18 OTHER CONTRACTORS
18.1 GENERAL
18.1.1 Scope
1 This Part specifies the requirements for access to the Site for other contractors, for
co-operation and co-ordination with other contractors and for the provision of facilities with
other contractors.
1 The Contractor shall allow other contractors unhindered access to any part of the Works
when in the opinion of the Engineer those parts are sufficiently completed.
d
18.3.1 Co-operation at Site Level
ite
lim
1 The Contractor shall carry out his work in a manner that causes the minimum amount of
interference to other contractors working on the Site.
rv
2 The Contractor shall co-ordinate his operations with the activities of other contractors where
necessary in order to avoid conflicts and ensure orderly progress of the Works.
se
3 Those works associated with existing or future service installation shall only be carried out by
ro
1 If specified in the Contract, the Contractor shall provide site facilities for other contractors.