Professional Documents
Culture Documents
Diseño de Escalera - Primer Y Segundo Tramo: Datos Distribucion de Acero
Diseño de Escalera - Primer Y Segundo Tramo: Datos Distribucion de Acero
2. METRADO DE CARGAS
Wu2
Wu1
1.125 m 2.650 m
X RB
Wu1 TRAMO DESCANSO
Carga Muerta Carga Viva
P.P = 432.00 Kg/m S/C = 360.00 Kg/m
Acabados = 120.00 Kg/m
552.00 Kg/m 360.0 Kg/m
WD1 = 662.40 Kg/m WL1 = 576.0 Kg/m Wu1 = 1238.40 Kg/m
Wu2 TRAMO PASOS
Carga Muerta Carga Viva
P.P = 771.70 Kg/m S/C = 360.00 Kg/m
Acabados = 120.00 Kg/m
891.70 Kg/m 360.00 Kg/m
WD1 = 1070.04 Kg/m WL1 = 576.00 Kg/m Wu2 = 1646.04 Kg/m
3. CALCULO DE MOMENTO
RB = 3038.57 Kg
4. DISEÑO EN ACERO
Para Momento Positivo: 2.24 T-m
Asumiendo varilla de acero: Ф= 1/2
b= 120.00 cm As = 1.27 cm²
d= 12.37 cm
a= 0.98 cm USAR = 5 Ф 1/2 @ 30
As (+) = 5.00 cm² Ok!
As (+) = 5.00 cm²
S= 30.00 cm
# Varillas = 5
As min = 2.67 cm²