You are on page 1of 29
GAMBAR KONSTRUKSI JARINGAN SUTM UP2K SULUT 2018/2019 rmx uassno, RINCIAN ANGGARAN BIAYA (RAB) Mire mami foal ea an | am [ww | om | oo al a zon Sisal — | aoe a a3] {| 3 pene oo Ss Saas feet ieee — a a Sa| — 3059 “1 [MATWRIAL NOW UTAMA & ASA PASANG — a | Sone a =n a es ane z faa ae ne laateee 3 et et Ar " ra Se ee ee TOD a 2 [eamve yee #10 (bes 50505), 3 z 5 Doobie ame bane Set 7 eosti rm oe na TO EDT wer Se z F-Atuminur Binding we mr 2 e-Jont Seve 7ors0 mm Set 3 abot and nat 16x80-r water Set 2 .Deute Arm Band Set 7 PT. PLN (Persero} Direncana = TimDistibusi [oatatan WILAYAH SULUTENGGO Digambar Tim Distibus Disetujui [poms ah No, Gambar [ koxstmenserms a DETAIL A, ‘PENGEOORANTIANG BESI BULAT 12M DAN 9M PEN BEsi2M PENGE NG BES Volume Cor =(r)2 x mt xTinggi @.Voume Cor = (r)2 x xTrggi = (02012x3,14x0.50 (0,572 x3,14x0,50 0.06 m3 0.04 ms ». Volume Tieng 1)2 XW xTingg b.Voume Tieng = (r)2 x wr Tigh 0.092%3:14%0.50 = (00772%3,16%0,80 0.01 m3 0.01 m3 €. Volume Cor Tang = 0,06 MS -0,01 m3 ©. Volume CorTiang = 0,04 M3 -0,01 m3 0.08 m2 0.03 m3 PT. PLN PESERO) WILAYAH PENGECORAN TIANG BES! BULAT “TIANG 12 mtr DAN § mtr 2018 By Pangadaen GAMBAR KONSTRUKSI TIANG SUTR TIANG TOPANG TARIK KONSTRUKSI TIANG TR TOPANG TARIK KEBUTUHAN MATERIAL 4 Gatvans Stat Wire 22 mm? 2 Patok Schoor UNP 8 Rod Stay 3 Wire Cip 4 Spanschroot Tum Bucle 12" 5 Double Guy Wire Band 6 Toa insulator Bsr KONSTRUMGI TANG TR 'TOPANG TARIK oe 1 Penton KETERANGAN : 1) Single Arn Band & Nut M16 + Washer 2 Murbautdan sing 58" x70 mm 3 Besi Siku 50x50x5 iB PF PLN (Parser) KONSTRUKSI SKOR SANG PADA TIANG BES! BULAT 2018 _KONTRUKSLKONEKTOR PRESS (haa? } Cctatan ‘Bacan konektor morpunjal ua beng sang: 1. Labangpasang 1 berber sini erbuka, untuk pemasangan kabel utara, 2 Lubeng pasang 2 berbenuk sina tert, untuk pemasangan kab yang akan lsambungkan ke kabel ama. ‘Konstruks! dengan dua lubang pasang borbentuk snr terbuka tidak diperbolehkan. Bsc KONEKTOR PRESS CCO 2018 By. Pngadtan Pes 1100] co , 1 __ [ross ArmUNP 10x 2000 mm ed $2 80 2 [Mur baut dan ring 5/8" x 70 mm Pes 2 | =3 = = 3 [Single Arm Band & Nut M16 + Washer _| Pcs 7 Ll a = = 4 Arm tie brace 50.50x1270 mm. Pes 07 [ 5__ [Arm Tie Band + Nut & Washer Pes 7 i” \ 300 \ 2 2 “s GAMBAR KONSTRUKSI JARINGAN SUTR UP2K SULUT 2018/2019 rims esney RINCIAN ANGGARAN BIAYA (RAB) eva neon oon] mn ww |_an | an | an | ae [1 fhe 2 " a a | Toate camer 530 H ny 7 a = i = “taio] ti semis at insas| aa fies sed Sp 3 a ct eT tt ; se | Fan 7 Fcc p se Sain| ase] Imex : 4 Ti 10[ tas} se Ee 5 os Taio] —— se | Sa : i 0] aim] sr 1 soe = = “iso | S| shew | a 24 nace i i010] at [2 nT = — a | is | si Slut 3 ‘| anf a] — eae oma SOD i a | air 25 inn lan I os ‘nae | a eye ni Pan i t a] 23ers Sea Si i od ie | se a7) a lode Sele Ze “ sa_| ——339| a] a] ss] —— ra Sfp Sine 4 = Sa | exe] Teac | aa 2h 4 = sm sa] tia] 3 a =| | an as] — ae — a ‘Slegter —y th] temo] —— 90] tar | —— sa si ft 3] | || | [feet aa - 5 ine 30[ lao] isa] nr ‘TAMPAK DEPAN KEBUTUHAN MATERIAL, ‘TAMPAK SAMPING TR 1 (KONSTRUKSI TIANG PENUMPU SUSPENSION SUDUT 0-30) ‘SATUAN VOLUME Paste Sra ®h 2 [2 Stoppina Bucke Bh [5 Staniess Steel Sip @ O75 mir Bh Ig Suspension Camo Bh I. Suspension Camp Bracket eh Keterangan Kontruksi suspension dapat dipakai pada lintasan jaringan 0° sampai 30° PT. PLN (Persero) WILAYAH SULUTENGGO Brencore Tin Disb Digamber Tn Distibus [oattan KONSTRUKSI TRI (SUSPENSION) TRL Diketane Dicer No. Gambar TAMPAK DEPAN TR 2 (KONSTRUKSI TIANG PENUMPU STRAIN CLAMP SUDUT 30-90) KEBUTUHAN MATERIAL saTUAN | VOLUME fi Plastic Stap Bh 2 [2 Stopping BucKe Bh 2 3. Stainioss Stoo! Stip @ O75 mw Bh Zz I Strain Wedge Clamp Bh 2 [5 Tension Bracket Bh 1 Keterangan Kontruksi suspension dapat dipakai pada lintasan jaringan 30° sampai 90° PT. PLN (Persero) WILAYAH SULUTENGGO KONSTRUKSI TR2 (LARGE ANGLE) TRZ ‘TAMPAK SAMPING Detail dalam a ‘TAMPAK ATAS | TR 3 (KONSTRUKSI FIX DEAD END PADA TIANG AKHIR ATAU AKHIR INTASAN) KEBUTUHAN MATERIAL f_Dead End Tubes: Paotin fs. PvC2"50 om [4 Paste Step 5. Stopping Bucks [6 Staiess Steel Stip @ 076 mir [7. Stain Wedge Clamp [8 Tension Bracket PT. PLN (Persero) WILAYAH SULUTENGGO KONSTRUKS TRS (ADJUSTABLE DEAD END ASSEMBLY) ‘VOLUME 4 8 2) 2) 5) 8)s)s)5) 2) 2 Disetujt TR3 KODE PADA GAMBAR DISTRIBUSI TR 4 (KONSTRUKSI TIANG PENYANGGA EMPAT JUR KEBUTUHAN MATERIAL SATUAN | VOLUME Suspension Clamp Bracket Sa 2 [2 Suspension Camp Set 2 a. Staniees Stee Stip @ O7E me Bh “ la Stopong Buckie Ba 4 5. Pasi Sap Bh e 5. Compression Connector SD.705070 mar Vi | Bh 6 [Compression Connector §0:7025.95 mn? + va | Bh 2 PT PLN (Persero) Direncana : TimDistnbusi | Catatan WILAYAH SULUTENGGO Digambar - Tim Distibusi NSTRUKSI TR4 (FIXED DEAD E [Diketahu No. Gambar ASSEMBLY) Disetuji Tes KETERANGAN : TENSION BRACKET. 4 STOPPING BUCKLE. PLASTIC STRAP, PTPLN @ersero) WILAYAHSULUTTENGGO ‘ADJUSTABLE DEAD END ASSEMBLY 2010 GAMBAR KONSTRUKSI TIANG SUTR TIANG TOPANG TARIK KONSTRUKS! TIANG TR TOPANG TARIK KEBUTUHAN MATERIAL, 1 Galvanis Stall Wire 22 mm* 2 Patok Schoor UNP @ Rod Stay 3 Wre Clip 4 Spanschroet/ Turn Bucle V2" 5 Double Guy Wire Band 8 Toei Insulator Pr PLS EERTERABE A KONSTRUKSI TANG TR TTOPANG TARIK Pardon 4 2 3 4 5 6 7 8 ° KETERANGAN STAINLESS STEEL STRIP. ‘STOPPING BUCKLE. KAWAT BC 50 mot KAWAT TEMBAGA 50/70 MN PIPA 1/2" PELNDUNG PENTANAHAN LINK:(BINDING RINGS) cor TANG, GROUND ROD LUJUNG SUTR DENGAN PENTANAHAN GAMBAR KONSTRUKSI GARDU DISTRIBUSI UP2K SULUT 2018/2019 RINCIAN ANGGARAN BIAYA (RAB) TSE a o| = | =| = | eae : f= = —— eee z Ses a : —— a : ae I a[ aes aan : = 7 =s{ ae be a ee pe Se Ss ee eae al : et se sees ele feet = ts |stats Se oe} st ee Sa —————— Sees | ee eee Se —— a a ee 1s} ast — Sets a te |e et attest wai 3 = a a TT on ——— 3 [on SiN ion AN ST a A ~ ai ‘ian | 347.90] 312.50] ae =a 8 Sis oS ae 7 ee ae ee [fase = a pe ad age ma mr i mo “3m “490 S| Tass fetes =F Sees Samana == teeta es aoe = = Se a Fs anal —ee Scenes T= eee — — =a[ me ee ® o~ —~@ sting FCO ke Arrestor & ‘jumper ke rato rai Dawah PuBeTR @l @ Integrated grounding Iubangmasutan & tluran rangka dudukan trafo eas Integrated grounding PTPLN (Persero) [Ditencana : Tim Distibust catatan WILAYAH SULUTENGGO [Digembar Tim Devibush [Diketahui No. Gambar KONSTRUKSI GARDU CANTOL Disetu DAFTAR KEBUTUHAN MATERIAL GARDU CANTOL, NO_|WATERIAL UTANA ‘SATUAN | VOLUME 1 | TRAFO DISTRIBUS! 3 PIASA SDA ® T 2 | Lightning Arester 20 KV, 10 KA Poline) Bt a 3 emon20 Kv Paine (Type tt) Sa 3 4 | Kantor AAC 70 mn? Mir 5 5} Live Line Cemestor (LUC) 7-180 mn? Bh 3 2 | Kael Schon ALA 70 mm (FCO & LA) Dh 2 ds Rabel Schoen AL-A. 70 en? (Gouin LA - Dulas Bashing Print Teal Bh 3 6 | abe Sehoon Bint AL-CU 70 rn? (ishing Prime) Be a 2 |: Compreson Gomes Type G50-750-7 (Bushing TMALA Be 3 NO [MATERIAL NON UTAMA ‘SATUAN | VOLUME Rang Duals Trl Cal 5 ‘esi UNP 6031000 mm op gv >70 se 2 ° Sea UNP 505050 mm ht ip gan =70 se 2 wo | Aum Te type 810 bss 50505) se 2 1 Dovbl Am ibe set 1 2 Donble Ann alt & Nt ML163350 mm set 3 B Bat & Net M1650? set 5 | PoeBand So ' 15 | Rngha Duan FCO ‘Ba UNP 1005052500 su st ip a >70 se 1 ‘See Am band se 1 Deable Ar Tie bond see 1 ‘Amn Tie Tye 810 (Se 1.50.50.5) Ba 2 Bol & Not M1680 en? set 2 | Rana Dash PDT 16 | PHB TR 2 Joruan SPLN DS set ' Bol & Nut M16880 mm? se 4 17 | Bes UNP soxsu0 mm bot dip gale se 2 ” Sige Ar band se 2 Kabel Schoen Tembsgn CU-CU 150 mn? (Bushing Sehander-On Lod Sic ry ‘ Kabel Soma Tembags CU-CU70 mn? (2 Janse) Bh 5 |- Kabel Schoen Bical AL-CU 70 me (Body PHB-TR) Ph 1 1s | Ppa atic" Mr 8 9 | Ppa cahnie2” Me 6 | Bow Gane Be 1 1B Gans 2° Bh 2 20 | sini Stes! Sip @ 075 tr Be 2 20 | sep Bocke Bb 2 Plt Tanda Bahay 450m plat Im a pty og Bh 1 21 |-Aanm Tie and 2 3°,2" se 2 22 | Baan mame ang pd (cst) LOST 030-70 plate ein se 1 cir love Nea Tesion metal AXG 7-70 (4a) TR sap samba se 6 at lev Now Tsien Bieta A1Gs 50.70 nurs) TR sia sab se 2 NO [PEWASANGAN ARDE, ‘SATUAN | VOLUME’ | Kenst 8050 mn? ir 35 23 |-Pipa Galvanis 3/4" @6 meter (arde) Big 3 26 |-cromting Rod 5° 2500+ clap Be 3 25 | sea steve Non Tension Bieta AIC 50-70 ma? Bb 3 26 | compesion Comecer Type 50-7050-70 un? Bb 3 Petambun Aree, Ponsa Nota! Tale Penta Boy Teo RINCIAN ANGGARANBIAYA (RAB) eee i or im [Mer] im | alae twin = = =a fot cu 20 KV Peay 3| 8.70 | fem m2 nue 9 a | 1 aa.i0} 9.0} ee : ee cael aa zee SE aa a iar te | St — a 1 nessa a oo a a Se eee eet ee i Conan pe 30705070 3| = S50] ‘a s00| tos] sso arama stapes eel meer ee Efi a ee = Se tea i fee : ce oe : a j— Fee PTPLN (Persero) [Direncana Tim Distibusl (Gatatan WILAYAH SULUTENGGO Diganbar_- Tim Dietibusl KONSTRUKSI GARDU PORTAL = Nercerber seu ‘GRD PORTAL revis (2) DAFTAR KEBUTUHAN MATERIAL GARDU PORTAL, NO [MATERIAL UTAWA ‘SATAN | VOLUWE 1} TRARO DISTRIBUSI FHASA TDD KVA Bk T 2 | Liohing Arnoser20 KV, 10 KA Pols) Bh a 3 |curowt20 KV Pate ype 1) se 3 4 kontakor AAAC 70 mim? Me Is 35 | Live Lite Cerner (LLC) 7450 ma? Bh 3 Ga | Kabel Schoo AL-AL 70 (FCO ALA) Bb 2 (3 | Kael Schoen AL~AL 70 ma (Grounding LA - Daan Basing rier Ta) Be 3 e | Kabel Schoen Bisel AL-CU 70 mn (using Pine) Bb 3 1]. compression Comet Type G 50705070 mn? iin TMLA) a 3 NO__[WATERIAL NOW UTAWA ‘SATAN | VOLUME Raga Dada Tae Por ¥ Pagar? La arg Bes Se T 9 | renga Daten FCO Bes UNP 10050352500 sm at ip galv>70 sa 1 Sele Arm nd su 2 11 | Rongla Daan PB ‘PTR San SPLN D3 st ' Best UNP 05052500 tat ot ip ga >70 sa 2 Bole & Norm. 1650 me? se 4 Sle Am and se ‘ |- Kabel Shoes Tega CU-CU 150mm? (hing Sender - On Loa Sits) Ba 8 | Kael Schoen Tembage CUCL! 70s (4 arse) Bh 6 [Katt Schoen Bieta AL-CU 70m (ody PHE-TR) Ba 1 | NYY 180m? abel Uns) Mr 36 -NYY 70 ma abe Jara) Mer 160 2 [Pipe shai 3" xn Mir . 13 Pipe Gavan 2" 3,6nm Mir 2 -1.bow pvea* Bh 1 topo pve 2" Be 4 14 [Arm Ti Band 3°." wen pip abel tas se 2 13 [Am Beard” wk pps ae jrusan se 2 16 Staion Set Srp 0175 mt Bh 2 16 [sipping Baste 2 2 Pt Tanda Eakey 4xStem plat Im oat sy/aon ago Dh 1 17 |-Betn mst sang gard Pol 150s 50.300 plaster aan set 1 Soe See Non Tension Bieta AICU 70-70 mn? (jn); TR sip smb, set B | een Steve Non Tension Biss Ou 0-70 a duncan) Rip seb se 4 NO_[PEMASANGAN ARDE, ‘SATUAN | VOLUME” | Revat BCS mn? "ie 36 |- Pipa Gavan 34" 2.5mm x6mt (arse) Bs 3 18 |-Gromsing Rod 8" 250 m+ tmp Bb a 19 |Join love Now Tio inetd ANC 50.70 an? Bh 3 20 | Conprenion Cmnetor Type G 50-700-70 na? th 3 Peabo Ares, Pann Nel Tae, Pension Body Teo {GRO PORTAL revisi (2) [KONSTRUKS! GARDU PORTAL TUMPL-TUMPU (TAMAR DEPAN) 2a

You might also like