You are on page 1of 3

ASSIGNMENT 3

GROUP-1

Q.1 why joints are provided in pavements?

Q.2 Write a note on penetration macadam also take photograph of WBM road and attach in the

assignment.

Q.3 How tack coat is prepared visit site and write down the procedure you learn.

Q.4 Discuss the process of laying tack coat.

Q.5 what do you mean by Bitumen macadam.

GROUP-2

Q.1 Write a note in semi dense asphalt concrete

Q.2 various types of mixers

Q.3 manual mixer and mechanical mixer, which one is better

Q.4 how the joins in concrete are provided

Q.5 what do you mean by mix seal.

GROUP-3

Q.1 Write a note on Bitumen macadam

Q.2 Joints in reinforced concrete pavement.

Q.3 what are grouts.?

Q.4 Explain built up spray grout.


Q.5 Define the term overlay construction.

GROUP-4

Q.1 Discuss the process of laying tack coat

Q.2 Various types of mixers

Q.3 Joints in reinforced concrete pavement.

Q.4 How the joins in concrete are provided

Q.5 How we analyze cement concrete pavement .

GROUP-5

Q.1 Discuss various types of mixtures.

Q.2 Asphalt concrete is different from plain concrete. Comment.

Q.3 Discuss the construction process of cement road

Q.4 Write a note on semi-dense asphalt concrete.

Q.5 How the joins in concrete are provided

GROUP-6

Q.1 Discuss the construction process of reinforced concrete road

Q.2 Discuss the construction process of cement road

Q.3 Discuss various types of mixtures.

Q.4 Define pavers


Q.5 Explain the following : finishers, mixers.

GROUP-7

Q.1 How the joins in concrete are provided

Q.2 Explain open graded premix

Q.3 Define overlay construction

Q.4 Enlist the various equipment used in construction

Q.5 Discuss the process of laying tack coat