontinued by the sub contractor due to some reasons of his own the
EMD and SD shall be forfeited.
7. If the work is stopped by ECR / KSR Infratech the deposit amounts shall be released along with
final bill.
8. The work measurements shall be done once in a month and payments shall be made within 15
days after submitting the bills. Security deposit of 5% shall be deducted from the running bills
and shall be paid along with final bill.
9. The accumulated SD shall be paid to sub-contractor after 6 months from the date of completion
of work.
10. Income tax shall be deducted as per Govt. rules and regulations and TDS certificates will be
issued to that extent.
11. Any government taxes applicable during the period of execution of work shall be applicable.
12. Since Royalty will be deducted by ECR at source from our bills, you need not consider Royalty
while calculating the cost of Earth work and other concrete works.
13. Cement and Steel will be issued by KSR free of cost at KSR’s godown in Sahebgunj and the same
should be transported by you at your own cost to the work spot.
14. Any dispute among sub-contractor and KSR Infratech should be solved on mutual discussions
and minutes of meeting. Third party or Arbitration is not acceptable.

Signature of sub-contractor. Authorised representative.

M/s KSR INFRATECH INDIA (P) Ltd.