Dow.com
Event description
Date: January 15th.
Description: BBLDPE train was SD yesterday evening due to a leak detected on the lube oil tubing of
Hypercompresor cyl#5 (2nd stage), no gas leak detected. After inspections, a crack was found on this
tubing.
The plant SU after cylinder 4&5 corrective work and it was running for 2 days and a half when SD due
to a peroxide swap due to valve failure. Then it was SU again and it was running for 5 hours aprox until
the oil tubing failure.
AU Losses: TBD.
Eatool: TBD.
WO: 20013037934.
DOW RESTRICTED 2
Findings Cylinder # 5 2nd stage
Tubing at the
discharge oil
Manzel pump
that is going to
the cylinder 5.
DOW RESTRICTED 3
Findings Cylinder # 5 2nd stage
After replace and inspect the check valve and tubing it was
seen high temperature signs due to the gas flow going
through the tubing.
DOW RESTRICTED 4
Findings Cylinder # 5 2nd stage
DOW RESTRICTED 5
Thank
You
ME: Nasif, Victoria.
RE: Quel, Julio