=
UA
4 October 2019
‘The Project Manager
The Arab Contractors (Osman Ahmed Osman & Co.)
34 Adly St-Cairo-Egypt
Tel: 3959500-3059522,
Fax: 2637674
mal: arabe4@arabeont com
‘Attn: Eng. Hesham Ahmed Abdou
NATIONAL ROADS DEVELOPMENT AND MAINTENANCE (NROMP)
CCIVIL WORKS FOR THE UPGRADING OF TIRINYL-PALLISA-KUMIPALLISA-
KAMONKOLI ROADS FROM GRAVEL TO BITUMINOUS STANDARCS;
LOT2: PALLISA- KAMONKOLI (44KM) ROAD
IOBIMC:No: ICM-MCICW-2
PROCUREMENT REFERENCE NO; UNRAMWORKSI2013-14/00030101/02
Confirmation of Acoustic White Line Width as 100 mm
Reference js made to your leter dated 28" September 2019 and recelved on the
‘same date in which you requested for our confirmation of the width of the Acoustic
White Line as 100 mm,
By this letter therefore, we confirm the width ofthe Acoustic White Line as 100 mm
as clearly deseribed under Bil item 55.03 (a) ()
Yours faithfully,
=e
Ronald Olaki
Resident Engineer
Copy to: Contract Manager, Eng. Richard Wabuna
e083) 23100-28414 48D Ema aaah Wt ee
a comecan oid