CHAIRMAN ADDRESS
Dear
Minister of Public Work, Republic of Indonesia, or representative
Chairman of Engineering Board, Indonesian Academy of Science
Invited Guest,
Sponsors,
Participants, and
Ladies and Gentlemen
It is a great pleasure for me, on behalf of the organizing committee members, to welcome you
this morning to this important event for our society. In this opportunity, we wish to express
our sincere thanks to the keynote speakers and invited speakers for their coming to this annual
conference for giving lecture and share their valuable experience in the field of geotechnical
engineering.
Annual conference this time coincides with HATTI council meeting that is most important to
continue our organization in task of develop geotechnical engineering for serving
infrastructure construction now and future. HATTI council meeting is intended to vote the
president of HATTI for the next term, 2019-2023. We wish the next President is still continue
and develop the existing program.
This conference delivers 10 keynote speakers, 3 technical sessions and 40 papers in three
classes of paralel sessions. Some of main activities of HATTI in this year are also briefly
presented, such as the Act regarding Construction Services, Engineering Profession and
Government Ordinance/Regulation as application of the Act. Discussion on the ground
motion selection for design in order to mitigate liquefaction hazard especially for
reconstruction Palu city after Palu Earthquake on September 28, 2018.
Through this conference, it is hope the participants can extract invaluable lessons from the
keynote lectures and fruitful interaction between them. Before ending allow me, on behalf of
conference committee members, to wish the participants and sponsors our gratefully
acknowledge. At last, we apologize if there is any mistake in our part.
i
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Ladies and Gentlemen, the theme of this conference is "Geotechnical Engineering Role in
Mega Structure Construction: Welcoming 4.0 Industry Revolution”. This theme is
expected to anticipate the increasingly rapid development and required in infrastructure
sector in Indonesia especially to face the future of mankind such as Industry Revolution
step, from 4.0 to the next. 4.0 Industry Revolution is often called as Information
Technology (IT) Society. Even on the construction industry, IT is already applied
widespread in all of the world. However, in the geotechnical field, both theories and
practice somehow are still based on conventional or conservative way due to safety reason.
Therefore, geotechnical engineers are constantly being asked to update their knowledge.
In closing, I extend many thanks to all participants, particularly to main sponsor Bauer
Pratama Indonesia, co-sponsors Geotekindo and Liebherr and other sponsors my gratefully
acknowledge. I wish you enjoy and every success with this conference. Thank you.
ii
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ORGANIZING COMMITTEE
Secretariat : Sugino
Sya’bani
Publisher : Himpunan Ahli Teknik Tanah Indonesia
(Indonesian Society for Geotechnical Engineering)
iii
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
iv
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
TABLE OF CONTENTS
Keynote Speakers :
Session I : R.A1
1. Karakteristik Transfer Beban Dan Pola Penurunan Terhadap Waktu Pada
Controlled Modulus Column Menggunakan Analisis Numerik Tiga Dimensi
.P$EXKXUR\URK9LTUL)DKPL$QG0DV\KXU,UV\DP 31-38
v
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Session II : R.B1
8 Identifikasi Arah Kelongsoran Tanah Di Bawah Badan Jalan Rel Kerta Api
Akibat Adanya Aliran Air Bawah Tanah /XVPHLOLD$IULDQL$PULO0DDUXI
6LUHJDU1XU$ULIDLQL$KPDG=DLQXGLQ 79-85
9. Analisis Stabilitas Lereng Dengan Perkuatan Sheet Pile (Studi Kasus: Ruas
Jalan Meulaboh – Geumpang Sta 84+280 Provinsi Aceh) 0XQLUD6XQJNDU
5H]D30XQLUZDQ'DQ'HYL6XQGDU\ 86
11. Debris Flow Threat In Poi Village After 2018 Palu Earthquake: Simulation
And Recommendations %:LGMDMD$QG.$*DXWDPD 93-96
12. Modelling Unsaturated Slope With Soil Vision $QWKRQ\*XQDZDQ 97-101
13. Lem Slope Stability Analysis And The Newmark Lateral Displacement
Analysis 5HQJJR*LQDQMDU:LOKDP*HRUJH/RXKHQDSHVV\ 102-110
14. On The Effect Of The River Water Flow And Scour To The Slope Stability
Analysis :LOKDP*HRUJH/RXKHQDSHVV\%DPEDQJ/DUHQR 111-118
15. Perubahan Stabilitas dan Penentuan Lokasi Longsor Susulan Lereng Tanah
di Lapangan Berdasarkan Pendekatan Cracks Soil (Pembuktian
Laboratorium dan Validasi Lapangan) 6WHSKDQXV
$OH[VDQGHU...................................................................................................... 119-126
vi
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
16. Evaluation Of Trial Embankment Settlement On Soft Clay Soil With Coral
Fragment In Cilegon %LOOLH$GKLWDPD6RN-LQ/HH$JL+DJDWD*LQWLQJ« 127-134
18. Perbandingan Hasil Analisis Struktur Penahan Tanah Pada Tanah Lunak
Dengan Program Plaxis-2d Menggunakan Soil Model Hardening Soil Dan
Soft Soil %XGLDQWDUL+/DNVLWD$QG(ULF&KULVWRSKHU-K««««««« 140-144
21. Studi Kasus Stabilitas Timbunan Terhadap Relokasi Sungai Beringin Pada
Jalan Tol Batang – Semarang $:DK\XGL3UDGLSWD'ZL$SULOLD'DQ
5.DUOLQDVDUL«««««««««««««««« 162-168
Session IV : R.A2
23. Amplification Factor Study For Bali, Indonesia Using Openquake *DUXS/
*RUR0DV\KXU,UV\DP,UZDQ0HLODQR$QG0$VUXULIDN«« 177-182
vii
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
28. Pemilihan Dan Modifikasi Ground Motion Sesuai Sni 1726: 2019 Untuk
Perancangan Gedung Tahan Gempa Indonesia 1LFN$OH[DQGHU 217-236
Session V : R.B2
33. Hubungan Nilai Cbr (California Bearing Ratio) Terhadap Kandungan Air
Pada Tanah 'HYL 2NWDULQD <DQ -XDQV\DK 'HZL )DGLODVDUL 1RFL
)DX]L\DK« 263-268
34. Penentuan Parameter Dari Sifat Fisik Dan Mekanis Tanah Gambut Melalui
Uji Laboratorium 6WXGL.DVXV7DQDK*DPEXW'HVD3HUJDP3XODX5XSDW
5LDX(IDQ7LIDQL«««««««««««««««««««««««« 269-274
35. Kajian Karakteristik Clay Shale Pada Ruas Jalan Tol Cipularang Km
121+100 –Km 67+200 $QGL 6DWWD 0DNDUHWWH 6W 0W 'LDK $IIDQGL 6W
0W 275-286
38. Studi Laboratorium Effek Slag Baja Dan Slag Ferronickel Terhadap Tanah
Lanau Dengan Kadar Air Tinggi $QDVWDVLD6UL/HVWDUL 302-306
Session VI : R.C2
39. The Effect Of Setup Time On Friction Pile Capacity at Project X $JDSH
'HVIDQGL6700&IS«««««««««««««««««««« 307-312
viii
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
40. STATRAPID – An Alternative For Pile Static Loading Test *RXZ 7MLH
/LRQJ«««««««««««««««««««««««««««««« 313-319
43. Studi Kasus Penanganan Tanah Lunak Menggunakan Stuktur Pile Slab –
Spun Pile Pada Jalan Tol Pejagan Pemalang 5 $QJJDUD 0 5LIN\
)DNKUXUUR]\0)DQ6\RI\DQ5.DUOLQDVDUL......................................... 333-337
45. Respons Pondasi Tiang Akibat Beban Lateral Dan Momen Secara Analitik
Dan Numerik $QZDU 'ROX 8QLYHUVLWDV 7DGXODNR 0DUWLQL 8QLYHUVLWDV
7DGXODNR«««««««««««««««««««««««««««« 343-349
46. Prediction of Pile Load Capacity Using Static Load Test Results According
to Various Test Standards 3URI5DPOL1D]LU«« 350-358
ix
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRACT: This paper presents the design and construction of a deep basement structure for the super-tall
Indonesia-1 project in Jakarta. Indonesia-1 is a prominent development in Thamrin Street, with two towers
reaching 303 meters high and seven levels of subterranean basement structure. Currently this is the deepest
basement structure ever built in Jakarta. The excavation depth reaches 24.5 meters, occupying an area of
14,000 square meters and gross floor area of the basement itself is 97,000 square meters. The total constructed
floor area of the development is 306,000 square meters. The basement construction for this project adopted
top-down method. Design considerations include many aspects, among others permanent retaining wall design,
site constraints, availability of equipment and local expertise, suitable construction method and sequences
selected, basement slab diaphragm action, ground water pressure, and foundation system.
Keywords: design, construction, deep basement, top-down construction, diaphragm action
Recently, deep basement structures have Some of the main issues for the deep basement
become an inseparable solution to urban construction of Indonesia-1 development are
building developments in Jakarta. It is common the depth of excavation which reaches
for buildings with more than 30 floors above 24 meters deep, the proximity to the adjacent
grade to have between 3 to 5-level deep buildings, the high water table, deep clay soil
basement structures. One of the reasons is to and the lack of work space. For this project,
provide parking space, and underground diaphragm wall 1 meter thick is used for the
parking facilities are believed to improve both earth retaining structure. The basement slabs
aesthetic and commercial qualities of urban act as supports for the perimeter retaining wall.
developments as a whole and its surrounding Required openings for construction
community. The design and construction of activities have been incorporated in the design
deep basement in the densely-built urban right from the beginning, taking the sequence of
setting of Jakarta CBD area must consider the work into consideration. Availability of
impact to the nearby structure as well as public equipment, resources and local skills have been
utilities. The construction of deep basement considered too, including traffic regulation in
takes up a considerable portion of the cost and the area. Fig.1 shows the location of the two
time involved for the entire project. The success towers of Indonesia-1 with a river at the back
of a project will be governed by proper and neighboring buildings.
selection and application of deep basement
construction method and its design.
This paper presents the design and
construction of a seven levels deep basement
structure for the super-tall Indonesia-1 project
located in downtown Jakarta.
1
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
3 SUBSOIL CONDITION
2
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
The analysis and design of the diaphragm
wall was performed by FEM using Plaxis. As
the basement was constructed in clay layer, the
drained concept based on bi-linear Mohr-
Coulomb failure theory was used for FEM
analysis. The Young’s modulus (Eu) was used
in terms of undrained shear strength (Su) of
Eu/Su = 400 for and Eu/NSPT 1.2-1.5 for stiff
clay and sand respectively. This correlation is
normally used by geotechnical experts in
Indonesia and strictly enforced by the expert
panel review team of the municipality of
Jakarta. Inclinometer reading shows the
predicted D-Wall deformation from the initial
analysis is too large. Then a back-analysis was
conducted using both MC and Hardening Soil
model with more realistic value of E following
a study by Chandra et al. The result using HS
model and E50 value equal to 9,000xN matches
quite well with the inclinometer reading, while
using the MC model is still larger than the
monitored value. See Fig.5 below.
3
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Design is performed based on analysis result The working platform is designed at B-1 slab
from the computer model. Some of the level with higher live load than required by
considerations for the analysis are the sequence code provision to accommodate the
when the particular slab level will be cast, to construction equipment and storage of
what extent excavation can go, the presence of materials. Excavation up to B-1 was easier and
large openings to facilitate the construction of faster since it was an open type, but the balance
the core-wall of the two towers and the ramps of excavation had to be performed under
adjacent the diaphragm wall at two corners of suspended RC slab with installed plunge
the basement. columns as constraints. The soil to be removed
For Indonesia-1, the size of the two big was targeted at 3,000 m3/day and 2000 m3/day
openings at the tower area can facilitate for open and under slab excavation,
excavation and soil extraction process but respectively.
creates huge in-plane stresses on the slab.
Before starting the analysis, the construction
method must first be simulated to see the
constructability of the basement structure, as
shown in Fig.6. Fig.7 shows the aerial view of
the basement during construction, with the
openings as designed. Fig.8 shows the FE
model used in the design of the basement slab.
Consistency between design assumptions and
actual construction condition is critical for RC
slab, particularly when construction is carried
out zone by zone. Fig.9 shows the analysis Fig. 8. FE Model of the 7-Level Basement
result of in-plane stresses in the slab and the Structure of Indonesia-1
corresponding steel rebar.
Fig. 6. Construction Procedure for Indonesia-1 Fig. 9. Analysis Result and Design of B-1 Slab
Basement Structure
Analysis result, amount and location of steel
rebar to strengthen the slab around openings at
one particular slab level are shown in Fig.9.
From the analysis it is clear that the size and
location of the openings play a big role in the
design of basement slab.
The corner ramps need a special study. First
a quarter of circular ring beam was constructed
and struts were installed. After excavation
reached the bottom level and the B-7 slab was
cast, the lowest strut was removed and the RC
ramp with radial rings was cast. The sequence
was repeated until all the struts were removed.
Fig. 7. Aerial View of the Basement During Fig.10 shows the construction of the ramp.
Construction. Two Ramps at the Corners Require
Special Construction Procedure
4
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
8 CONCLUDING REMARKS
5
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Gedung 98 lantai di Kuala Lumpur didukung piled-raft foundation, dimana setengah beban
(≈ 3900 MN) ditahan oleh (96) bored-piles (D180 cm, L=18 m) tertanam dalam karstic limestone dan
setengahnya ditahan subgrade. Investigasi lapangan membuktikan adanya rongga berisi sand/silt mixture di
beberapa boreholes, yang menjadi tantangan dalam desain dan konstruksi. Static loading test dengan sistem
reaksi sampai 76 MN (≈ 200% DL) dan PDA test menggunakan 8 MN (80 ton) drop hammer dilakukan untuk
mengkonfirmasi kapasitas tiang. Alat strain gages dan “Distributed Strain Fiber Optic (DSFO)” digunakan
untuk mengukur distribusi tegangan dan beban saat loading test. Pelajaran yang dapat diambil dari desain dan
konstruksi piled-raft foundation ialah bagaimana menangani rongga dan menentukan panjang dari tiang.
Pengawasan jangka panjang dilakukan memakai beberapa alat seperti pressure cells untuk mengukur reaksi
subgrade dan strain gages untuk mengukur distribusi beban yang ditahan oleh bored piles untuk memastikan
kemampuan aktual dari piled-raft foundation dan membandingkannya dengan desain.
Kata Kunci: piled-raft, batuan karst, rongga, distributed strain fibre optic
ABSTRACT: The 98-story tower in Kuala Lumpur is supported on a piled-raft foundation, where half of the
tower loads (≈ 3900 MN) are carried by (96) bored piles (D180 cm, L=18 m) socketed into karstic limestone
while the other half is carried by subgrade rock. Site investigation revealed infill cavities containing sand/silt
mixture in some boreholes, posing challenges to the design and construction of the foundation. Static loading
tests by reaction systems up to 76 MN (≈ 200% DL) and PDA tests using an 8 MN (80 tonne) drop hammer
were conducted to confirm the pile capacity. Instrumentation by strain gages and “Distributed Strain Fiber
Optic (DSFO)” were used to both measure the mobilized strain and load transfers during the loading test.
Lessons learned from the design and constructions of the piled-raft foundation are discussed and include how
to treat the cavities and to determine the pile lengths. Long-term monitoring using various instrumentation
(e.g. pressure cells to measure subgrade reactions and strain gages to measure the transfer load of bored piles)
were carried out to confirm the actual performance of the piled-raft foundation and to compare to design
prediction.
Keywords: piled-raft, karstic rock, cavities, distributed strain fibre optic
6
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
and the subgrade reaction modulus of the Since the total displacement from the
underlying rock mass. This information is loading test is very small (< 10 mm) and
obtained from the full-scale pile loading test in MIDAS analyses predict small differential
combination with the rapid pile dynamic test settlements between the tower and podium to be
(PDA). about 20 mm, no construction joint (pour strip)
Instrumented head-down static loading tests is recommended. The settlement monitoring
were performed for compression and tension until topping off confirms small differential
test piles up to 76 MN (≈ 200% DL) and settlement between the tower and podium.
-12 MN, respectively. The compression test for
the tower pile was conducted by a reaction
system, where strain gages and “Distributed 2 SUBSURFACE CONDITIONS
Strain Fiber Optic (DSFO)” were used to
measure the strain and load transfers. The The project site is located near the edge of the
tension test was conducted for the podium pile, Kenny Hill formation, where karstic features of
where surface footings of 2 m x 10 m were used limestone, such as steeply inclined bedrocks,
to support the compressive reaction loads. The slime zones, sinkholes, cavities, pinnacles, and
load-movement from these footing supports floaters (Fig.1) are often encountered and thus
were used to generate the modulus subgrade pose challenges to the design and construction
reaction of underlying rock mass. This method of the pile foundation as experienced by the
was more reliable for developing the subgrade nearby Petronas towers.
modulus as opposed to the small plate bearing
tests, where the presence of cavities in the rock
could exist and affect the response. In addition,
PDA tests using an 8 MN (80 tonne) drop
hammer were conducted to confirm the pile
capacity, including the pile capacity with the
largest cavity.
During construction, probing tests were also
conducted at the tower pile locations to check
for the presence of a cavity; if found, injection
grouting was performed to close the cavity. In
addition, the pile length was adjusted
(extended) by ignoring the shaft resistances Fig. 1. Some Piling Problem in Limestone
from the cavity layer. Among 96 tower piles, (Neoh, 1998)
23 piles encountered an infill cavity with
thickness varying from 2 m to 12 m, such that The study began with intensive rock coring
pile lengths were extended from design 18 m to to both establish representative subsurface
maximum 30 m. Additional shallow probing of stratigraphy and to identify the extent of the
3-5 m in depth was conducted near the cavity cavity. During exploration, a geologist logged
piles to assure no weak rock was present near the core samples for examining the joint
surface subgrade. spacing, dip angles, Total Core Recovery
The results of the MIDAS analyses (TCR), Rock Quality Designation (RQD),
concluded that tower loads (3,900 MN) are cavity thickness, and cavity material.
shared between bored piles and rock subgrades. Laboratory testing comprising of an unconfined
Various instrumentations were installed in the compression test (UCT) to measure UCS
rock and bored piles to monitor the (Uniaxial Compressive Strength), point load
performance of the piled-raft foundation until test (PLT), unit weight (γ), Poisson ratio (ν),
the structure was completed (topping off). The and elastic modulus of intact rock (E) were
results from monitoring concluded that at conducted to establish site-specific correlations
topping off, the pile reactions reached 22 MN between RQD vs. UCS and RQD vs. E. To
and induced bearing pressure on rock subgrade determine the elastic modulus of representative
that reached 320 KPa. These are less than both rock mass (Em), a correction factor (Fig.2) was
the design pile capacity of 38 MN and the applied to a modulus of intact rock (E).
allowable bearing pressure on rock of about
50 KPa.
7
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Coring logs (Fig.3) indicate that a subsurface shows a site-specific correlation of UCS vs.
at depths of 20 m to 60 m is underlain by PLT of intact rock where UCS = 20 Is(50) is used
moderately to slightly weathered and fairly for this project, which is within the range of
strong limestone with mean RQD = 56-86% UCS=10-30 Is(50) for KL limestone as reported
and lower bound RQD = 35-75%. We do not by Tan & Chow (2013). The following design
observe any rock anomalous such as inclined parameters for limestone and infill cavities are
bedrock, slime, pinnacle and floater below the used for design purposes.
pile tip at 20 m. Few infill cavities and
exceedingly fractured rocks were found in some
areas on the upper 20 m such as PB-2 at 5-8 m
and PB-1 at 12-14 m. After careful review of
the geological features of the exposed rock and
the unpredictable nature of the cavity zone, it is
assumed that a 3 m cavity (modeled as medium
dense sand) is present across the tower,
beginning at 3 m below.
Fig. 4a. RQD vs UCS
8
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
In this equation, quc is the unconfined
(uniaxial) compressive strength of intact rock
(UCS), α is a reduction factor as function of quc
(Fig.5a), and β is a reduction factor as a
function of rock mass discontinuity (Fig.5b).
Laboratory tests indicated that for RQD =
40%, the design UCS is about 24 MPa. When
using α = 0.07 and β = 0.65 (Fig.5a & 5b), a
rock socket friction fs is about 0.07 x 0.65 x
24,000 = 1,092 kPa. This is consistent with
local practice, where (fs) is 5% of the
Fig. 4e. UCS vs Is(50) unconfined compressive strength of rock or
concrete, whichever is less. For limestone with
Limestone with RQD = 40-60% has UCS = UCS = 24 MP and a concrete grade of 60 with
0.6 RQD = 24-36 MPa, Is(50) = 1.2-1.8 MPa, γ UCS = 60 MPa (cube strength), the computed
= 27 kN/m3, υ = 0.25, Ei = 0.8 RQD = 32,000- fs = 0.05 x 24,000 = 1,200 kPa.
48,000 MPa with modulus reduction of 0.13-
0.2, resulting in Em = 4,000-10,000 MPa.
Infill cavities of medium to dense silty sand
are assumed with unit weight = 17 kN/m3,
friction angle = 38o, Poisson ratio (υ) = 0.3 and
Young modulus (E) = 5,000 MPa. The extent of
the cavities is assumed to be located at a depth
of 3-6 m below the raft, covering the entire
tower site. Under this assumption, the subgrade
rock on the uppermost 3m should be fairly
strong (RQD ≥ 40%), and this should be
confirmed during subgrade preparation. Any
weak rock and loose debris shall be removed
and replaced by backfill concrete, if necessary.
3 PILED-RAFT ANALYSES
9
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
The safe (allowable) rock socket friction (fs) In this project, the tall tower is supported on
is determined not only from theoretical (96) bored piles of 1,800 mm in diameter, with
estimates, but also from the results of an effective length of 18 m for a 38-MN
instrumented loading tests at the vicinity sites allowable working load. The subgrade rock is
as well as intuitive judgment of minimum pile fairly strong with UCS = 24 MPa, E= 32,000
length with respect to tower heights. To confirm MPa and a 3 m thick cavity beginning at 3 m
the safe rock socket friction, we reviewed the below the raft foundation. The geotechnical 3D
results of (3) instrumented loading tests finite element software MIDAS-GTS-NX
performed at the TRX site: a) the first test pile (version 2015) is used to compute the load
(D180 cm with 18 m rock socket) was loaded distribution (pile and raft), displacement,
up to 75 MN with a pile movement of about 7 induced stress, and subgrade reaction on the
mm, resulting in the maximum rock socket rock. The raft is modeled using solid element,
friction on the uppermost 3 m of 3350-5800 the piles are modeled as pile elements, and the
kPa; shaft friction and end-bearing on the rock is modeled as a 3-D solid element
lowest 15 m had not been mobilized yet; b) the following the Hoek-Brown constitutive model
second test pile (D = 90 cm with a 5 m rock for jointed rock. Fig.6 shows the 3D modeling
socket) was loaded to 19 MN with a pile of the piled-raft foundation.
movement of about 11 mm, resulting in the
maximum rock socket friction of 1600 kPa and
small mobilized end- bearing (640 kPa); and c)
the third test pile (D = 120 cm with a 6.7 m rock
socket) was loaded to near-failure at 28 MN
with a pile movement of about 40 mm, resulting
in the ultimate side friction of 750 kPa with an
end-bearing of 11,000 kPa. These (3) loading
tests confirmed that the safe rock socket friction
of 400 kPa is appropriate for the bored pile
design of this project.
The project design adopts an allowable rock
socket friction of 400 kPa in compression and
200 kPa in tension by ignoring the pile base-
bearing resistance. This is a prudent approach
knowing that the effective cleaning of the pile
base for underwater construction is difficult to
achieve. For transient (temporary) loading,
such as wind load, the local code limits the load
to 20% of the permanent (sustained) working
load. Since seismic loads are considered
transient loads, they are calculated for short and
long period response values, SDS and SD1 of
0.25 g and 0.08 g, respectively, and then
multiplied by an “importance factor” of 1.5.
The safe capacity of a bored pile socket in a
fairly strong rock is mainly controlled by a
structural capacity of about 0.25% concrete Fig. 6. 3D Modeling of Piled-Raft
grade (cube strength) used for the pile.
According to the local codes, adopted from The results of parametric MIDAS analyses
British codes, the contribution of steel show the computed displacement and induced
reinforcement in resisting the compression load stresses within subgrades, (Fig.7) where the
is ignored. The allowable rock socket side contribution of both pile and raft are assured to
shear, determined by the required length of have equal share in carrying the tower load. The
bored piles, guard against overturning of the tall average subgrade reaction is about 70,000
tower due to wind loads (the prime transient kN/m3 (with a range of 40,000-100,000 kN/m3)
load). and the pile stiffness is about 5,250 kN/mm
(with a range of 4500-6000 kN/mm).
10
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Among the 96 tower piles, 23 piles
encountered infill cavities with thicknesses
varying from 2 m to 12 m, such that pile lengths
were extended from the design to 18 m to 30 m
maximum. Additional shallow probing of 3 to 5
m in depth was conducted near the cavity piles
to assure no weak rock was present near the
surface subgrade (upper 3 m). As part of
QA/QC during constructions, each tower pile
was subjected to the Cross-hole Sonic Logging
(CSL) and/or the Low Strain Pile Integrity Test
(PIT) test to confirm that the structural integrity
of each pile was of a good standard.
To verify the pile capacity and load-
movement characteristic, a static compression-
loading test by reaction system was conducted
to 76 MN (200% DL = 38 MN). Strain gages,
telltale and a new device called “Distributed
Strain Fiber Optic (DSFO)” were used to
instrument the test pile. DSFO is a
complimentary device to conventional strain
gages, and allows continuous measurement of
the pile strain during loading tests. At a
maximum peak load of 76 MN, the movement
at the pile head was about 8 mm and the residual
movement after unloading was 2 mm (Fig.8a).
The strain profile measured from strain gages
and the DSFO were fairly consistent, indicating
the peak test load of 76 MN was carried by the
shaft friction on the upper half length of the test
Fig. 7. Displacement and Induced Stress from
pile and that no load had been transferred to the
MIDAS
pile toe.
PDA tests using an 8 MN drop hammer were
performed on two test piles that represented
4 CONSTRUCTION OF PILED-RAFT
normal piles and cavity piles. Load transfers
FOUNDATION
from PDA tests are consistent with static
loading tests (Fig.8b). In this figure, MIDAS
The extent of the cavity was relatively
shows a good comparison of load transfer
unknown, unpredictable, and risky for the
curves, static tests, and PDA tests, suggesting
foundation, and thus, probing tests by rock
that the input parameters for piled-raft analyses
coring to depths 5 m below the pile toe were
are reasonably representative.
conducted for most tower piles. If a cavity
The tension-loading test on a podium pile
and/or exceedingly fractured rocks (RQD<
(D100 cm; L=11 m) was conducted up to -12
10%) were found, injection grouting was
MN using support footings of 2 m x 10 m in
performed for cavity treatment and pile length
dimension. Under the peak load of -12 MN,
was adjusted (extended) by ignoring the shaft
each footing carried a compression reaction
resistance in the cavity. Local practice in
load of 6 MN, equivalent to an induced pressure
dealing with the cavity was also implemented
of 300 kPa. The measured vertical movement
as such: a) If a multilayer cavity with
was about 5 mm, resulting in a modulus
intermittent rock was found, the shaft friction
subgrade reaction of about 60,000 kN/m3,
contribution for an intermittent rock with
which is consistent with the MIDAS model.
thickness less than 1 m was ignored, and b) if a
thick cavity (> 10 m) was encountered, the pile
length was subject to effective pile embedment
depths below 60 degrees inclinations from the
lower bedrock level of the adjacent piles.
11
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
6 CONCLUSION
12
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ACKNOWLEDGEMENTS Rosenberg, P. and Journeux, N.L. 1976. Friction and End
Bearing Tests on Bedrock for High Capacity
The author expresses his sincere appreciation to Socketed Design, Can. Geotech. J., 13, 324-333.
Tan, Y.C. and Chow, C.M. 2013. Foundation Design and
Mr. Roland Suckling, the project director of this Construction in Limestone Formation: A Malaysian
super tall tower, for his permission to publish Consultant’s Experience, International Simposium on
part of the study report. Advances in Foundation Engineering, Singapore,
Dec 5 – 6th.
Tomlinson, M.J. 1995. Foundation Design and
REFERENCES Construction, 6th edn., Longman
Williams, A. F. and Pells, P. J. N. 1981. Side Resistance
Horvath, R.G. 1978. Field Load Test on Concrete-to- Rock Sockets in Sandstone, Mudstone and Shale,
Rock ‘Bond’ Strength for Drilled Pier Foundations, Can. Geotech. J. 18(4), 502-513.
University of Toronto, Publication 78-07.
Neoh, C. A. 1998. Design & Construction of Pile
Foundations in Limestone Formation, Journal –
Institution of Engineers, Malaysia. Vol. 59, No. 1, pp.
23–38.
13
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRACT: In Kuala Lumpur another Super High Rise Tower is in the Planning. The Tower will be in the
vicinity of the highest Twin Towers in the world, the KLCC Twin Towers, also known as Petronas Towers.
The height of the Super Tower is not yet finalized but the foundation does cater for a height well in excess of
800 m. At the current date, this would be the highest Tower in South East Asia. It has almost double the height
of the Twin Towers (452 m). The project will in all likelihood also deliver a new world record in Bored Piling.
The Tower is located in the central business district of Kuala Lumpur which is known for its difficult karst
limestone geology. To safely transfer the loads the Engineers designed a Bored Pile Foundation with 2.5 m
diameter Piles reaching a possible design length of up to 150 m. The construction of the Bored Piles is well
under way and reaches almost completion. Bauer (Malaysia) Sdn Bhd mobilized for the execution of the
Project the BG 72 (modified to reach this drilling depth w/o Kelly Extension) which is the biggest Kelly
Drilling Rig in the world with the longest Kelly in the world. The Rig was equipped with the Bauer B-Tronic
System, a digital tool which records the performance of the Rig. The data can be monitored life and online via
internet on computers in offices authorized to have access to the information. Such state of the art technology
certainly is of great help in the execution of such mega piles. The construction of such piles requires however
much more than state of the art equipment alone. This paper will highlight some of the challenges and
difficulties which arise with the construction of such mega piles. The construction of Piles of this size and
depth requires a new thinking not only about Equipment but sound knowledge and experience about the
principles of borehole stabilization, the control of such powerful rigs, permanent material and quality control
during construction.
14
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
It was also said that the Petronas Twin From past experience Bauer knew that for depth
Towers would have the deepest Foundation in in this magnitude Bored Piles have significant
the world, whilst reference is being made to the economical and technical advantage over
Barrettes under the Twin Towers. Some of the Barrettes. During the time when the Twin
barrettes indeed reached a depth of about 130 m Towers were constructed in the mid 90’s
from road level. However, the construction of however no Drilling Rig did exist to construct
the barrettes were carried out from a reduced such deep piles. This has changed since that
level of about 15 m to 20 m below the Road time drastically.
level which would result in an installation depth
of approximately 110 m to 115 m deep.
Such a pre-excavation of the site was in case
of the Lot LMN not possible. All Piles needed
to be constructed from the road level. The
ultimate design length was estimated during the
planning phase for some piles to be maximum
150 m. Presently the construction of the Bored
Piles is almost completed pending some piles Fig. 2. Overview of the Construction Site with D-
which can only be executed after some critical Wall and Foundation Piles in KLCC Lots L&M
utility diversion will have been done. The so far
maximum drilling depth is slightly in excess of
130 m. From the initial Soil Investigation it may 3 EQUIPMENT MOBILIZED
however be the case that in the remaining area
piles will need to be constructed deeper. The main equipment for the drilling of the deep
Bored Piles were the BG 48 (125 m) and the BG
72 (150 m). The BG 72 was modified and
2 BAUER’S SCOPE of WORK imported from Germany to the site in Kuala
Lumpur. These 2 rigs were assisted at times by
The site layout is shown in Fig.2. The additional BG 40 for the Podium Piles. The
foundation works were divided in the Bored BAUER BG 72, weighing almost 300 tons, is
Piles for the Podium and for the Tower. The capable of drilling shafts with up to 4.6 m
excavation for the 5 basements (27 m diameter, can deploy up to 720 kNm torque, and
excavation) was secured by a Diaphragm Wall. can drill down to 150 m deep. Both, BG 48 and
The basement is planned to be constructed in a BG 72, were operating without Kelly extension
top down method by the subsequent contractor. but with tailor made 5 fold telescoping Kellies.
For this purpose the Bored Piles were equipped It is the first time in history that a 5-fold
with heavy King Posts up to 89 tonnes weight. lockable Kelly was extended to a length of 150
BAUER’s foundation work, awarded by the m and exceeds the Kelly used for the
Arah Moden Sdn Bhd, the Project Owner can construction of the Bored Piles for the Jeddah
be summarized as follows: Tower Beckhaus and Heinzelmann (2015). The
a. 209 m linear Diaphragm Wall with 1 m long Kelly allows much faster and efficient
width and 30 m to 40 m depth, in total excavation of the Bored Piles compared to
7,500 m²; using time consuming extension Kellies which
b. 225 nos. of Bored Piles with drilling need to be lifted into the hole and be connected
depth up to max 150 m, divided into; to the Kelly on the rig by a separate crane.
- 88 nos. with 2.0 m diameter were The mobilization and set up for both BG 48
for the Podium, and (250 tonnes) and the BG 72 (300 tonnes) was a
- 137 nos. with 2.5 m diameter were major task. The BG 72 is too heavy and too big
for the Tower to be transported in 1 part. The rig was
c. 154 nos. of Kingpost Installation in both completely dismantled and was transported
Podium and Tower Area; with 10 heavy transports to site. The assembling
d. Facilitation Works and Monitoring. of the BG 72 took 10 days using a 360 tonne
and 140 tonne mobile crane. Five specialized
One of the winning influences in the award mechanics supervised by a German Mechanical
was that BAUER replaced in their bid the very Engineer undertook the task to erect the 43 m
deep barrettes with an anticipated depth in high BG. Fig.3 shows the assembling process.
excess of 130 m by Bored Piles diameter 2.5 m.
15
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
16
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Under the Railway Act and as agreed for this
project, the design had to cater that the angular
distortion along the railway track shall not be
more that 3 mm over 6 m, and the total
movement of any part of the rail structure in any
direction shall not be more than 15 mm.
Detailed and complicated finite element
calculations were carried with different statical
systems. At the end the Engineer and Owner
decided to prefer a non rock socketed solution
whereby all Bored Piles were to be determined
2.0 m above the competent Limestone rock,
competent as being defined once combined the Fig. 8. Recovered Limestone Rock from Rock
total of RQD and TCR is > 80%. Probing
The Bored Piles were designed for a load
varying between 22 MN and 90 MN. For the 2.5
m Bored Pile a Concrete G 50 was used. The
allowable structural compression capacity of
the piles combined with the influence of the
steel was in the range between 104 MN and 146
MN.
In order to determine the competent rock
levels, a detailed probing exercise was carried
out at each pile and the results were compiled
in a rock map. Fig. 9. Competent Rock Mapping for the Piling
The geology of this jobsite with a stiff Works in the Tower Area
“Kenny Hill” top layer and underlying
limestone bedrock is well known to BAUER as
having executed many piling works within this 5 THE PILE CONSTRUCTION
area. The three-dimensional model in the left
Fig.7 indicates the various soil layers as found To allow a safe construction with such heavy
within the soil investigation (SI). rigs the entire site was covered with a 25 cm
thick reinforced concrete slab. The slab was
necessary to maintain a clean and stable all
weather platform for the deep drilling and
installation of the very heavy equipment and
large quantities of permanent materials. The
rebar cages for the long piles had a weight of
almost 80 tonnes and needed to be coupled over
the Borehole. Kingposts had a weight up 89
tonnes and the long Bored Piles required the
installation of concrete in excess of 600 m³.
Fig. 7. Continuously Updated 3D-Model of the The Piling Specification had very strict
Subsoil Situation Based on SI Information (Left), requirements. Tolerances of the Bored Piles
Used to Specify the 2m-Embedment into were 75 mm at COL (> 27 m below GL) and an
Competent Rock, Indicated by Red Columns overall verticality of not more than 1:100. The
(Right) 75 mm requirement meant for the first 30 m
drilling already a tolerance of about 1:300. The
By end of August about 86% of all Bored Kingposts had to be installed with a tolerance
Piling Works was completed. The remaining of 1:200.
areas are until now not accessible due to A further difficulty was that the Engineer
outstanding utility diversions. The recovered wanted to have the Bored Pile material
Limestone rock from rock probing is shown in installation completed within latest of 36 hours
Fig.8 and the results of the rock mapping are from the completion of drilling. Such
shown in Fig.9. limitations for such deep piles needed an
enormous advance planning of operations and
17
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
the logistic for supply control of the materials.
Not to forget that the volume of excavated
material for a 130 m deep pile is 650 m³. The
steps for the material installation are:
(a) cleaning and desanding of borehole;
(b) installation of rebar (9 sections for 12 m
cages); and
(c) pouring of concrete.
Given the fact that KLCC is in the midst of
KLC Business District the concreting could be
done only overnight.
18
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
become very heavy and is hardly pumpable for Working 24 hours per day BAUER achieved
recycling. For systems with reversed a production of 4 to 5 Bored Piles a week
circulation methods (one of which is also the (including material installation) in the Tower
Cutter or Hydrofraise) this is extremely Area using the BG 48 and BG 72.
difficult. The production is reduced drastically For the selection of the suitable Concrete
under such conditions and can proceed further Mix for such deep piles using high strength
only by adding very special additives into the concrete, it is highly recommended to refer to a
Bentonite Slurry. This makes the construction Concrete Expert and consider the Guide to
expensive and the progress slow. A heavy Tremie Concrete for Deep Foundations as
bentonite will make a proper casting of tremie shown in Fig.13. The Mixes have to be stable
concrete more difficult and insufficient cleaned under great installation pressure in depth. The
slurries in a pile before casting can lead to tendency of segregation which is increasing
quality problems of the concrete in the pile. with depths must be eliminated. Next to the
Therefore, and following the experience from measurement of slump alone from a delivered
previous sites within KLCC sites a Polymer truck it is important to measure the flowability
Slurry was specified. BAUER used the LTP of the concrete over time. The concrete must be
Slurry which was developed in BAUER (M)’s flowable over a period of up to 12 hours.
material division. The LTP Slurries have been Theoretically the concrete of the first truck
proven to be of utmost quality and reliability on should be found on top of the pile. Therefore
many deep drilling sites. A variety of different the concrete of the first trucks must maintain its
Polymer-types are being used and blended to parameters important for proper installation
suit most of all ground conditions. over the entire time of concreting. Tests are
described and recommended in the Guides
which must be followed (L-Box Test etc.).
6.3 Installation of Rebar Cages and Construction failures for such Mega Piles have
Concreting massive consequences in cost and time. Worse,
The individual reinforcement cage sections undetected failures, the future suitability of the
were regularly fabricated in 24 m length to foundation may be in doubt.
reduce the numbers of cage lapping for placing
the cage into the shaft, Fig. 12 (left three
pictures).
19
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
such works. The supervisory staff of the carried out by conducting three bi-directional
Engineer as well. With these deep piles the “Osterberg cell” pile load tests, see Fig.14. The
foundation industry enters a new area of test results confirmed the Engineer’s
requirements for both execution of works and assumption in regards to the assumed bearing
temporary and permanent materials. Therefore parameters. BAUER had no part in the design.
best testing is to carry out the works in a But the instrumented test showed maximum
professional and defined manner at a time friction values of 192 Kpa in the hard Kenny
before subsequent (post) testing is done. Hill with SPT > 50 and an endbearing of 6,214
The “Recommendations on Piling” of the Kpa at a load of 2.25 times the Working Load
German Geotechnical Society give valuable which confirmed the Engineer’s design
information on determining pile resistances parameters.
using different methods, on quality assurance
during pile execution, and also on pile integrity
testing, all supplementing existing standards,
generally based on European Norms. This
handbook respects the complex and
interdependent aspects of installation impacts
on pile performance and testing in detail. For
example, the execution of the piles is
recognized in determining pile resistance by
using empirical data, again derived from static
pile load tests. In this regard, it is seen critical
to use purely geotechnical methods from first
principles, e.g. utilizing the soil stiffness Fig. 14. Test result confirming the pre-design and
modulus, for calculating the external bearing the consultant’s assumptions
capacity of bored piles and serviceability It is self understood that results from
(settlement) limit states, amongst others individual tests have only then a general
because the pile installation process with its meaning for a site as long the geology does not
associated alterations to the ground around the change and the methods and quality used for
pile has proven difficult to determine Ernst & subsequent working piles remains the same as
Sohn (2014). Similarly the Hong Kong Code of used for the construction of the test pile. To
Practice Building Departement Hong Kong mention only one influence it is of course clear
(2017) in conjunction with the Geoguide Series that if a Test Pile was constructed using
prescribes typical and conservative parameters Polymer then later the support fluid cannot be
of the soils and rocks met in Hong Kong which changed to Bentonite.
can be used safely without further testing on As mentioned above, with respect to the
site. The parameters are called “presumed complex technology required to execute bored
allowable bearing pressures”. These values can piles successfully, in particular of such great
be increased if tests will be carried out proving depths, present design and execution standards
that the actual materials met on site do allow are not up to date, nor contain the full range of
such action safely. Therefore these Standards factors which are required to be managed.
by all means shall not being taken as “bibles” Supplementary guidelines were also taken
which rules can be used universally. They advantage of. In order to fill any such gap, the
cannot. The soils and rocks in every region and European Federation of Foundation
country are different. The local experience and Contractors (EFFC) and the Deep Foundation
knowledge about the engineering geology Institute (DFI) published Practical Guidelines
cannot be replaced by Standards from overseas. on Support Fluids and Tremie Concrete, which
It is however wished that every country should for the case of the “support fluids”, in the
develop such Standards describing the authors opinion are well worth to be amended
engineering geology and specifies minimum and improved allowing to incorporate
construction standards which must be followed. additional experience from the execution of
On most of the sites and particularly for such Mega Foundations like the KLCC Lot
major structures like the LMN Tower, a LMN which of a kind are hardly built in
verification process (test) for the “external” Europe, in order to arrive and describe the state-
bearing capacity of foundation piles is needed. of-the-art practice. The efforts of these groups
For the reference site, a full-scale test has been
20
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
of expert in any case are extremely appreciated
and the value of such guidelines is of enormous
importance for the industry. BAUER will
continue to contribute with expertise in these
expert task groups and associated R&D work,
as it’s believed that these two guides help to
create a common understanding also of
appropriate methods for quality assurance
EFFC/DFI (2019), EFFC/DFI (2018).
As discussed above, a crucial aspect of
quality assurance during pile execution was the
vertical drilling within a tolerance of 1/100. For
Fig. 15. Verticality Check by Koden
monitoring the pile alignment, three methods
have been used in this project: including The patented SONICALIPER by Fugro is a
KODEN, SONICALIPER. BAUER later sonar caliper, with basically using the same
suggested the use of the DIS which for long method as the Koden, accordingly with similar
piles in BAUER’s opinion has definite limitations. By scanning the shaft’s surface at
advantages and offers more certainty in the incremental depths by a full 360-degree pass,
interpretation of the results. In fact the Engineer the diameter is determined and the verticality of
specified the use of SONICALIPER. a shaft assessed by evaluating up to 120
Koden, a well-known ultrasonic-echo recorded individual echo returns per pass. Other
device, is a Method which originally was used than Koden, the Sonicaliper digitalizes the data
more in Diaphragm Walls and Barrettes but is and uses software to visualize and to create
now also used for round shafts. Whilst pulling calculations immediately after the shaft has
the device from the bottom with a winch on top, been profiled. The verticality is derived from
the distance to the surface of the excavation (in the offset of the calculated best-fitting ring in
two directions), as function of wave speed and relation to the vertically projected datum ring.
reflection time, is displayed onto a log printout. Even though the method delivers good
A downside of this method is often reported to accuracy, the results can be influenced by the
be the need for a quite clean support fluid. A density of the support fluids and also by locally
high density support fluid can affect the wave overbreaks in a pile (at a critical location close
propagation, and in particular lead to irregular to the pile toe) which are not always avoidable
signals and difficult to interpret results if but do neither harm nor affect the eccentricity
changing over depth. It has also been of a pile. For a long pile these influences may
experienced that the sensors can deviate from play a decisive factor whether a pile will be
its vertical central position, related to the datum accepted or rejected.
(start point). The sensor is free-hanging on a Deviations of the sensor itself from
cable, and so retaining its central position only verticality shall be noticed using onboard
relies on gravity. Assuming that the sensor is sensors, and any twist of the device relative to
representing the center point of the pile axis its initial orientation shall also be compensated
over depth should therefore be double-checked, (Sonicaliper.com). For verticality check,
in particular in fluids of high gel strength. With usually the total center offset is used, whereas a
regards to the application of the Koden at lesser encroachment value may indicate a larger
KLCC, it can be stated that with polymer fluids shaft diameter than its nominal, and a
a time consuming cleaning or even fluid reinforcement cage might rather position itself
exchange (as would be needed for bentonite) closer to the vertical projection. The sonar
becomes less relevant. caliper test at KLCC was done on behalf of the
The Koden System seldom has been used for Client with respect to the contract requirement,
depths to 100 m and above. At KLCC the which has been the deviation at the end of the
Koden was used for an internal verticality drilling, when the shaft was completed, see
check. The Koden was used to check the Fig.16.
vertical installation of the starter casing, then to
check the alignment of subsequent excavation,
e.g. at the cut-off level and at around the
maximum depth of the Koden, limited by the
actual winch and cable, see Fig.15.
21
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
direction of the total offset from the projected
center, and a plausibility check can be done
even by visual inspection as well as an
estimated extrapolation as backup data. The
DIS was approved as a standard quality control
for verticality for the execution of the Jeddah
Tower foundation piles Beckhaus and
Heinzelmann (2015), where the system proved
its accuracy against Koden.
As all measurement methods available face
the challenge with the fact that the true
inclination value will remain unknown, and
Fig. 16. Exemplary Verticality Check Result by tolerances given are based on theoretical
SoniCaliper considerations and are difficult to prove under
BAUER suggested to implement as an real conditions, a redundancy in the verticality
additional Verticality Measurement Method, check can only be achieved by using more than
the Drilling Inclination System (see Fig.17) one system. A redundancy in the verticality
check can only be achieved by using more than
one system, like as undertaken by Bauer at
KLCC. Fig.18 presents a comparison of results
from the three different methods used, with –
ignoring some outliers– a quite an acceptable
correlation. In other cases, some discrepancies
did require assessment by the project team to
review the real deviation. Despite the
theoretical accuracy of each system, also
considering the different measuring principles
and evaluation approaches, for the purpose to
limit discussions to a minimum, by engineering
assessment, it seems prudent to allow at least
Fig. 17. BAUER DIS with Measuring Cylinder for an absolute tolerance of 2 cm plus a depth
Lowered with a Rope Surveyed by a Total Station depending extra tolerance of order 0.05% for
The Drilling Inclination System, developed any system, this accumulating to ±7 cm for a
and patented by BAUER, is based on the verticality check at 100 m depth.
precise measurement of a guided cylinder in the
excavation, by means of a non-contact
tachymetric system surveying the suspension
rope’s inclination. Reflector-less measurement
of the rope is done on several layers and a
special software solves the overdetermined
equation which provides a high accuracy of the
measurement. In order to reliably estimate the
real inclination of the rope, additional check
values are taken into account, and only then the
position of the top of the cylinder is evaluated,
basically by extrapolation down to its actual
depth. The advantage of this geometrical and
geodetic method is multiple. The measurement
Fig. 18. Comparison of the Verticality Check by
does not need to rely on the validity of a
Three Independent Methods
calibration, i.e. on constant fluid properties in
greater depth, nor is it sensitive to support
fluid’s properties at all. The system is also quite Beside the obligatory quality assurance
robust and allows a very fast verticality check. testing prior and during the execution,
Finally, DIS can reliably determine the angular additional integrity testing after completion of
orientation to allow a high accuracy of the the works was requested. All construction piles
have Cross-Hole Sonic Logging (CSL) pipes
22
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
installed. Having tested around 25% of ACKNOWLEDGEMENTS
executed piles with no major changes in First
Arrival Times (FAT) to date, not revealing any We would like to express our sincere thanks to
structural issues with the integrity of the shafts the Client, KLCC Properties, and the
thereby maintaining confidence in the internal Consultant Engineers, ARUP & LERA Sdn
bearing capacity, all tested piles were accepted Bhd, for an always professional, fair and
to date. Nevertheless, it seems fair to claim, friendly cooperation, also to our BAUER
with more than 60 years of experience in bored colleagues, in particular for their commitment
pile foundation and its quality control, that to high quality and safe work. Further we wish
quality assurance and management of the to thank Prof. Ir. Masyhur Irsyam for giving us
processes prior to and parallel to the actual the opportunity to deliver this Paper for the
execution process are to be preferred, and KOGEI XI PIT XXIII 2019.
possible anomalies should never be assessed on
the results of ultrasonic testing in isolation only
Beckhaus and Heinzelmann (2015). For the
benefit of future applications, and discussions,
a sub-group of the German Geotechnical
Society is updating the relevant part of the
Recommendations on Piling Ernst&Sohn
(2014), not limited to CSL but including also
Thermal Integrity Profiling (TIP), with the aim
to establish a common understanding of best
practice in execution, evaluation and
assessment of non-destructive integrity testing.
REFERENCES
7 CONCLUSION
Beckhaus, K., & Heinzelmann, H. 2015. Ultrasonic
BAUER has successfully installed the so far Integrity Testing for Bored Piles. Proceedings of the
deepest bored piles in the world. At deadline of International Symposium on Non-Destructive Testing
this paper submission shafts exceeding 130 m in Civil Engineering (NDT-CE). Berlin.
deep had been drilled, by use of the worldwide Ernst & Sohn. 2014. DGGT: Recommendations on Piling
(EA Pfähle). 2nd edition. German Geotechnical
biggest drilling rig, the BAUER BG 72, with Society. Germany.
deeper piles are expected to be constructed. Buildings Department (Hong Kong). 2017. Code of
The works have been performed in a timely Practice for Foundations.
manner and with a high quality standard, both Guide to Support Fluids for Deep Foundations. 1st
as required by the Client. The positive project edition. European Federation of Foundation
results should especially be credited due to the Contractors, UK. Deep Foundation Institute, USA.
challenges required to be overcome with the EFFC/DFI. 2019.
site location within the Kuala Lumpur City Guide to Tremie Concrete for Deep Foundations. 2nd
edition. European Federation of Foundation
Centre, working 24/7 in an extremely busy area. Contractors, UK. Deep Foundation Institute, USA.
BAUER (Malaysia) Sdn Bhd has managed to EFFC/DFI. 2018.
successfully work under these conditions
without receiving a single complaint from any
of the stakeholders surrounding the site, i.e.
mosque, hotels, residences and malls.
With regards to the verticality of the bored
piles, other measurements have been cross-
checked with the BAUER Drilling Inclination
System, and proven to be a robust and accurate
method to efficient control of the verticality
during the drilling as well as a final-check for
acceptance purposes.
23
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRACT: Landslides are one of natural disasters that cause a huge number of casualties and economic
losses in the past decade in Indonesia and worldwide. Landslides threaten more than 40 million people in
Indonesia living in high to very high risk zones. Consequently, it is crucial to develop a disaster risk reduction
strategy for landslides to support the disaster management policy in Indonesia that puts forward multi-sectoral
preventive-oriented efforts and focuses on disaster risk reduction. Disaster management should be driven by a
structured, measurable and sustainable strategy. The strategy must comprise assessment and mapping of
disaster risks, application of numerical modeling/simulation, designing of countermeasures, and
implementation of early warning systems using the appropriate and most adaptive technology. The whole
strategy should be promoted to be a national and international standard as global reference in landslide risk
reduction.
Keywords: landslide mitigation, early warning, landslide mapping, risk modelling, global standard
24
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
25
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
adaptive technology. The strategy should be set and validated in 26 landslide cases and 6 debris
forth in a national and international standard as flows in the Asia-Pacific region. In a recent
a reference to disaster risk reduction actions in study, Fathani et al. (2017b, 2017c) found that
Indonesia and worldwide. hyperconcentrated solid-liquid mixture flow
model and Mohr-Coulomb model are suitable
for modeling landslide and debris flow
3.1 Risk assessment and mapping mechanisms.
Risk assessment is based on technical,
institutional, and socioeconomic/cultural
surveys of the disaster-prone communities 3.3 Landslide disaster countermeasures
Fathani et al. (2017a). Technical surveys are Landslide disaster countermeasures can be
undertaken to investigate geomorphological, conducted by a structural or non-structural
geological and geotechnical conditions and to mitigation. Several examples of structural
determine the vulnerable zones and ground mitigation are control works and restraint
movement mechanisms so that the most works. On the other hand, non-structural
appropriate monitoring technology could be mitigation emphasizes more on improving
placed. The results of this survey are realized in community’s knowledge and preparedness and
the form of community-based disaster strengthening the organization with policy and
vulnerability and risk maps Karnawati et al. regulation.
(2011). Disasters events are unique as they happen
The institutional survey is conducted to map in different types of geomorphological,
the institutions that play important roles in geological, and geotechnical conditions, thus it
disaster management. Socio-cultural surveys is inappropriate to take a uniform approach
are conducted to determine the condition of when applying preventive measures. Risk
society and the potential vulnerable community assessment is the key to develop appropriate
and properties. Social surveys are conducted to mitigation methods and technologies. In
determine the understanding and aspirations of general, structural mitigation is costly and time
the people against the threat of landslides. consuming; on the other hand, relocating
community living in disaster prone area is very
difficult. In this situation, the effective way of
3.2 Numerical modeling for landslide reducing disaster risk is raising the community
movement awareness and preparedness by the
Several methods to model the prediction of implementation a community-based early
landslide movement and the extent of the warning system.
affected area, both empirically and rationally,
have been developed Pastor et al. (2014).
Rational methods are based on the use of 3.4 Early warning system: technological
mathematical models that can be classified as innovation
discrete and continuum models. This model can The implementation of early warning system is
be divided into several types, namely 3D in-line with the seventh global target of Sendai
models based on mixture theory, velocity- Framework 2015-2030, which is increasing the
pressure model, and depth-integrated model. availability and accessibility of multi hazard
The depth-integrated model is outstanding in early warning systems, risk assessment, and
terms of time and calculation accuracy. This disaster risk information. Since 2006, Fathani et
model is used to describe the movement of al. (2014, 2016) has developed the disaster
landslides, rock avalanches, lava flows, debris monitoring and warning system technology and
flow, and snow avalanche McDougall and at the present has reached the 5th generation
Hungr (2004); Sassa et al. (2010); Miyamoto which is called Gadjah Mada Early Warning
(2010); and Fathani et al. (2017b). System or GAMA-EWS as shown in Fig.3.
Fathani et al. (2017c) developed a 3D quasi Around 35 types of equipment, such as
model using the Navier-Stokes Equation as extensometer, crackmeter, tiltmeter,
governing equation, in which the resistance on inclinometer, rain gauge, ultrasonic/Lidar water
the slip surface was approached using level sensor and groundwater sensor, are
Coloumb, Newton and Manning's resistance protected with 5 patents. The equipment uses
law, and the effects of the earthquake was taken more than 90% of local component and is
into consideration. This model has been applied produced by small and medium industry
26
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
(UKM) in Yogyakarta and Central Java (2016), Kerinci (2017), Gunungkidul (2017),
Province. and others.
Numerous studies regarding the
determination of warning criteria for various
types of ground movement have been
conducted by analyzing rainfall, ground water
fluctuation, surface deformation or the
movement on failure plane, and change of
gradient or monitoring point on the slope
surface Faris and Fathani (2013). Applying
appropriate criteria for each warning level
(caution-warning-evacuate) optimizes the
function of this monitoring and early warning
system in detecting hazard Fathani and
Karnawati (2018).
Landslide monitoring and early warning
system that connects with telemetric system Fig. 3. Schematic Diagram of Landslide
(SMS, GSM, Radio Frequency, Wi-Fi, to Monitoring and Early Warning System.
satellite) has been installed in 110
districts/cities in 32 provinces in Indonesia, and The technological innovation is the result of
also in Myanmar. Besides BNPB, Ministry for long-term research that has supported the
the Development of Village, Disadvantaged establishment of a teaching industry for
Regions and Transmigration (Kemendesa GAMA-EWS mass production. The value of
PDTT), and Disaster Management Agency the technological innovation is huge for
(BPBD), this technological innovation has also reducing disaster risks by increasing the
been used by industries/private sectors. The resilience of government-community-private
early warning system is proven to be able to sector, including universities to uphold the
save lives in Banjarnegara (2007), Aceh Besar sovereignty of technological innovation
(2015), Donggala (2016), Lombok Barat particularly in the area of disaster management.
27
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
4 EQUIPMENT MOBILIZED After going through series of ISO meetings,
on March 16th, 2018 ISO 22327:2018 on
According to UN-ISDR (2006), a complete and landslide early warning system was officially
effective early warning system should consist adopted and published by ISO/TC 292 Security
of four inter-related elements which are (1) risk and Resilience. This is the first international
knowledge, (2) monitoring and warning standard proposed by Indonesia and even by a
service, (3) dissemination and communication, developing country. This ISO follows the
and (4) response capability. The hardest Indonesian National Standard SNI 8235:2017
challenge is not in the development of regarding landslide early warning system
technology aspect but in the implementation published a year earlier. For the success of ISO
stage that involves community living in the 22327:2018 publication, International
vulnerable area and close cooperation between Organization for Standardization (ISO) has
government and related stakeholders. Based on entrusted Indonesia to propose a general
that condition, Fathani et al. (2016) has standard for multi-disaster early warning
developed a landslide early warning system that system (ISO 22328-1:2019) that includes
integrates both technical and social aspects that technical specifications for flood, tsunami,
function effectively from the installation, volcanic eruption, and other disasters.
operational, to the maintenance phase.
Referring to the four inter-related elements
above, BNPB and UGM, supported by National 5 STRENGTHENED INDONESIAN
Standardization Agency (BSN) and RESILIENCE: REDUCING RISK FROM
Meteorological, Climatological, and DISASTERS (STIRRRD)
Geophysical Agency (BMKG), have promoted
a national standard SNI (8235:2017) and an Indonesia is committed to fully adopt and
international standard on the guidelines for the support Sendai Framework (2015-2030),
implementation of landslide early warning Sustainability Development Goals (SDGs),
system ISO (22327:2018). The system Climate Change Agreement, and other global
comprises 7 main sub-systems which are (1) commitments. Budgeting plan policy, capacity
risk assessment, (2) dissemination and building of central and district government and
communication of knowledge, (3) local communities, and disaster mitigation-
establishment of disaster preparedness team, based infrastructure development are important
(4) development of an evacuation route and to reduce disaster risk and achieve sustainable
map, (5) development of standard operating development Fathani et al. (2017).
procedures, (6) monitoring, early warning and From 2011 to 2019, UGM in collaboration
evacuation drill, and (7) commitment of the with GNS Science New Zealand has been
local government and community on the initiating Strengthened Indonesia Resilience:
operation and maintenance of the whole system Reducing Risk from Disaster (StIRRRD). The
Fathani et al. (2016). program is conducted in 10 districts/cities in 4
provinces (West Sumatera, Bengkulu, Central
Sulawesi, and West Nusa Tenggara), supported
by the Ministry of Foreign Affairs and Trade
(MFAT) New Zealand, BNPB, Bappenas,
Kemendesa PDTT, MOHA, and Ministry of
Public Works. This program has succeeded in
formulating policy strategies, programs, and
mechanisms of multi-disaster risk reduction
implementation and organizations for
optimizing disaster risk reduction in Indonesia.
6 CONCLUSION
28
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
conducting adaptive applied research, (3) Fathani, T.F., Legono, D. & Karnawati, D. 2017c. A
registering research results for intellectual numerical model for the analysis of rapid landslide
property rights, (4) commercializing research motion. Journal of Geotechnical and Geological
Engineering. Vol. 35(5): 2253- 2268.
products, (5) encouraging the research products Fathani, T.F., Wilopo, W., Daly, M. & Glassey, P. 2017d.
to become a reference for national and Penguatan ketangguhan Indonesia melalui
international standards in the form of SNI or pengurangan risiko bencana (StIRRRD).
ISO. Pengurangan Risiko Bencana di Daerah Tertinggal.
Landslide early warning system has gone Kemendesa PDTT, Jakarta: 79-88.
through that process. Nevertheless, innovation, Fathani, T.F., Karnawati, D. & Wilopo, W. 2016. An
evaluation, and improvement are still integrated methodology to develop a standard for
intensively carried out until now. In addition to landslide early warning systems. Journal of Natural
Hazards and Earth System Sciences. Vol. 16(9):
landslide early warning system, the concept and 2123-2135.
strategy of early warning system in other types Fathani, T.F., Karnawati, D. & Wilopo, W. 2014. An
of disaster has been implemented such as adaptive and sustained landslide monitoring and early
volcanic eruption Fathani and Legono (2010; warning system. Landslide Science for a Safer
2011), debris flow Fathani and Legono (2013), Geoenvironment, Methods of Landslide Studies.
and flood. Springer. Vol. 2: 563-567.
There are still a lot of challenges in Fathani, T.F. & Legono, D. 2013. The application of
monitoring and early warning system of rainfall-
mitigating landslide disaster. It is expected that
trigered debris flow at Merapi Volcano, Central Java,
various efforts and strategies described in this Indonesia. Progress of Geo-Disaster Mitigation
speech could strengthen the nation resilience in Technology in Asia, Environmental Science and
keeping its sustainability and encourage the Engineering. Springer-Verlag: 263-275.
establishment of technological innovation Fathani, T.F. & Legono D. 2011. Sustaining community
especially in disaster mitigation. disaster preparedness: self-evacuation drill against
volcanic disaster. Simposium Gunung Merapi -
Kajian Perilaku, Dampak, dan Mitigasi Bencana
Akibat Erupsi Merapi 2010. Yogyakarta: 113-120.
REFERENCES Fathani, T.F. & Legono, D. 2010. A self-evacuation drill
development program for community resilience
Bappenas. 2015. Rencana Pembangungan Jangka against Mt. Merapi disaster. International Workshop
Menengah Nasional (RPJMN) 2015-2019. Buku III on Multimodal Sediment Disaster Triggered by
Agenda Pembangunan Wilayah, KPPN/Bappenas: 1- Heavy Rainfall and Earthquake and the
1 – 1-48. Countermeasures. Yogyakarta: 125-136.
BNPB. 2016. Risiko Bencana Indonesia (RBI). Glade, T. & Crozier, M.J. 2005. A review of scale
Direktorat Pengurangan Risiko Bencana, BNPB, dependency in landslide hazard and risk analysis.
Jakarta. Landslide hazard and risk. John Wiley & Sons: 75-
BNPB. 2014. Rencana Nasional Penanggulangan 138.
Bencana (2015-2019). Badan Nasional Guidelines for implementation of a community-based
Penanggulangan Bencana. landslide early warning system. ISO/TC 292 Security
Faris, F. & Fathani, T.F. 2013. A coupled and Resilience – Emergency Management. ISO
hydrology/slope kinematics model for developing 22327:2018.
early warning criteria in the Kalitlaga Landslide, Karnawati, D., Maarif, S., Fathani, T.F. & Wilopo, W.
Banjarnegara, Indonesia. Progress of Geo-Disaster 2013. Development of socio-technical approach for
Mitigation Technology in Asia, Environmental landslide mitigation and risk reduction program in
Science and Engineering. Springer. Part II: 453- 467. Indonesia. Asean Engineering Journal, Part C. Vol.
Fathani, T.F. & Karnawati, D. 2018. A landslide 2(1): 22-49.
monitoring and early warning system. Landslide Karnawati, D., Fathani, T.F., Sudarno, I., Andayani, B.,
Dynamics: ISDR-ICL Landslide Interactive Teaching Legono, D. & Burton, P.W. 2011. Landslide hazard
Tools. K. Sassa et al. (eds.), Springer: 297-308. and community-based risk reduction effort in
Fathani, T.F., Karnawati, D. & Wilopo, W. 2017a. Karanganyar and the surrounding area, Central Java,
Promoting a global standard for community-based Indonesia. Journal of Mountain Science. Vol. 8: 149-
landslide early warning system. Advancing Culture of 153.
Living with Landslides. Springer. Vol. 1: 355-361. Pastor, M., Blanc, T., Haddad, B., Petrone, S., Sanchez,
Fathani, T.F., Legono, D. & Alfath, M.A. 2017b. M., Drempetic, V., Issler, D., Crosta, G., Cascini, L.,
Sensitivity analysis of depth-integrated numerical Sorbino, G. & Coumo, S. 2014. Application of a SPH
models for estimating landslide movement. Journal depth-integrated model to landslide run-out analysis.
of Disaster Research. Vol. 12(3): 607- 616. Landslides. Vol. 11(5): 793-812.
29
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
McDougall, S. & Hungr, O. 2004. A model for the Sassa, K., Nagai, O., Solidum, R., Yamazaki, Y. & Ohta,
analysis of rapid landslide motion across three- H. 2010. An integrated model simulating the
dimensional terrain. Canadian Geotechical Journal initiation and motion of earthquake and rain induced
41: 1084-1097. rapid landslides and its application to the 2006 Leyte
Miyamoto, K. 2010. Numerical simulation of landslide landslide. Landslides. Vol. 7(3): 219-236.
movement and Unzen-Mayuyama disaster in 1792, Sistem peringatan dini gerakan tanah. Badan Standarisasi
Japan. Journal of Disaster Research. Vol. 5(3): 280- Nasional (BSN). SNI 8235:2017.
287. UN-ISDR. 2006. Developing an early warning system: a
checklist, The 3rd International Conference on Early
Warning (EWC III).
30
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Controlled Modulus Columns (CMC) merupakan teknik perbaikan tanah yang instalasinya
dilakukan dengan membentuk inklusi semi-kaku guna meningkatkan kekuatan massa tanah secara
keseluruhan dalam upaya menangani permasalahan-permasalahan seperti penurunan dan daya dukung.
Penggunaan CMC bertujuan untuk mengetahui besarnya penurunan yang terjadi pada tanah lunak terhadap
konstruksi timbunan setinggi 8 m pada ruas jalan tol Pemalang-Batang, serta peranan lapisan berbutir yang
dikenal dengan istilah Load Transfer Platform (LTP) dalam upaya menyalurkan beban yang bekerja pada
timbunan menuju kolom CMC melalui arching yang terbentuk di dalam lapisan LTP. Analisis dilakukan
terhadap model numerik 3D dengan bantuan perangkat lunak PLAXIS dengan hasil yang menunjukkan
adanya reduksi besar penurunan pada permukaan tanah asli hingga 50% serta waktu yang dibutuhkan
menjadi lebih cepat.
Kata Kunci: perbaikan tanah, controlled modulus column, timbunan, tanah lunak
ABSTRACT: Controlled Modulus Columns (CMC) is a ground improvement technique which is installed
by forming semi-rigid inclusion to enhance the stiffness of soil mass in global area in an effort to deal with
some issues such as settlement or bearing capacity. The aim of using CMC is determine the magnitude of
settlement that occurred on the soft soil under 8 m height of embankment at Pemalang-Batang toll road, and
the role of granular soil layer known as Load Transfer Platform (LTP) in an effort to transfer the load to the
column through arching effect that formed inside the LTP. The numerical analysis using PLAXIS 3D
software has been done and gave a result that CMC can reduce settlement until 50% and increasing the time
to reach final settlement.
Keywords: soil improvement, controlled modulus column, embankment, soft soil
31
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
waktu konstruksi serta cocok digunakan pada 3 MEKANISME TRANSFER BEBAN
berbagai jenis propertis tanah yaitu Controlled Mekanisme transfer beban pada tiang
Modulus Column (CMC). konvensional pada umumnya dapat dikatakan
CMC merupakan teknik perbaikan tanah langsung diterima secara langsung oleh tiang
yang instalasinya dilakukan dengan itu sendiri. Pada suatu tiang sepanjang L (Gbr
membentuk inklusi semi-kaku untuk 1a), beban pada tiang secara bertahap
meningkatkan kekuatan massa tanah secara meningkat dari nol menjadi Q(z=0) pada
keseluruhan dalam upaya menangani permukaan tanah. Sebagian beban yang
permasalahan-permasalahan seperti penurunan bekerja akan ditahan oleh friksi yang bekerja
dan daya dukung. Inklusi semi-kaku pada di sepanjang selimut tiang Q1, dan sebagian
CMC merupakan suatu jenis kolom beton yang lagi ditahan oleh tanah bagian bawah yang
instalasinya dilakukan dengan cara dibor berada di ujung tiang, Q2. Pengukuran yang
menggunakan auger khusus. Auger khusus dilakukan untuk mengetahui beban yang
yang digunakan dalam instalasi CMC mampu dipikul oleh selimut tiang, Q(z), pada
memberikan efek displacement pada tanah di kedalaman tertentu (z), akan menghasilkan
sekitar kolom sehingga dapat memberikan efek variasi nilai seperti yang ditunjukkan pada
pemadatan akibat adanya perubahan rasio pori Gbr. 1b.
dan tegangan pada tanah.
Metode perbaikan tanah dengan nama
Controlled Modulus Column (CMC) pertama
kali dipatenkan oleh Menard pada tahun 1990-
an. Massa komposit antara tanah dan CMC
memiliki kekakuan yang lebih besar
dibandingkan dengan kondisi tanah sebelum
diperkuat sehingga dapat mengurangi
deformasi secara keseluruhan dan mengurangi
penurunan yang terjadi akibat beban struktur
terhadap rentang nilai yang diizinkan Setiaji et
al. (2018). Gbr. 1. Mekanisme Transfer Beban pada Tiang
Konvensional (Das, 2014)
32
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
terbesar pada sistem CMC terjadi pada bidang peralatan konstruksi bekerja di atas tanah pada
ini. saat proses instalasinya.
5.1 Lokasi
4 LOAD TRANSFER PLATFORM (LTP) Studi kasus dalam penelitian dilakukan pada
Load Transfer Platform (LTP) merupakan lokasi proyek pekerjaan jalan tol Pemalang –
suatu lapisan berbutir yang terpadatkan dengan Batang, UP Bojong (STA 354+870) dengan
baik yang diletakkan pada bagian atas dari estimasi luas area 4200 m2. Pada lokasi ini
kepala kolom CMC. Fungsi utama dari LTP rencananya akan dilakukan timbunan sebelum
yaitu sebagai penyalur beban dari struktur yang jembatan (oprit) setinggi 8 m.
bekerja menuju kolom CMC. Tujuan lain
penggunaan LTP juga dapat digunakan sebagai
working platform yang memungkinkan
33
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
34
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
6 HASIL ANALISIS
35
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
perkuatan CMC penurunan yang terjadi di
lapisan 1 yaitu sebesar 69.02%.
36
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Hasil perhitungan dimensi lengkung spiral
yang terbentuk pada lapisan LTP berdasarkan
← Elevasi (m)
pendekatan diagram Prandtl menunjukkan beban aksial (kN)
tinggi lengkung sebesar 0.8 m, seperti yang
ditunjukkan pada Gbr 15.
7 KESIMPULAN
37
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
DAFTAR PUSTAKA Larisch, M. 2014. Behaviour of stiff, fine-grained soil
during the installation of screw auger displacement
Abuhuroyroh, K., Bechet, O., & Utomo, P. 2011. piles. Queensland: The University of Queensland.
Application of Controlled Modulus Columns (CMC) Setiaji, R. R., Utomo, P., & Abuhuroyroh, K. 2018. A
for Large Storage Tank in Indonesia. New Breakthrough – Application of Control
ASIRI. 2012. Recomendations for the desain, Modulus Column for Settlement and Stability
contruction and control of rigid inclusion ground Control under Soft Soil and High Embankment Load
improvements. at Pemalang-Batang Toll Road. SEAGC. 2018
Das, B. M. 2016. Principles of Foundation Engineering.
Global Engineering: Timothy L. Anderson.
38
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Likuifaksi merupakan suatu fenomena hilangnya kuat geser tanah karena adanya penambahan
tekanan air pori akibat beban gempa yang terjadi pada tanah nonkohesif. Tanah berpotensi likuifaksi akan
berubah sifatnya menjadi cairan sehingga membahayakan bangunan yang berada di atasnya. Oleh karena itu,
perlu adanya upaya perbaikan pada tanah berpotensi likuifaksi. Dynamic Compaction (DC) merupakan salah
satu metode perbaikan tanah yang paling sering digunakan untuk mitigasi likuifaksi. Prinsip dari DC yaitu
meningkatkan kekuatan tanah pasir lepas dengan cara memberikan energi pada tanah sehingga tanah menjadi
padat. Pada penelitian ini akan dilakukan analisis pengaruh perbaikan tanah menggunakan DC pada area
runway di Proyek Pembangunan New Yogyakarta International Airport (NYIA). Analisis yang dilakukan yaitu
membandingkan nilai kepadatan relatif (Dr) sebelum dan setelah perbaikan menggunakan DC. Hasil dari
analisis menunjukkan bahwa adanya kenaikan nilai Dr sebesar 43% pada tanah padat sedang, 30% pada tanah
padat, dan 1 % pada tanah sangat padat.
Kata Kunci: likuifkasi, mitigasi, dynamic compaction, new Yogyakarta international airport, kepadatan
relatif
ABSTRACT: Liquefaction is a phenomenon of shear strength lose due to increasing of pore water pressure
that occurs by earthquake on saturated noncohesive soil. Behavior of soil with liquefaction potential could be
issue for building on the ground surface. Therefore, ground improvement is needed to be apply on soil with
liquefaction potentially. Dynamic Compaction (DC) is one of the most soil improvement methods that
commonly used in order to mitigation of liquefaction hazard. The principle of DC is to increase the strength
of loose sand soil by providing energy until the soil mass becomes densify. In this study, analysis of soil
improvement effect using DC will be taken in the runway area of the New Yogyakarta International Airport
(NYIA) Project. The analysis carried by comparing relative density value of soil (Dr) in case before and after
improvement. The results of the analysis indicated that there was an increase in Dr value by 43% in medium
dense soil, 30% in dense soil, and 1% in very dense soil.
Keyword: liquefaction, mitigation, dynamic compaction, new Yogyakarta international airport, relative
density
39
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
likuifaksi tergantung dari beberapa parameter, Gbr. 2 merupakan beberapa contoh kenaikan
seperti kepadatan relatif tanah (Dr), jumlah derajat kepadatan menggunakan DC dengan
partikel lempung di antara partikel granular, beberapa nilai derajat kepadatan awal.
dan drainase yang terjadi (Jitno, 2015). Syarat Sedangkan Gbr. 3 menunjukkan variasi
terjadinya likuifaksi: beberapa kenaikan derajat kepadatan (Ir)
a. Pasir lepas dan jenuh air berbanding kedalaman untuk lokasi yang
b. Beban gempa atau pembebanan yang berbeda.
cepat
c. Ketika tegangan efektif sama dengan nol.
Indonesia merupakan wilayah rawan
terhadap bahaya gempa karena Indonesia
berada di antara tiga lempeng besar bumi yang
aktif. Peristiwa gempa yang sering terjadi di
Indonesia merupakan akibat dari proses
pergerakan lempeng tektonik. Katalog kejadian
gempa di Indonesia dapat dilihat pada Gbr. 1.
= (1)
40
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2 DYNAMIC COMPACTION g. Jumlah tumbukan dan fase yang dapat
dihitung dengan Pers. (5).
Pengertian Dynamic Compaction (DC)
menurut Han (2015), yaitu metode perbaikan AE = (5)
tanah dengan cara menurunkan beban (tamper) halmana:
secara bebas dari ketinggian tertentu ke N = jumlah tumbukan pada satu lintasan
permukaan tanah dengan pola untuk di titik tumbuk (umumnya 5-10
memadatkan geomaterial yang bermasalah tumbukan)
hingga kedalaman yang cukup dalam. Adapun W = berat tamper (ton)
berat tamper yang umum digunakan yaitu H = tinggi jatuh (m)
sebesar 5-40 ton dan tinggi jatuhnya setinggi A = luas pengaruh (ekuivalen) di titik
10-40 m, yang dapat memperbaiki tanah hingga pemadatan (A = s2 untuk pola segiempat
kedalaman lebih dari 10 m. atau 0.867 s2 untuk pola triangular)
Menard dan Broise (1975) mengusulkan s = spasi tumbukan (m)
teori Dynamic Compaction untuk menjelaskan
bahwa tanah berbutir halus yang jenuh dapat Gbr. 4 menunjukkan perubahan volume,
diperkuat dengan cara menjatuhkan tamper tekanan air pori berlebih, dan kekuatan tanah
secara berulang. Para peneliti tersebut selama dan setelah tumbukan.
menghubungkan Dynamic Compaction dengan
4 (empat) mekanisme utama, yaitu:
a. Kompresibilitas tanah jenuh
b. Generation dan disipasi tekanan air pori
berlebih
c. Perubahan permeabilitas
d. Thixotropic recovery
Menurut Han (2015), terdapat faktor-faktor
yang sangat berpengaruh terhadap hasil dari
metode DC, yaitu sebagai berikut:
a. Jenis tanah yang cocok untuk DC
b. Kedalaman perbaikan yang dapat
dihitung dengan Pers. (2).
D =n WH (2)
halmana:
D = kedalaman perbaikan (m)
W = berat tamper (ton)
H = tinggi jatuh (m)
n = konstanta, tergantung pada jenis
tanah, derajat kejenuhan, dan kecepatan
tumbukkan.
Gbr. 4. Perbedaan Volume, Tekanan Air Pori
c. Bentuk dan berat tamper Berlebih, dan Kekuatan Tanah Selama dan
d. Tinggi jatuh dan energi yang dapat Setelah Proses Tumbukan (Setelah Menard dan
dihitung dengan Pers. (3). Broise, 1975)
.
H = (W H ) (3)
W H merupakan energi per tumbukan 3 LOKASI STUDI KASUS
dari tamper (ton-m), yang ditentukan dari
persamaan menghitung kedalaman Lokasi studi kasus yang akan ditinjau yaitu di
perbaikan yang dibutuhkan. area Pembangunan New Yogyakarta
e. Pola dan spasi tumbukan International Airport (NYIA) di Kulon Progo
Yogyakarta. Pada lokasi tersebut merupakan
f. Kedalaman crater yang dapat dihitung
daerah yang memiliki kecepatan pergerakan
dengan Pers. (4). lempeng tektonik yang cukup besar.
.
d = 0.028N WH (4)
41
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Kondisi tanah di lokasi Pembangunan NYIA 4 METODE PENELITIAN
merupakan pasir lepas jenuh air dan berada di
wilayah tektonik yang tinggi, sehingga akan
berpotensi mengalami likuifaksi (Gbr. 5). Oleh 4.1 Penentuan Lokasi yang akan Ditinjau
karena itu perlu upaya mitigasi dari bahaya Lokasi yang akan diteliti di seluruh area
likuifaksi. Pembangunan NYIA ini yaitu area runway.
Pada Pekerjaan Pembangunan Bandara Pada area runway, pekerjaan SPT dilakukan
NYIA ini, metode perbaikan DC diusulkan sebanyak 16 titik untuk pre-DC (warna kuning)
untuk menangani masalah tanah pasir lepas dan 30 titik untuk post-DC (warna merah) yang
yang berpotensi likuifaksi. Adapun pekerjaan ditunjukkan pada Gbr. 8.
DC dilakukan untuk sisi udara, yaitu runway,
taxiway, apron. Perbaikan tanah dengan DC di
lokasi Pembangunan NYIA ditunjukkan pada
Gbr. 6 di bawah ini, sedangkan Gbr.7
menunjukkan pembentukan crater akibat
pemadatan dengan DC.
42
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
percepatan puncak di permukaan (PSA) sebesar berbanding lurus dengan tekanan overburden
0.4 g. efektif pada pasir yang dapat dilihat pada Pers.
Analisis potensi likuifaksi dilakukan (6) dan Pers. (7) .
berdasarkan data SPT yang didapatkan dari N = 17 + 24 Dr (6)
pengujian di lapangan sebelum dilakukannya
perbaikan tanah (pre-DC). Metode analisis N adalah nilai dari SPT, ′ adalah tekanan
yang digunakan yaitu dengan metode overburden efektif dalam kPa dan Dr adalah
perhitungan yang diusulkan oleh Seed dan Idris kepadatan relatif yang dinyatakan sebagai
(1971). rasio, bukan persentase. Nilai Dr dapat dicari
Tahapan evaluasi potensi likuifaksi menurut dengan persamaan berikut, dimana nilai Dr
Seed dan Idriss (1971), yaitu: yang dihasilkan dinyatakan dalam persen.
a. Menentukan nilai Cyclic Stress Ratio
(CSR) D = 21 (7)
.
b. Menentukan nilai Cyclic Resistance Ratio
(CRR) berdasarkan data N-SPT Pada pekerjaan pembangunan bandara ini,
c. Menentukan nilai Magnitude Scaling telah dibuat sebuah kriteria desain berupa nilai
parameter tanah minimum agar tanah dapat
Factor (MSF) kuat menahan beban gempa sehingga tidak
d. Menghitung nilai Factor of Safety menyebabkan terjadinya likuifaksi. Kriteria
terhadap likuifaksi. desain minimum yang digunakan untuk nilai Dr
yaitu sebesar 70%.
Analisis potensi likuifaksi ditentukan
dengan beberapa persyaratan, yakni letak muka
air tanah, nilai faktor keamanan, nilai (N1)60, 5 HASIL DAN PEMBAHASAN
kedalaman, dan jenis tanah. Kondisi likuifaksi
terjadi apabila memenuhi 5 (lima) persyaratan Hasil analisis potensi likuifaksi sebelum adanya
tanah terlikuifaksi sebagai berikut: perbaikan (pre-DC) ditunjukkan pada Tabel 2.
a. Berada di bawah muka air tanah Pada area runway seperti yang ditunjukkan
b. Nilai faktor keamanan kurang dari 1.3 pada Tabel 2 dapat dilihat bahwa tanah yang
c. Nilai (N1)60 kurang dari 30 (Youd dkk, berpotensi likuifaksi rata-rata berada di
2001) kedalaman 2 – 4 m, akan tetapi terdapat titik bor
d. Kedalaman kurang dari 20 m dengan kedalaman tanah berpotensi likuifaksi
e. Jenis tanah, yaitu tanah pasir. mencapai 6 – 8 m.
Hasil dari analisis pada kedalaman 0 – 6 m saat
kondisi pre-DC menunjukkan bahwa rata-rata
4.3 Evaluasi Nilai Kepadatan Relatif Tanah nilai Dr tidak mencapai desain kriteria,
sedangkan untuk kondisi post-DC nilai Dr
Berdasarkan data uji yang telah dilakukan oleh
untuk semua lokasi yang ditinjau menunjukkan
Gibbs dan Holtz (1957), Meyerhof (1957)
lebih tinggi dari desain kriteria. Grafik
mengusulkan korelasi antara nilai NSPT dan
hubungan antara nilai Dr dengan kedalamana,
kepadatan relatif tanah (Dr) untuk pasir bersih.
pada kondisi pre-DC dan post-DC ditunjukkan
Menurut Meyerhof (1957) menjelaskan bahwa,
pada Gbr. 9 dan Gbr. 10.
resistensi penetrasi diasumsikan meningkat
dengan kuadrat dari kepadatan relatif dan
43
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Dr (%)
0 20 40 60 80 100 120
0
Kedalaman (m)
8 Kriteria Desain
RW 2
10 RW 7
RW 16
RW 21
12 RW 26
RW 31
14 RW 35
RW 42
RW 47
16
RW 52
RW 57
18
Gbr. 9. Grafik Hubungan antara Nilai Dr dengan Gbr. 10. Grafik Hubunan antara Nilai Dr
Kedalaman Kondisi Pre-DC dengan Kedalaman Kondisi Post-DC
Pada tanah eksisting dengan kedalaman 0 – kelompok dense sebesar 30%, sedangkan untuk
6 m, kepadatan tanah akan dikelompokkan kelompok very dense hanya sebesar 1%.
menjadi 3 (tiga) bagian berdasarkan nilai derjat
kepadatan awalnya (Dr0), yaitu tanah dengan
kepadatan medium dense, dense, dan very 6 KESIMPULAN
dense. Tanah dengan kelompok medium dense
memiliki nilai Dr0 sebesar 40 – 60%, kelompok Setelah dilakukannya analisis pengaruh DC
dense dengan nilai Dr0 sebesar 60 – 80%, terhadap tanah berpotensi likuifaksi, maka
sedangkan very dense dengan nilai Dr0 sebesar dapat ditarik beberapa kesimpulan sebagai
80 – 100%. Hasil analisis menunjukkan bahwa berikut:
pada tanah pasir medium dense rata-rata a. Berdasarkan analisis potensi likuifkasi,
kenaikan nilai Dr yaitu sebesar 43%, untuk kondisi tanah di lokasi pembangunan
44
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
NYIA pada area runway memiliki potensi Lee, F. H., & Gu, Q. 2004. Method for Estimating
Dynamic Compaction Effect on Sand. Journal
likuifaksi pada kedalaman 0 – 6 m.
of Geotechnical and Geoenvironmental
b. Pada kondisi pre-DC, nilai kepadatan Engineering, 130(2), 139-152.
relatif awal (Dr0) kurang dari kriteria Menard, L., & Broise, Y. 1975. Theoretical and Practical
desain yaitu di bawah 70% pada Aspects of Dynamic Compaction.
Geotechnique, 25(1), 3 - 18.
kedalaman tanah berpotensi likuifkasi. Meyerhof, G. G. 1957. Discussion on Research on
c. Perbaikan tanah menggunakan DC dapat Determining The Density of Sands by Spoon
meningkatkan nilai Dr sebesar 43% untuk Penetration Testing. Proc. 4th Int. Conf. on
SMFE, 3, p. 110.
tanah medium dense, 30% untuk tanah Oshima, A., & Takada, N. 1997. Relation between
dense, dan 1% untuk tanah very dense. Compacted Area and Ram Momentum by
d. Metode perbaikan dengan Dynamic Heavy Tamping. 14th International Conference
Compaction dapat mengurangi potensi on Soil Mechanics and Foundation
Engineering. Hamburg.
likuifkasi di lokasi pembangunan NYIA Pusgen. 2017. Peta Sumber dan Bahaya Gempa
pada area runway berdasarkan nilai Indonesia Tahun 2017. Jakarta: Pusat Litbang
kepadatan relatifnya. Perumahan dan Permukiman.
Pramana, I.M.W. 2015. Analisis Potensi Likuifaksi
dengan Data SPT dan CPT (Studi Kasus:
Kawasan Benoa Denpasar). Bachelor Thesis,
DAFTAR PUSTAKA Universitas Udayana.
Seed, H. B., & Idriss, I. M. 1971. Simplified Procedure
Gibbs, H. J., & Holtz, W. G. 1957. Research on for Evaluating Soil Liquefaction Potential.
Determining The Density of Sands by Spoon Journal of Soil Mechanics and Foundation
Penetration Testing. Proc. 4th Int. Conf. on Division, 97 (SM9), 1249 - 1273.
SMFE, 1, pp. 35-39. Youd, T. L., Idriss, I. M., Andrus, R. D., Arango, I.,
Han, J. 2015. Principles and Pratice of Ground Castro, G., Christian, J. T., . . . Stokoe II, K. H.
Improvement. New Jersey, Canada: John Wiley 2001. Liquefaction Resistance of Soils,
& Sons. Summary Report from the 1996 NCEER and
Jitno, H. 2015. Catatan Kuliah Topik Khusus Rekayasa 1998 NCEERR/NSF Workshop on Evaluation
Geoteknik, 2015. of Liquefaction Resistance of Soils. Journal of
Geotechnical and Geoenviromental
Engineering.
45
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Kolom Grout Modular (KGM) adalah metode perbaikan tanah dengan menggunakan
semi–rigid kolom grout-semen untuk meningkatkan daya dukung tanah sehingga masalah penurunan
dan angka keamanan timbunan dapat dipecahkah. Pemasangan KGM sendiri dilakukan dengan
menggunakan auger yang dirancang khusus yang dapat membentuk kolom grout-semen dengan
diameter tertentu dan tidak menimbulkan material buangan di lapangan. Jalan Tol Pemalang - Batang
yang memiliki panjang 39.2 km dengan 13 jembatan akan dikonstruksi di atas tanah lunak. Dalam
proyek ini 13 lokasi jembatan tersebut menggunakan Metode KGM. Lokasi penelitian ini
difokuskan pada lokasi Oprit Jembatan Sungai Gresek. Perbaikan tanah menggunakan Metode
KGM dipilih untuk meningkatkan daya dukung tanah sehingga mengurangi penurunan tanah dan
meningkatkan faktor angka keamanan terhadap stabilitas timbunan oprit jembatan dalam waktu
yang relatif cepat.
Kata Kunci: jalan tol, kolom grout modular (KGM), penurunan, angka keamanan, stabilitas, timbunan
ABSTRACT: Grout Modular Column (KGM) is a ground improvement technique which is installed
by forming semi-rigid column grout cement to enhance global stiffness of soil mass so that issues
such as settlement and slope stability can be controlled. The installation of KGM itself is performed
using a specially designed auger element that able to can form a grout-cement column with a certain
diameter and does not cause waste material in the field. Pemalang - Batang Toll Road which has
39.2 km length with 13 embankments at bridges approach will be constructed above soft soil. In this
project 13 locations at bridge approach are improved using KGM Method. This research focused on
location named Gresek Under Bridge. Soil improvement using the KGM Method was chosen to
enhance the capacity of soil so can it reduce the settlement and increase the safety factor of the
embankment bridge approach stability in the fast time.
Keywords: toll road, grout modular column (KGM), settlement, safety factor, stability, embankment
46
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
jalan tol ini rencananya akan memiliki panjang Rumus yang digunakan sebagai berikut:
39.2 km yang dikelola oleh PT Pemalang
Batang Tol Road. Tol ini terbagi menjadi 2 Q + Fn = Fq + Qp (1)
seksi: Seksi I (Pemalang - Pekalongan)
panjang 20.05 km dan Seksi II (Pekalongan - Metode perbaikan tanah dengan
Batang) panjang 16.7 km. menggunakan KGM memiliki beberapa
Lokasi penelitian ini terletak pada timbunan kelebihan sebagai berikut:
Oprit Jembatan Kali Gresek, Jembatan tersebut a. Tidak menimbulkan getaran saat
memiliki bentang 25.6 m. Tinggi timbunan instalasi sehingga relatif tidak
pada oprit Jembatan Kali Gresek adalah 5.9 m. mengganggu lingkungan sekitar.
Konstruksi oprit timbunan terdapat pada tanah b. Proeses instalasi menghasilkan material
lunak yang dalam yang akan mengakibatkan buangan yang relatif sedikit.
penurunan tanah yang besar, sehingga c. Tidak memerlukan penyemprotan air dan
membutuhkan perbaikan tanah dasar. udara dengan tekanan tinggi seperti pada
Metode perbaikan tanah yang digunakan umumnya metode soil mixing, dimana
pada lokasi penelitian adalah menggunakan proses tersebut dapat mengganggu
Kolom Grout Modular (KGM). lingkungan sekitar.
47
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2.2 Load Transfer Platform (LTP) 2.4 Data Tanah
Load Transfer Platform (LTP) yaitu suatu Penyelidikan tanah yang terdapat pada lokasi
material yang diletakkan di atas pondasi tiang penelitian dapat dilihat pada gambar. Terdapat
pancang / kolom pada kasus ini yaitu Kolom 4 Sondir (CPT) pada lokasi penelitian yang
Grout Modular (KGM) dimana Load Transfer dilakukan oleh PT. Soilens dan 2 Borelog
Platform (LTP) berfungsi menyalurkan beban (SPT) sebelum konstruksi oleh KSO Reka
timbunan menuju kolom yang menahan Menard. Analisa pada penelitian ini lebih
tegangan bawah tanah secara efisien. dikhususkan pada konstruksi timbunan
Load transfer platform merupakan suatu dibelakang abutment A1 Jembatan UB Kali
lapisan yang terdiri dari material granular Gresek.
diperkuat dengan adanya geotekstil/geogrid.
SO.I-177
SO.II-1
SO.I-175
UB Kali Gresek
STA 353+200 8
10
Kedalaman (m)
12
14
18
20
22
24
SO-I-175 SO-I-176
SO-I-177 Desain Line
Gbr. 4. Aktual Lapangan Jembatan Kali Gresek Gbr. 6. Design Line Hasil Olah Data CPT
48
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Tabel 1. Parameter Tanah
Soil k c Eref
No
Type (m/day) (kN/m³) kPa ( o) kPa
LTP
1 8.64E-1 19 1 35 35000
(Sirtu)
0.00
Clay
2 8.64E-5 16 5 10 2250
N= 3
5.00 Sandy
3 Clay 8.64E-3 17 5 25 5,250
N= 7
10.00 Clayey
4 Sand 8.64E-4 17 2 28 4500
N= 6
15.00 Clay
5 8.64E-4 17 7 21 6000
N= 8
Clayey
20.00 6 8.64E-4 17 7 21 9000
N= 12
Clayey
25.00 7 Silt 8.64E-3 17 7 21 12500
N= 17
Gravelly
30.00 8 Sand 8.60E-0 19 5 35 84000
N = 60
9 Backfill 8.64E-1 19 5 28 18000
49
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2.6.1 Axisymmetric Model
50
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
b. Axial forces maksimum 232.9 kN/m.
Gbr. 15. Keluaran Axial Forces Gbr. 18. Angka Keamanan Long Term
DAFTAR PUSTAKA
51
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Studi ini menyajikan pemetaan tanah lunak di Surabaya Timur, Indonesia, yang dapat
digunakan sebagai referensi untuk desain perbaikan tanah menggunakan Prefabricated Vertical Drain (PVD).
Data pengujian tanah lapangan dan data uji laboratorium, terutama pengujian konsolidasi, digunakan sebagai
referensi dalam penelitian ini. Penelitian ini juga membahas hubungan koefisien konsolidasi (Cv) dengan
berbagai jarak PVD. Metode statistik sederhana diterapkan dalam menganalisis data tanah di Surabaya timur.
Sistem informasi geografis (GIS) diterapkan untuk membuat peta tanah lunak dalam lingkup penelitian ini.
Peta yang dihasilkan adalah peta kedalaman tanah lunak termasuk panjang pengaliran (Hdrainage), pemetaan
nilai Cv, dan peta waktu selesainya konsolidasi di wilayah studi. Penelitian ini bertujuan untuk memudahkan
perencana dalam mendesain perbaikan tanah dengan menggunakan PVD, khususnya di daerah Surabaya
Timur dan daerah lain yang memiliki karakteristik tanah yang mirip dengan data dalam penelitian ini.
Kata Kunci: PVD, pemetaan, GIS, tanah lunak, koefisien konsolidasi, perbaikan tanah
ABSTRACT: This study presents soft soils mapping in East Surabaya, Indonesia, that can be used as a
reference for soil improvement design using Prefabricated Vertical Drain (PVD). Field testing data and
laboratory test data, especially consolidation testing, are used as a reference in this study. This study also
discusses the coefficient of consolidation (Cv) with various spacing of PVD. Simple statistical methods are
applied in analyzing soil data in east Surabaya. Geographic information systems (GIS) are applied to create
soft soil maps within the scope of this study. The resulting maps are a map of soft soil depths including
drainage length, mapping of Cv values, and map of the time of completion of consolidation in the study area.
This study aims to facilitate planners in designing soil improvement using PVD, especially in East Surabaya
and other areas that have soil characteristics similar to the data in this study.
Keywords: PVD, mapping, GIS, soft clay, coefficient consolidation, soil improvement
52
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Efektivitas penggunaan PVD sebagai metode kondisi tanah sebagai parameter desain dasar
perbaikan tanah telah diteliti dan diterapkan untuk konstruksi PVD.
pada berbagai aspek telah diterbitkan oleh Tujuan dari penelitian ini adalah untuk
Shen et al. (2005), Chu et al. (2006), dan menentukan zonasi parameter dan pemetaan
Abuel-Naga et al. (2006). PVD digunakan tanah untuk desain PVD di wilayah Surabaya
untuk mengurangi panjang aliran air di pori- Timur dan menghasilkan grafik variasi Cv
pori tanah dan untuk mempercepat laju versus waktu dan jarak efektif pemasangan
penurunan. Hasil akhir dari desain PVD PVD. Jenis peta yang dihasilkan dari
berupa jarak dan konfigurasi pemasangan penelitian ini adalah: peta distribusi nilai Cv;
PVD. Desain PVD memerlukan koefisien peta kedalaman tanah compressible dan lama
konsolidasi (Cv), yang dapat diperoleh dari tes waktu selesainya konsolidasi. Analisis akan
laboratorium. Oleh karena itu, nilai CV dalam dilakukan dengan menggunakan variasi
desain PVD sangat penting. koefisien konsolidasi (Cv) yang diperoleh dari
Desainer PVD selalu perlu menghitung Laboratorium Mekanika Tanah dan Batuan,
ulang instalasi desain PVD di setiap area Teknik Sipil ITS. Zonasi yang dihasilkan
dengan data tanah yang berbeda. Setiap jenis berasal dari pemrosesan data kemudian
tanah, dengan konsistensi yang berbeda, akan diverifikasi oleh grafik perhitungan numerik.
memiliki nilai Cv yang berbeda. Oleh karena Grafik ini berupa hubungan koefisien
itu, perhitungan baru selalu dilakukan setiap konsolidasi dengan waktu efektif untuk PVD
kali untuk desain sehingga membutuhkan pada tanah dasar dengan jarak dan pola
waktu yang lama. Namun, dalam beberapa pemasangan yang berbeda. Hasil verifikasi
kasus, engineer PVD melakukan desain tanpa kemudian dibandingkan dengan beberapa hasil
melakukan perhitungan baru, tetapi sebaliknya desain PVD yang telah diterapkan di
menggunakan pengalaman lapangan (dengan lapangan.
kondisi yang seharusnya tidak sama) untuk Hasil penelitian ini diharapkan dapat
mengurangi biaya proyek terkait biaya membantu engineer untuk melakukan desain
konsultasi desain. Jika kondisi tanah perbaikan tanah lunak menggunakan PVD,
diasumsikan tanpa pengetahuan teknis dan terutama di daerah Surabaya Timur dan daerah
pengalaman yang baik, akan ada beberapa lain yang memiliki tanah dasar tanah lempung
kondisi yang dapat merusak struktur yang yang relatif lunak dan kondisi tanah yang
dibangun di atasnya. Kasus terburuk adalah relatif sama dengan yang digunakan dalam ini
longsornya tanah timbunan. Untuk penelitian kali ini.
menghindari kondisi yang disebutkan di atas,
perlu menetapkan daerah zonasi referensi
(pemetaan data tanah). Pemetaan yang 2. METODOLOGI DAN PARAMETER
diharapkan didasarkan pada variasi koefisien
konsolidasi dari tes laboratorium. Selain
pemetaan perlu juga untuk menghasilkan 2.1 Methodology
grafik jarak pemasangan PVD berdasarkan Penelitian ini dilakukan dalam tiga tahap:
variasi nilai koesfien konsolidasi (Cv). pengumpulan semua data dari hasil tes
Pemetaan dan grafik ini diharapkan dapat laboratorium yang dilakukan oleh
membantu engineer untuk melakukan desain Laboratorium Mekanika Tanah dan Batuan
PVD dengan lebih baik. ITS; persiapan peta zonasi nilai parameter Cv
Studi terbaru tentang pemetaan tanah bawah dan kedalaman tanah; persiapan grafik Cv dan
permukaan di Surabaya Timur dilakukan oleh waktu penyelesaian konsolidasi ketika tanah
Satrya et al. (2014). Hasilnya adalah pemetaan dasar sudah diperbaiki dengan menggunakan
kedalaman tanah bawah tanah di wilayah PVD. Data tanah yang digunakan dalam
Surabaya Timur menggunakan Analisis penelitian ada 95 titik yang tersebar di 55
Gambar Geo-Tomografi. Peta-peta ini hanya lokasi di wilayah Surabaya Timur. Data utama
bertujuan untuk menentukan kedalaman tanah yang digunakan adalah parameter konsolidasi
lunak sebagai tanah dasar untuk desain tanah dasar tanah. Data tersebut kemudian
pondasi dan pemetaan tidak dapat digunakan diolah menggunakan metode statistik
untuk melakukan desain PVD, sehingga ada sederhana untuk mengetahui variasi koefisien
kebutuhan untuk melakukan penelitian lebih konsolidasi. Beberapa data pada kedalaman
lanjut sehingga dapat menghasilkan pemetaan tertentu tidak memiliki parameter konsolidasi,
53
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
d w 2.d m (4)
2.2 Pre-fabricated Vertical Drain
Teori konvensional untuk desain saluran Berdasarkan Rixner et al. (1986), ada 2 jenis
vertikal mengasumsikan bahwa bentuk saluran konfigurasi instalasi PVD; pola persegi
vertikal adalah lingkaran jika dilihat dari panjang atau pola segitiga. Nilai diameter
bentuk sebenarnya (kolom saluran pasir). efektif (De) karena pemasangan PVD
54
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
55
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
distribusi lebih dari 20%, maka data tidak dikelompokkan Mochtar (2010) pada Tabel 1.
dapat diterima dan harus dihilangkan. Dari total 95 titik dengan data hasil
investigasi tanah, 54 titik telah memiliki hasil
tes konsolidasi, dan untuk 41 titik sisanya
3. ANALISIS DATA diperlukan beberapa pendekatan untuk
Analisis data dilakukan pada 95 titik yang menentukan besarnya Cv. Kemudian data
tersebar di 55 lokasi. Dari 95 titik data, hanya lengkap dikorelasikan dengan parameter tanah
35 titik yang memiliki data pengujian lengkap dasar tanah lainnya yang ada menggunakan
di lapangan (N-SPT dan boring). Sementara statistik sederhana. Hasil korelasi dari nilai Cv
itu, 60 titik data lainnya hanya memiliki data dan berat volume berdasarkan data yang
CPT (Cone Penetration Test) yang dapat tersedia dapat dilihat pada Tabel 2.
digunakan untuk menentukan kedalaman
tanah yang mudah memampat. Untuk data
konsolidasi dari 95 titik data hanya memiliki
54 set data konsolidasi yang lengkap. 41 titik
lainnya tidak memiliki data konsolidasi
sehingga korelasi data dilakukan dengan
menggunakan pendekatan statistik sederhana.
Semua titik memiliki data uji volumetrik
gravimetric dari hasil uji laboratorium untuk
setiap sampel dengan kedalaman yang Gbr. 2. Schmertmann Profiling Chart (1978)
ditentukan pada setiap titik uji.
Secara umum, pengujian investigasi tanah Tabel 1. Konsistensi Tanah Kohesif
untuk menentukan parameter tanah dilakukan
dengan mengambil sampel tanah hanya dari Soil Cu qc
NSPT
lapisan tertentu. Pengujian juga dilakukan consistency kPa kPa
untuk menentukan berat unit dan parameter Very Soft 0 -12.5 0 - 2.5 0 - 1000
konsolidasi tanah. Oleh karena itu, 12.5 -
pengelompokan jenis tanah pada setiap Soft 25 2.5 - 5 1000 - 2000
kedalaman tertentu sangat penting untuk Medium 25 - 50 5-10 2000 -4000
memastikan nilai-nilai parameter tanah pada Stiff 50 - 100 10-20 4000 - 7500
jenis tanah tertentu. 100 - 7555 -
Selain itu, jenis tanah di setiap lapisan juga Very Stiff 200 20-40 15000
menentukan kondisi drainase di lapisan tanah
Hard > 200 > 40 > 150
lunak. Kondisi drainase tunggal (single drain) Sumber Mochtar (2010)
terjadi ketika lapisan-;lpaisan tanahnya beruoa
tanah lempung dan kondisinya adalah drainase Tabel 2. Korelasi Nilai Cv dan Berdasarkan Data
ganda ( double drainage) ketika lapisan tanah Konsolidasi dari Lab Mekanika Tanah ITS
yang mudah mempat diapit oleh lapisan tanah
pasir. Nilai-nilai tersebut menentukan lamanya t (t/m3) Cv (cm2/s)
waktu yang diperlukan untuk pemampatan 1.1-1.299 0.000562882
tanah dalam arah vertikal. 1.3-1.399 0.000550174
Namun, dari 95 titik yang ada terdapat 60 1.4-1.45 0.000463571
titik data uji yang tidak memiliki nilai bore log 1.451-1.499 0.000577875
atau NSPT lengkap. Untuk menentukan jenis
1.5-1.55 0.000430286
tanah dan jumlah NSPT, setiap lapisan tanah
akan didekati menggunakan hasil uji sondir 1.551-1.599 0.000437
seperti yang telah dilakukan dalam penelitian 1.6-1.65 0.000510778
sebelumnya tentang Pemetaan Tanah Dasar di 1.651-1.699 0.000598
wilayah Surabaya Timur Satrya, et al. (2013). 1.7-1.99 0.000663417
Pendekatan ini menggunakan Schmertmann
Profiling Chart Schmertmann (1978) pada
Gbr. 2 berdasarkan nilai cone resistance (Cn),
rasio gesekan (Fr) yang diperoleh dari hasil
sondir dan konsistensi tanah yang
56
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
57
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
DAFTAR PUSTAKA
58
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Akagi, T. 1977. Effect of mandrel driven sand drains on Conference on Soil Mechanics and Foundation
strength. In Proc. 9th International Conference Engineering, vol. 3, Stockholm.
on Soil Mechanics and Foundation Engineering, Hansbo, S. 1987. Design aspects of vertical drains and
Tokyo, vol.1: 3-6. lime column installation. In Proc. 9th Southeast
Ardana, M. S., Mochtar, I. B. 1999. Pengaruh Asian Geotechnical Conference, vol. 2(8): 1-12.
Tegangan Overburden Effective dan Platisitas Hansbo, S. 1994. Foundation Engineering. Amsterdam:
Tanah Terhadap Kekuatan Geser Undrained Elsevier Science B.V.
Tanah Lempung Berkonsistensi Sangat Lunak Hansbo, S. 1997. Practical aspects of vertical drain
Sampai Kaku yang Terkonsolidasi Normal. design. In Proc. 14th International Conference on
Master Thesis Program, Pasca Sarjana, Teknik Soil Mechanics and Foundation Engineering, vol.
Sipil ITS. 3, Hamburg.
Barron, R. A. 1948. Consolidation of fine-grained soils Holtz, R. D. 1987. Preloading with prefabricated
by drain wells. Transactions of ASCE, 113, paper vertical strip drains. Geotextiles and
2346: 718-724. Geomembranes, 6(1-3): 109-131.
Basset, R. H. and Yeo, K. C. 1988. The behavior of Holtz, R. D. et al. 1991. Prefabricated Vertical Drains:
reinforced trial embankment on soft shallow Design and Performance. CIRIA ground
foundation. In Proc. Int. Geotechnical Symposium engineering report: ground improvement. Oxford:
on Theory and Practice of Earth Reinforcement, Butterworth- Heinemann.
Fukuoka, Kyusu. Japan. Rotterdam: A. A. Hongjun, L. and Longtan, S. 2011. Three-dimensional
Balkema: 371-376. finite element limit equilibrium method for slope
Bergado, D. T., Alfaro, M. C., Balasubramaniam, A. S. stability analysis based on the unique sliding
1993. Improvement of soft Bangkok Clay using direction. Geotechnical Special Publication, 216:
vertical drains. Geotextiles and Geomembranes, 48-55
12: 615-663. Humphrey, D. N., Holtz, R. D. 1987. Reinforced
Bergado, D. T., Anderson, L. R., Miura, N., embankments - a review of case histories.
Balasubramaniam, A. S. 1996. Soft ground Geotextiles and Geomembranes, 6(4): 129-144.
improvement in lowland and other environments. Indraratna, B., Redana, I. W. 1998. Laboratory
New York: ASCE Press. determination of smear zone due to vertical drain
Bergado, D. T., Manivannan, R., Balasubramaniam, A. installation. Journal of Geotechnical Engineering,
S. 1996. Proposed criteria for discharge capacity ASCE, 125(1): 96-99.
of prefabricated vertical drains. Geotextiles and Jamiolkowski, M., Lancellotta, R. 1981. Consolidation
Geomembranes, 14: 481-505. by vertical drains - uncertainties involved in
Bergado, D. T., Balasubramaniam, A. S., Fannin, R. J., prediction of settlement rates. Panel discussion,
Anderson, L. R, Holtz, R. D. (V. R. Schaefer Proc. 10th International Conference on Soil
(Ed.) 1997. Fullscale fill test of prefabricated Mechanics and Foundation Engineering,
vertical drain (PVD) on soft Bangkok Clay and Stockholm, vol. 1: 345-451.
subsiding environment in ground improvement, Jamiolkowski, M., Lancellota, R. and Wolski, W. 1983.
ground reinforcement, ground treatment. New Precompression and speeding up consolidation. In
York: ASCE: 372-393. Proc. 8th European Conference on Soil
Bergado, D. T., Balasubramaniam A. S., Fannin, R. J., Mechanics and Foundation Engineering, vol. 3,
Holtz R. D. 2002. Prefabricated vertical drains Helsinki.
(PVD) in soft Bangkok clay: a case study of the Johnson, S. I. 1970. Foundation precompression with
new Bangkok International airport project. vertical sand drains. Journal of the Soil
Canadian Geotechnical Journal, 39: 304-315. Mechanics and Foundation Division, 96(SM1):
Bishop, A. W. 1955. The use of slip circles in the 145-175
stability analysis of earth slopes. Geotechnique, Karunaratne, G. P., Chew, S. H., Leong, K. W., Wong,
5(1): 7-17. W. K., Lim, L. H., Yeo, K. S., Hee, A. M. 2003.
Chu, J., Bo, M. W., Choa, V. 2004. Practical Installation stress in prefabricated vertical drains.
considerations for using vertical drains in soil Journal of Geotechnical and Geoenvironmental
improvement projects. Geotextiles and Engineering, 129 (9): 858-860.
Geomembranes, 22: 101-117. Kremer, R. H. J., Oostveen, J. P., van Weele, A. F., De
Fellenius, W. 1936. Calculation of the stability of earth Jager, W. F. J., Meyvogel, I. J. 1983. The quality
dams. Trans. 2nd Cong. on Large Dams, vol. 4: of vertical drainage. In Proc. 8th European
445. Conference on Soil Mechanics and Foundation
Fowler, J., Koerner, R. M. 1987. Stabilization of very Engineering, vol. 2, Helsinki.
soft soils using geosynthetics. In Proc. Li, A. L., Rowe, R. K. 2001. Combined effects of
Geosynthetics ‘87 Conference, New Orleans, vol. reinforcement and prefabricated vertical drains on
1: 289-299. embankment performance. Canadian
Hansbo, S. 1979. Consolidation of clay by band-shaped Geotechnical Journal, 38: 1266-1282.
prefabricated drains. Ground Engineering, 12(5): Lo, D. O. K., Mesri, D. 1994. Settlement of test fills for
16-25. Chek Lap Kok airport in vertical and horizontal
Hansbo, S. 1981. Consolidation of fine-grained soils by deformations of foundations and embankment.
prefabricated drains. In Proc. 10th International
59
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
New York: ASCE, edited by A.T. Yeung and G. Rowe, R. K., Soderman, K. L. 1984. Comparison of
Felio: 1082-1099. predicted and observed behaviour of two test
Lockett, L., Mattox, R. M. 1997. Difficult soil problems embankments. Geotextiles and Geomembranes,
on Cochrane Bridge finessed with geosynthetics. 1(2) : 143-160.
In Proc. Geosynthetics ‘87 Conference, New Rowe, K. R., Taechakumthorn, C. 2008. Combined
Orleans, 1: 309-319 effect of PVDs and reinforcement on
Rixner, J. J., Kraemer, S. R., Smith, A. D. 1986. embankments over rate-sensitive soils.
Prefabricated vertical drains, Vol. I, II, and III: Geotextiles and Geomembranes, 26: 239-247.
summary of research report-final report. Federal Schimelfenyg, P., Fowler, J., Leshchinsky, D. 1990.
Highway Administration. Report No. FHWA- Fabric reinforced containment dike, New Bedford
RD-86/169, Washington, D.C.: 433. superfund site. In Proc. 4th Int. Conference on
Rowe, R. K., Soederman, K. L. 1987. Reinforcement of Geotextiles, Geomembranes and Related
the embankment on soils whose strength Products, The Hague, 1: 149-154.
increases with depth. In Proc. Geosynthetics ‘87 Terzaghi, K. 1943. Theoretical Soil Mechanics. New
Conference, New Orleans, vol. I: 266-277. York: John Wiley.
Rowe, R. K. (1984). Reinforced embankment: Analysis Yeung, A. T. 1997. Design curves for prefabricated
and design. Journal of Geotechnical Engineering, vertical drains. Journal of Geotechnical and
ASCE, 110(GT2) : 231-246. Geoenvironmental Engineering, 123(8): 755-759.
60
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Pembangunan konstruksi Jalan Tol Ruas Pemalang Batang merupakan salah satu bagian dari
pembangunan serentak Jalan Tol Transjawa dari Banten hingga Banyuwangi yang mempunyai panjang total
± 39 km. Dari data soil investigasi berupa Borlog dan Sondir diperoleh tanah lunak (compressible) hingga
kedalaman lebih dari 15 m. Vacuum Consolidation Method merupakan salah satu soil treatment yang
digunakan dari beberapa soil treatment lainnya dengan panjang penanganan ± 4.6 km. Sistem Vacuum
Consolidation Method yang menggunakan pompa yang berkekuatan tekanan hingga 80 kPa dikhawatirkan
dapat mengganggu fungsi pondasi pada area struktur Jalan Tol khususnya pada Box Jalan. Dengan tinggi
timbunan pada Oprit Box Jalan hingga 5 s.d 8 m, maka metode soil treatment yang dipilih sebagai transisi
antara area Vacuum Consolidation Method dengan Box Jalan adalah dengan Minipile dengan Platform.
Pondasi minipile yang digunakan berbentuk kotak dengan ukuran 20x20 cm dengan Platform berupa
sirtu/granular setebal 1.5 m sebagai Load Transport Platform (LTP), hal ini dilakukan untuk
mempertimbangkan safety factor dan besar settlement yang terjadi sesuai dengan kriteria yang disyaratkan.
Kata Kunci: minipile dengan platform, vacuum consolidation method, box jalan, tanah lunak
ABSTRACT: The construction of the Pemalang Batang Toll Road is one part of the simultaneous
construction of the Transjawa Toll Road from Banten to Banyuwangi which has a total length ± 39 km.
From soil investigation data in the form of Borlog and Sondir, soft soil (compressible) was obtained to a
depth of more than 15 m. Vacuum Consolidation Method is one of soil treatment used from several other soil
treatment with a handling length of ± 4.6 km. It is feared that system of Vacuum Consolidation Method
which uses pumps with pressure up to 80 kPa can disturb the function of the foundation of Toll Road
structures, especially on the Road Box. With an embankment height on the Oprit Box Road until 5 to 8 m, the
soil treatment method chosen as a transition between the area of the Vacuum Consolidation Method and the
Road Box is Minipile with Platform. The minipile foundation used is in the form of a box with a size of 20x20
cm with a 1.5 m thick Platform as a Load Transport Platform (LTP), this is done to consider the safety factor
and the amount of settlement that occurs in accordance with the required criteria.
Keywords: minipile with platform, vacuum consolidation method, road box, soft soil
1 PENDAHULUAN
segala aspek kehidupan yang berhubungan
Pulau Jawa merupakan pulau dengan populasi dengan masyarakat juga mempunyai
penduduk terpadat di Indonesia yang jumlah pertumbuhan paling tinggi. Keadaan tersebut
populasinya mencapai lebih dari 50% dari turut memaksa pemerintah melalui Lembaga
total penduduk Indonesia. Dengan data terkait untuk menyusun program pemerintahan
populasi penduduk paling besar untuk menunjang pertumbuhan masyarakat di
mengakibatkan dari Pulau Jawa.
61
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Salah satu program yang dicanangkan oleh 2.2 Vacuum Consolidation Method (VCM)
pemerintah adalah program peningkatan Metode Vacuum Consolidation merupakan
infrastuktur yang diantaranya adalah suatu sistem unyuk mempercepat konsolidasi
pembangunan Jalan Tol Trans Jawa yang tanah dengan melakukan pemompaan vakum
rencananya akan dibangun sepanjang 1.167 pada tanah lunak dengan maksud untuk
km yang dimulai dari Merak yang berakhir di mengurangi kadar air maupun kadar udara
Banyuwangi. pada butiran tanah.
Jalan Tol Pemalang Batang mempunyai
panjang ± 39.2 km yang merupakan salah satu
dari ruas Jalan Tol Trans Jawa yang
diresmikan pemerintah pada Desember 2018
lalu. Jalan Tol Pemalang Batang berlokasi di
Jawa Tengah melewati 3 daerah yaitu
Pemalang, Pekalongan dan Batang yang
terbagi menjadi 2 Seksi yaitu Seksi 1
(Pemalang - Pekalongan) dengan panjang
20.05 km dan Seksi 2 (Pekalongan - Batang)
dengan panjnag 16.7 km yang dikelola oleh
PT Pemalang Batang Toll Road. Jalan Tol ini
menghubungkan Jalan Tol Pejagan Pemalang
Seksi 3 & 4 dan Jalan Tol Semarang Batang, Gbr. 1. Aplikasi Vacuum Consolidation pada Jalan
sehingga perannya sebagai salah satu alat Tol Pemalang Batang
pemerataan ekonomi khususnya di Jawa
Tengah sangatlah diharapkan. Pada metode ini digunakan pompa vakum
untuk menyedot air dan udara keluar dari
tanah. Tekanan vakum yang digunakan adalah
2 PEMBAHASAN sebesar ± 80 kPa yang setara dengan ± 5 m
timbunan tanah, tekanan air pori akan turun
secara drastis dan menjadi negatif yang akan
2.1 Permasalahan menyebabkan tanah terkonsolidasi dan
Berdasarkan Soil Investigasi berupa Borlog kekuatan tanah akan meningkat.
dan Sondir didapati bahwa sebagian besar
tanah eksisting pada trase Jalan Tol Pemalang
Batang adalah tanah lunak. Jumlah Soil
Investigasi berupa Borlog sebanyak 88 titik
dan Soil Investigasi berupa Sondir sebanyak
258 titik, berdasarkan data tersebut maka
dilakukan penentuan perbaikan tanah yang
dilakukan oleh berbagai pihak termasuk tenaga
ahli geoteknik baik dari perencana maupun
lembaga terkait. Setelah dilakukan kajian dan
diskusi maka dipilihlah berbagai metode
perbaikan tanah lunak yang diantaranya adalah
sebagai berikut : Gbr. 2. Sistem Vacuum Consolidation
a. Kolom Grout Modular sepanjang 0.792
km 2.3 Zona Transisi antara Box Jalan dengan
b. Vacuum Consolidation Method Area Vacuum
sepanjang 4.619 km
c. PVD Preloading sepanjang 18.800 km Pekerjaan Vacuum Consolidation Method pada
d. Replacement + geotekstil sepanjang Jalan Tol Pemalang Batang sepanjang ±4.6 km
11.930 km terbagi menjadi 12 Zona Vacuum
Consolidation. Zona vakum tersebut
menyesuaikan data tanah pada area tersebut
dan perpotongan dengan area struktur baik itu
Jembatan ataupun Box Jalan (Pedestrian).
62
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Oleh sebab itu perlu dilakukan kajian teknis
untuk menentukan metode perbaikan tanah
yang akan digunakan sebagai zona transisi
antara zona vacuum consolidation dengan area
struktur tersebut. Zona transisi digunakan
untuk menanggulangi pengaruh tekanan
pompa vacuum consolidation terhadap pondasi
struktur agar tidak mempengaruhi fungsi
daripada pondasi struktur. Gbr. 4. Posisi Zona Transisi (Minipile dengan
Pada Jalan Tol Pemalang Batang terdapat Platform) terhadap Jalan dan Zona Vacuum
15 buah Box Jalan yang nantinya dibutuhkan
metode perbaikan tanah yang akan menjadi Gbr. 4 merupakan posisi letak zona transisi
area transisi dengan area vacuum (minipile dengan platform) terhadap box jalan
consolidation. Berikut merupakan tabel lokasi dan zona vacuum. Terlihat bahwa zona transisi
box yang memerlukan zona transisi dengan (minipile dengan platform) membatasi zona
area vacuum consolidation. vacuum dengan area box jalan agar tidak
mempengaruhi fungsi pondasi box.
Tabel 1. Lokasi Box yang Memerlukan Zona
Transisi
2.4 Metode Perbaikan Tanah Minipile
No. Nama Box STA dengan Platform
Box Pedestrian Karang Minipile dengan Platform adalah metode
1. 338+982
Asem perbaikan tanah dengan memanfaatkan
2. Box Drainase K. Silumping 346+505 minipile/tiang pancang untuk menyalurkan
3. Box Pedestrian Pendowo 346+705 seluruh beban konstruksi kedalam tanah.
Box Ped. Bulak Pelem 349+084 Minipile dengan Platform memanfaatkan Load
4.
Box Sal. Injeksi PG. Sragi 349+100 Transfer Platform (LTP) berupa sirtu/granular
5.
Box Ped. Desa Bulak
349+518
untuk menyalurkan seluruh beban ke pancang
Pelem untuk membentuk suatu kesatuan yang kokoh
6. Box Ped. Purwodadi 2 350+218 guna menyangga beban diatasnya. Platfom
7. Box Kab. Sembung Jambu 352+908 pada Jalan Tol Pekalongan Batang ini
8. Box Pedestrian 353+017 dilakukan penambahan berupa geotekstil
9. Box Sembung Jambu 1 353+300 dengan kuat tarik 50 kN/m2 yang berfungsi
10. Box Drain Kali Gempol 353+831 untuk memeperkuat Platform tersebut.
11. Box Sembung Jambu 2 354+017
12. Box Pedestrian 355+025
13. Box Ped. Jajar Wayang 1 355+602
14. Box Ped. Jajar Wayang 356+123
15. Box Pedestrian Rengas 356+338
63
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Konsistensi
No Kedalaman
Tanah
64
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
dengan jenis kalkulasi plastik pada analisis
numerik. Sedangkan tahapan kalkulasi Berikut merupakan output hasil running
konsolidasi dilakukan dengan menggunakan analisis minipile dengan platform berdasarkan
kalkulasi consolidation pada analisis numerik. permodelan analisis numerik (Gbr. 8) dan
Pada tahapan kalkulasi analisis numerik gambar tipikal minipile dengan platform
analisis di run hingga waktu konsolidasi (Gbr. 6). Dalam hal ini tahapan kalkulasi
jangka panjang yaitu meliputi tahapan analisis numerik yang diamati adalah tahapan
konsolidasi 1 tahun, 3 tahun, 10 tahun hingga akhir konstruksi konsolidasi 1 tahun dari akhir
50 tahun. konstruksi dan konsolidasi 10 tahun dari ahir
Berikut merupakan tahapan pada analisis konstruksi.
numerik yang meliputi tahapan konstruksi dan
tahapan konsolidasi : a. Tahapan Akhir Konstruksi
Tabel 3. Tahapan Konstruksi pada Analisis Tahapan akhir konstruksi merupakan tahap
Numerik ketika seluruh pekerjaan telah selesai
dikerjakan dan perkerasan jalan telah selesai
Safety dibangun.
No Tahapan Konstruksi Hari
Factor
1. Timbunan lantai kerja 4 5.09
2. Pekerjaan Minipile 28 4.67
3. Timbunan Sirtu 0.5 m 4 2.02
Timbunan Sirtu 1
4. mdan geotekstil 50 7 3.91
kN/m2
5. Timbunan tanah 0.5 m 4 3.84
6. Masa tunggu 14 hari 14 3.82
Timbunan 1 m dan
7. 7 3.87
geotekstil 100 kN/m2
8. Timbunan tanah 1 m 7 3.87 Gbr. 10. Total Displacement Tahapan Akhir
9. Masa tunggu 14 hari 14 3.80 Konstruksi Adalah Sebesar 0.397 m
10. Timbunan tanah 1 m 7 3.10
Timbunan hingga top
11. 7 2.58
timbunan
12 Masa tunggu 20 hari 20 2.56
Timbunan preloading
13. 7 2.33
1m
Timbunan preloading
14. 7 2.14
1m
15. Masa tunggu 45 hari 45 2.16
16. Unloading preloading 7 2.58
17. Pekerjaan perkerasan 28 2.57 Gbr. 11. Safety Factor Tahapan Akhir Konstruksi
18. Beban lalu lintas 1 2.79 Adalah Sebesar 2.57
19. Konsolidasi 1 tahun 365 2.81
20. Konsolidasi 3 tahun 730 2.82 Berdasarkan pada Gbr. 10 dan Gbr. 11 di
21. Konsolidasi 10 tahun 2555 2.76 atas didapat nilai total displacement pada akhir
22. Konsolidasi 50 tahun 14600 2.76 konstruksi sebesar 0.397 m dan nilai safety
factor sebesar 2.57.
Berdasarkan data hasil running pada
analisis numerik maka akan didapatkan output b. Tahapan Konsolidasi 1 Tahun
dalam banyak hal. Pada kasus ini hal yang
akan diamati adalah berupa penurunan tanah Tahapan konsolidasi 1 tahun setelah akhir
(displacement) dan besar bidang gelincir konstruksi merupakan tahapan 1 tahun setelah
(safety factor). seluruh pekerjaan termasuk perkerasan jalan di
lapangan telah selesai dikerjakan.
65
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
konstruksi sebesar 0.441 m dan nilai safety
factor sebesar 2.76.
3 KESIMPULAN
66
23Annual
rd
National Conference on Geotechnical Engineering
Jakarta -INDONESIA, 12-13 November 2019
U.S. Department of Transportation Federal Highway
Administration. 2017. Ground Modification
Methods Reference Manual – Volume II.
67
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Pada pembangunan konstruksi Jalan Tol Semarang - Batang Seksi 4 dan 5 terdapat suatu area
lahan dengan nilai Activity yang cukup besar dan pada uji laboratorium terdapat nilai kandungan mineral
montmorillonite sehingga dapat disimpulkan kondisi tanah merupakan tanah ekspansif. Untuk mengurangi
kondisi pengembangan (swelling) dan penyusutan (shrinkage) yang terjadi akibat tanah ekspansif perlu
dilakukan pengujian dan penanganan pada tanah ekspansif. Pengujian dilakukan dengan mengetahui nilai
infiltrasi pada tanah ekspansif dengan uji double ring infiltrometer. Dengan diketahuinya nilai infiltrasi yang
didapat dapat digunakan untuk melakukan pengecekan kestabilan tanah ekspansif sehingga dapat disimpulkan
penanganan yang aman dan efektif untuk kestabilan konstruksi di atas tanah ekspansif. Penggunaan
penanganan dengan menutup tanah ekspansif pada slope atau lereng sehingga tidak terpengaruh oleh cuaca.
Kata Kunci: tanah ekspansif, montmorillonite, infiltrasi, double ring, pengembangan, penyusutan
ABSTRACT: Part of the site of construction at Semarang – Batang Toll Road Section 4 and 5 located in an
area with a quite large activity value and from the laboratory test there is found a montmorillonite mineral
content so that it can be concluded that soil condition is expansive soils. To reduce the conditions of swelling
and shrinkage that occur due to soil condition, handling of expansive soil are needed. Double ring infiltrometer
test was done to measure the infiltration value of the surface soil. By knowing the value of infiltration obtained,
the stability of expansive soil can be analysis due to the impact of water infiltration. Then the handling of
expansive behaviour of soil on slope by ground cover could be design to protected it from the weather.
Keywords: expansive soil, montmorillonite, infiltrasi, double ring, swelling, shrinkage
68
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
konstruksi karena volume tanahnya berubah - 2.2 Uji Double Ring Infiltrometer
ubah. Tanah ekspansif yang mengembang Uji Double Ring Infiltrometer yaitu suatu uji
akibat kadar air yang tinggi akan mengalami coba yang dilakukan untuk mengetahui
kehilangan kekuatan atau daya dukung dan kecepatan rembesan air terhadap tanah selama
akan menyebabkan kerusakan pondasi atau waktu yang di tentukan.
keruntuhan lereng.
Lokasi penelitian ini terletak pada galian
ramp 1 Kaliwungu dengan dalam galian 7.5 m
dengan slope 1V: 2H dan metode perbaikan
tanah yang digunakan yaitu dengan penerapan
mengganti dan melindungi tanah permukaan
dari pembasahan dan pengeringan yang
berlebihan (pengendalian kadar air tanah)
sehingga diharapkan kadar air pada tanah
ekspansif tersebut nilainya relatif konstan.
69
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
(Liter)
Time
Date
etc.
Ring Flow
Ring Flow
Reading
Reading
(cm/h) (cm/h)
Annular
Inner Ring Inner Annular
Space Remarks:
Trial No.
(Liter)
Weather
Time
Date
Ring Flow
Ring Flow
Condition,
Reading
Reading
70
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Berdasarkan hasil Uji Coba Double Ring di
dapatkan nilai infiltrasi rata-rata sebesar 0.0216
m/hari.
Slity Clay
2 0.8 – 5.0 10
(CH)
Slity Clay
3 5.0 – 13.5 23
(CH)
Clayey Silt
4 13.5 – 21.0 50
(ML)
Sand Well
5 21.0 – 36.0 Graded 50
(GW)
71
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Setelah dilakukan perkerasan jalan (akhir
konstruksi), tekanan air pori sebesar -20 kN/m2.
72
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
b. Faktor Angka Keamanan Gbr. 15. Keluaran Tekanan Air Pori Tanah.
Angka faktor keamanan setelah dilakukan
perkerasan jalan yaitu sebesar 1.162. b. Faktor Angka Keamanan
Angka faktor keamanan setelah dilakukan
perkerasan jalan yaitu sebesar 2.521.
Dengan Metode Short Term Gbr. 18. Keluaran Faktor Angka Keamanan.
a. Tekanan Air Pori (Pressure)
Setelah dilakukan perkerasan jalan (akhir Dengan Metode Weathered Effect
konstruksi), tekanan air pori sebesar -20 a. Tekanan Air Pori (Pressure)
kN/m2. Setelah kondisi tanah jenuh saat turun hujan,
tekanan air pori sebesar -20 kN/m2.
73
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
3 KESIMPULAN
74
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRACT: The last decades, many researchers present the paper regarding to the potential of using waste
material in order to improve the soil subgrade layer in a road project. The waste material used in this study
from one of the power plant in the pulp and paper industry in Riau province – Indonesia, called fly ash. The
aim and objective of this study is to determine the California Bearing Ratio (CBR) value for soil road
subgrade mixed with some percentage of waste material. The second objective is to determine the optimum
of percentage using fly ash mixed with the soil. The laboratory testing of the soil mixed with the fly ash on
the CBR value for the soaked and un-soaked condition. The stabilized of the soil subgrade mixed with the
waste material were compared to the control sample of the road subgrade criteria accordingly to Indonesia
Public Work Department (PUPR) from Standard Specification for Road Works. The present paper
describes a study carried out to check the improvements in the properties of soil with fly ash in
varying percentages. Laboratory trials tests have been carried out and results are reported in this
paper.. However, the result of CBR values were fulfilled the requirement for road subgrade criteria from
PUPR Indonesia for Standard Specification for Road Works. These study shows, waste material like fly ash
could be used as an alternative solution to mix with the soil to improve the CBR value.
Keywords: waste material, fly ash, california bearing ratio, road subgrade
75
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2 MATERIALS AND METHODS Table 3. Classification of FA (ASTM-C618)
Chemical Class F Class
2.1 Waste Material (Fly Ash) properties C
The waste material used in this study were SiO2 + 70 50
collected from RAPP Plant in Pangkalan Al2O3 +
Kerinci – Riau Province. The waste materials Fe2O3
are a waste product produced from the Min (%)
combustion of coal for electric power SO3 5 5
generation. A detail physical properties of Max (%)
waste material from plants were shown in LOI Max 6 6
Table 1. (%)
Table 1. Physical Properties of RAPP Waste-
Material 2.2 Soil Road Sub-Grade
Properties Values Regarding the index properties of the soil, it is
Specific gravity 2.05 possible to state that the soil is a highly plastic
Particle size distribution: CH-type clay according to the Unified Soil
Gravel (%) 0 Classification System. The physical properties
Sand (%) 22,92 of soil using in this study are given in Table 4.
Fine/Silt (%) 77,08 A soil obtained from Pangkalan Kerinci
area in Pekanbaru was used in this
The result for the chemical properties of the investigation. The soil is a clay of high
waste material test is shown in Table 2. plasticity. Due to the lower bearing capacity of
the soil, the buildings in this area have a
Table 2. Chemical Properties of RAPP Fly Ash significant settlement problem.
(FA)
Table 4. Physical Properties of Soil
Chemical properties Chemical
values (%) Description parameter value
Silicon Dioxide 48.2 Specific Gravity 2.49
Aluminium Trioxide 13.2 Atterberg Limits
Fero Dioxide 4.3 LL 77.50
Calcium Oxide 18.6 PL 33.10
Magnesium Oxide 0.9 IP 44.40
Loss on Ignition 8.4 Compaction Factor
γ (gr/cc) 1.472
Based on the result of physical properties w (%) 24.25
test, it shows that the RAPP fly ash (FA) Particle size
classified as light materials due to the specific distribution
gravity is about 2.05. According to (Muhardi et Passing #200 (%) 97.33
al., 2010), the lower specific gravity of fly ash Passing #4 (%) 100.00
due to the lower Fero Oxide content since the
specific gravity related to the chemical
composition. Based on Table 3 shows that the 2.3 Laboratory Testing
RAPP fly ash (FA) classified as class C
The are some testing carried out in this study
(ASTM-C618, 2008). RAPP fly ash (FA)
to determine the index and engineering
consists of total combination composition of
properties of the soil sub-grade. The main
Silicon Dioxide, Aluminium Dioxide and Fero
testing method is the California Bearing Ratio
Dioxide more than 50%.
(CBR) test. The CBR test carried out to
determine the CBR value of the sample.
a. Preparation of sample
The testing used in this study is the
California Bearing Ratio (CBR) test. Five
sets of the sample were prepared to
76
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
determine the CBR value. The first sample than the CBR value for soaked condition.
is the original of soil considered as control. Instead, the trends of graph seen similarly. For
The other samples were mixed with 4 un-soaked condition, the CBR value can
different percentage of FA at 40%, 50%, increase from 8.8% (original soil) to 31.4%
60% and 70% of dry weight of the sample. (soil mixed with 60% of FA). The rate of
The mixtures are compacted at a maximum increasing the CBR value up to 256% from the
dry density and optimum water content and original of soil. For soaked condition, the CBR
moulded into CBR mould for CBR testing. value can increase from 3.7% (original soil) to
18.4% (soil mixed with 60% of FA). The rate
b. California Bearing Ratio (CBR) Test of increasing the CBR value up to 397% from
The California Bearing Ratio(CBR) tests the original soil. This result shows the
were carried out to determine the CBR optimum percentage of 60% FA mixed with
index value and the test carried out based the soil is suitable and performed in un-soaked
on the standard procedure given in (ASTM- and soaked condition. Therefore, both
D1883, 2014). CBR test method is used to conditions are fulfilling the requirement for
Indonesia Public Work Department (PUPR)
evaluate the potential strength of the
from Standard Specification for Road Works
subgrade material. CBR defined as the ratio for subgrade layer of road pavement.
of the load sustained by the specimen at 2.5 Fig. 2 shows the laboratories result for
or 5.0 mm penetration to the load sustained Atterberg Limits value of soil mixed with
by standard load aggregate at corresponding 40%, 50%, 60%, 70% of FA.
penetration level.
The entire tests to determine CBR value STRESS STRAIN CURVE
600
Load (Lbs)
500
3 RESULTS AND DISCUSSIONS
400
300
3.1 The Laboratory Result for CBR Value 200
30
700
20
600
10
500
0
Load (Lbs)
0 20 40 60 80
400
Percentage of FA
300
Fig 1. The CBR Value vs the Percentage of FA
200
77
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Fig. 4 shows the laboratories result for CBR material (fly ash and bottom ash) as an
value of soil subgrade (60%) mixed with waste additive material to the soil mixed was
material (60%) for soaked and unsoaked improved the CBR value strength. The
condition. percentage is suitable for soaked and unsoaked
condition accordingly to the CBR value index.
STRESS STRAIN CURVE
800
700
ACKNOWLEDGEMENTS
600
The authors would like to thank STT-
500 Pekanbaru for using the soil mechanic
Load (Lbs)
400
laboratory and Kemenristekdikti-Indonesia for
funding this research year 2018.
300
200
100
REFERENCES
0
0 0,1 0,2 0,3 0,4
ASTM-C618. 2008. Specification for Coal Fly
Penetration (inch) Ash and Calcined Natural Pozzolanic
for Use as a Mineral Admixture in
Fig 4. The Laboratory Result for CBR Value
Portland Cement Concrete. Annual
Unsoaked 60% - 40%
Boof of ASTM Standard, Philadelphia,
USA.
3.2 The California Bearing Ratio (CBR) ASTM-D1241. 1994. Standard Specification
Mixed with Waste Material for Material for Soil Aggregate
Table 5 shows the CBR value versus Subbase, Base, and Surface Course.
percentage of waste material from RAPP American Society for Testing and
mixed with soil subgrade for soaked and Materials, Annual Book of ASTM
unsoaked condition. Its shows that the CBR Standards, 4(8), West Conshohocken,
value for soaked condition relatively lower Pennsylvania.
than CBR value for unsoaked condition. Its ASTM-D1883. 2014. Standard test method for
cause of saturated of soil for soaked condition. California bearing ratio (CBR) of
It shows the CBR values increase 24.3% for
laboratory-compacted soils: ASTM
60% - 40% soil mixed for soaked and
unsoaked condition. For the 50% - 50% mixed International West Conshohocken, PA.
with the soil and waste material, the CBR Ferreira, C., Ribeiro, A., & Ottosen, L. 2003.
value increase 17.9% for soaked and unsoaked Possible applications for municipal
condition. solid waste fly ash. Journal of
hazardous materials, 96(2-3), 201-216.
Table 5. The CBR Value for Soaked and Unsoaked Muhardi, A., Khairul, A., Wei, L., & Lim, Y.
Condition at Every Percantage of Waste Material 2010. Engineering Characteristics of
Sample Soil : Waste CBR CBR Tanjung.
of Material Soaked Unsoaked Norazalan, Norbaya, & Fadzil, M. 2011. The
(%:%) % % Potential of using Bottom Ash (BA)
1 60 : 40 11.9 14.8 Additives in Road Base. Paper
2 50 : 50 16.2 19.1 presented at the International Building
and Infrastructure Technology Penang,
Malaysia.
4 CONCLUSION
According to this study, waste material from
RAPP coal power plant (fly ash and bottom
ash) are suitable material to be used as additive
for soil subgrade. It was proved by laboratory
experimental result. By using the waste
78
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Di Sumatra, khususnya Sumatra Selatan, ada jalur kereta api antara Baturaja - Martapura. Dari
zaman Belanda telah dibuat jalur kereta api ini, dan sampai sekarang masih digunakan dan bahkan dibuat
double track. Sehingga tanah dasar harus cukup kuat untuk memikul beban berat. Oleh karena beban berat,
beberapa lokasi jalur mengalami kondisi yang tidak menguntungkan. Maka dari itu perlu dilakukan
penelitian penyebab penurunan jalan kereta api. Hasil penelitian ini dapat mengetahui tingkat muka air tanah,
identifikasi tanah dan kedalaman tanah keras serta nilai N-SPT. Hasil penelitian menyatakan bahwa ada
lapisan tanah lempung dan cadas muda berbatuan padat mulai dari kedalaman 4 m. Berdasarkan rekonstruksi
geolistrik 3D dan bor mesin, arah aliran air dari jalur 3 ke jalur 1 adalah arah timur laut ke barat daya, di
mana arah tanah longsor atau gerakan tanah mengikuti pola aliran air. Dari penelitian ini dapat menjadi
rekomendsi untuk penanganan kondisi jalan tersebut.
Kata Kunci: parameter tanah, kelongsoran, penurunan tanah, tekanan air pori
ABSTRACT: In Sumatra, especially South Sumatra, there is a railroad line between Baturaja - Martapura.
The Dutch era has made the railway, and until now, it is still in use. The sub-grade must be strong enough to
carry a heavy load. Due to heavy loads, some track locations experience unfavorable conditions. So it is
necessary to research the causes of the decline in the railroad. The results of this research are known as the
groundwater level, soil identification and hard soil depth. The findings state that there is a layer of solid clay
and rock from a depth of 4 m. Based on the 3D resistivity test reconstruction and machine drill modeling, the
direction of water flow from lane 3 to lane 1 is the northeast direction to the southwest, where the landslide
direction or ground movement follows the water flow pattern. From this research can be a recommendation
for handling these road conditions.
Keywords: soil property index, landslide, consolidation of soil, pore pressure
79
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
beban kendaraannya juga besar. Kereta api dengan alat geolistrik dalam mengetahui arah
yang berjalan diatas rel, sehingga tanah dasar penyebab kelongsoran.
atau tanah timbunan yang mendukung beban Sedangkan dengan alat bor mesin akan
kereta api harus mampu menahan beban berat. dilakukan sebanyak 3 titik dan mengambil
Di Sumatra Selatan kendaraan jenis ini undisturbed dan disturbed sampel serta
sangat digunakan sepanjang masa terutama mencari arah aliran air, menentukan tinggi
untuk mengangkut batu bara. Kendaraan yang muka air tanah dan jenis batuannya dan
mengangkut batu bara berangkaian gerbong permasalahan amblesan pada badan rel kereta
cukup banyak disebut Babaranjang. api.
Rangkaian kereta ini sangat berat sehingga Sehingga hasil dari penelitian ini akan
harus ditopang dengan konstruksi badan rel menjadi rekomendasi sistem perbaikannya.
yang kuat. Konstruksi rel di Sumatra dibuat sebab itu digunakan bor mesin dan geolistrik
sejak zaman Belanda dan sampai saat ini adalah yang sangat penting dilakukan dengan
masih digunakan. Karena persediaan batu bara permodelan pendekatan 2D dan 3D.
sangat banyak, dan memerlukan transportasi Penggunaan alat geolistrik ini akan melihat
untuk mengangkutnya, oleh sebab itu sering arah alirannya dan lapisan batuannya. Alat
mengganggu pelayanan kereta api penumpang. geolistrik ini juga membantu mencari solusi
Oleh pemerintah dibangun suatu konstruksi rel cara penanggulangi lapisan penyusun batuan
kereta api di sebelah jalan rel yang lama atau (litologi) daerah survei berdasarkan nilai
dibangunnya double track. resistivitas batuan. Schon, J.H. (1996)
Tanah timbunan tersebut yang merupakan memetakan persebaran lapisan batuan
bagian dari badan jalan rel, baik itu dari tanah berdasarkan pemodelan data dan menganalisis
asli ataupun sudah diperbaiki. Tanah tersebut pola lapisan tanah keras-lunak dan pola aliran
akan mengalami penurunan bentuk akibat air berdasarkan pemodelan 3D.
memikul beban dari beban kereta api. Sebab
struktur tanah yang lemah maka, untuk 2 METODE PENELITIAN
menghindari penurunan tanah yang berlebihan
akan mengakibatkan terjadinya kerusakan Lokasi survei merupakan area jalur perlintasan
pada struktur badan jalan terjadi penurunan kereta api, yang secara administratif terletak di
dan menaiknya tanah ke permukaan balas. wilayah Martapura - Baturaja, Provinsi
Oleh karena itu, diperlukannya analisis Sumatera Selatan. Lokasi survei geolistrik ini
struktur badan jalan rel untuk mengetahui berada pada koordinat 4°14'33.30" LSS dan
penyebab terjadi penurunan tersebut dengan 104°15'57.36" BT.
beberapa variasi pembebanan dan kecepatan. Penelitian ini mengambil lokasi
Permasalahan adalah ada beberapa titik pengamatan yang diperlihatkan pada Gbr. 1,
disepanjang badan rel sering terjadi dimana lokasi penelitian tersebut diambil dari
kelongsoran dan badan jalan mengalami gambar kontur. Kondisi seperti ini sangat
pergerakkan, sehingga sering terjadi memudahkan untuk menginterprestasikan
kelongsoran dan ambles. Perbaikan badan masalah tersebut.
jalan rel kereta api terus dilakukan sepanjang Metode penelitian ini menggunakan 2 alat
tahun. Penanganan sudah dilakukan tetapi yang berbeda, tetapi dengan alat ini dapat
konstruksi badan rel tetap tidak stabil. mendukung penelitian dan mendapat
Dari permasalahan diatas maka, dilakukan kesimpulan satu sama lainnya sehingga
suatu penelitian yang bertujuan mendapatkan hasil yang baik.
mengidentifikasi arah aliran air yang
menyebabkan kelongsoran badan jalan kereta
api dan mengidentifikasi besarnya penurunan 2.1 Bor Mesin
tanah dibawah badan rel. Hasil dari percobaan Penggunaan alat bor mesin untuk mencari
ini direncanakan menjadi masukkan bagi kekerasan tanah dasar yang diukur
pemangku kepentingan untuk mencoba berdasarkan nilai N SPT > 50, Das, Braja.M.
mencari solusi penyebab sering terjadi (2010). Selain itu akan mengambil sampel
amblesan pada badan jalan rel tersebut. tanah setiap kedalaman 2 m. Sampel tanah
Penelitian ini menggunakan alat bor mesin tersebut dibawa ke laboratorium untuk diuji
setiap titik berjarak ± 70 m satu sama lainnya. karakteristik fisik dan mekanik tanahnya dan
Untuk mengetahui arah aliran air maka dibantu konsolidasi, sesuai dengan ASTM, Look, B.G.
(2007), Craig,R.F. (1991), Laboratory soils
80
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
testing (1970), Gatot, S.B. (2011). Kapasitas permasalahan badan jalan selalu mengalami
mesin dapat mencapai 40 m. pergerakan. Pada Gbr. 1 diperlihatkan letak
dimana bor mesin dilakukan dan garis tempat
dilakukannya percobaan geolistrik. Titik ke 3
2.2 Geolistrik (tiga) dari bor mesin adalah 100 m dari titik 2,
Penyelidikan geolistrik ini dilakukan pada lihat Gbr. 4.
lokasi jalur rel kereta. Pengukuran Dari pengamatan langsung dilapangan,
menggunakan alat geolistrik yang dilakukan maka diperkirakan bahwa sering terjadinya
dengan menggunakan konfigurasi dipole- amblesan pada bagan rel adalah disebabkan
dipole secara lateral dan hasil pengukuran adanya aliran air bawah tanah. Pengamatan
berupa data persebaran nilai resistivitas batuan disekitar lokasi adalah adanya elevasi yang
yang akan dimodelkan secara 2 dimensi (2D), lebih rendah dari sisi sebelah kanan rel dan
sedangkan citra batuan keras-lunak dan arah terdapat sungai kecil. Dilihat dari arah tanah
aliran air dalam batuan dimodelkan secara 3 nya mengalami pergerakan kearah sungai. Dari
dimensi (3D), Rasimeng, S. dkk. (2007), hasil survay selama 3 bulan, tanah mengalami
Hutapea, B. (1999 & 2001). Pengukuran pergerusan cukup signifikan.
geolistrik 2D menggunakan 32 buah elektroda,
1 buah switch box, dan multi-channel
electrode resistivity. Dari peralatan tersebut,
arus dialirkan ke dalam tanah melalui 2
elektroda arus dan perekaman beda potensial
diukur dengan 2 elektroda potensial yang
diletakkan juga di atas permukaan. Data arus
dan beda potensial inilah yang diolah untuk
menggambarkan lapisan-lapisan batuan di
bawah permukaan.
Sistem kerja alat geolistrik mengalirkan
arus listrik DC (Direct Current) yang
mempunyai tegangan tinggi ke dalam tanah,
Grandis, H. (2010). Injeksi arus listrik ini
menggunakan elektroda arus yang ditancapkan
ke dalam tanah pada jarak tertentu. Semakin
panjang jarak elektroda arus, akan
menyebabkan aliran arus listrik bisa
menembus lapisan batuan lebih dalam. Bila
posisi jarak elektroda arus diubah menjadi
lebih besar maka tegangan listrik yang terjadi
pada elektroda potensial ikut berubah sesuai
dengan informasi jenis batuan yang ikut
terinjeksi arus listrik pada kedalaman yang Gbr.1. Lokasi Pembagian Survay
lebih besar Suhanto dll. (2005).
3 HASIL - RESULT
Pulau Sumatra terutama sumatra bagian
selatan memiliki kontur yang beragam. Pada
saat suatu kontruksi jalan melewati jalan yang
didukung dengan tanah yang keras maka jalan
tersebut tidak punya masalah dengan tanah
tersebut yang menjadi penyokong utama beban
kendarannya. Tetapi sebagain jalan harus
melewati kondisi yang tidak menguntungkan..
Penelitian ini mengambil posisi 3 (tiga) titik
bor mesin dan 3 (tiga) lintasan geolistrik
dimana arahnya sejajar dan searah, hal ini
dilakukan untuk memudahkan mengevaluasi Gbr. 2. Situasi Pergerakan Tanah
81
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Dari pengamatan langsung dilapangan, lebih rendah dari sisi sebelah kanan rel dan
maka diperkirakan bahwa sering terjadinya terdapat sungai kecil. Dilihat dari arah
amblesan pada badan rel dan penyebabnya tanahnya mengalami pergerakan kearah
akan dievaluasi yang diperkirakan disebabkan sungai. Oleh sebab itu maka diperlukan
adanya aliran air bawah tanah. Pengamatan evaluasi arah aliran air dan kedalaman muka
disekitar lokasi adalah adanya elevasi yang air tanah (m.a.t.) dari permukaan dasar tanah.
Gbr. 3. Diskripsi Tanah dan nNilai NSPT dari Tiitk Bor 1, 2 dan 3
Letak air tanah pada masing masing titik Dari hasil percobaan yang dilakukan
bor adalah berbeda. Pada tabel 1 adalah dengan metode geolistrik akan diketahui
memperlihatkan kondisi muka air tanah dan harga tahanan jenis pada masing-masing
lapisan batuannya. Pada titik 1, muka air lapisan batuan dan hasil ini kemudian dipakai
tanah berada 1 m dari muka tanah, sedangkan sebagai dasar untuk menafsirkan jenis batuan
pada titik 2 dan titik 3, muka air tanah berada masing-masing lapisan dan jumlah/volumetrik
dikedalaman 3 m. Pada lokasi 1 dan lokasi 2 batuan tersebut Zaenudin dkk. (2014).
terdapat tanah timbunan sampai dengan 4 m. Survei Geolistrik dilakukan 3 lintasan,
Setelah itu lempung warna kecoklatan. Tetapi yakni lintasan 1, lintasan 2, dan lintasan 3.
pada titik 3 terdapat lempung berwarna coklat Survey dilakukan dengan menggunakan multi
muda. . Nilai SPT > 50 pada masing–masing elektrode, yakni sebanyak 32 elektroda
titik berbeda untuk titik 1 dan titik 3 nilai dengan jarak antar elektroda 3 m, sehingga
tersebut didapat mulai kedalaman 6 m. panjang masing-masing lintasan 96 m.
Setelah kedalaman 10 m baru terdapat cadas Panjang lintasan tersebut dapat mencapai
muda. Penentuan jenis batuan dilihat secara kedalaman 24 m. Arah lintasan Tenggara -
Visual, dan dilakukan pengujian dari gradasi Barat Daya searah rel kereta api. Terdiri dari
saringan. 2 lintasan sebelah kiri (Barat Daya) rel dan 1
82
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
lintasan diselah kanan (Timur Laut) rel, Gbr. sedikit, yakni lapisan batuan atau adanya
1. tanah keras.
Hasil survay yang dilakukan oleh geolistrik Rekonstruksi data 3D Resistivity diperoleh
menunjukkan lapisan batuan seperti pada Gbr. dengan cara menggabungkan seluruh data
3. resistivity ke dalam sebuah frame yang sama.
Perhitungan volumetrik dari data 3D
Arah U Resistivity Imaging dengan dibentuk dari
Arah longsor
Jalur Aliran lintasan pengukuran Geolistrik 2D yakni
Longsor
lintasan 1, 2 dan 3. Berdasarkan rekonstruksi
Jalur Rel PT
KAI
data 3D Geolistrik pada lintasan 1 hingga
lintasan 3, menjelaskan bahwa arah aliran air
Lokasi tanah
diidentifikasi pada nilai resistivitas di antara
mengalamni
4,06 Ωm hingga 40 Ωm (diindikasikan oleh
kelongsoran
lapisan berwarna biru dan hijau) yang
bersumber dari batuan pasiran/timbunan.
Sedangkan pada lapisan batuan keras
(bedrock) diidentifikasikan pada nilai
resistivitas di antara 100 Ωm hingga 500 Ωm.
Dari Gbr. 3. diperlihatkan gambar 3D yang
mana terlihat jelas arah aliran air yaitu dari
timur laut ke barat daya atau arah dari titik
Gbr. 3. Rekonstruksi 3D Arah Aliran Air bor 1 ke arah titik bor 3, lihat tabel 1 dimana
Lokasi studi secara topografi, sebelah arah longsoran atau pergerakan tanah (land
Barat Daya lebih rendah dari pada Timur Laut slide) mengikuti pola aliran air ini.
rel kereta api, lihat Gbr. 1 dan Gbr. 2. Pada Sehingga diyakinkan bahwa adanya aliran
Gbr. 1 digambarkan line pada uji geolistrik air bawah tanah berdasarkan pemodelan
dan penempatan titik bor. Penempatan rekonstruksi geolistrik dan pengeboran. Dari
tersebut berdasarkan kondisi diperkirakan penelitian yang dilakukan menggunakan ke
adanya kerusakan badan rel. Penempatan titik dua alat ini yang dapat mendeteksi arah aliran,
bor mesin berada ditengah-tengah lintasan sehingga penyebab kelongsoran badan jalan
geolistrik. rel kereta api dan arah kelongsoran tanah
Penampang Geolistrik secara 2D dan disisi kiri rel dapat diketahui. Dari penelitian
menjadi 3D untuk masing-masing lintasan diatas, maka pihak yang berkepentingan
pada peta topografi hasil olahan Software dalam melakukan penanganan kelongsoran
Surfer ditunjukan pada Gbr. 3. Warna pada dapat melakukan alternatif perbaikkannya.
penampang menunjukan nilai resistivitas, dari Hasil dari pengeboran dengan bor mesin
warna biru tua (resistivitas rendah) hingga menunjukkan bahwa setelah pengujian fisik
coklat gelap (resistivitas tinggi). Nilai tanah didapat nilai kadar air antara sebesar
resistivitas ini berkaitan langsung dengan 40.78% - 46.67%, dari Uji Atterberg sebesar
kekerasan batuan. Semakin keras 60.76% untuk nilai LL dan 36.82% untuk
batuan/tanah semakin besar pula nilai nilai PL, sedangkan IP didapat 23.85%. Kadar
resistivitasnya. Semakin keras batuan, lempung lolos saringan No. 200 (0.075 mm)
semakin kecil/sedikit pori-pori batuannya, sebesar 74.79%. Data ini diambil hasil
sehingga semangkin kecil pula daya tampung pengeboran pada titik 1 dikedalaman sampai
fluidanya. Karena semakin banyak fluida dengan 9 m. Data tersebut dipakai untuk
yang mengisi batuan/tanah akan melihat kestabilan badan rel dengan melihat
menyebabkan nilai konduktivitasnya semakin nilai konsolidasi.
tinggi, atau resistivasnya semakin rendah, Pada Gbr. 4 menunjukkan kondisi
Telford, W.M. dkk. (2000). potongan melindang dari studi yang
Pada Gbr. 3 dengan lapisan warna biru tua. dilakukan. Akibat dari adanya aliran air maka
menunjukan kandungan air yang semakin lereng pertama mengalami pergerakkan dan
besar, yakni lapisan batuan/tanah lunak. Dan kelongsoran.
sebaliknya, nilai resistivitas tinggi
ditunjukkan pada Gbr. 3 yaitu berwarna
coklat, menunjukan kandungan air yang
83
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Bagian tanah yang mengalami kelongsoran
adalah tanah dibawah badan rel kereta api
sampai ke lereng yang pertama. Hasil
percobaan konsolidasi yang dilakukan ke dari
sampel dari 3 (tiga) bor mesin maka didapat
hasil nilai diperlihatkan pada Tabel 2.
Pada tabel 2 diperlihatkan nilai Cv pada bor
1 mendapatkan nilai 0.146 cm2/dt dan
semangkin kedalam yaitu pada kedalaman > 8
m mendapatkan nilai Cv 0.065 cm2/dt. Sesuai
dengan kondisi tanah dibawah badan rel yang
sering terjadi kelongsoran sehingga nilai Cv
lebih besar. Braja M Das (2009), menyatakan
bahwa nilai kompresi (Cc) dan Cv, indeks
swell (Cs), void rastio awal, (eo) dan tegangan
Gbr.4.Ilustrasi Penampang Melintang dari akan meningkat di lapisan tanah liat atau
Lokasi Studi. lempung.
Tabel 2. Nilai Cv, Koefisien Konsolidasi dan Cc Adalah Indeks Pemampatan atau Compresion Index dari
Ke-3 sampel Hasil dari Bor Mesin
Bor 1 Bor 2 Bor 3
Consolidation Kedalaman bor dalam satuan meter
0-2 2-6 8-10 2-6 6-8 10-24 0-2 2-4 6-18
Cv (cm2/dt) 0.146 0.072 0.065 0.112 0.036 0.024 0.131 0.141 0.093
Cc 0.119 0.108 0.094 0.079 0.210 0.339 0.145 0.082 0.160
Akibat dari aliran air supaya mengurangi c. Lapisan yang diduga mengandung air atau
kompresibilitas dari tanah akibat aliran air, dialiri air berkisar pada nilai resistivitas di
maka disarankan adanya sistem penanganan antara 4.06 Ωm - 40 Ωm. Dari hasil bor
dapat berupa dinding penahan tanah atau mesin juga adanya lapisan air mulai dari 1
mengalirkan aliran air atau membuat gorong- m. Hal ini terdapat pada bor 1 dan pada bor
gorong dibawah rel. 3 muka air tanah berada dikedalaman 2 – 3
m. Artinya bahwa lapisan badan rel kereta
api terdapat aliran air yang bergerak dari
4 KESIMPULAN - CONCLUSION titik 1 ke titik 3 atau dari arah timur laut ke
barat daya. Sehingga lapisan tanah di
Adapun kesimpulan dari hasil survei bawah badan jalan rel mendapatkan
geolistrik adalah sebagai berikut: koefisien konsolidasi sebesar 0.146 cm2/dt.
a. Berdasarkan hasil bor mesin terdapat 2
lapisan tanah asli dan batuan. Dimana
tanah lempung padat dan cadas. Meskipun PENGHARGAAN–
ada di permukaan tanah timbunan. Lapisan ACKNOWLEDGEMENTS
tanah keras dimulai pada kedalaman - 6 m.
Hal ini terlihat dari mulai nilai NSP> 34,
terus naik sampai kedalaman 16 m. Penghargaan kepada penyandang dana dan
b. Berdasarkan hasil pengujian dengan pemilik pekerjaan PT KAI Sumatra Bagian
geolistrik, terdapat 2 lapisan tanah/batuan Selatan untuk kami melakukan penelitian.
di bawah permukaan yang dapat dicitrakan PT. Lampung Geosains Survei yang telah
berdasarkan nilai reistivitas secara membantu dalam menganalisa program
geolistrik, yaitu lapisan keras yang geolistrik dalam menentukan arah aliran air
berkorelasi dengan nilai resistivitas tinggi tanah.
dan lapisan lunak yang berkorelasi dengan
nilai resistivitas rendah.
84
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
DAFTAR PUSTAKA – REFERENCES Look, B.G., 2007, Handbook of Geotechnical
Investigation and Design Tables, Taylor & Francis
Grandis, H. 2010. Direct Current Resistivity Group, London, UK, 356p.
Das, Braja.M. 2010. Principles Of Geotechnical
Method: Concept and Application in Sounding,
Engineering, Seventh Edition, 662p.
Mapping, and Tomography. Bandung, ITB. Afriani, L., Adha, I., Setyanto, 2018. Innovative
Rasimeng, S. Haerudin, N. Harmen. 2007. design of soil pressure modeling test apparatus to
“Penentuan Lithologi Batuan Bawah Permukaan determine the amount of soil compaction energy to dry
Menggunakan Metode Resistivitas Sounding di Daerah density value, Proceding ICRS, Unair Surabaya.
Prospek Geothermal Gunung Rajabasa”. Makalah Dies Laboratory soils testing. 1970. Engineer Manual
Natalis Unila 2007. EM-1110-2-1906, U.S. Army Crops of Engineers,
Suhanto, E. Bakrun. 2005. Penyelidikan Geolistrik Dept. of the Army, Washington, D.C.
Gatot, S.B., 2011, “Soil testing in the laboratory,
Tahanan Jenis di Daerah Panasbumi Pincara
explanations & Guides” Graha Ilmu Publish, 123p.
Kabupaten Masamba Sulawesi Utara. Pemaparan
Braja M. Das, 2009, Principle of Geotechnical
Hasil Kegiatan Lapangan Subdit Panasbumi. Engineering, edisi ke 7, 683 hal.
Schon, J. H. 1996. “Physical Properties of Rocks,
Zaenuddin, A. Taufiq. Mega, H.D. Triyanto, D.
Fundamentals and Principles of Petrophysics”. Institute
2014. “Geoelectric Resistivity Method with Werner-
of Aplied Geophysics, Leoben, Austria. Schlumberger Configuration For Analysis Seawater
Telford, W.M., Geldart, L.P., Sheriff, R.E., and
Intrusion At Teluk Betung Area, Lampung”. Hokkaido
Keys, D.A. 1990. Applied Geophysics.
International Scientific Assosiation.
Cambridge University Press. Cambridge.
85
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Peristiwa longsor yang terjadi pada ruas Jalan Meulaboh–Geumpang menyebabkan hubungan
transportasi darat menjadi terganggu, maka diperlukan analisis stabilitas lereng yang bertujuan untuk
menentukan faktor keamanan (factor of safety) dari bidang longsor yang terjadi. Faktor keamanan yang dihitung
yaitu pada kondisi awal (eksisting) dan kondisi setelah adanya perkuatan (reinforcement). Analisis ini dilakukan
dengan menggunakan metode Bishop (kondisi eksisting) dan metode elemen hingga (Plaxis) untuk kondisi
dengan perkuatan. Variasi penempatan sheet pile terdiri dari 3 variasi yaitu terletak pada bagian atas, tengah
dan bawah dari kemiringan sudut yang terbentuk pada lereng dengan kedalaman masing-masing sepanjang
12 m, 10 m, dan 5 m. Nilai faktor keamanan yang didapat setelah menggunakan perkuatan sheet pile untuk
masing-masing variasi adalah 1.52; 1.57; dan 1.19. Hasil perhitungan faktor keamanan (FK) yang didapat
menunjukkan bahwa penempatan sheet pile pada bagian tengah menghasilkan nilai faktor keamanan yang lebih
besar yaitu FK sebesar 1.57 (FK >1.50).
Kata Kunci: stabilitas lereng, faktor keamanan, sheet pile, program Plaxis
ABSTRACT: Landslide events that occur on The Meulaboh-Geumpang Road section have caused total failure
of transportation, so that an analysis of slope stability is needed to determine the safety factor (factor of safety)
of the landslide. This analysis was carried out using the Bishop method (existing condition) and the finite
element method (Plaxis) for conditions with reinforcement. The variation of sheet pile placement consists of 3
variations, which are located at the top, middle and bottom of the angle slopes with a depth of 12 m, 10 m and
5 m respectively. The safety factor values obtained after using sheet pile reinforcement for each variations are
1.52; 1.57; and 1.19. The results of the calculation of the safety factor (FK) indicate that the placement of the
sheet pile in the middle obtained a greater safety factor value of 1.57 (FK> 1.50).
Keywords: landslide stability, factor of safety, sheet pile, Plaxis software
86
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Artikel ini dapat menjadi sebuah panduan pada faktor keamanan seismik dan statik untuk
stabilitas timbunan pada Jalan Tol Serang-Panimbang. Slope-W 2012 digunakan pada variasi tinggi
timbunan 0-15 m dengan perbandingan kemiringan 1V:2H. Nilai faktor keamanan dapat dijadikan pedoman
untuk menentukan tinggi timbunan minimum dan N-SPT minimum pada tanah eksisting di bawah tanah
timbunan. Hasil penelitian menggabungkan faktor keamanan statik dan seismik berdasarkan syarat kriteria.
Maka kemiringan dengan tinggi maksimum 4 m harus memiliki nilai N-SPT 5-8, tinggi maksimum 5-8 m
harus memiliki N-SPT 9-12, tinggi maksimum 9-10 m harus memiliki N-SPT 13-15, tinggi maksimum 11-12
m harus memiliki N-SPT 16-20, tinggi maksimum 13-14 m harus memiliki N-SPT 20-25, dan tinggi antara
15 m harus memiliki N-SPT 25-30.
Kata Kunci: faktor keamanan, N-SPT, kemiringan, seismik, statik, tinggi timbunan
ABSTRACT: This article can be a guideline to static and seismic safety factors for the stability of
embankment slopes on Serang Panimbang Toll Road. Slope-W 2012 was used on variations in the height of
embankments area 0-15 m with a slope 1V:2H. The FS values become the benchmark for determining the
minimum embankment height and the minimum N-SPT value of existing ground level below embankment.
The result combines minimum static and seismic safety factor based on criterias. The slope with a maximum
height of 4 m must have the existing ground level with a minimum N-SPT 5-8, 5-8 m must have the existing
ground level with a minimum N-SPT 9-12, 9-10 m must have the existing ground level with a minimum
N-SPT 13-15, 11-12 m must have the existing ground level with a minimum N-SPT 16-20, 13-14 m must
have the existing ground level with a minimum N-SPT 20-25, and 15 m must have the existing ground level
with a minimum N-SPT 25-30.
Keywords: safety factor, N-SPT, slope, seismic, static, height of embankment
87
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Pengontrolan batas tinggi timbunan dan 2 NUMERICAL PARAMETER DAN
kemiringan pada ruas tol Serang-Panimbang ANALISIS
dilakukan saat proses desain alinyemen
vertikal dan horisontal trase jalan. Proses
desain trase jalan (termasuk alinyemen vertikal 2.1 Pembebanan
dan horizontal jalan) membutuhkan control Beban Lalu Lintas
guide untuk mengetahui batasan tinggi dan Berdasarkan Panduan Geoteknik 4 (2002),
kemiringan timbunan. Apabila trase didesain beban lalu lintas ditambahkan untuk analisis
berdasarkan control guide batasan tinggi dan stabilitas timbunan jalan.
kemiringan timbunan, maka desain akan
mengurangi resiko penambahan perkuatan Tabel 1. Beban Lalu Lintas dalam Analisis
untuk kestabilan timbunan yang berdampak Kelas Jalan Beban Lalu Lintas (kPa)
pada biaya. Analisis desain geoteknik juga
I 15
akan lebih mudah dalam mengelompokkan
II 12
area mana saja yang harus diberi penambahan
III 12
perkuatan kestabilan timbunan bila ada
beberapa area yang mengharuskan desain Beban Perkerasan
tinggi timbunan melebihi control guide Beban perkerasan dengan detail slab beton 30
batasan tinggi dan kemiringan timbunan. cm , lean concrete 15 cm, dan agregat klas A
Ruas Jalan Tol Serang-Panimbang berada 15 cm.
dalam tahap konstruksi yang direncanakan qm = 2,4 (0,3 +0,15) + 2,2 (0,15)
sepanjang 50 km pada tahap awal. Investigasi qm = 1,08 + 0,33 = 1,29 t/m2
penyelidikan tanah telah dilakukan untuk qm= 12,9 kN/m2
menunjang proses desain geoteknik di Beban total
sepanjang 50 km. Penyelidikan tanah yang qt = qm+qL
dilakukan adalah site investigation dan qt= 27,9 30 kN/m2
pengujian laboratorium. Uji lapangan berupa
borlog dan uji laboratorium berupa index
properties, proctor, consolidation dll. Hasil
penyelidikan tanah menunjukkan bahwa
kondisi tanah di daerah sepanjang rencana
jalan tol adalah mayoritas tanah yang bersifat
kohesif, terdapat pula beberapa spot kasus
khusus seperti tanah organik dan tanah lunak
di sepanjang rencana jalan. Pembahasan akan
berfokus pada daerah-daerah yang bukan
termasuk kasus khusus. Hasil penyelidikan Gbr.1. Ilustrasi Surcharge Load pada Timbunan
tanah digunakan untuk menghitung kestabilan
timbunan jalan. Maka surcharge load yang berada di atas
Timbunan pada rencana Jalan Tol Serang- timbunan adalah beban lalu lintas dan
Panimbang tertinggi sebesar 15 m dengan perkerasan qt = 30 kN/m2
rencana kemiringan slope sepanjang 50 km
sama yaitu 1:2. Artikel ini membahas
mengenai batasan ketinggian timbunan yang 2.2 Parameter dan Kriteria
dihubungkan dengan nilai N-SPT tanah dasar. Perhitungan kestabilan membutuhkan
Perhitungan kestabilan tanah menggunakan parameter-parameter tanah seperti c, ϕ, dan ϒ.
Slope-W 2012 baik seismik maupun statik. Parameter tersebut diambil berdasarkan
Maka batas timbunan langsung dapat diketahui statistik hubungan N-SPT (penyelidikan
pada suatu area di sepanjang rencana jalan lapangan) dengan data laboratorium, sehingga
dengan melihat nilai N-SPT tanah dasar area menghasilkan ketentuan nilai parameter-
tersebut. parameter tiap lapisan dan ketentuan parameter
timbunan dalam artikel.
88
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Tabel 2. Parameter Lapisan Tanah Dasar untuk menopang timbunan, didasarkan dengan
Lapis N-SPT c kN/m2 ϕ ϒ kN/m3
hasil penyelidikan lapangan borlog yang
menunjukkan bahwa keadaan rata-rata lapisan
1 0-4 4 10 15 tanah di daerah Serang Panimbang memiliki
2 5-8 14 10 16 tebal kurang lebih 5 m tiap lapisannya.
3 9-12 25 10 16 Variasi kedua dalam artikel ini adalah
4 13-15 36 10 17 tinggi timbunan. Rencana timbunan tertinggi
5 16-20 44 10 17 adalah 15 m sehingga variasi tinggi timbunan
dimulai dari 1-15 m. Dengan menggabungkan
6 20-25 55 10 18
dua variasi tersebut maka artikel melakukan
7 26-30 69 10 18 pemodelan dengan acuan Tabel 5. Sketsa
pemodelan pada Gbr.2.
Tabel 3. Parameter Timbunan
Parameter c kN/m2 ϕ ϒ kN/m3
Timbunan 30 10 18
89
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Tabel 6. Hasil FS Timbunan Berdasarkan Variasi Tinggi Timbunan dan Lapisan Tanah Dasar Secara Statik
FS Tinggi Timbunan (m)
Lapis
Tanah
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(A dan
B)
1 dan 2 1.52 1.47 1.39 1.27 1.2 1.16
2 dan 3 2.3 2.1 1.85 1.7 1.6 1.51 1.43 1.36 1.29 1.24
3 dan 4 1.91 1.79 1.68 1.59 1.51 1.48 1.43 1.38 1.33
4 dan 5 1.71 1.65 1.59 1.54
5 dan 6
Tabel 7. Hasil FS Timbunan Berdasarkan Variasi Tinggi Timbunan dan Lapisan Tanah Dasar Secara
Seismik
FS Tinggi Timbunan (m)
Lapis
Tanah
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(A dan
B)
1 dan 2 1.00 0.91 0.86 0.80 0.75 0.70
2 dan 3 1.76 1.48 1.36 1.17 1.08 0.98 0.92 0.88 0.84 0.80
3 dan 4 1.42 1.26 1.18 1.11 1.05 0.99 0.90 0.88 0.86 0.83 0.80
4 dan 5 1.18 1.05 1.02 0.98 0.95 0.92
5 dan 6 1.15 1.11 1.07 1.03 1.00
6 dan 7 1.13 1.09
7 dan 7 1.13
90
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
91
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
tanah dasar lapis 6. Sedangkan slope dengan d. Apabila slope memiliki ketinggian
ketinggian antara 15 m harus berada di tanah maksimum 11-12 m maka timbunan harus
dasar lapis 7. berada di tanah dasar dengan N-SPT 16-20
Kemudian hasil lapisan tanah dasar e. Apabila slope dengan ketinggian antara 13-
dihubungkan dengan nilai N-SPT yang 14 m harus berada di tanah dasar dengan N-
mewalikili sesuai dengan Tabel 2. Maka SPT 20-25.
artikel mendapatkan ketentuan batasan tinggi f. Sedangkan slope dengan ketinggian antara
timbunan dengan nilai N-SPT sebagai berikut : 15 m harus berada di tanah dasar dengan N-
slope memiliki ketinggian maksimum 4 m SPT 25-30.
maka timbunan harus berada di tanah dasar Hasil artikel ini dapat dijadikan acuan desain
dengan N-SPT 5-8, slope memiliki ketinggian slope statis sepanjang konstruksi area Serang-
maksimum 5-8 m maka timbunan harus berada Panimbang 50 km untuk mengontrol
di tanah dasar dengan N-SPT 9-12, slope kestabilan slope timbunan jalan.
dengan ketinggian antara 9-10 m harus berada
di tanah dasar dengan N-SPT 13-15, slope
memiliki ketinggian maksimum 11-12 m maka DAFTAR PUSTAKA
timbunan harus berada di tanah dasar dengan
N-SPT 16-20, slope dengan ketinggian antara Abramson, L. W., Thomas, S. L., Sunil, S., Glenn, M.
13-14 m harus berada di tanah dasar dengan N- B. 2002. Slope Stability and Stabilization
SPT 20-25. Sedangkan slope dengan Methods, John Wiley & Sons, Inc, New York.
ketinggian antara 15 m harus berada di tanah Almeida, M. d., & Soares Marques,M.E. (2013). Design
and performance of Embankment on Very Soft
dasar dengan N-SPT 25-30. Soils. London: CRC Press.
Budhu, Muni. 2011. Soil Mechanics and Foundation
3rd Edition. New York : John Wiley & Sons, Inc.
4 KESIMPULAN Craig, R.F. 2004. Craig’s Soil Mechanics 7th Edition.
New York : Spon Press.
Dengan demikian desain slope sepanjang Cheng, Y.M. and Lau, C.K. 2008. Slope Stability
Serang-Panimbang dalam kondisi tanah Analysis and Stabilization. Great Britian : Antony
normal (bukan kasus tanah khusus) dapat Rowe, Chippenham, Wilts.
mengacu pada guideline perhitungan Das, Braja M. 2010.Principles of Geotechnical
kestabilan timbunan statik dan seismik seperti Engineering(7ed.). Stamford : CengageLearning.
Departemen Permukiman dan Prasarana Wilayah, 2002,
dibawah ini, Panduan Geoteknik 4 Desain dan Konstruksi,
Kestabilan Statik WSP International, Indonesia.
a. Apabila slope memiliki ketinggian GEO-SLOPE. 2012, Stability Modeling With SLOPE/W
maksimum 7 m maka timbunan harus 2012 Version. Calgary, Alberta, Canada.
berada di tanah dasar dengan N-SPT 5-8. Hardiyatmo, H. C, 2006. Mekanika Tanah 1, Gadjah
b. Apabila slope memiliki ketinggian Mada University Press, Yogyakarta.
maksimum 8-11 m maka timbunan harus Kulhawy, F.H.& Mayne, P.W. 1990. Manual on
berada di tanah dasar dengan N-SPT 9-12. Estimating Soil Properties for Foundation
c. Sedangkan slope dengan ketinggian antara Design. New York: Holister Hall.
Liu, C.Y. and Hounsa, U.S.F. 2018 Analysis of Road
12-15 m harus berada di tanah dasar dengan
Embankment Slope Stability. Open Journal of
N-SPT 13-15. Civil Engineering, 8, 121-128.
Kestabilan Seismik Morgenstern, N.R. and Price, V.E. 1965 The Analysis of
a. Apabila slope memiliki ketinggian the Stability of Generalised Slip Surfaces.
maksimum 4 m maka timbunan harus Géotechnique, 15, 79-93.
berada di tanah dasar dengan N-SPT 5-8. Terzaghi, K., dan Peck, R. 1943, Theoritical Soil
b. Apabila slope memiliki ketinggian Mecanic, John Willey & Sons, New York.
maksimum 5-8 m maka timbunan harus US Army Corps of Engineers. 2003. Engineering and
berada di tanah dasar dengan N-SPT 9-12 Design—Slope Stability (PDF). US Army Corps
c. Apabila slope dengan ketinggian antara 9- of Engineers, Washington DC.
Wyllie, Duncan C., & Christopher W. Mah. 2004. Rock
10 m harus berada di tanah dasar dengan N-
Slope Engineering: Civil and Mining. 4rd. (ed).
SPT 13-15. New York:Spoon Press. London.
92
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRACT: This paper is intended to provide recommendations regarding the possibility of debris flow
occurrence in the Poi Village area, Palu. This type of mass movement can occur considering that in the
highland areas, there has been an accumulation landslide material as a result of the massive earthquake in
Palu in September 2018. It is possible that at any time this material can flow and pile up low-land area
including Poi Village and existing road networks. For this reason, the analysis was carried out using the
Bingham and Voellmy fluid friction models and laboratory testing of landslide material. Although the both
models have a limitation, numerical simulations can provide predictions of the affected area. There are two
main simulation scenarios, namely landslide material flowing freely into the residential area and the debris
flow material restrains by sabo dams. The affected area for the first simulation is around 400 ha. Whereas
the second simulation shows the use of sabo dam is less effective because of the large volume of avalanches
which reaches 6.5 million m3. For this reason, a recommendation in the form of relocation of Poi Village
settlements can be done or if national road access remains opened, then the choice to make a road in the
form of a bridge over the affected area can be another option.
Keywords: continuation landslide, debris flow, Bingham, Voellmy, FLO-2D, RAMMS, sabo dam
1 INTRODUCTION
93
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
material. Table 1 presents the results of the
laboratory tests.
94
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
discharge of 7222 m3/s for 15 min of
transportation time.
4 STRUCTURAL COUNTERMEASURE
Fig. 4. Voellmy Fluid Model
One of structural countermeasures to dealing
3.1 FLO-2D Program with debris flow is sabo dam. Sabo dam is a
kind of dam which can resist the flow material
The analysis of the continuation landslide (i.e. debris flow) by reducing its velocity. The
result using the FLO-2D program implies that most effective way to control a debris flow is
the material landslide direction is from north to to trap all its sediment using the storage
south, and the impacted area is ±600 ha (which capacity of sabo dams Mizuyama (2008). The
is the size of ±700 soccer fields). The greater the dam angle, the greater the impact of
maximum flow depth is 3.8 m, and the debris flow exerted on the dam Liu et al.
maximum flow velocity is 18.9 m/s. The (2013).
impacted area of continuation landslide
captured using the FLO-2D program is
depicted in Fig. 5 and Fig. 6.
95
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
mitigation plan is to relocate the people around
the impacted area, especially the people in Poi
Village.
REFERENCES
96
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRACT: Slope failure is one of the most frequent natural disasters in Indonesia. In 2018, more than 600
slope failures were recorded. Most of the slope failures occur during rainy season. This is because when water
infiltrates into unsaturated soil, its water content increases, causing the soil to be heavier and weaker. In
unsaturated state, soil has additional shear strength from negative pore water pressure, also known as suction.
Contribution of shear strength from negative pore water pressure is traditionally known as apparent cohesion.
When the soil becomes saturated, the apparent cohesion becomes zero, making the soil weaker. With
development of unsaturated soil mechanics, the means to quantify this apparent cohesion becomes known.
However, testing required to accurately quantify unsaturated soil properties is expensive and time consuming.
Fortunately, unsaturated soil properties can be estimated from grain size distribution and void ratio. One
software capable of estimating unsaturated soil properties is Soil Vision. In this paper, basic unsaturated soil
mechanics is briefly explained, followed by example how Soil Vision can be used to estimate unsaturated soil
properties and analyze slope stability when subjected to rainfall.
97
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
where ua = pore-air pressure, uw = pore-
water pressure, ua – uw = matric suction, and b
= angle indicating the rate of increase in shear
strength with respect to a change in matric
suction.
With the inclusion of matric suction to shear
strength, the failure envelope becomes a plane.
This equation is very useful to determine shear
strength of unsaturated soil if relationship
between water content and matric suction is
known.
Fig. 1. Monthly Rainfall and Slope Failures in
2018
2.2 Soil Water Characteristic Curve (SWCC)
98
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
silt has a liquid limit and plastic limit of 24%
and 17% respectively, giving a USCS
classification of CL-ML. The other inputs
required are a combination of any 3 amongst
specific gravity, gravimatric/volumetric water
content, porosity/void ratio, dry/total unit
weight or degree of saturation. After all the
required parameters have been input,
estimation of the SWCC can be carried out. Fig.
5 shows the estimated SWCC for the silt. With
the same input, the hydraulic function and
saturated permeability can also be estimated.
Fig. 4. Example of Permeability versus Matric Fig. 6 shows the estimated hydraulic function.
Suction (Fredlund et al. 2012)
Table 1. Grain Size Distribution of The Sample Silt
2.4 Summary Particle diameter Percent passing
(mm) (%)
To be able to analyze stability of unsaturated 0.220 100
soil slope, one has to obtain the SWCC, 0.130 90
0.100 82
hydraulic conductivity function and b of the
0.070 70
soil. However, obtaining these relationship are 0.050 62
not easy. Unsaturated soil testings are 0.040 57
expensive and time consuming. In the next 0.030 50
section, soil vision, a software for analyzing 0.020 38
unsaturated soil is introduced. 0.011 23
0.009 20
0.006 16
3 SOIL VISION 0.003 12
0.001 9
3.1 Introduction
Soil Vision is a software dedicated to solving
not only slope stability of unsaturated soil, but
also other unsaturated soil related problems.
This includes unsaturation due to freezing and
chemicals contamination; flow of air, liquid and
heat at different degree of saturation. These
functionality are separated into eight modules.
In one of the available modules, estimation of
SWCC and hydraulic conductivity function is
made possible. Fig. 5. Estimated SWCC for Sample Silt
99
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
For the shear strength, Kranh (2007)
suggests b can be estimated as half of ’.
100
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
4 SUMMARY Fredlund, D.G., Morgenstern, N.R., and Widger, R.A.
1978. The Shear Strength of Unsaturated Soils.
This paper intends to give a brief Canadian Geotechnical Journal, 15(3): 313-321.
Fredlund, D.G. and Xing, A. 1994. Equation for The
background on unsaturated soil mechanics and Soil-Water Characteristic Curve. Canadian
introduce software capable of analyzing Geotechnical Journal 31(4): 521-532.
unsaturated soil slopes. Hopefully, with better Fredlund, D.G., Rahardjo, H. and Fredlund, M.D. 2012.
awareness of unsaturated soil, occurance of Unsaturated Soil Mechanics in Engineering Practice.
slope failures can be reduced. USA: John Wiley & Sons.
Kranh, J. 2007. Geoslope Software Manual.
Weather and Climate. 2019. Average monthly snow and
REFERENCES rainfall in Bandung (West Java) In Millimeter.
Accessed from: https://weather-and-
climate.com/average-monthly-precipitation-
Badan Nasional Penanggulan Bencana (BNPB) (2019).
Rainfall,bandung,Indonesia on 10 October 2019.
Bencana Alam di Indonesia Tahun 2018-2019.
Accessed from: http://bnpb.cloud/dibi/tabel1a on 10
October 2019.
101
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Dalam melakukan analisa steep slope di daerah gempa khusunya di Indonesia, selain memerlukan
kajian yang lebih mendalam tentang kestabilan lereng, diperlukan juga analisis deformasi lateral yang terjadi
pada saat gempa. Dalam makalah ini para penulis ingin menyajikan analisa kestabilan & deformasi lateral
(menggunakan analisis Newmark) dari beberapa buah lereng yang ditinjau dengan mempertimbangkan keadaan
tanah dan kondisi seismik setempat. Penulis memakai metode analisa dari Makdisi-Seed (1971) serta Bray-
Travasarou (2008) dalam memberi contoh penyelesaian masalah.
Kata Kunci: Makdisi-Seed, Bray-Travasarou, Newmark
ABSTRACT: In performing slope stability analysis, especially in earthquake zone in Indonesia, the deeper
analysis is needed besides of slope stability itself. The lateral deformation analysis of slope is needed to be done
during earthquake condition. In this paper, the authors are going to present slope stability and lateral
deformation (using Newmark analysis) of several assessed slope with considering soil & local earthquake
condition. Authors are using analysis based on Makdisi-Seed (1971) also Bray-Travasarou (2008) for giving
example in problem solving.
Keywords: Makdisi-Seed, Bray-Travasarou, Newmark
102
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
103
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Equilibrium Analysis approaches such as the
Bishop, Janbu, Morgenstern-Price, Spencer,
Corp Engineers 1&2, and GLE methods. One
of those models is Mohr-Coulomb which is
used in this project. The Mohr–Coulomb failure
criterion represents the linear envelope that is
obtained from a plot of the shear strength of a
material versus the applied normal stress. This
relation is expressed as:
104
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
strength for cohesive materials. Similar
approach was also used to assess the stability
under seismic loading. For long-term stability,
however, effective stress soil parameters were
used for all materials.
To synchronize the material type and
undrained shear strength from N-SPT
correlation, the inspection was done to define
material type and undrained shear strength in
existing open slope. The results of analyses are
presented in the next section.
Fig. 5. Empirical Correlation for Internal Friction
Angle
2.3 Total and Effective Stress Analyses Fig.6. N-SPT and Vane Shear Test Point for
The stability of slopes under short-term Section A
conditions was analyzed using undrained
Table 3. Reference for Effective Parameter Assumption (CUR 1996)
ϒ ϒsat E c'
Admixture Consistency 3 3
Cc Cr+ Φ'
kN/m kN/m Mpa kPa
Loose 17 19 0.008 - 75 32.5 -
Slightly Medium 18 20 0.004 - 125 35 -
Silty 19 or 0.003 or 150 or 37.5 or
Dense 21 or 22 - -
20 0.002 200 40
Loose 18 20 0.009 - 50 35 or 40 -
Very Silty Medium 19 20 0.006 - 75 30 -
20 or 22 or 0.003 or 125 or
Dense - 32.5 -
21 22.5 0.002 150
Loose 17 19 0.021 - 25 30 -
Clean Medium 18 20 0.006 - 75 32.5 -
19 or 0.003 or 125 or
Dense 21 or 22 - 35 or 40 -
20 0.002 150
Slightly
18 or 0.008 or 27 or
Silty, - 20 or 21 - 25 or 35 -
19 0.005 32.5
Clayey
Very
18 or 0.009 or
Silty, - 20 or 21 - 20 or 30 25 or 30 -
19 0.009
Clayey
27.5 or
Soft - 19 0.168 0.017 2 0
30
Slightly 27.5 or
Medium - 20 0.084 - 5 2
Sandy 32
0.049 or 27.5 or 5 or
Stiff - 21 or 22 - 10 or 20
0.003 35 7.5
Very 0.092 or 27.5 or
- - 19 or 20 - 5 or 10 0 or 2
Sandy 0.055 35
105
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ϒ ϒsat E c'
Admixture Consistency 3 3
Cc Cr+ Φ'
kN/m kN/m Mpa kPa
Soft - 14 1.357 0.136 1 17.5 0
Clean Medium - 17 0.362 0.036 2 17.5 10
0.168 or 17.5 or 25 or
Stiff - 19 or 20 0.013 4 or 10
0.069 25 30
Soft - 15 0.759 0.076 1.5 22.5 0
Lightly Medium - 18 0.237 0.024 3 22.5 10
Sandy 0.126 or 22.5 or 25 or
Stiff - 20 or 21 0.013 5 or 10
0.069 27.5 30
Very 0.090 or 7.5 or
- - 18 or 20 - 2 or 5 0 or 2
Sandy 0.027 32.5
Soft - 13 1.69 - 0.5 15 0 or 2
Organic 0.60 or
Medium - 15 or 16 - 1 or 2 15 1 or 2
0.420
106
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Table 5 Summary of Ground Water Table during permanent condition or earthquake
Designed condition.
No. Section Normal Water Note
Table (m) 3.1 Cross Section A Slope SGS Pipeline X-Y
By sub Short Term Condition (Total Stress Analysis)
1 A 3
drainage
Actual
2 B 2
condition
Actual
3 C 7
condition
Table 6. Soil Properties for Cross Section from BH-A1 and BH-A2
Unit
Cohesion
Material Name Color Weight Strength Type Phi
(kN/m3) (kN/m2)
Sandy Silt 13 Mohr-Coulomb 24 0
107
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Fig.11. FoS = 1.003 in seismic condition Fig. 12. FoS = 2.016 in static condition using
normal water table
Note. The effective parameter for longterm 3.2 Newmark Lateral Displacement
condition were derived from judgment
considering the long term and environmental The Newmark Lateral Displacement is also
effect. been done to predict lateral displacement of
each slope section during earthquake using
Cape Mendocino PET 090 built in earthquake
data in SLIDE 2017 program and is used due to
its similarity with the existing earthquake
condition. This lateral displacement prediction
is used especially when the safety factor is less
than required. The lateral displacement
analyses are presented as follow:
From the analysis above, based on the
simulations; the lateral displacement of each
Fig.13. FoS = 1.14 in static condition using slope is in the range of 15 cm to 18 cm.
extreme ground water table
108
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Table 7 Summary of Safety Factor
Computed
Section Case Factor of Note
Safety
Static – >
A Short 2.045 1.30
Term
(OK)
Seismic <
A – Short 1.10
1.003
Term (Not
Fig.14. Section A Lateral Displacement (15.562 OK)
cm) Static –
Long >
A term - 2.016 1.50
Normal
GWT (OK)
Static –
Long >
A term - 1.14 1.00
Extreme
GWT (OK)
Static – >
B Short 1.812 1.30
Term
Fig.15. Section B - Lateral Displacement (17.02 cm) (OK)
Seismic <
B – Short 1.10
1.05
Term (Not
OK)
Static –
Long >
B term - 1.757 1.50
Normal
GWT (OK)
Static –
Long >
Fig.16. Section C - Lateral Displacement (17.959 B term - 1.119 1.00
cm) Extreme
GWT (OK)
Static – >
4 SUMMARY AND CONCLUSIONS C Short 2.549 1.30
Slope stability of SGS Pipeline X-Y area has Term
(OK)
been assessed for both short term static and Seismic >
seismic loading, as well as for their long-term C – Short 1.519 1.10
static stability. The effects of water table on the Term
(OK)
stability have been considered. Based on the Static –
results of the assessment, the following Long >
conclusions are presented: C term - 2.014 1.50
a. The computed factors of Safety for Normal
GWT (OK)
different cases are summarized in the
Table 7, below: Static –
Long >
C term - 1.208 1.00
Extreme
GWT (OK)
109
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Computed c. Regarding this results, Contractor has
Section Case Factor of Note analyzed the lateral displacement using
Safety Newmark’s method and has been
Diagonal Static – presented in section 3.2.
Sect.STA >
Short 2.087 1.30
0+450 ~ Term
0+ 525 (OK)
REFERENCES
Diagonal Seismic
Sect.STA >
– Short Edil, T.B. and Wang, X. (2000). “Shear strength and Ko
0+450 ~ 1.304 1.10
Term of peats and organic soils”, Geotechnics of High
0+ 525 (OK) Water Content Materials, ASTM STP 1374.
Static – SNI 1726-2012 (2012). Tata cara perencanaan ketahanan
Diagonal Long gempa untuk struktur bangunan gedung dan non
Sect.STA >
term - 1.809 1.50 gedung, BSN
0+450 ~ Normal CUR Centre for Civil Engineering Research and Code.
0+ 525 GWT (OK)
(1996). Building on Soft Soils, 1st Edition, A.A.
Balkema.
Diagonal Static
Long
– The Ministry Regulation #22 /2007, Public Work
Sect.STA term - > Ministry #378/KPTS/1987
0+450 ~ Extreme 1.016 1.00 Kulhawy, F and Mayne, P. (1990). Manual on estimating
0+ 525 GWT (OK) Soil Properties for Foundation Design, Electric
Power Research Institute, California.
Marcuson, W.F. and Franklin, A.G. (1983).Seismic
b. Based on the computed FoS, it can be Design, Analysis and Remedial Measures to Improve
the Stability of existing Earth Dams – Corps of
concluded that the slopes considered in Engineers Approach, in Seismic Design of
this stability assessment satisfy the Embankment and Caverns, T.R. Howard, Ed., New
stability requirements, being greater than York, ASCE.
1.00 for long-term static extreme Slide 2D version.”Rocscience,Inc”, 2017
condition, and less than 1.1 for short-term Wesley, L. (2009). Behaviour and geotechnical
properties of residual soils and allophane clays.
seismic condition for section A & B. Obras y Proyectos 6, 5-10.
110
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
On The Effect of The River Water Flow and Scour to The Slope
Stability Analysis
Wilham George Louhenapessy
Structure and Geotechnical Engineering (SGE), Calvin Institute of Technology
Bambang Lareno
Indonesia College of Informatics Management and Computer
ABSTRAK: Dalam analisa kestabilan lereng di sisi sebuah sungai, setelah longsor pertama, upaya perbaikan
telah dilakukan. Namun pergerakan longsor masih berlanjut, dalam kurun belasan tahun. Dalam hal ini
kiranya perlu ditinjau penyebabnya. Salah satu hipotesa yang perlu diuji adalah seberapa jauh pengaruh
aliran dan gerusan air terhadap kestabilan lereng disamping sungai tersebut. Inspeksi singkat telah dilakukan
demikian pulan penyelidikan tanah (data primer), untuk mengetahui keadaan dan pengaruh sungai, sehingga
dapat disusun upaya-upaya tindak lanjut penanganannya dengan lebih berhasil. Pada lokasi, aliran air
berpengaruh dalam menaikan muka air tanah sehingga dapat mereduksi tegangan geser tanah. Studi
parametrik dipilih karena dapat dihubungkan dengan perpindahan yang diukur terjadi pada lereng
(observasi), sehingga memverifikasi hasil pengukuran dan analisis numerik (Metode Elemen Hingga).
Simulasi Studi Parametrik menunjukkan bahwa model numerik yang tergantung waktu dapat berguna sebagai
alat peramalan, termasuk berbagai kemungkinan gerusan dan kondisi gerusan.
Kata Kunci: kestabilan lereng, metode elemen hingga, rayapan, viscoplastisitas, studi parametrik,
pemodelan multi-laminasi (Zienkiewicz-Pande 1977)
ABSTRACT: In the slope stability analysis of a river, after the first landslide, repair efforts have been made.
But the landslide movement still continues in years. Certainly need to be investigated again the details of the
cause. One of the hypothesis that need to be tested, is how far the influence of flow and scour to the side
slope stability of the river. A brief inspection has been carried out and soil investigation has been done
(primary data) to determine the condition and influence of the river, so that better follow-up efforts /
solutions can be arranged. At landslide sites, water flow has an effect in raising the groundwater level so as
to reduce the shear stress. The Parametric Studies are chosen for their strong relation between measured
displacement within the slope, to verify the measurements and the numerical analysis (FEA) results. The
Parametric Study simulation shows that time-dependent numerical model could be useful as forecasting tool,
including various possible scour and non-scour condition.
Keywords: slope stability, limit equilibrium method, finite element method, creep, viscoplasticity,
parametric study, multilaminate model (Zienkiewicz-Pande 1977)
1 INTRODUCTION authors try to connect the link between the
creep behaviour of the slope and the scour due
Many road infrastructure, bridges and tunnels to the river flow, that flow near the toe of the
are located on the slopes of the hills / slope. Meaning, that the Geotechnical issue
mountains. The structure on the slopes/or can be explained by the fluid mechanics issue
underground excavation, over time are Briaud (2007).
deformed, due to the time-dependency nature In this paper, we will present the results of
of the soil / rocks materials (Rheology). For many events occurred in a nearby bridge
example, from several previously recorded location. Landslide / Slope instability that
projects (Table 1), it is shown that in some occur on the road to the bridge (Fig. 1), has
areas of one mining / civil engineering facility disrupted the traffics for years. Every
there has been deformations on the landslide, then be recovered by fill
slopes/tunnels Fenget.al. (2003); Panet and construction by the owner.
Guenot (1982); De Caro, M. et.al. (2016). The
111
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
112
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Furthermore, the slope stability analysis 3 INSPECTION RESULTS AND
proceeds, by using following methods: DISCUSSIONS
a) Finite Element Method 1 (FEM #1),
b) Limit Equilibrium Method (LEM),
c) Finite Element Method 2 (FEM #2), 3.1 Definition for Slope and Landslide
with an implementation of the Slope is a surface that connects higher ground
Multilaminate-Model, Newmo3962 with lower soil surface, and slope stability is
(have an ability to simulate the rock closely related to landslides or ground motion
creep / viscoplasticity); with the which is the process of transferring soil mass
following failure criteria: naturally from higher to lower places. While
Mohr Coloumb landslides occur because the imbalance of
Creep/viscoplasticity: Bingham forces acting on the slope or the force on the
Model by Bingham (1922). slope area is greater than the restraining force
Those three methods above, and two criteria in the slope.
above, are undertaken to do assessment and On every slope, there is always the possibility
identify the slope stability problems; and to of landslides. Landslides occur due to driving
find solutions (provide recommendations for forces exceeding the opposing forces produced
handling and repair measures). With this, we by soil shear strength along landslide fields
hope that the infrastructure buildings in both Das (1985). Technically it can be said that
road and mine projects are safe and sound. The landslides occur if the safety factor (SF) does
Flow Chart of this assessment is illustrated in not meet (SF <1.5).
Fig. 2.
3.2 Definition for Flow and Scour
2 METHODOLOGIES Scouring with clean water (clear-water scour)
The research method used is descriptive is scouring that occurs if there is no movement
explanatory method by Kothari (2004). This of basic material (no material is transported)
method contains several steps: (1) Selecting upstream of the building, or theoretically, τ0
and formulating the problem, (2) Determining <τc ; where τ0 is the shear stress that occurs
the objectives of the study, (3) Providing scope Briaud (2007), while τc is the critical shear
of research, (4) Exploring the sources of stress of the riverbed grains. Scouring with
relevant literature, (5) Formulating hypotheses sedimentary water (live-bed scour) is scouring
to be tested, both explicitly and implicitly, (6) that occurs when flow conditions in a river
Doing field work (in-situ) to collect data, (7) cause riverbed material to move or
Modelling with Slope Stability and theoretically (τ0> τc) the shear stress in the
Reinforcement Strategy and providing channel is greater than its critical value Chow,
interpretation of results in relation to the et al. (1988). The scour depth balance is
conditions to be investigated, and (8) achieved when the amount of material that has
Conducting generalizations and deductions moved from the scour hole is as much as the
from the findings and hypotheses tested. material supplied to the scour hole. This
The hypothesis to be tested is the flow and balance is difficult to occur if the water level
scour of water have a significant influence on changes frequently, coupled with the changing
the instability of river slopes. speed.
113
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
direction is caused by the remnants of the downstream. The second flow flows and seeps
bridge wing-wall in the river (Fig. 2). The between the u-ditch wall and the abutment
wing-wall on both sides of the bridge had wall (Fig. 3).
collapsed several years before, and had not Due to the flow is clamped by two concrete
been fully cleaned. There is one part that is big fields, then the flow has the potential to raise
enough to direct the flow. Thus, the the ground water level. Changes in
downstream flow turns sideways, and the groundwater level will change the mechanical
bottom of the bridge slopes downward. properties of the soil, especially the shear
Grinding takes place little by little (creep). strength. The surface of the road embankment
is at + 9.40 m from the original riverbed. So
when it rains normally with a long duration,
this flow can affect the strength of the bottom
of the embankment.
114
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
4 MODELING OF FINITE ELEMENT FEM- situ). The testing procedure is based on ASTM
2 (WITH TIME-STEP) Standards. A summary of the results can be
seen in Table 2. (below).
4.1 4.1 Soil Parameters
Geotechnical design parameters are interpreted
based on the results of a combined
interpretation of laboratory and field tests (in-
PS, Translation from Bahasa Indonesia: Lapisan = Layer, Lempung = Clay (CH),
Lab. = Laboratory, gunakan = use
Fig. 9 depicted the vertical stress (S-YY)
when elastic and the yield condition (failure).
4.2 4.2 Geotechnical Modelling (Finite Maximum concentrated stress appears in
Elemen Method) element #53 (at the middle of the slope).
The following step will be the Finite Element Fig. 10 depicted the Displacement Resultant
Analysis or FEM-2 (accompanied by capability and Principal Stresses (S-11) in Finite Element
to simulate creep / time-based creep or Time- modeling, with and without a Soil Retaining
Step). The FEM-2 is used to model the cross Wall.
section of the bridge (Fig. 4) , the Finite
Element modeli was made as in Fig. 5, where
there were 147 elements and 498 nodal points.
5 RESULTS
Fig. 7 shows the horizontal displacement of
points on the slopes (points 71, 112, 205, 472)
displaced up to 70 cm; At the right hand side
of Fig. 7, shows the RESULTS, in the form of
deformed shaped.
Fig. 8, depicted the horizontal and resultant
displacements of the bridge’s cross section
slope. Where the right hand side does not have
support / pinned (modeling assuming the
scour), hence produce a deformation up to 1.2
m.
115
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Fig.7 The horizontal displacement of points on the slopes (points 71, 112, 205, 472) displaced up to 70 cm;
Top Right: Shown the RESULTS, in the form of the deformed shaped
Fig. 6. FEM Mesh Modeling Finite Element Model with 147 Elements and 498 Nodal Points
116
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
117
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
REFERENCES Kothari, C. R., 2004. Research Methodology: Methods
and Techniques. 2nd ed. New Delhi: New Age
Aydan, O., Ito, J., Akagi, T., Ito, T., & Sato, J. 1995. International.
Prediction of deformation behaviour of a tunnel in Louhenapessy, W. G. and Pande, G.N. 2000.
squeezing rock with time-dependent characteristic. Newmo3962_2000: User’s Instruction Manual,
Pages 463-469 of: Pande, G.N., & Pietruszczak, S. Internal Report No.CR / 1022/ 00. Dept. of Civil
(eds), NUMOG V, Davos, Switzerland, 1995. Engineering, Univ. of Wales Swansea.
Balkema. 5th Int. Symp. on Numerical Models in Marhendi, T., 2018. Pengaruh Meander dan Keamanan
Geomechanics. Lereng Terhadap Kejadian Longsor di Jalan Raya
Bingham, E.C. 1922. Fluidity and Plasticity, 1 Ed. New Prupuk-Bumiayu (km 115+50 – 115+900). Techno,
York: McGraw-Hill. April, 19(1), pp. 007-014.
Briaud, Jean-Louis. 2007. Case Histories in Soil and Melville, B. W., 2015. Pressure-flow scour at bridges.
Rock Erosion: Woodrow Wilson Bridge, Brazos In: D. &. A. Cheng, ed. Scour and Erosion. London:
River Meander, Normandy Cliffs, and New Orleans Taylor & Francis Group, pp. 449-453.
Levees - The 9th Ralph B. Peck Lecture - Prof J.L. Pande, G.N. & Williams, J.R. 1990. Numerical Methods
Briaud; Holder of the Buchanan Chair Texas A&M in Rock Mechanics. Chichester: John Wiley.
University Panet, M. 1996. Two case-histories of tunnels through
Chow, V. T., Maidment, D. R. & Mays, L. W., 1988. squeezing rocks. Rock Mechanics & Rock
Applied Hydrology. New York: McGraw-Hill. Engineering, 29 (3), 155-164.
Das, B. M., 1985. Principles of Geothecnical Panet, M., & Guenot, A. 1982. Analysis of convergence
Engineering. 3rd ed. Boston: PWS Publishing behind the face of a tunnel. Pages 197—204 of:
Company. Tunnelling 82. A.A. Balkema.
De Caro, M., Crosta, G. B., Castellanza, R., Agliardi, F., Zienkiewicz, O.C., & Cormeau, I.C. 1974. Visco-
Volpi, G., & Alberti, S.; 2016, 2D modelling of plasticity - Plasticity and Creep in Elastic Solids - A
rockslide displacements by non-linear time Unified Numerical Sollution Approach. Int. J. for
dependent relationships. In landslides and Numerical Meth. in Engineering, 8, 821-845.
engineered slopes. Experience, theory and practice. Zienkiewicz, O.C., & Pande, G.N. 1977. Time
Proc. of the 12th int.sym. on landslides (Napoli, dependent multi-laminate model of rocks - a
Italy, 12-19 June 2016). numerical study of deformation and failure of rock
Handayani, T., Wulandari, S. & Wulan, A., 2014. masses. Int. J. Numerical and Analytical Meth. in
Pengaruh Muka Air Tanah terhadap Kestabilan Geomech. 219-247)
Lereng menggunakan GeoSlope/W 7.12. Jakarta,
s.n., pp. 409-415.
118
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Umumnya kejadian longsor terjadi pada saat hujan lebat hingga sangat lebat. Kejadian longsor
yang terjadi di dalam suatu bentang lereng dan talud tidak terjadi secara bersamaan tetapi terjadi secara
partial. Kejadian longsoran yang partial tersebut disebabkan oleh keberadaan cracks di dalam lereng. Untuk
pembuktian keberadaan cracks di lapangan dilakukan uji induced polarization. Hasil induced polarization di
temukan adanya nilai chargeability ≥ 1% dan < 1%. Kemudian dilakukan pengambilan dua buah sampel
tanah pada sampel tanah yang memiliki nilai chargeablity ≥ 1% dan < 1%. Kedua sampel tersebut kemudian
dilakukan uji CT-Scan. Hasil uji CT-Scan pada sampel yang memiliki nilai chargeability ≥ 1% ditemukan
banyaknya lubang di dalam sampel tanah dibandingkan dengan < 1%. Sampel yang memiliki lubang inilah
yang mengindikasikan keberadaan cracks di dalam lereng. Pembuktian keberadaan cracks yang berpengaruh
terhadap stabilitas lereng dilakukan pengujian di laboratorium dan lapangan. Hasil pengujian di
laboratorium cracks yang terjadi mengalami perubahan panjang dan luasan. Cracks yang terbentuk
mempengaruhi perubahan stabilitas lereng dan penurunan nilai keamanan lereng. Cracks yang terjadi di
dalam lereng terbentuk secara acak dan dapat membentuk cracks pattern yang menyerupai bidang longsor.
Bentuk cracks pattern ini yang digunakan di dalam analisis stabilitas lereng. Untuk hasil di lapangan hasil
analisis kesetimbangan lereng dapat menunjukkan lokasi lokasi stress – strain maksimum. Stress-strain
maksimum di dalam lereng inilah yang dapat menentukan lokasi longsor selanjutnya/ latent landslide.
Kata Kunci: cracks soil, cracks pattern, analisis longsor, induced polarization, chargeablity, latent
landslide, stress-strain
119
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
CT-Scan dapat dilihat pada Gbr. 3.
Keberadaan lubang-lubang tersebut merupakan
interpretasi cracks yang terjadi di dalam tanah.
Jadi dapat dikatakan dengan nilai IP ≥ 1%
tanah yang adalah telah mengalami
cracks/retak di dalam lereng.
120
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
kadar air dan perkembangan cracks di dalam di dalam lereng menurunkan angka Faktor
lereng buatan digunakan 3 kali siklus Keamanan dari lereng.
pengamatan yang dapat dilihat pada Gbr. 6. Perubahan angka keamanan di dalam lereng
Setiap siklus pengamatan memiliki jarak 2 disebabkan karena terjadinya perubahan kadar
minggu. air dan cracks pattern di dalam model
Perubahan cracks yang terjadi di dalam laboratorium. Perubahan angka Faktor
lereng membentuk cracks pattern yang Keamanan (FK) pada Siklus 1 atau siklus awal
menyerupai bidang longsor yang tergambar memiliki FK = 7.25, Siklus 2 FK = 5.15 dan
dari hasil TR dan untuk perkembangan cracks Siklus 3 FK = 2.67. Untuk hasil analisis
di dalam lereng terlihat dari hasil IP. perubahan FK dapat dilihat pada Gbr. 7.
Perubahan dan penjalaran cracks yang terjadi
Gbr. 3. Hasil Pengujian CT-Scan untuk Sampel yang Diambil pada IP ≥ 1% dan IP ≤ 1%
121
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
122
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 7. Hasil Analisis Faktor Keamanan Setiap Siklus Percobaan di Model Laboratorium
Pembentukan zona saturasi pada kedalaman yang membentuk mahkota longsor. Bentukan
6 – 10 m, maka pada bagian atas zona saturasi mahkota longsor pada line 1 ditemukan hingga
merupakan daerah yang rawan akan terjadinya 50 m dari ujung tebing, line 2 sepanjang
longsor pada saat hujan lebat, hujan sangat 43 m, line 3 sepanjang 36 m. Untuk kedalaman
lebat atau sesaat setelahnya. Kemudian hasil bidang longsor yang dibentuk dari cracks
dari line 1 – 3 digabungkan untuk pattern pada line 1 hingga kedalam 10 m,
mendapatkan pemetaan subsurface secara line 2 hingga kedalaman 13 m, line 3 hingga
keseluruhan pada daerah penelitian. kedalaman 8 m dan penjelasan di atas dapat
Hasil penggabungan dari line 1 – 3 dilihat pada Gbr. 11.
didapatkan bahwa ada daerah atau zona yang
123
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Analisis yang dilakukan dengan
menggunakan metode finite element/ elemen
hingga 3 dimensi dengan menggunakan
bantuan software Midas GTS NX. Hasil
analisis didapatkan adanya suatu zona yang
mengalami tengangan dan regangan yang
maksimum. Artinya pada daerah tersebut perlu
diwaspadai akan mengalami longsoran.
Kejadian longsor susulan terjadi pada tanggal
16 januari 2017. Sebelum kejadian longsor
pada lokasi tersebut ditandai dengan kejadian
hujan lebat sehingga daerah yang diduga
memiliki tegangan dan regangan yang
maksimum mengalami kelongsoran. Untuk
lebih jelasnya dapat dilihat pada Gbr. 13.
Gbr. 8. Keberadaan Cracks Yang Terlihat Jelas Artinya ketika dapat mengetahui posisi cracks
Setalah Terjadi Longsor pattern yang terjadi di dalam lereng dan
mengetahui daerah daerah zona saturasi yang
tergambarkan dalam bentuk stratifikasi tanah
maka dapat memprediksi bidang lemah bahkan
longsor susulan /latent landslide yang akan
terjadi berikutnya.
Pada Gbr. 13, terlihat dengan jelas lokasi
atau tempat terjadinya tengangan dan regangan
maksimum yang terjadi di dalam lereng,
sehingga pada bagian tersebut dapat ditentukan
Gbr. 9. Kondisi Awal Longsor Dusun sebagai lokasi longsor susulan.
Sumberjo Desa Olak Alen Kab. Blitar
124
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 12. Bentuk Mahkota Longsor Dusun Sumberjo Desa Olak Alen Kab. Blitar (Alexsander et al., 2018)
125
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 13. Validasi Hasil Analisis Longsor Susulan di Lapangan (Alexsander et al., 2018)
Dari uraian di atas maka dapat disimpulkan, Alexsander Stephanus. 2019. Identifikasi Keberadaan
bahwa : dan Perubahan Cracks dalam Lereng Tanah Melalui
a. Di dalam lereng cracks yang terbentuk Pengujian Tomographic Resistivity dan Induced
secara acak, tetapi dalam keacakan Polarization Sebagai Upaya Pembuktian Hipotesa
“The Concept Of Cracked Soil” (Identification of the
tersebut bila diperhatikan membentuk existence and propagation of cracks inside soil slope
cracks pattern yang menyerupai bidang through testing by tomographic resistivity and
longsor. induced polarization method as a mean to explain the
b. Dalam analisis kelongsoran harus concept of cracked soils). P.hD Thesis, Civil Engr.
diketahui dahulu daerah bidang lemah Dept. of ITS, Institut Teknologi Sepuluh Nopember,
berupa cracks dan zona saturasi yang Surabaya. (unpublished).
terjadi di dalam lereng. Alexsander Stephanus, Mochtar Indrasurya B, Utama
c. Pola sebaran cracks yang terjadi di Widya. 2017. “The Measurement of Water Intrusion
dalam lereng terjadi secara acak. Trough Cracks Propagation Inside Slope to Explain
Keacakan cracks yang terjadi bisa the Cause of Slope Failure – Case Study
Embankment in the Sanggu Buntok Airport, Central
membentuk cracks pattern yang mana Kalimanatan, Indonesia”, Electronic Journal of
cracks pattern ini lah yang membentuk Geotechnical Engineering pp 5347 – 5362. Bund
bidang longsor dan sebagai penentu 22.14.
kesetimbangan lereng Alexsander Stephanus, Mochtar Indrasurya B, Utama
Widya. 2018. Field Validated Prediction of Latent
Slope Failure Based on Cracked Soil Approach.
Lowland Technology International Association of
Lowland Technology. Vol 20 (3) 245 – 258.
Geogiga. 2014. Geoelectricity Manual Software.
Midas GTS NX ver 2.1. 2016. Manual Software.
Mochtar, Indrasurya B. 2012. Kenyataan Lapangan
Sebagai Dasar Untuk Usulan Konsep Baru Tentang
Analisa Kuat Geser Tanah dan Kestabilan Lereng.
Pertemuan Ilmiah Tahunan Himpunan Ahli Teknik
Tanah Indonesia (PIT HATTI 2012)
Plaxis Ver 8.6, Manual Software.
126
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Uji coba timbunan akan dilakukan untuk memprediksi perilaku penurunan lapisan lempung lunak.
Uji coba timbunan dibangun di atas wilayah pesisir di Cilegon, Banten, Indonesia. Sebagian besar tanah di
dekat pantai adalah lempung yang sangat sensitif dengan terdapat banyak fragmen karang. Timbunan,
investigasi lokasi, dan survei penurunan tanah disiapkan oleh Lotte Engineering and Construction. Terkadang
cukup sulit untuk memprediksi besarnya penurunan yang terjadi di tanah lempumg yang sangat sensitif.
Besarnya penurunan yang terjadi seringkali diperkirakan menggunakan analisis numerik. Hasil pengamatan
penurunan di lapangan akan dibandingkan dengan hasil pemodelan numerik menggunakan metode elemen
hingga. Model elemen hingga digunakan model setengah bagian timbunan untuk menggambarkan perilaku
konsolidasi lapisan tanah lempung dalam kondisi pembebanan. Parameter konstitutif tanah yang akan
digunakan dalam pemodelan adalah model Mohr-Coulomb dan Hardening Soil. Metode perhitungannya adalah
konsolidasi. Hasil dari penelitian ini adalah metode elemen hingga menaksir terlalu rendah total penurunan
dalam tanah lempung yang sangat sensitif dengan kandungan fragmen coral.
Kata Kunci: timbunan, tanah lempung lunak, fragmen karang, penurunan, konsolidasi
ABSTRACT: A trial embankment will be conducted to predict the settlement behavior of the soft clay layer.
The trial embankment was built on coastal area in Cilegon, Banten, Indonesia. Most of the soil near the shore
is a very sensitive clay with a lot of coral fragment. Trial embankment, site investigation, and settlement plate
survey are prepared by Lotte Engineering and Construction. Sometimes it is quite difficult to predict the
magnitude of the settlement that occurs in a very sensitive clay. The magnitude of the settlement that occurs is
often estimated using numerical analysis. The results of observations of settlement in the field will be compared
with the results of numerical modeling using the finite element method. The finite element model is used a half
section embankment model to illustrate the consolidation behavior of the clay layer under loading condition.
The soil constitutive parameters to be used in modeling are Mohr-Coulomb and Hardening Soil models. The
calculation method is consolidation. The result of this study is the finite element method underestimated the
total settlement in the very sensitive clay with coral fragment layer.
Keywords: trial embankment, soft clay, coral fragment, settlement, consolidation
127
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
settlement due to embankment in coastal areas
that contain a lot of coral. Numerical analysis
was performed using the finite element method
with two constitutive models, namely Mohr
Coulomb and Hardening Soil. The
embankment construction area in Cilegon. The
construction area is located on the coastal area
near the shoreline in Fig. 1. The surface layer of
the soil contained a lot of coral fragment.
The distribution of soft clay thickness can be
seen on the Fig. 2.
Fig. 3 Soil Sample
Cs H σ′0 + Δσ′
Sc = 1+e0
log ( σ′0
) (2)
128
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
129
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Fig. 10. Initial Void Ratio Fig. 13. Over Consolidation Ratio (OCR)
Average of void ratio for soft clay(N<6) is Because of large variation in
1.92 (0.40~3.75) preconsolidation pressure (Pc’) and over
consolidation ratio (OCR), the calculation
taking conservative value of Pc’ and OCR. The
value of Pc’ 49 kPa.
130
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2.4 Trial Embankment Dimension 3 NUMERICAL MODELLING
The Trial embankment location is shown in Fig.
16. The Trial embankment were carried out at 3.1 Constitutive Model
the project site location in Cilegon. The trial
Brinkgreve et al (2006) explained that a
embankment cross section and upper view can
material model is a set of mathematical
be seen in Fig. 17 and Fig. 18. Actual photo of
equations that describes the relationship
the embankment in field can be seen on Fig. 19.
The embankment was carried out using fill between stress and strain. Material model are
often expressed in a form in which infinitesimal
material with approximated density around 20
increments of stress are related to infinitesimal
kN/m3.
increments of strain.
There are several constitutive model that can
be used in the Plaxis 2D program. The choice
of constitutive model is very dependent on field
conditions, the availability of parameters, and
the level of accuracy to be achieved. On this
paper, the Mohr Coulomb and Hardening Soil
Model is used in the model.
131
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
parameter was not available. So a correlation is 3.3 Result
used to obtained the stiffness modulus. In this paper, modelling is done in plain strain
condition. Soil is modeled using triangular
3.2 Input Parameter element with 15 nodes. The boundary condition
used standard fixities menu from PLAXIS. The
The input parameter for Mohr Coulomb and standard fixities automatically set general
Hardening soil model as mention on table 1 and boundary conditions to the geometry model.
table 2 below, This boundary conditions are generated
Table 1. Input Parameter (1) according to the following rules according to
manual PLAXIS 2D by Brinkgreve et al.
Type Fill Sand (2006):
Mohr a. Vertical geometry lines for which the x-
Material Model Mohr Coulomb coordinate is equal to the lowest or
Coulomb
Material Type Drained Drained highest x coordinate in the model obtain
ɣ sat (kN/m3) 20 20 a horizontal fixity (ux=0).
ɣ unsat (kN/m3) 16 16
b. Horizontal geometry lines for which the
y-coordinate is equal to the lowest y-
E (kN/m2) 30000 38000 coordinate in the model obtaine a full
V 0.30 0.30 fixity (ux=ux=0)
Kx (m/day) 1 1 c. Plates that extend to the boundary of the
Ky (m/day) 1 1 geometry model obtain a fixed rotation
Ф 34 39 in the point at the boundary (ϕz=0) if at
c (kN/m2) 1 1 least one of the displacement directions
of that point is fixed.
Table 2. Input Parameter (2)
The boundary of the model is far enough so
Coral Clay Coral Clay that it does not affect the magnitude of the
Type
HS MC settlement. This can be seen in Fig. 24 and Fig.
Hardening Mohr 27, where the maximum settlement is not
Material Model
Soil Coulomb affected by the boundary.
Material Type UnDrained Undrained The geometry of the finite element model is
ɣ sat (kN/m3) 16 16 similar to the field condition. The Geometry of
ɣ unsat (kN/m3) 15 15 the Mohr Coulomb Model is shown on the Fig.
E (kN/m2) - 700
22 and for the Hardening Soil Model on the Fig.
25. The deformed Mesh for Mohr Coulomb
v 0.30 0.30 Model is shown on the Fig. 23 and for the
Kx (m/day) 4.49E-04 4.49E-04 hardening soil model on the Fig. 26.
Ky (m/day) 2.48E-04 2.48E-04
Ф 12.6 12.6
c (kN/m2) 33.7 33.7
E50ref (kN/m2) 1200 -
Eoedref (kN/m2) 960 -
Eurref (kN/m2) 5400 -
132
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Fig. 24. Vertical Displacement Contour Mohr Fig. 27. Vertical Displacement Contour Hardening
Coulomb Soil Model
According to Susila and Apoji (2012) the The summary of settlement curve can be
deformation behavior produced by MC model seen on the Fig. 28. The settlement curve use
and HS model is not significant for peat soil. the data from middle settlement beacon that
For this paper, the supporting soil is soft happen on the center of the embankment. The
clay mixed with coral fragment and the Mohr coulomb model result is closed to the
magnitude of the deformation for the two model Theoritical Settlement. The hardening soil
is quite different. The maximum magnitude of model is more closed to the field settlement
vertical displacement for mohr coulomb model result.
is 0.587 meter. The maximum magnitude of
vertical displacement for hardening soil model
is 0.799 meter. The vertical displacement
contour can be seen on Fig. 24 for Mohr
Coulomb model and on Fig. 27 for Hardening
Soil model.
133
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
things that cause this to happen. One of them is more similar to the theoretical
due to greater permeability because there is a settlement calculation. The hardening
coral fragment in the clay layer. So that the soil model deformation is more similar
consolidation process occurs faster. In addition, to the actual field deformation. The
the settlement plate is not installed above the hardening soil model is more suitable
geotextile. this is done to show the maximum approach to model the settlement
actual settlement that may occur. behavior for field condition.
d. The consolidation process that occurs in
embankment in the field occurs faster
4 CONCLUSION because of the higher permeability
given by the coral fragment contained in
The trial embankment is conducted on the site the soft clay layer.
project in Cilegon. The finite element model
has built to evaluate the actual field settlement.
The finite element model using the Mohr ACKNOWLEDGEMENTS
Coulomb Soil Model and Hardening Soil
Model. Following is the summary of the result: The construction of the trial embankment, soil
a. The laboratory result interpretation: investigation, and monitoring control of the
Average of water content for soft settlement beacon is done by PT. Lotte
clay(N<6) is 72.8%. Chemical Indonesia (LCI) and PT. Lotte
Average of unit weight for soft Chemical Titan Nusantara (LCTN).
clay(N<6) is 15.5kN/m3
Average of specific gravity for soft
clay(N<6) is 2.62 REFERENCES
Average of liquid limit for soft
clay(N<6) is 76.2% Das, Braja M. (7th edition). 2010. Principles of
Average of plasticity index for soft Geotechnical Engineering. Stamford: Cengage
Learning
clay(N<6) is 45.0% Brinkgreve, R.B., Broere,W., and Waterman, D. 2006.
Based on atterberg limit, clay is Manual PLAXIS 2D – Version 8. Delft, Netherlands:
classified with CL and CH as above PLAXIS bv.
graph. (Most data is located on high Susila, E., Apoji, D. 2012. Settlement of Full Scale Trial
plasticity side) Embankment on Peat in Kalimantan: Field
Average of void ratio for soft Measurements and Finite Element Simulations.
Jurnal Teknik Sipil ITB. Vol 19 no 3. Page 249-264.
clay(N<6) is 1.92 Terzaghi, K. 1925. Erdbaumechanik auf
Average of undrained shear strength Bodenphysikalischer Grundlager, Deuticke, Vienna.
for soft clay(N<6) is 10.7 kPa Terzaghi, K., and Peck, R. B. 1967. Soil Mechanics in
Because of large variation in Engineering Practice, 2nd ed., Wiley, New York.
preconsolidation pressure (Pc’) and Watabe, Y., Sassa, S., Kaneko, T., Nakata, Y. 2015.
Mechanical Characteristics of reconstituted coral
over consolidation ratio (OCR), the gravel soils with different fractions of finger-coral
calculation taking conservative value fragments and silt matrix. Soils and Foundation
of Pc’ and OCR. The value of Pc’ 49 Volume 55 issue 5. Pages 1233-1242. The Japanese
KPa. Geotechnical Society
b. The finite element modeling result, Watabe, Y., Kaneko, T., Sassa, S. 2016. Mechanical
Maximum vertical deformation for properties of coral-silt composite soils evaluated on
the basis of skeletal structure of coral gravels. The
Theoritical Settlement is 0.6712 15th Asian Regional Conference on Soil Mechanics
meter. and Geotechnical Engineering. Pages 547-551. The
Maximum vertical deformation for Japanese Geotechnical Society
Field Settlement is 0.81 meter. Watabe, Y., Sassa, S., Kaneko, T., Nakata, Y. 2017.
Maximum vertical deformation for Mechanical Characteristics of undisturbed coral
gravel soils: The intergranular void ratio as common
Mohr Coulomb model is 0.587 governing parameter. Soils and Foundation Volume
meter. 57 issue 5. Page 760-775. The Japanese Geotechnical
Maximum vertical deformation for Society.
Hardening Soil model is 0.799 meter.
c. Based on the settlement curve, the Mohr
Coulomb soil model deformation is
134
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Pada pembangunan konstruksi Jalan Tol Batang Semarang Seksi 2 telah terjadi suatu longsoran
dalam pelaksanaan pekerjaan timbunan tinggi 3.5 m di atas tanah lunak dengan kedalaman 15 m, dimana
pekerjaan dilakukan dengan cepat akibat kebutuhan jalan fungsional mudik lebaran. Back analysis dilakukan
dan menghasilkan hasil yang sesuai dengan kondisi longsor di lapangan. Back analysis dilakukan dengan cara
melihat bidang gelincir dan pengangkatan tanah (heaving) yang terjadi disamping kaki timbunan dengan lebar
10 m dan tinggi 1 m. Maka untuk mengatasi masalah tersebut perlu dilakukan perkuatan tanah menggunakan
berbagai alternatif, salah satunya dengan menggunakan minipile dengan platform. Analisis menggunakan
metode elemen hingga untuk mencari nilai safety factor, displacement dan besar settlement telah dilakukan,
dan menghasilkan nilai sesuai kriteria.
ABSTRACT: In the construction of Batang Semarang Toll Road Section 2 there has been a landslide at work
implementation of a 3.5 m height embankment on soft soil with a depth 15 meter, where the work is done
quickly due to need for Eid trip functional road. Back analysis is done and produce a result that match with
landslide condition at site. Back analysis is done by looking at slip area and removal of soil (heaving) that
occured at the side of embankment foot with a width of 10 meter and a height of 1 meter. Then to overcome
these problem soil reinforcement should have been applied. There are various alternatives, one of them by
using minipile with platform. The analysis using finite element method to find value of safety factor,
displacement and settlement has been done and produce values according to criteria.
135
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Penggunaan timbunan badan jalan di atas
tanah lunak membutuhkan berbagai alternatif
perbaikan tanah untuk mengatasi masalah
stabilitas lereng, daya dukung tanah dasar dan
penurunan tanah dasar. Salah satunya dengan
menggunakan minipile dengan platform.
Analisis dilakukan menggunakan metode
elemen hingga untuk mencari nilai safety
factor, displacement dan besar settlement.
Gbr. 3. Heaving
136
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Analisis dilakukan menggunakan metode
elemen hingga dan perkiraan bidang gelincir
dimodelkan setengah lingkaran menggunakan
Interface. Didapatkan nilai total displacement
sebesar 1.64 m ditunjukkan dalam Gbr. 6 dan
safety factor sebesar 1.1 dengan kedalaman
bidang gelincir sedalam 3 m di bawah
permukaan tanah ditunjukkan dalam Gbr. 7.
137
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
soft soil model untuk tanah lempung berjenis 60 cm kelas beton B dan parameter minipile
sangat lunak. ukuran 20x20 disesuaikan dengan spesifikasi
Pemodelan pada spun pile menggunakan PT Pacific Prestress Indonesia. Sedangkan
pile diameter 60 cm kedalaman 17.2 m dengan untuk tie beam menggunakan beton K-350 cast
interval 1.5 m, serta matras menggunakan tie in situ.
beam tinggi 40 cm dan lebar 3 m. Sedangkan Tahapan penimbunan dalam analisis
pemodelan pada mini square pile menggunakan disesuaikan dengan rencana penimbunan
pile ukuran 20 x 20 cm kedalaman 20.3 m setinggi 5.7 m, pemodelan beban truk
dengan interval 1.8 m, serta matras bermuatan sebesar 8 kN/m2 hingga pemodelan
menggunakan geogrid 1 lapis dan sirtu setebal beban lalu lintas sebesar 90.4 kN/m2 pada
1 m ditunjukkan dalam Gbr. 8. Dan untuk timbunan badan jalan. Serta penimbunan
parameter minipile, spun pile dan tie beam preloading setinggi 2 m yang bertujuan untuk
ditunjukkan dalam Tabel 3. Penggunaan memampatkan tanah dasar dan selanjutnya
parameter spun pile disesuaikan dengan dilakukan unloading pada preloading.
spesifikasi PT Wijaya Karya Beton diameter
138
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
total displacement tahapan akhir konstruksi b. Setelah dilakukan analisis menggunakan
sebesar 19.18 cm sehingga didapatkan minipile dengan platform, didapatkan
settlement sebesar 2.17 cm ditunjukkan dalam hasil sebagai berikut :
Gbr. 11.
Adanya kenaikan nilai safety factor
sehingga timbunan memiliki
stabilitas lereng yang aman.
139
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Perbandingan Hasil Analisis Struktur Penahan Tanah pada Tanah
Lunak dengan Program PLAXIS-2D Menggunakan Soil Model
Hardening Soil dan Soft Soil
Budiantari Herdianti Laksita
PT IFP Pratama Desain
Eric Christhoper Jacinto Husin
PT IFP Pratama Desain
ABSTRAK: Dalam analisis struktur penahan tanah untuk galian besmen pada tanah lunak, pemilihan soil
model untuk lapisan tanah lunak perlu diperhatikan. Apakah perlu untuk selalu menggunakan soil model soft
soil pada lapisan tanah lunak? Bagaimana jika digunakan soil model yang lain, apakah perbedaannya cukup
signifikan? Untuk mengetahui hal tersebut, telah dilakukan studi pada 2 proyek galian besmen; 1 proyek
berlokasi di Jakarta Utara dengan ketebalan lapisan tanah lunaknya sekitar 11 m dan 1 proyek berlokasi di
Surabaya dengan ketebalan lapisan tanah lunaknya sekitar 18 m. Studi dilakukan dengan menggunakan
program Plaxis-2D dimana 2 tipe soil model pada lapisan tanah lunak yaitu soil model Hardening Soil (HS)
dan soil model Soft Soil (SS) akan dibandingkan hasilnya. Pemodelan aliran air tanah yang digunakan dalam
analisis adalah preatik dan analisis dilakukan untuk kondisi undrained dan drained. Hasil studi menunjukkan
bahwa perbedaan hasil analisis antara soil model HS dan soil model SS tidak terlalu signifikan, sehingga
perencana dapat memilih diantara kedua soil model tersebut, mana yang akan digunakan untuk lapisan tanah
lunak.
Kata Kunci: struktur penahan tanah, tanah lunak, Plaxis 2D, soil model
ABSTRACT: Soil models for soft soil layers in earth retaining structures analysis for basement excavation
should be carefully selected. Is it necessary to always use Soft Soil models for the soft soil layer? What if
another soil model is used, will the difference be significant? To answer the question, case studies were carried
out on 2 basement excavation projects; 1 project is located in North Jakarta with soft soil thickness of 11 m
and the other projects is located in Surabaya with soft soil thickness of 18 m. The study was conducted utilizing
Plaxis-2D program adopted 2 types of soil model for the soft soil layers; namely Hardening Soil (HS) and Soft
Soil (SS). Pore pressure calculation type used in the analysis was phreatic, and the analysis was carried out for
both undrained and drained condition. Comparison of analysis results shows that the difference between the
HS model and the SS model is not significant. Therefore, either one of the two soil models can be selected as
a soil model for the soft soil layer.
Keywords: earth retaining structure, soft soil, Plaxis 2D, soil model
140
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2 METODA ANALISIS Analisis dilakukan untuk 2 kondisi yaitu
kondisi undrained dan kondisi drained.
Analisis struktur penahan tanah dilakukan Analisis dilakukan mengikuti proses
menggunakan program Plaxis 2D. Pada pelaksanaan yang artinya analisis dilakukan
program Plaxis 2D, tersedia beberapa soil bertahap dari pembuatan struktur penahan
model antara lain Mohr Coulomb (MC), tanah, penggalian untuk pemasangan sistem
Hardening Soil (HS), Hardening Soil with penunjang baris pertama, pemasangan sistem
Small Strain Stiffness (HSsmall) dan Soft Soil penunjang baris pertama diikuti dengan
(SS). Untuk analisis galian pada tanah NC clay, pekerjaan galian untuk pemasangan sistem
soil model rekomendasi pertama dari Manual penunjang baris berikutnya dan seterusnya
Plaxis adalah soil model Hardening Soil with sampai galian mencapai cut-off level.
Small Strain Stiffness (HSsmall) dan soil model
Soft Soil (SS), sedangkan soil model 3 DATA PROYEK
rekomendasi kedua adalah soil model
Hardening Soil (HS). Soil model Mohr
Coulomb (MC) yang merupakan soil model 3.1 Proyek-1
yang paling sederhana dan banyak dipakai Proyek 1 yang terletak di Jakarta Utara terdiri
dalam routine design work oleh Manual Plaxis dari 4 buah bangunan komersial 8 sampai 15
direkomendasikan hanya untuk preliminary lantai dengan 3 lapis besmen yang menyatukan
analysis. seluruh bangunan. Akan ada urugan sehingga
Soil model MC memodel perilaku non linear nantinya lantai besmen 1 akan berada dibawah
tanah menjadi bilinear (linear elastic perfectly tanah. Kedalaman galian 8.5 m dan tanah clay
plastic). Stiffness parameter (E) diasumsikan sangat lunak dengan N-SPT = 1 dijumpai
konstan pada zona elastik. Pada kondisi aktual, sampai 2 m dibawah dasar galian. Sebagai
perilaku tanah adalah non linear yang artinya pengaman galian digunakan D-Wall tebal 60
nilai E tidak pernah konstan, tetapi selalu cm dengan sistem penunjang 2 baris ground
berubah tergantung dari stress levelnya. anchor untuk 3 sisi. Dan pada satu sisi yang
Pada soil model HS, perilaku non linear berimpitan dengan lahan tetangga digunakan
tanah dimodel dengan kurva hiperbolik dan D-Wall tebal 80 cm dengan sistem penunjang 2
nilai kekakuannya tergantung dari stress level. baris diagonal strut. Untuk studi yang akan
stiffness parameter-nya terdiri dari secant ditinjau adalah D-Wall tebal 80 cm dengan
stiffness (E50), tangent stiffness for primary sistem penunjang diagonal strut. Profil tanah
oedometer loading (Eoed), unloading/reloading dengan nilai N-SPT dan potongan D-Wall
stiffness (Eur) dan stress level dependancy (m). disajikan pada Gbr. 1.
Soil model HSsmall parameternya sama
dengan soil model HS ditambah 2 parameter
small strain stiffness yaitu shear modulus at
very small strain (G0) dan threshold shear
strain (γ0.7).
Stiffness parameter pada soil model SS
adalah modified compression index (λ*) dan
modified swelling index (κ*). Nilai λ*
merupakan fungsi dari parameter CC dan eo dan
nilai κ*merupakan fungsi dari parameter CS dan
eo.
Mempertimbangkan kemudahan dalam
menentukan parameter tanahnya maka soil
model untuk lapisan tanah lunak yang
digunakan dalam studi ini adalah Hardening
Soil (HS) dan Soft Soil (SS).
Pemodelan aliran air tanah yang digunakan Gbr. 1. Profil Tanah dan Potongan D-Wall pada
dalam analisis adalah preatik karena jenis tanah Proyek-1
di sepanjang kedalaman galian pada kedua
proyek yang ditinjau adalah clay yang relatif Parameter tanah yang digunakan dalam
kedap. Jadi diasumsikan steady state flow tidak analisis dirangkumkan pada Tabel 1.
terjadi.
141
23rd Annual National Conference on Geotechnical Engineering
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Jakarta - INDONESIA, 12-13 November 2019
3.2 Proyek-2
Proyek-2 terletak di Surabaya. Proyek ini
merupakan proyek Apartement yang terdiri dari
3 Tower 50 lantai dengan 2 lapis besmen yang
menyatukan ketiga tower. Kedalaman galian
sekitar 10 m dan tanah clay sangat lunak dengan
N-SPT ≤ 1 dijumpai sampai 8 m dibawah dasar
galian. Sebagai pengaman galian digunakan
secant pile dia. 1.2 m dengan spacing c/c 2.04
m. Mempertimbangkan adanya lapisan tanah
lunak yang sangat tebal maka metoda
konstruksi yang digunakan adalah metoda top-
down construction dengan lantai besmen B1 Gbr. 2. Profil Tanah dan Potongan Secant Pile
sebagai sistem penunjang. Profil tanah dengan pada Proyek-2
nilai N-SPT dan potongan secant pile disajikan
pada Gbr. 2. Parameter tanah yang digunakan dalam
analisis dirangkumkan pada Tabel 2.
142
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Depth ( m )
-10 -10
-5 -5
Depth ( m )
Depth ( m )
-10 -10 -5 -5
Depth ( m )
Depth ( m )
-15 -15
-20 -20
-20 -20
-25 -25
143
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
maupun kondisi drained. Perbedaan nilai e. Perbedaan nilai defleksi maupun nilai
momen maksimum antara soil model HS dan momen antara soil model HS dan soil model SS
soil model SS adalah sekitar 2% ~ 5%. tidak terlalu signifikan, dimana perbedaannya
Membandingkan bending moment pada adalah sekitar 5%. Jadi perencana dapat
kondisi undrained dan kondisi drained pada memilih soil model yang akan digunakan untuk
kedua soil model maka baik soil model HS lapisan tanah lunak, apakah soil model HS atau
maupun soil model SS, kondisi drained yang soil model SS, tergantung mana yang lebih
memberikan bending moment yang lebih besar. memudahkan dalam penentuan parameter
tanahnya.
5 KESIMPULAN
Dari hasil studi pada 2 proyek seperti diuraikan UCAPAN TERIMA KASIH –
diatas, dapat ditarik kesimpulan sebagai ACKNOWLEDGEMENT
berikut:
a. Secara umum, hasil analisis soil model HS Ucapan terima kasih penulis tujukan kepada Bapak
dan soil model SS relatif hampir sama. Ir. Irawan Firmansyah, MSCE yang telah
memberikan inspirasi untuk penulisan makalah ini
b. Hasil Plaxis-drained analysis lebih kritis dan juga telah berkenan mereview makalah ini.
dibandingkan dengan hasil Plaxis-undrained
analysis, baik untuk soil model HS maupun
soil model SS, dengan catatan pemodelan DAFTAR PUSTAKA
aliran air tanahnya adalah preatik.
c. Plaxis-undrained analysis menunjukkan Beberapa Laporan Proyek
bahwa soil model SS memberikan defleksi Bowles, J.E. 1988. Foundation Analysis and Design, 4th
yang sedikit lebih besar dibandingkan Edition. McGraw-Hill
dengan soil model HS. Tetapi sebaliknya, Braja, M. Das. 1990, Principle of Foundation
Plaxis-drained analisis menunjukkan bahwa Engineering, 2nd Edition. PWS-Kent Publ. Co.
Plaxis bv 2019. Manual PLAXIS-2D
soil model HS yang sedikit lebih besar Surarak et al., 2012. Stiffness and Strength Parameters
defleksinya. for Hardening Soil Model of Soft and Stiff Bangkok
d. Soil model HS memberikan momen yang Clays. Soil and Foundation, The Japanese
lebih besar dibandingkan soil model SS, baik Geotecnical Society, Elsevier B.V., pp. 682-697.
untuk Plaxis-undrained analysis maupun
Plaxis-drained analysis.
144
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Analisis Dua Tahap Pengaruh Pelepasan Strutting Terhadap
Kekuatan Secant Pile Proyek Basement 4 Lantai Hotel Tentrem
Semarang
Hanggoro Tri C. Andiyarto
Dosen Program Studi Teknik Sipil Universitas Negeri Semarang
Kukuh C. Adi Putra
Program Studi Magister Teknik Sipil Universitas Diponegoro
Masita Fika Maghfiroh
Program Studi Teknik Sipil Universitas Negeri Semarang
ABSTRAK: Konstruksi basement bangunan bertingkat tinggi menjadi populer saat ini, karena ketersediaan
area yang terbatas sementara kebutuhan untuk area parkir semakin bertambah dengan meningkatnya jumlah
kendaraan. Pada proyek Hotel Tentrem Semarang pekerjaan basement dilakukan dengan menggunakan
metode konstruksi bottom-up dalam 4 tahap penggalian dengan struts baja 4 tingkat. Kedalaman galian tanah
maksimum adalah -16 m pada tahap galian terakhir. Lubang yang digali dipertahankan oleh dinding secant
pile tebal 0.88 m sedalam -33 m. Instrumen yang digunakan untuk memantau perilaku tanah dan struktur
akibat penggalian adalah inclinometer dengan persebaran 8 titik.
Paper ini menyajikan studi yang mengevaluasi pengaruh pelepasan struts terhadap kekuatan dinding
secant pile. Evaluasi dilakukan dengan dua tahap, yaitu tahap pertama menganalisis pengaruh tahapan
pelepasan struts terhadap deformasi horisontal secant pile dengan Plaxis 2D v8.6 kemudian membandingkan
hasilnya dengan data inclinometer. Tahap kedua mengevaluasi gaya aksial maksimum dan momen lentur
secant pile hasil analisa Plaxis 2D v8.6 kemudian memplot nilai tersebut menggunakan software PCA-COL.
Hasilnya, dari tahap pertama didapat gaya aksial maksimum secant pile sebesar -1022,3 kN dan momen
lentur maksimum secant pile sebesar -1209.986 kNm serta deformasi horisontal tiang masih dalam batas ijin
yang disyaratkan. Untuk analisa tahap kedua, nilai gaya aksial dan momen lentur dinding secant pile masih
berada di dalam area grafik diagram interaksi P-M. Sehingga dapat disimpulkan dinding secant pile masih
aman dan layak digunakan untuk konstruksi selanjutnya.
Kata Kunci: Basement, Deformasi Horisontal, Secant Pile, Strutting
145
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2 TINJAUAN PUSTAKA 2.4 Sistem Strutting
Pemilihan material strut bergantung pada
2.1 Struktur Basement besarnya tekanan lateral, metode galian,
kedalaman galian, lebar galian, lamanya waktu
Pada sistem bottom-up, galian tanah dapat pemasangan dan kemudahan pemasangan. Di
berupa open cut dan digali ke tingkat strut lapangan, jenis strut paling banyak digunakan
pertama. Strut tingkat pertama dipasang adalah strut baja karena lebih mudah dalam
sebelum penggalian berlanjut. Tanah digali ke pemasangan, memiliki kuat tekan yang besar
tingkat strut berikutnya dan strut tingkat kedua dan dapat digunakan berulang kali. Setiap strut
dipasang lalu dilanjutkan hingga penggalian dalam penahan galian sebaiknya dibuat
mencapai kedalaman akhir. Jumlah level strut proposional terhadap beban maksimum yang
bergantung pada kedalaman galian. Pelat diberikan oleh diagram tekanan untuk
basement paling bawah dicor terlebih dahulu mengurangi pergerakan sistem penahan tanah
sehingga menjadi raft foundation dengan (Vijayawada, 2011; Redana, 2010).
menggunakan metode papan catur, kemudian
basement diselesaikan dari bawah keatas
dengan menggunakan scaffolding. Kolom,
balok dan slab dicor di tempat (cast in place).
Proses ini berlanjut ke atas sampai slab paling
atas dibangun. (Kajewski, 1994).
146
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2.6 Field Monitoring Inclinometer 3 HASIL DAN ANALISIS
Pemasangan instrumentasi dan monitoring
harus sudah dimulai sebelum dilakukannya 3.1 Analisis Data Tanah
pekerjaan yang menyebabkan terjadinya
Lingkup pekerjaan penyelidikan tanah
perubahan tegangan dan deformasi pada tanah
adalah melaksanakan 3 titik pengeboran dalam
di sekitar galian dan pada struktur penahan
hingga kedalaman 30 m, pengujian SPT
tanah, sehingga diperoleh pembacaan awal
dengan interval 1,5 m dimulai dari kedalaman
(datum) bagi pembacaan-pembacaan
15m hingga akhir pengeboran dan tidak
berikutnya, setelah terjadinya deformasi. Jadi
mengambil contoh tanah tak terganggu (UDS).
sebelum dilakukannya galian basement dan
Berdasarkan hasil penyelidikan tanah
dewatering, pemasangan instrumentasi dan
didapat grafik N-SPT vs kedalaman tanah,
monitoring harus sudah dimulai. Berikut
disajikan letak titik pemasangan inclinometer. diketahui bahwa tanah di bawah permukaan
lokasi Hotel, Mal dan Apartemen Tentrem
terbentuk dari tanah berbutir halus (fine-
grained soil) yang secara visual
diklasifikasikan sebagai tanah lempung (clay).
Kedalaman 37 m hingga 40 m merupakan
lapisan berbutir kasar (granular soil) yang
teridentifikasi sebagai pasir halus (fine sand).
Konsistensi tanah pada kedalaman 15 m
adalah lunak (soft). Setelah kedalaman 15 m
hingga ditemukannya lapisan pasir, konsistensi
tanah adalah agak kaku hingga kaku (medium
stiff - stiff). Di bawah lapisan pasir konsistensi
tanah adalah kaku hingga sangat kaku (stiff –
very stiff). Profil dari masing-masing lapisan
tanah dapat dilihat pada gambar di bawah ini.
147
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
3.2 Analisis Data Inclinometer
Hasil pengukuran deformasi di lapangan
menggunakan inclinometer adalah sebagai
berikut:
Gambar. 5. Hasil deformasi inclinometer titik 2, Gambar. 7. Sistem Strutting Hotel, Mall dan
5 dan 8 tanggal 25 Juni 2018 arah x Apartement Tentrem
148
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
3.3 Analisis Pemodelan Plaxis 2D
Lapisan tanah pada galian dimodelkan
dengan Model Mohr-Coulomb. Model yang
sangat dikenal ini digunakan untuk pendekatan
awal terhadap perilaku tanah secara umum.
Model ini meliputi empat buah parameter,
yaitu modulus Young (E), angka poisson (ν),
Gambar 9. Tekanan Air Pori Tanah Sebelum
kohesi (c), dan sudut geser (φ). Informasi data
Penggalian
input program Plaxis 2D disajikan pada
gambar dan tabel di bawah ini.
Gambar. 8. Model Geometri Secant Pile dengan Gambar 13. Deformasi horisontal setelah
Strutting penggalian yaitu sebesar 79.84 mm
149
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
3.4 Analisa Deformations, Axial Force,
Bending Moments, dan Shear Force
Penampang Secant Pile
Untuk mengetahui perilaku secant pile pada
saat tahapan pelepasan strutting maka akan
ditampilkan diagram gaya-gaya yang bekerja
berupa gaya geser, gaya aksial, momen lentur
dan pergerakan horisontal pada dinding saat
tahapan pelepasan strutting layer 4, 3, 2, dan 1
dari kiri ke kanan disajikan pada gambar di
bawah ini.
150
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
3.5 Perbandingan Hasil Inclinometer dan
Hasil Deformasi Plaxis 2D
Disajikan penyimpangan perbandingan
perpindahan horizontal setiap tahap pelepasan
strutting dari data inclinometer dengan hasil
analisa Plaxis 2D sebagai berikut.
Basement 4
Elv. -16.0 m
Basement 4
Elv. -16.0 m
Basement 4
Elv. -16.0 m
Basement 4
Elv. -16.0 m
153
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
154
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Perhatian terhadap permasalahan defleksi turap vinyl adalah hal yang lumrah terjadi bagi para
praktisi. Alasan inilah yang membuat pemakaian turap vinyl sangat terbatas. Pada umumnya prediksi defleksi
yang sangat tinggi lumrah terjadi dikarenakan rendahnya nilai modulus elastisitas turap, serta konservatifnya
desain tekanan lateral tanah, yang berakibat prediksi defleksi yang sangat tinggi. Mayoritas perencanaan
dilakukan dengan acuan U.S. Steel Sheet Piling Design Manual. Namun studi terbaru menunjukkan defleksi
yang terjadi pada turap vinyl tidaklah setinggi yang diprediksi. Belum pernah ada kriteria desain atau acuan
untuk menangani kasus ini secara khusus. Studi ini bertujuan untuk memberi jawaban lebih lanjut untuk
membedakan defleksi pada perhitungan desain dengan menggunakan metode-metode yang umum digunakan,
serta defleksi aktual. Untuk meraih tujuan tersebut, penggunaan model fisik diharapkan dapat membantu
menjawab pertanyaan tersebut. Hasil dari model fisik kemudian dibandingkan dengan hasil perhitungan
defleksi dari U.S. Steel Sheet Piling Manual, serta software-x yang merupakan software milik perusahaan
produsen. Studi ini diharapkan dapat menjadi kerangka awal untuk penelitian-penelitian selanjutnya. Hasil
yang didapatkan bahwa defleksi dari model fisik lebih kecil daripada defleksi prediksi perhitungan yang
dilakukan. Didapatkan rasio antara 0.24-0.87 untuk perbandingan defleksi antara defleksi aktual dengan
perhitungan.
Kata Kunci: tekanan lateral tanah, turap, vinyl, modeling fisik, geoteknik
ABSTRACT: Concerns on vinyl sheet pile anticipated high deflection have been widely well noted by
practitioner in the field. This particular reason has made its uses are very limited in height. It is very common
to predict deflection based on vinyl material low elastic modulus with a very conservative soil lateral load
methods, resulting in a very high deflection value. Majority of people are using U.S Steel Sheet Piling Design
Manual as reference to design vinyl sheet pile, whilst recent study has shown its deflection is much lower than
predicted. There has been no specific design criteria or guide to address this specific problem. Therefore a new
method has to be developed to better predict vinyl sheet pile deflection. This paper aims to deliver insights to
differentiate deflection value calculated by common methods used by practitioner and actual deflection in the
field. To achieve the aim, a physical modeling approach is used in this particular paper. Results are then
compared with the U.S. Steel Sheet Piling Manual method, and using a built-in software produced by producer.
This paper would serve as an initial framework for future studies to develop specific design method for vinyl
sheet piling. Results shown that actual deflection in the modeling is smaller than prediction. Deflection ratio
between actual and calculated deflection is around 0.24-0.87.
Keywords: soil lateral load, sheet pile, vinyl, physical modeling, geotechnical
155
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
material that is now quite popular to make sheet such as Rankine coefficient of active and
piles among practitioner is vinyl. For cost passive soil lateral load. These methods can
comparison, its cost is cheaper in total drastically over-predict vinyl sheet pile
compared to the other two materials (Istijono deflection compared to those actually happened
and Hakam, 2015). A study by Dutta P.K. et al. in the field. It is believed that relative flexibility
(2003) shows that an approximately ten-year- and changes in soil loading with movement will
old vinyl sheet pile installations have not shown actually diminish its deflection (Yeats, 2006).
significant degradation in the material. These problems rise question about how does
Compared to steel that tends to become rusty practitioner should do with the designing
and needed to be replaced, it is a very process. Thus, this study aims to compare
significant advantage. results from design process and the results
Vinyl material itself was accidentally taken from physical modelling, to better give
synthesized by Eugen Bauman, but then later insight about vinyl sheet pile deflection
developed by B.F. Goodrich Company and behavior.
Waldo Semon. The material itself is formed
from two natural resources, salt (57%) and oil
(43%). It is formed from polymerization of the 2 METHODS
vinyl chloride monomer (Tahira et. al., 2014).
Comparison between steel and PVC properties
can be seen in table 1. 2.1 U.S Steel Sheet Piling
U.S. Steel sheet piling itself uses a simple
Table 1. Properties of Polyvinyl Chloride formula to predict deflection, based on loads
Properties Steel Rigid PVC and modulus of elasticity. The loads itself
3
depends on which method used to calculate
Tensile strength (psi) 50–80 × 10 5.500–8.000
loads. In this equation Pt is the equal point load
3
Tensile yield (psi) 29-200 × 10 5.500–8.000 to the soil lateral load, l is the total length of the
Compressive strength - 7.000–13.000 wall, and y is the distance from the top point of
(psi) the wall.
Flexural strength (psi) - 10.000–13.500
Pt
Tensile modulus (psi) 30 × 10 6
300–500 × 103 Δl = . (y5 – 5l4y + 4l5) (1)
60EI.l2
7
Flexural modulus (psi) 2.90 x 10 400–450 × 103
Δl = displacement
Due to its low elastic modulus, Pt = total applied load
approximately 375.000 psi or equal to 2600 E = elastic Modulus
MPa, there is a general understanding that the I = area moment of inertia
lower elastic modulus the higher its deflection. l = wall Height (H) + 0.5 D
On the other hand, a study by Touchstone y = distance from the top point of the wall.
(2010) has shown a quite different result that H = exposed length of sheeting
actual deflection might be smaller than D = penetration of sheeting from surface
predicted. It shows smaller deflection value
compared to the deflection value induced by
using larger deflection coefficient suggested by 2.2 Software-X
Van de Kuilen (1999). Touchstone (2010) has While the software-x (since there is no
also mentioned that a longer time frame has endorsement is implied, the producer’s name is
allowed vinyl sheet pile to increase rigidity. to be anonymous) produced by the producer,
Vinyl sheet pile designing method itself has has a simple ability to calculate serviceability
mainly adopted from steel sheet pile design loads, and also deflection value. The soil lateral
method since there has not been a particular load itself are modeled as the Mohr-Coulomb
method developed as guidance to design vinyl model and calculated using Rankine active and
sheet piling. This raised a problem to further passive soil pressure. Wall is modeled as a
using vinyl as an alternative material for sheet beam on the elastic foundation that was
piling. introduced by Winkler in 1957, and Finite
One other thing the current method used has difference is used for calculation. Subgrade for
been considered very conservative due to the soil spring coefficient on the software itself is
conservative prediction of soil lateral load, using formula by Chadeisson,R (1961) and
156
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Monnet et al. (2004). Since it is a software E
G = 2(1+μ) (5)
produced by a producer, the parameters of sheet
pile is predetermined, so it needs to be scaled
down. Fig. 1 showed the cross section used on G = soil shear modulus
the software-x. Its moment inertia is 5325 E = soil elastic modulus
cm4/m. A 2600 MPa modulus of elasticity to be μ = soil Poisson’s ratio
used in the calculation in software-x.
3 SCALES AND EXPERIMENTAL
EQUIPMENT
Name γ Φ c’ PI
NC = normally consolidated soil (kN/m3) (ᵒ) (kPa)
OC = overconsolidated soil Loose Sand 19.07 30 0 0
Cu = soil Cohesion Clay 16.7 13 5 0.24
Soft Clay 16.7 5 1.6 0.24
The G itself then is determined using a common
correlation between E and G using this formula.
Where μ is the soil Poisson ratio.
157
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Table 4. Soil Properties Used in the Software-x the soil condition used with the soil as an active
Calculation (Multiplied by Similitude Factor) lateral load. The soil used as the base is a clay
γ Φ c’ soil, with optimum water content and has been
Name PI
(kN/m3) (ᵒ) (kPa) compacted using proctor hammer. The clay
Loose Sand 19.07 30 0 0 used is in soft soil condition, with water content
Clay 16.7 25 14.8 0.24 approximately 67%, its liquid limit value,
Soft Clay 16.7 15 5 0.24 whilst the sand is very loose sand that has a
diameter smaller than 4.75 mm.
Schematic figure of physical modeling
3.2 Models and Modelling Box equipment is presented in Fig. 3 (a). These
There are three models condition presented in figure is made of 0.6 cm thick acrylic with L
this particular paper. These three conditions are shaped bolted steel frame. Two dials are used to
based on different types of soil used for the read the deflection value of the wall. It is a
active lateral load. The condition itself is mechanical dial with the smallest scale of 0.01
mimicking a wall within a water body, to keep mm, with 2 cm maximum reading value.
embankment from collapsing. There will be A pump is presented to circulate water
two lateral loads that push the wall, the water constantly, to keep water height, and to keep
height or hydrostatic load and the embankment another side of the wall from flooding
soil height. The idea is if wall deflection is very excessively. Very thin styrofoam is embedded
high, can it be countered by using hydrostatic between the wall and the equipment box to
load to minimize the wall deflection. A minimal withstand water from flowing excessively to the
water level then to be determined to counter the other side of the wall. Its friction is ignored in
soil lateral load. the calculation due to very small value.
The retaining wall itself is made of 2 mm
thick PVC Board, 30 x 20 cm in size. Half of its
height (30 cm) is embedded into the base soil.
According to the laboratory test result, its
bending modulus of elasticity is 1948.09 MPa,
lower than 2600 MPa value that is used by
actual vinyl sheet pile. Therefore, an adjustment
is needed to compare the results calculated by
(a) the software.
(b)
(a)
(c)
Fig 2. (a) Free-Standing Wall, (b) Sand Active
Lateral Load (c) Soft Clay Active Lateral Load
158
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
height then raised to the next 1.5 cm. The
maximum height of water will be 10.5 cm, 4.5
cm lower than the wall and the soil from the
active side of the wall.
4 RESULTS
159
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
model 2, the results from each calculation and
modeling is quite different from each other. The
U.S. Steel Sheet Pile Method predict a pre-
deflection around -40 mm, while software is
rather over calculate the cohesion effect,
resulted in pre-deflection almost 0 mm. While
the model gives around -18 mm pre-deflection.
Same as model 2, calculation predicts the wall
deflection to be affected by rising the water
level, while in the model, water almost has no (a)
effect to diminished wall deflection, with the
deflection is quite constant at -20 mm.
(b)
(a)
(c)
Fig. 5. Model Test Result. (a) Model 1 – Free
Standing Wall (b) Model 2 – Loose Sand (c) Model
3 – Soft Clay
(b)
(a)
(c)
Fig. 4. (a) Model 1 test – freestanding wall
(b) Model 2 test – Loose Sand (c) Model 3 test –
Soft Clay
(b)
160
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ACKNOWLEDGEMENTS
REFERENCES
161
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Ahmad Wahyudi
PT. Erka Konsultan Enjiniring
Pradipta Dwi Aprilia
PT. Perentjana Djaja
Rinda Karlinasari
PT. Erka Konsultan Enjiniring
ABSTRAK: Jalan Tol Batang–Semarang adalah jalan tol yang terbentang sepanjang 75 kilometer yang
menghubungkan wilayah Kabupaten Batang dengan Kota Semarang, Jawa Tengah. Sungai Beringin adalah
salah satu sungai dengan morfologi yang terdiri atas lengkungan sungai yang membentuk huruf S dan tepat
berada pada trase jalan tol Batang–Semarang sepanjang 1279 m. Relokasi alur sungai diperlukan untuk
mempertahankan fungsi hidraulis sungai sebagai saluran drainase alami. Adanya relokasi sungai dengan
kebutuhan penampang basah yang cukup lebar mengakibatkan timbunan badan jalan tol berbatasan langsung
dengan rencana relokasi alur sungai. Perkuatan timbunan jalan tol terhadap relokasi sungai Beringin dipilih
dengan menggunakan Sheet pile sebagai dinding penahan tanah untuk mengurangi deformasi lateral dan
meningkatkan faktor angka keamanan terhadap stabilitas timbunan.
Kata Kunci: Sheet pile, Stabilitas Timbunan, Deformasi Lateral, Faktor Keamanan
ABSTRACT: Batang–Semarang Toll Road is a toll road that stretched along 75 kilometers connecting the
Regency of Batang with the City of Semarang, Central Java. Beringin River is a river with morphology
consisting of river curves that form the letter S and is right on the Batang–Semarang toll road along 1279 m.
Relocation of river basins is needed to maintain the river hydraulic function as a natural drainage channel. The
existence of river relocation with the need for a wet sectional area depends on the embankment of the road
directly adjacent to the river channel relocation plan. Reinforcement of toll road embankment on the relocation
of the Beringin river is chosen by using Sheet pile as retaining wall to reduce lateral deformation and increase
the safety factor to increase embankment.
162
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Pada Sta. 444+680 – Sta. 445+500 di atas 2.2 Tekanan Tanah Aktif dan Tekanan Tanah
alur sungai Beringin yang di relokasi dengan Pasif
morfologi yang terdiri atas lengkungan sungai Rankine menyelidiki keadaan tegangan di
yang membentuk huruf S dan tepat berada pada dalam massa tanah yang berada pada kondisi
trase jalan tol Batang–Semarang sepanjang keseimbangan plastis. Keseimbangan plastis
1279 m. Adanya relokasi sungai yang adalah suatu kondisi dimana setiap titik dalam
berbatasan langsung antara badan jalan tol suatu massa tanah menuju proses keadaan
dengan rencana relokasi alur sungai diperlukan runtuh.
sutau dinding penahan tanah sebagai perkuatan.
Komponen gaya-gaya yang bekerja pada
Metode perkuatan yang dipilih pada lokasi studi
kasus adalah Sheet pile sebagai dinding turap dapat ditentukan dengan terlebih dahulu
penahan tanah untuk mengurangi deformasi menghitung tegangan tanah lateral aktif (σa )
lateral dan meningkatkan faktor angka dan tegangan tanah lateral pasif
keamanan terhadap stabilitas timbunan. (σp ) menggunakan Teori Rankine.
2 PEMBAHASAN
163
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Silty Sand
Gbr. 2. Tekanan Pasif Rankine (Sumber: Principle Gbr. 3. Permodelan Sheet Pile dengan lapisan tanah
of Foundation Engineering, Braja M. Daz) Silty Sand (SM)
Dimana :
∅
Kp = tan2 (45 + 2 )........................................(5)
164
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Alur Sungai
Trase jalan tol Eksisting
Batang-Semarang
Alur Relokasi
Rencana Dinding Sungai
Turap (Sheet pile)
165
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2.5 Permodelan Turap (Sheet pile) Tabel 3. Tahapan Konstruksi pada Program
Numerik
Permodelan turap (Sheet pile) diambil dari
potongan melintang jalan. Material Sheet pile No Tahapan Kosntruksi Hari Jenis Analysis
yang digunakan adalah Sheet pile tipe FCSP– 1 Replacement – Elv. 58.12 7 Plastic
320 C–500. Tinggi timbunan dari tanah
eksisting ± 7.8 meter. Berdasarkan data tanah 2 Replacement – Elv. 55.12 7 Plastic
BH–V 19A dan BH–V 19B terdapat tanah 3 Timbunan – Elv. 58.12 7 Plastic
kompresibel sedalam 3 meter, sehingga
4 Timbunan – Elv. 59.12 7 Plastic
dilakukan replacmenet tanah kompresibel
sedalam 1.5 meter. Kedalaman pemancangan 5 Timbunan – Elv. 60.12 7 Plastic
Sheet pile hingga mencapai konsistensi tanah 6 Timbunan – Elv. 61.12 7 Plastic
keras dengan nilai SPT 33 pada kedalaman 5
7 Timbunan – Elv. 62.12 7 Plastic
meter dengan tinggi total Sheet pile 10 meter.
Pada sisi depan Sheet pile terdapat timbunan 8 Timbunan – Elv. 63.12 7 Plastic
dengan pasangan batu dinding sungai yang 9 Timbunan – Elv. 64.12 7 Plastic
dapat berfungsi sebagai tekanan tanah pasif.
10 Timbunan – Elv. 65.12 7 Plastic
11 Timbunan – Elv. 65.66 7 Plastic
Clayey Silt Clayey Silt
12 Pemancangan Sheet pile 28 Plastic
Silty Sand Clayey Silt 13 Timbunan – Elv. 63.40 7 Plastic
Clayey Silt
Silty Sand Clayey Silt
Silty Sand
14 Timbunan – Elv. 65.66 7 Plastic
Silty Sand
Silty Sand
Silty Sand 15 Konsolidasi 30 hari 30 Consolidation
16 Pekerjaan perkerasan 28 Plastic
Gbr. 9. Permodelan Sheet pile pada Program 17 Beban lalu lintas 1 Plastic
Numerik
18 Konsolidasi 1 tahun 365 Consolidation
Berikut detail permodelan Sheet pile dengan 19 Konsolidasi 3 tahun 730 Consolidation
menggunakan program numerik : 20 Konsolidasi 10 tahun 2555 Consolidation
21 Konsolidasi 20 tahun 3650 Consolidation
Timbunan
Dinding Sungai
Berdasarkan hasil analisa program numerik
dengan tahapan konstruksi di atas penulis
Sheet pile membatasi pengamatan terhadap keluaran
analisa numerik antara lain total displacement,
deformasi lateral pada Sheet pile dengan 2 titik
Gbr. 10. Detail Permodelan Sheet pile pada Program tinjauan pada Sheet pile yaitu pada ujung Sheet
Numerik pile (titik A) dan dasar Sheet pile (titik B) serta
Safety Factor.
Tahapan analisa permodelan diatas meliputi
tahapan konstruksi berupa replacement,
timbunan, pemancangan Sheet pile, pasangan Titik A
batu dinding sungai dan perkerasan jalan
dimana pada tahapan konstruksi dilakukan
kalkulasi dengan jenis plastic analysis.
Kemudian tahapan konsolidasi sebagai analisa
Titik B
jangka panjang dilakukan kalkulasi dengan
jenis consolidation analysis.
Berikut merupakan tahapan pada analisa Gbr. 11. Titik Tinjauan Deformasi Lateral pada
program numerik yang meliputi tahapan Sheet pile
konstruksi dan tahapan konsolidasi :
166
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Berikut hasil pengamatan terhadap keluaran Deformasi lateral yang terjadi pada ujung
program numerik setelah tahapan konstruksi Sheet pile (titik A) tahapan pemancangan Sheet
selesai hingga pekerjaan perkerasan atau dalam pile sebesar 0.38 cm dan tahapan konsolidasi 10
hal ini penulis sebut sebagai tahapan akhir tahun sebesar 1.15 cm. Sehingga deformasi
konstruksi, konsolidasi 1 tahun setelah akhir lateral yang terjadi adalah selisih antara
konstruksi dan konsolidasi 10 tahun setelah deformasi saat pemancangan dan konsolidasi
akhir konstruksi. 10 tahun yaitu sebesar 0.77 cm.
a. Total displacement
- Tahapan akhir konstruksi - Dasar Sheet pile (titik B)
c. Safety Factor
- Tahapan akhir konstruksi
167
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
- Tahapan konsolidasi 10 tahun 2. Deformasi lateral Sheet pile yang terjadi
pada ujung Sheet pile (titik A) sebesar 0.77
cm dan pada dasar Sheet pile (titik B) sebesar
0.04 cm.
3. Dengan penanganan Sheet pile dapat
meningkatkan faktor angka keamanan
terhadap stabilitas timbunan sebesar 1.8.
168
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Artikel ini menyajikan sebuah kasus galian dalam beserta analisa tiga-dimensinya. Kasus galian
ini menyajikan penggunaan sistem dinding penahan tanah yang terinsipirasi dari alam, yang dinamai dinding
U-shape. Sistem ini terinspirasi dari akar buttress pada pohon-pohon tua yang berfungsi untuk menstabilkan
batang pohon tersebut. Dinding U-shape merupakan kombinasi dari dinding buttress-cross yang berfungsi
untuk mereduksi defleksi dinding yang disebabkan oleh galian dalam. Pada kasus ini, galian dalam berada
disekitar gedung bertingkat rendah, menggunakan pondasi dangkal, dan hanya berjarak 1 hingga 2 m dari
sisi galian. Analisa metode elemen hingga tiga-dimensi dilakukan untuk mensimulasikan dan mengkaji
kinerja dari dinding U-shape. Hasil menunjukan bahwa pergerakan lateral maksimum pada titik SID-1 dan
titik SID-2 berkurang sebesar 57% bila dibandingkan dengan tanpa penggunaan dinding U-shape.
Kata Kunci: galian, deformasi, analisa tiga dimensi, dinding buttress-cross
ABSTRACT: This paper presents a deep excavation case-history and its three-dimensional finite element
analysis. The project describes the application of bio-inspired earth retaining wall system, namely the U-
shape wall. This system was inspired by buttress roots on old trees that be used to stabilize the tree stem.
The U-shape wall is a composite buttress-cross wall that could be applied for reducing excessive movements
induced by excavation. The U-shape wall is an auxiliary measure in controlling the diaphragm wall
deflection and avoids the low-story adjacent buildings from damages, in which those low-story buildings
were founded in shallow foundations and located 1 to 2 m from the excavated area. Three-dimensional finite
element analyses were conducted to simulate and examine the performance of the U-shape wall. The result
shows that the maximum lateral deflections at the SID-1 and SID-2 were reduced 57%, compared to no U-
shape wall installation.
Keywords: excavation, deformations, three-dimensional analysis, buttress-cross wall
169
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
and equipment of cross walls and buttress
walls are similar to the construction technique
and equipment of diaphragm walls Ou et al.
(2006). The application of buttress wall,
abbreviated as BW and cross wall, abbreviated
as CW, has been proofed as one of the
effective solutions for reducing ground surface
settlements or protecting adjacent buildings
during excavation Lin et al. (2018). In those
projects, either the BW or the CW were
individually constructed.
170
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
coefficient of the at-rest earth pressure for the all directions at the bottom of the geometry. In
fine-grained soil was estimated based on Ladd addition, the distance between the diaphragm
et al. (1977) which was K 0,OC (1 sin ')OCR sin ' . wall and the outer boundary of mesh was
ensured to be larger than two times the final
c.cos 3 'sin
m excavation depth to minimize the boundary
Eur E ref
ur c.cos p ref sin (2) effect.
Furthermore, all analyses were performed in
full-scale and the significance adjacent
The structural members, such as diaphragm structures were also modeled. All of the
walls, buttress walls, cross walls, tunnel lining adjacent buildings were founded on shallow
and concrete floor slabs, were assumed to foundations. Thus, the adjacent buildings were
behave as the linear-elastic material. The simply modeled with a uniform loading acting
stiffness of diaphragm walls was reduced by on the plate element Hsieh et al. (2015). A 15
20% from its nominal value, considering that kPa uniform loading was assumed to model
the stiffness of the concrete diaphragm wall one story of the buildings. Since those adjacent
reduces when a large bending moment of the buildings were more than 10 years old, the
diaphragm wall causes the occurrence of excess pore pressure induced by the loading of
cracks in the concrete. The soil stress those buildings was assumed to fully dissipate.
redistribution might be generated due to the Hence, in modeling, the full dissipation of
installation of diaphragm walls and buttress excess pore water pressure in undrained soil
walls and its quality of construction layers was conducted prior to excavation.
Comodromos et al. (2013). But, the numerical
analysis might not be able to model all of the
installation effects precisely. For 3 CASE STUDY
simplification, the diaphragm wall and buttress
wall were assumed to be wished in place Hsieh
et al. (2013) and Lim et al. (2016) with the 3.1 Project Overview
consideration of the weight of the concrete Bade road excavation project is a new well-
from the diaphragm wall and buttress wall documented case history which was located in
over the existing soil. The Poisson’s ratio of Taipei, Taiwan. The building is a 13-stories
concrete was assumed 0.2. In addition, the building with three levels of basement. Fig 3
temporary struts and the concrete floor slabs shows the layout of the excavation along with
were installed right after each stage of the location of inclinometers and adjacent
excavation. Both cross walls and buttress walls buildings. The adjacent buildings were
would be demolished along with excavation dominated by two-story and three-story old
stages until the end of the excavation. buildings, and the closest distance to the
According to ACI 318-95 (1995) code, the excavation area is about 1 to 2 m only, which
nominal value of concrete Young’s modulus was located on the east and west diaphragm
could be estimated by using an equation walls. The south side of the excavation area is
Ec 4700 f c ' , where f c ' is the compressive a main road with 18 m in width, and the north
strength of concrete (unit: MPa). In the side of the excavation area is a street with 4 m
analyses, the interface friction (Rinter) between in width. Adjacent to the street, a block of low-
the structural elements and adjacent soils was story buildings also exists. In case 1, the main
set as rigid (Rinter=1) and its behavior follows concern is to protect the adjacent buildings
the Mohr-Coulomb model Hsieh et al. (2013) which were located on the east and west side
Lim et al. (2016). because the distance is very close. Thus, the
Ten-node tetrahedral elements were 0.6 m thick cross wall was designed from GL -
employed to simulate the soil volume, 6-node 2 m to GL -23.5 m. In addition, the buttress
plate elements were used to model the walls type A (BW-A) with 6 m length was also
diaphragm wall, the concrete slab, and the designed from GL -2 m to GL -14.9 m. Then
buttress wall. The node-to-node element was the buttress walls type B (BW-B) with 6 m
utilized to model the struts. Moreover, 12-node length and 21.5 in height also constructed at
interface elements were applied to model the the south and north walls to minimize the main
soil-plate element interaction behavior. Soil road settlement induced by excavation.
movements normal to the four vertical sides
were restrained while they were restrained in
171
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
GL. 0.0 m
SF ' 27 e0=0.85g t=19kN/m 3 GL. -1.0 m
GL. -2.0 m CL/ML (1) ' 26 gt=18.7kN/m3
GL. -3.45 m N = 1-4 e0=0.96 cs=0.03
GL. -4.25 m GL. -4.5 m
GL. -5.7 m SM (1) ' 28 g =19.3kN/m3
t
GL. -6.7 m N = 8-9 e0=0.72
GL. -7.5 m
GL. -8.7 m ML (2) ' 28 g =19.3kN/m3
t
GL. -9.7 m N = 2-4 e0=0.72
Project area GL. -11.9 m
4m GL. -12.5 m
CL (2) ' 27 gt=18.5kN/m3
Neighbor open e0=0.95
space N = 1-4
cs=0.03
' 37
3F Building
(43.7 m x 21.5 m) 3F Building
q=45kN/m2 (39.2 m x 16.4 m)
q=45kN/m2
GL. -23.0 m
CL (3) ' 29 gt=19.0kN/m3
Main road 18 m N = 6-8
q = 10 kN/m 2
e0=0.83
cs=0.03
GL. -28.5 ~-26.5 m
3F GL. -29.0 m
4F Building Building ' 31 N= 10-17 SM (2) e0=0.86 gt=17.9kN/m 3
(36 m x 20 m) (17.5 m x
GL. -30.5 m
cs=0.03 ' 29 CL (4)
q=60kN/m2 20 m) e0=0.76 N = 7-9 gt=19.5kN/m3
q=45kN/m2 GL. -33.5 m
' 33 N = 21-22 SM (3) e0=0.77 gt=19.4kN/m3
GL. -35.5 m
cs=0.03 ' 30 N= 8-15 CL (5)
e0=0.79 gt=19.5kN/m3
GL. -38.5 m
' 34 N = 15-29 SM (4) e0=0.64 gt=20.4kN/m3 GL. -41.0 m
30.3 m
SID 5 cs=0.03 ' 32 N = 12-25 CL (6)
e0=0.83 gt=19.2kN/m3
Diaphragm
wall
Buttress
BW-B
wall GL. -50.0 m
SID 1 N= 25
(0,19.3
BW-A
cs=0.03 ' 35 ML (3) gt=20.4kN/m3
) BW-A e0=0.57 GL. -52.5 m
' 40 N-SPT >50 Gravel gt=22.2kN/m3
26.8 m
Fig. 4. Profile of The Excavation Sequence and
19.3 m
Cross wall
Struts
Subsurface Soil Layers
SID 4
BW-B SID 2
SID 3
3.2 Subsurface Soil Profile and Soil
35.2 m Parameters
Scale: North
0 1 2 3 4 5(m)
Fig. 4 shows the profile of the excavation and
the subsurface soil conditions along with their
Fig 3. Excavation Geometry, Adjacent Buildings, physical properties and strength parameters.
and Instrumentation The groundwater level was located at GL -2.5
m. The excavation depth was 11.9 m, which
The excavation depth was 11.9 m, which was completed in six stages using the bottom-
was completed using the bottom-up up construction method and the modeling
construction method shown in Fig. 4. As stages were listed in Table 1. In brief, each
shown in Fig. 4, the excavation was supported level of struts was installed directly after an
by 4 levels of struts. The thickness of excavation stage. After stage 1, groundwater
diaphragm wall was 0.7 m and the depth of the inside the excavation zone was pumped out
wall was 26.5 m for the north and south walls from SM(1) and ML(2) soil layers until GL -
and 28.5 m for the west and east walls. The 12.5 m. Initially, the ML(2) layer was not
unconfined compressive strength of concrete expected for dewatering because it was
( f c ' ) used for the diaphragm wall and the assumed has a low permeability. However,
bottom section of the cross and buttress walls during the construction process, the
(GL -11.9 m to GL-23.5 m) was 27.5 MPa. groundwater inside the ML(2) layer could also
Meanwhile, a low strength concrete with be pumped out easily. It indicates that the
fc '
=10.3 MPa was used for the upper section permeability of the ML(2) layer is quite high.
of the cross and buttress walls because the low The purpose of dewatering in this project is to
strength concrete would be easier to be ease the soil excavation. Thus, the ML(2) was
demolished. modeled as the drained material. In addition,
both the cross wall and the buttress walls were
demolished with excavation process.
Table 2. and Table 3. list the wall and struts
parameters used for analysis, respectively.
Furthermore, Table 4 lists the soil parameters
used for analysis. All of the parameters in the
tables were evaluated according to the methods
discussed in the preceding section.
172
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Table 1. Simulation Stages of Excavation A E
Strut Model Component
(m2) (GPa)
Stage Activities
and end
0 Initial condition
braces
0-a Activate adjacent buildings
3rd and 4th-
0-b Dissipate excess pore pressure H250x250x
0.0092 corner and
0-c Install retaining system 9x14
end braces
0-d Reset displacement to zero
0-e Activate traffic loadings
1 Excavate -2.0 m 3.3 Finite Element Modeling for Analysis
Dewatering the SM-1 and ML-2 to -
2 Fig 5.(a) show the three-dimensional finite
12.5 m
Install struts level 1 + preloading 600 element mesh of case 1. The boundaries in the
3 kN horizontal directions (x- and y-directions) were
Excavate -4.25 m placed at a distance of four times the
Install struts level 2 + preloading 900 excavation depth behind the wall to minimize
4 kN the boundary effect, and the boundary in the
Excavate -6.7 m depth direction (z-direction) was placed at the
Install struts level 3 + preloading 1200 bedrock. The boundary of the bottom surface
5 kN was restrained in all directions, and the vertical
Excavate -9.7 m boundaries were restrained in the horizontal
Install struts level 4 + preloading 1200 direction. Moreover, Figs 5.(b) and (c) show
6 kN the mesh of retaining wall system at the initial
condition and at a final condition, respectively.
Excavate -11.9 m
The structural members which were consist of
diaphragm walls, buttress walls and cross
Table 2. Simulation Stages of Excavation
walls (modeled with the plate element) and
t f c' E g struts (modeled with the node-to-node anchor).
Type Model
(m) (MPa) (kPa) (kN/m3) Uniform
loading/building
Diaphragm 24624
0.7 27.45 24
wall 591
Buttress and
15083
cross walls- 0.6 10.3 24
Plate 998
up
Buttress and
24624
cross walls- 0.6 27.45 24
591
down Roller boundary
A E (a)
Strut Model Component
(m2) (GPa) Corner
Buttress wall Strut
1st and 2nd Cross wall bracing Waler
Node-to-
Hx350x350 level-strut
node 0.0174 210
x12x19 and 1st
anchor
level-wale
Hx400x400 2nd level-
0.0219
x13x21 wale
3rd level-
2Hx350x35
0.0348 strut and Diaphragm wall
0x12x19
wale (b) (c)
173
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
3.4 Results and Discussions the main focus of the application of the cross
Although the analysis was performed in full- wall and the buttress walls.
scale, only the wall deflection at SID-1, SID-2,
and SID-4 was discussed because they were
Table 4. Input parameters of soils
Soil Drainage gt ' c' E50ref ref
Eoed Eurref
Depth (m) Description OCR K0 m
layer type (kN/m3) (deg) (kPa) (kPa) (kPa) (kPa)
1 0-1 SF Undrained 19.0 2.5 0.83 27 0 8164 5715 24491 1
2 1 -4.5 CL/ML (1) Undrained 18.7 1.5 0.69 26 0 10391 7274 31174 1
3 4.5 - 7.5 SM (1) Drained 19.3 1 0.53 28 0 11986 17979 35958 0.5
4 7.5 - 12.5 ML (2) Drained 19.3 1 0.53 28 0 4973 7460 14920 0.5
5 12.5 - 23 CL (2) Undrained 18.5 1 0.55 27 0 11469 8028 34407 1
6 23 - 29 CL (3) Undrained 19.0 1 0.52 29 0 11071 7750 33213 1
7 29 - 30.5 SM (2) Drained 17.9 1 0.48 31 0 11644 17465 34931 0.5
8 30.5 - 33.5 CL (4) Undrained 19.5 1 0.52 29 0 10647 7453 31942 1
9 33.5 -35.5 SM (3) Drained 19.4 1 0.46 33 0 16807 16807 50422 0.5
10 35.5 - 38.5 CL (5) Undrained 19.5 1 0.50 30 0 10991 7694 32973 1
11 38.5 - 41 SM (4) Drained 20.4 1 0.44 34 0 18194 18194 54583 0.5
12 41 - 50 CL (6) Undrained 19.2 1 0.47 32 0 11594 8116 34783 1
13 50 - 52.5 ML (3) Undrained 20.4 1 0.43 35 0 10472 7330 31415 1
14 52.5 - 65 Gravel Undrained 22.2 1 0.36 40 0 85000 85000 255000 0.5
Note: pref = 100kPa and ur = 0.2 for all types of soils
(c).
Legend:
Measured
Computed
Computed (without cross and buttress walls)
174
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
SID-2 because the buttress wall type A (BW- 011-070-MY3 and Universitas Katolik
A) was installed near the SID-1. But, the Parahyangan. The authors would like to thank
measured and computed wall deflections of Sino Geotechnology, Inc. and Soonwell, Inc
SID-1 yielded closely to the SID-2 wall for the provision of detailed geotechnical
deflections and indicates the buttress wall information on the case studies.
which was near SID-1 has no effect in
reducing the wall deflection. According to Lim
et al (2016), the wall deflection control REFERENCES
mechanism of the buttress wall came from the
frictional resistance buttress walls and adjacent ACI Committee 318. 1995. Building code requirements
soils due to the lateral wall deflection. Since for structural concrete and commentary; ACI
the wall deflection at SID-1 was relatively 318R-American Concrete Institute (ACI),
small, due to the cross wall effect, then it could Farmington Hills.
Brinkgreve, R. B. J., Engin, E., and Swolfs, W. M. 2013
not effectively mobilize the shear resistance PLAXIS 3D Manual. Delft, Netherlands, PLAXIS.
between the buttress wall and adjacent soils. Calvello, M., and Finno, R. 2004. Selecting parameters
Thus, it could well understand that the effect to optimize in model calibration by inverse
of the BW-A was very minor. Although the analysis. Computer and Geotechnics 31(5): 410-
BW-A has a minor effect in reducing wall 424.
deflections, the contractor still constructed Comodromos, E. M., Papadopoulou, M. C., and
those BW-A for convincing the neighborhood Konstantinidis, G. K. 2013. Effects from
that their buildings are completely safe. Hence, diaphragm wall installation to surrounding soil
it was decided that the bottom of the BW-A and adjacent buildings. Computer and
was only founded at GL -14.9 m (3 m below Geotechnics 53: 106–121.
Do, T. N., Ou, C. Y., and Lim, A. 2013. Evaluation of
the final excavation level) to cut the factors of safety against basal heave for deep
construction cost. This is a good example of excavations in soft clay using the finite element
showing the art of decision making in the method. J Geotech Geoenviron Eng 139: 2125–
construction practice. 35.
Hsieh, P. G., Ou, C. Y., and Lin, Y. L. 2013. Three-
dimensional numerical analysis of deep
4 CONCLUSIONS excavation with cross walls. Acta Geotechnica 8:
33-48.
Based on the three-dimensional finite element Hsieh, P. G., Ou, C. Y., Lin, Y. K., and Lu, F. C. 2015
analysis results, it was found that UW was Lesson learned in design of an excavation with the
installation of buttress walls. Journal of
very effective in reducing the lateral wall GeoEngineering 10(2): 63-73.
deflection. As a consequence, deformation of Jaky, J. 1944. The coefficient of earth pressure at rest.
adjacent properties induced by excavation Journal for Society of Hungarian Architects and
could well control. Engineers 78(22): 355–358 (In Hungarian).
According to case-history, the maximum Khoiri, M., and Ou, C. Y. 2013. Evaluation of
lateral deflections at the SID-1 and SID-2 were deformation parameter for deep excavation in
reduced 57%, compared to no cross walls and sand through case histories. Computers and
buttress walls installation. When the lateral Geotechnics 47(1): 57-67.
wall deflection had been reduced to a very Ladd, C. C., Foott, R., Ishihara, K., Schlosser, F., and
Poulos, H. G. 1977. Stress-deformation and
small value, the application of buttress walls
strength characteristics. Proceedings of the 9th
was insignificant because the relative international conference on soil mechanics and
movement between the buttress wall and foundation engineering 2: 421–494: Tokyo.
adjacent soil was very small which causing the Lim, A., Hsieh, P. G., and Ou, C. Y. 2016. Evaluation of
frictional resistance between the buttress wall buttress wall shapes to limit movements induced
and adjacent soil was not effectively by deep excavation. Computer and Geotechnics,
mobilized. 78: 155-170.
Lim, A., Ou. C. Y., and Hsieh, P. G. 2019. An innovative
earth retaining supported system for deep
ACKNOWLEDGEMENTS excavation. Computer and Geotechnics 114:
103135.
Lin, P. Y., Lim, A., Ho, S. K., and Ho, S. P. 2018.
The authors acknowledge the support provided Application of the novel composite earth retaining
by the Ministry of Science and Technology in structure method to urban excavations: a
Taiwan via grant number MOST103-2221-E-
175
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
constructability analysis. Journal of the Chinese buttress walls. Journal of GeoEngineering 1(2):
Institute of Engineers 41(7): 603-611 579–86.
Ou, C. Y. 2016. Finite element analysis of deep Schanz, T., Vermeer, P. A., and Bonnier, P. G. 1999.
excavation problems. Journal of GeoEngineering Formulation and verification of the Hardening-
11(1): 91-101. Soil model. Beyond 2000 in Computational
Ou, C. Y., Lin, Y. L., and Hsieh, P. G. 2006. A case Geotechnics. Brinkgreve ed, Rotterdam Balkema:
record of an excavation with cross walls and 281-290
176
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
M. Asrurifak
Research Center for Disaster Mitigation, Institute of Technology of Bandung
ABSTRACT:
Due to the specific geographical location of Indonesia, earthquake hazard is very high, thus the disaster risk
reduction is very important. One of the effort of mitigation is the development of more accurate seismic risk
map which would figure out building damages along with its economic loss. In order to conduct seismic risk
analysis, it should carried out hazard analysis to produce seismic acceleration at ground surface which
considered site specific and amplification factor. The aim of this research was to carry out hazard analysis at
bedrock and surface for Bali Island, compute its amplification factor and verified it to the Indonesia Seismic
Code (SNI 1726-2012). Calculations were conducted by using an open source program OpenQuake developed
by The Global Earthquake Model (GEM). The method used in the analysis was Classical PSHA examining
site specific Vs30 (USGS data) and reference depth (Z1,0 and Z2,5). The seismic sources and GMPEs used in
this study were derived from the latest data in the calculation of Indonesia Seismic Hazard Maps 2017.
Calculations was run for intensity measure types of PGA, short period SA(0.2) and long period SA(1.0)
spectral acceleration at return period of 500years and 2500years. The results showed that range of the
amplification factor for intensity measure type of PGA, short period SA(0.2) and long period SA(1.0) at soil
classes SB, SC and SD were matched/well suited to the SNI 1726-2012 seismic code of Indonesia.
177
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Computation was conduct with the Classical 𝑆𝑆𝑀 = {𝑆𝑟𝑐1 , 𝑆𝑟𝑐2 , … , 𝑆𝑟𝑐𝐼 } (1)
PSHA (Probability Seismic Hazard Analysis)
method, computed using OpenQuake Engine each earthquake source through effectively
developed by the Global Earthquake Model discretization generates a number of distinct
(GEM). earthquake ruptures. A generic source i
determines a series of earthquake ruptures J.
178
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2.3 Ground Motion Prediction Equation
(GMPE) Logic Tree
The ground motion model or GSIM (Ground
Shaking Intensity Model) is a model for
calculating ground motion at a certain location
according to its specific rupture property. In a
simple case, the ground motion model
corresponds to Ground Motion Prediction
Equation / GMPE. Whereas in the case of the
more complex PSHA input model, the ground
motion model contains a set of GMPE where
each GMPE is considered for each tectonic
region. In this study, GMPE Logic Tree was Fig. 1. Map of Vs-30 (USGS data) for Bali Island
used in accordance with GMPE in the
calculation of the 2017 Indonesian Earthquake
Hazard Map (PUSGEN, 2017). 2.5 Work Flow of Classical PSHA
179
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Hazard Curves Calculator will calculate the Table. 2 Amplification Factor comparation: the
hazard curve at each location. Result vs Building Code (SNI 1726-2012) for
long period SA(1.0), PoEs = 2% in 50 years
Calculations are carried out for PGA, SA
(0.2) and SA(1.0) intensity measures with the Amplification Factor
probability of exceedance of 10% and 2% Soil Class
Result SNI 1726-2012
respectively in 50 years. < 0.992 1
SB
SC 1.26 - 1.57 1.3 – 1.7
SD 1.61 - 2.2 1.5 – 2.4
3 RESULT AND DISCUSSION
SE > 2.2 2.4 – 3.5
The outputs of Classical PSHA include: hazard
curve, uniform hazard spectra (uhs) and hazard
map mean (peak acceleration). Peak
acceleration data was then plotted with QGIS
and produces hazard maps at bedrock and at
surface. By comparing the peak acceleration
data on the surface and bedrock, the
amplification factor was obtained.
The acceleration in bedrock calculated by
Classical PSHA for the period of 0.2 second SA
(0.2) for a probability of exceeding 2% in 50
years was 0.851g - 1.222g, and for a period of
1.0 second SA (1.0) was 0.298g - 0.406g. The
acceleration at ground surface calculated by
Classical PSHA for the period of 0.2 second SA
(0.2) for a probability of exceeding 2% in 50
years was 0.823g - 1.444, and for a period of
1.0 second SA (1.0) was 0.285g - 0.720g. Fig. 3 Correlation Vs30 to Amplification Factor at
According to the Correlation Graph of the Soil Class SB, PoEs = 2% in 50 years
amplification factor with vs30 (Fig. 3, 4 and 5)
shows that at the same intensity measurement
level, the amplification factor value increasing
on softer soils (SD and SC).
The comparison of the amplification factor
of analysis results to the amplification factor in
SNI 1726-2012 (Table.1 and Table 2.) showed
that: for SA (0.2) the results are consistent on
SB and SC soils, while for SD and SE the
amplification factor results have higher values.
On the other hand, amplification factor
comparison of the results to seismic building
code for long periods (SA (1.0)) showed well
suited in all soil classes.
180
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
181
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Chiou B. S. J. and Youngs R. R., 2013. Update of the
ACKNOWLEDGEMENTS Chiou and Youngs NGA Ground Motion Model for
Average Horizontal Component of Peak Ground
Thanks to: Prof. Phil Cummins for the Motion and Response Spectra, PEER Report
opportunity to get access to running programs 2013/07
on Raijin's server, Center for Housing and Crowley, H. & Silva, V., 2013. OpenQuake Engine
Book: Risk v1.0.0., Pavia, Italy: GEM Foundation
Settlement Research and Development- GEM (2019). The OpenQuake-engine User Manual.
Ministry of Public Works and Housing Global Earthquake Model (GEM) OpenQuake
Bandung, and The National Center for Manual for Engine version 3.6.0. doi:
Earthquake Studies (PuSGeN) team for 10.13117/GEM.OPENQUAKE.MAN.ENGINE.3.6.0,
permission to use the PuSGeN server. 187 pages
Pagani, M., Monelli, D., Weatherill, G. A. and Garcia, J.,
2014. The OpenQuake-engine Book: Hazard. Global
Earthquake Model (GEM) Technical Report 2014-08,
REFERENCES
doi: 10.13117/-GEM.OPENQUAKE.TR2014.08, 67
pages.
Allen, T.I., and Wald, D.J., 2007. Topographic slope as Tim Pusat Studi Gempa Nasional (PUSGEN), 2017. Peta
a proxy for global seismic site conditions (VS30) Sumber dan Bahaya Gempa Indonesia 2017,
and amplification around the globe, U.S. Geological Bandung: Puslitbang Perumahan dan Permukianan
Survey Open-File Report 2007-1357, 69 p BPP Kementrian PUPR
Badan Standardisasi Nasional (BSN), 2012. SNI UNDRR, 2019. Global Assessment Report on Disaster
1726:2012 Tata Cara Perencanaan Ketahanan Risk Reduction, Geneva, Switzerland: United Nations
Gempa untuk Struktur Bangunan Gedung dan Non Office for Disaster Risk Reduction (UNDRR)
Gedung, Jakarta: Badan Sertifikasi Nasional (BSN)
182
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Jakarta merupakan kota dengan kepadatan penduduk yang tinggi namun rentan terhadap bahaya
seismik. Makalah ini memberikan hasil analisis risiko seismic untuk gempa skenario mekanisme subduksi
intraslab (Mw = 7.0; R = 117 km). Kerusakan bangunan dihitung berdasarkan kurva kerentanan sesuai jenis
struktur. Analisis pengaruh kondisi tanah lokal diturunkan berdasarkan korelasi empiris hasil pengukuran
SPT (Standard Penetration Test) dan kecepatan gelombang S, hasil korelasi digunakan dalam analisis
perambatan gelombang untuk menentukan besarnya percepatan di permukaan. Besarnya risiko seismik
bangunan dikuantifikasi sesuai probabilitas tingkat kerusakannya, sedangkan risiko terhadap populasi
dihitung sebagai variabel korban yang terpengaruh oleh kerusakan bangunan. Analisis pada proyeksi Kota
Jakarta tahun 2030 menunjukkan hampir 82% bangunan terpengaruh oleh gempa skenario yang digunakan,
korban jiwa mencapai 16,239 dan korban luka 53,834.
Kata Kunci: risiko seismik, Jakarta, subduksi intraslab
ABSTRACT: Jakarta is a densely populated city located in a seismic prone region. A seismic risk
assessment had been made for the residential function zones by considering earthquake scenario
corresponding to intraslab subduction mechanism (Mw = 7.0; R = 117 km). Building damage was projected
based on building structural fragility. Site characterization is derived based on empirical correlations
between the local SPT (Standard Penetration Test) data and S-wave velocity. The 1-D site response analysis
was carried out with over 1915 simulations to evaluate the intensity of earthquake shaking on ground
surface. The seismic risk to buildings were quantified by assessing the probability of the building damage
states, while the risk to the population was an estimated number of casualties as a result from damaged
buildings. Analysis on a projected Jakarta in 2030 shows that 82% buildings would be affected by
earthquake and the casualties are estimated to be 16,239 fatalities and 53,834 hospitalized injured.
Keywords: seismic risk, Jakarta, intraslab subduction
183
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Table 1. Selected Ground Motion to Represent Vs = 103.7 N0.294 (1)
Earthquake Scenario.
No Earthquake Events Mw R (km)
Miyagi Oki, STA-
1 IWTH20, data source 7.2 154
CESMD, 2005
Miyagi Oki, STA-
2 YMTH09, data source 7.0 152
CESMD, 2003
Nisqually, STA-WA:
Anacortes; Fire Station,
3 6.8 150
data source CESMD,
2001
Michoacán Earthquake,
STA-CALETA DE
4 6.6 138 Fig. 2. Value of Vs versus N-SPT
CAMPOS, data source
CESMD, 1997 The site response analyses then carried out
Southern Honshu to estimate the peak ground acceleration
Earthquake, STA- (PGA) at ground surface. Analysis is
5 6.4 152
TTRH02, data source performed with NERA, a free source one
CESMD, 2001 dimensional site response macro script by
Bardet and Tobita (2001). Input for NERA are
earthquake ground motion and distribution of
shear wave velocity (Vs) from bedrock to
ground surface. The depth of bedrock is
determined based on Ridwan (2016). Since the
depth of all boreholes in this study did not
reach the bedrock layer, the value of Vs is
assumed to be linearly increased from the
lowest depth of borehole the bedrock (760
m/s). From the results of 1915 simulations of
site response analysis, distribution of peak
ground acceleration (PGA) at the ground
surface were obtained. The contour map of
mean plus one standard deviation then drawn
on top of Jakarta in Fig. 3. Furthermore, by
adopting correlation by Wald et al. (1999),
distribution of Modified Mercalli Intensity
(MMI) for the earthquake scenario can be
estimated as seen in Fig. 4.
106.7 106.75 106.8 106.85 106.9 106.95
Fig. 1. Site Classification Based on Average N 6.1* S
the R2 value of Eqn. (1) is 0.686 which 106.7* E 106.75* E 106.8* E 106.85* E 106.9* E 106.95* E
184
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
estimate the number of dwellings. Number of
buildings were counted by dividing the
projected population by the average number of
residents per dwelling. By assuming the
MMI PGA
0.65g average number of residents to be 5 to 6
VIII
persons per dwellings, there were about 2.1
0.34g
million of buildings spread out in Jakarta. Fig.
VII
5 presented residential function zones
0.18g
extracted from RTRW spatial plan 2030.
VI
Description occupancy rates, and distribution
0.09g
of structural types are presented in Table 2.
6.1* LS
106.7* E 106.75* E 106.8* E 106.85* E 106.9* E 106.95* E
6.15* LS
6.25* LS
2 RISK ASSESSMENT
Based on the RTRW spatial plan 2030 it was 6.3* LS
Kode Blok
as the main source of information in PERDA 106.7* BT 106.75* BT 106.8* BT 106.85* BT 106.9* BT 106.95* BT
185
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
elasticity and thickness as the infill panel. The
6.1* S
width can be found out using equations given
6.15* S in FEMA 356. The diagonal strut was
6.2* S
designed in such a way thus it carries
compression only. At both ends of the strut,
6.25* S
transfer of bending moments to masonry was
People Population 6.3* S Unreinforced Masonry prevented by applying moment releases. The
strut was modeled as elastic element with
100 to 3000 1 to 130
3000 to 6000 130 to 260
6000 to 9000 260 to 390
9000 to 12000 6.35* S 390 to 520
12000 to 66000
106.7* E 106.75* E 106.8* E 106.85* E 106.9* E 106.95* E 106.7* E 106.75* E 106.8* E 106.85* E 106.9* E 106.95* E
186
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
superior, moderate and low construction 1
quality. P(D ds | S s) . ln (2)
ds
187
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
earthquake occurred while people were at Table 5. Relationships between Casualty Rates
home. The casualties caused by building and Damage States for Unreinforced Masonry
collapses and other building damage were Adopted from HAZUS-MH MR4
projected to be 16,239 fatality; 53,834 Indoor human injury dan death rates
hospitalized injured and 153,196 minorly Damage Severity Severity Severity
injured. State Severity 4
1 2 3
(%)
(%) (%) (%)
Table 4. Relationships between Casualty Rates Slight 0.05 0 0 0
and Damage States for Confined Masonry and
Infilled Frame Type Adopted from HAZUS-MH Moderate 0.35 0.4 0.001 0.001
MR4 Extensive 2 0.2 0.002 0.002
Complete 10 – 40 2 – 20 0.02- 5 0.02 - 10
Indoor human injury dan death rates
Damage Severity Severity Severity
State 1 2 3
Severity 4 Casualty leveli C ratei * Pds i * POP (3)
(%) where,
(%) (%) (%)
Slight 0.05 0 0 0 Crate i = casualty rate for buildings at damage state-i
0.2 0.025 0 0 Pds i = fraction of buildings of the particular category
Moderate
at damage state-i
1 0.1 0.001 0.001 POP = population within area being considered
Extensive
5 - 40 1 - 20 0.01 - 5 0.01 - 10
Complete
Tabel 6. Projected Casualities in DKI Jakarta 2030 due to Earthquake Shaking Based on Earthquake
Scenario Mw = 7,0; R = 117 km
Minor
Estimated Hospitalized Injured Fatality
Intensity Injured
Population
(MMI) Severity 1 Severity 2 Severity 3 Severity 4
Exposure
(person) (person) (person) (person)
VI 97,017 381 93 15 30
VII 11,734,805 151,325 45,091 8,080 16,038
VIII 42,088 1,490 470 86 171
Total 11,873,910 153,196 53,834 16,239
188
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ACKNOWLEDGMENTS Ridwan, M., Widiyantoro, S., Irsyam, M., Afnimar &
Yamanaka, H. 2016. Development of an
This study was supported by Research and engineering bedrock map beneath Jakarta based
Public Service Agency (LPPM) of Bandung on microtremor array measurements, Geohazards
in Indonesia: Earth Science for Disaster Risk
Institute of Technology. Authors would also Reduction. Geological Society, London, Vol. 441:
like to thank Government of DKI Jakarta for 153-165.
supporting data used in this study. Schnabel, P.B., Lysmer, J. & Seed, H.B. 1972.
SHAKE: A Computer Program for Earthquake
REFERENCES Response Analysis of Horizontally Layered Sites.
Report No. EERC 72-12, College of Engineering,
Abrahamson, N.A. 1998. Non-Stationary Spectral University of California, Berkeley.
Matching Program RSPMATCH. PG&E Internal Seed, H.B. & Idriss, I.M. 1970. Soil moduli and
Report. damping factors for dynamic response analyses.
Bardet, J.P. & Tobita, T., NERA. 2001. A Computer Earthquake Engineering Research Center
Program for Nonlinear Earthquake site Response Reports No. EERC: 70-10. University of
Analyses of Layered Soil Deposits. Departement California.
of Civil Engineering USC, LA. Seed, H.B. & Sun, J.I. 1989. Implications of Site
FEMA. 2005. FEMA 356-Prestandard And Effects in The Mexico City Earthquake of Sept.
Commentary For The Seismic Rehabilitation Of 19, 1985 for Earthquake-Resistant Design Criteria
Buildings, Applied Technology Council, in San Francisco Bay Area of California.
Washington. UC'B/EERC-89-03. University of California.
FEMA, HAZUS-MH MR4. 2003. Technical Manual, Sekretariat Daerah DKI Jakarta, PERDA Provinsi DKI
Washington. Jakarta no. 1 tahun 2014 tentang RDTR dan
Idriss, I.M. 1990. Response of Soft Soil Sites During Peraturan Zonasi. 2014.
Earthquakes. Proceedings of the Memorial Tata Cara Perencanaan Ketahanan Gempa Struktur
Symposium to Honor Professor Harry Bolton Bangunan Gedung dan Non Gedung. SNI-1726-
Seed. UC-Berkeley, Vol. 2: 273-290. 2012. 2012. BSN, Jakarta.
Imai, T. & Tonouchi, K. 1982. Correlation of N-value Wald, D. J., Quitoriano, V., Heaton, T. H., &
with S-wave Velocity and Shear Modulus. Kanamori, H. 1999. Relationships between peak
Proceeding of The 2nd European Symposium of ground acceleration, peak ground velocity, and
Penetration Testing. Amsterdam: 57-72. Modified Mercalli Intensity in California.
Ohta, Y. & Goto, N. 1978. Empirical Shear Wave Earthquake Spectra, Vol. 15, No. 3: 557-564.
Velocity Equations In Term Of Characteristic Soil Wijaya, I. I. D. G. W. 2009. Kajian Eksperimental
Indexs. Earthquake Engineering Structural Kinerja Dinding Bata Terkekang Portal Beton
Dyanamics, 6(2): 167-187. Bertulang, Thesis, ITB.
Prakoso, W.A. 2011. Shear-Wave Velocity of Yunita, H. 2013. Studi efek Kondisi Tanah Lokal dan
Cemented Soils of Jakarta. Jurnal Teknik Sipil, Sumber Gempa Dalam Analisis Respons Dinamik
ITB, 18 (3): 301-308. Tanah dan Implementasinya. Doctoral Thesis,
ITB.
189
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Daerah Istimewa Yogyakarta adalah salah satu kota besar di Indonesia yang memiliki makna
penting dari aspek politik, sosial, ekonomi, dan budaya. Area ini terletak di zona bahaya gempa tinggi
berdasarkan Peta Gempa Indonesia 2017. Lokasi penelitian ini memiliki percepatan batuan dasar yang tinggi
hingga mencapai 0.6g. Dalam studi ini, analisis ulang PSHA akan dilakukan menggunakan perangkat lunak
OpenQuake dengan database GEM dan atenuasi terbaru untuk melihat sensitivitas dalam hal akselerasi yang
dihasilkan di batuan dasar. Simulasi dilakukan dengan membuat dua skenario atenuasi logic tree, yang
selanjutnya disebut skenario Pusgen (1) dan skenario Cummin (2). Hasil dari penelitian ini adalah skenario
pertama akan menghasilkan akselerasi lebih besar dari skenario kedua. PGA pada batuan dasar berdasarkan
skenario Pusgen berkisar pada rentang nilai 0.431-0.720g, sementara skenario Cummin berkisar antara
0.405-0.709g.
Kata Kunci: bahaya gempa, sensitivitas atenuasi, PGA, OpenQuake
ABSTRACT: Special Region of Yogyakarta is one of big cities in Indonesia that has important meaning
from the political, social, economic and cultural aspect. This area is located in a high earthquake hazard
zone based on the 2017 Indonesia Earthquake Hazard Map. This location also mentioned has accelerated
bedrock acceleration up to 0.6g. In this study, a re-analysis of PSHA will be carried out using the
OpenQuake software with the GEM database and the latest attenuation to see the number of acceleration
differences generated in the bedrock. Simulation was done by making two logic tree attenuation scenarios,
later called the Pusgen scenario (1) and the Cummin's scenario (2). The result of this study is the first
scenario will result in an acceleration greater than the second scenario. Bedrock PGA based on Pusgen
scenario range from 0.431-0.720g in another hand Cummin's scenarios ranges from 0.405-0.709g.
Keywords: earthquake hazard, attenuation sensitivity, PGA, OpenQuake
1 PENDAHULUAN
yang merusak Yogyakarta diantaranya pada 4
Daerah Istimewa Yogyakarta (DIY) Januari 1840, 20 Oktober 1859, 10 Juni 1867,
merupakan salah satu provinsi di Pulau Jawa 28 Maret 1875 (New Comb dan Mc Cann,
yang memiliki potensi besar terhadap bencana 1987), 23 Juli 1943, 12 Oktober 1957, 14
geologi. Hal ini disebabkan adanya keberadaan Maret 1981, dan terakhir 27 Mei 2006 (USGS
Gunung Merapi di bagian utara, Zona dan BMKG, 2006). Gempa bumi terakhir 2006
Subduksi di bagian selatan dan Sesar Opak di dengan magnitude 6.2 merupakan gempa yang
daerah tersebut. Sejarah catatan gempa bumi berdampak terhadap kerusakan bangunan
190
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
rusak berat dan menghilangkan korban jiwa 110°5’ - 110°50’ BT. Provinsi ini seluas
terbanyak. 3,185.81 km2 atau 0.17% dari luas wilayah
Selain itu, DIY merupakan daerah yang Indonesia. Berdasarkan fisiografi, DIY
strategis dan mempunyai nilai-nilai penting, merupakan suatu depresi yang dibatasi oleh
seperti di antaranya ialah sisi sejarah, politik, Gunung Merapi yang berumur Kuarter di
ekonomi, social, dan budaya. Seiring dengan bagian utara, Pegunungan Selatan di bagian
perkembangan waktu, pembangunan, dan timur dan Pegunungan Kulon Progo di bagian
pemekaran wilayah, DIY merupakan suatu barat, dimana batuan kedua pegunungan
keniscayaan yang harus diatur dengan tersebut berumur Tersier, serta dibatasi oleh
perencanaan yang matang dan didukung Samudera India di bagian selatan (Van
dengan berbagai bidang keahlian untuk Bemmelen, 1949).
mendapatkan manfaat yang optimal. Dari sisi Berdasarkan peta geologi lembar
teknik sipil, salah satu yang menjadi pokok Yogyakarta (Rahardjo, Sukandarrumidi, dan
perhatian adalah pengaruh kondisi geologi dan Rosidi, 1995) dan lembar Surakarta dan
kegempaan dalam rencana pengembangan tata Giritontro (Surono dan Sudarno, 1992),
ruang khususnya infrastruktur. Analisis singkapan batuan tertua di Pegunungan Selatan
kegempaan yang tepat diperlukan sebagai dan Kulon Progo adalah Formasi Kebo-Butak
upaya meminimalkan dampak resiko yang berumur Oligosen hingga Miosen Awal yang
ditimbulkan dalam mitigasi bencana gempa terdiri dari produk gunungapi purba kelompok
bumi di masa mendatang. Beberapa penelitian breksi andesitik, tuff, lapilli tuff, aglomerat,
yang telah dilakukan di daerah penelitian dan pembentukan batuan aliran lava andesitik
adalah analisis focal mechanism dengan (lihat Gbr. 1). Selanjutnya sedimen adalah
mempertimbangkan sumber subduksi di Formasi Semilir berumur Miosen Awal hingga
daerah selatan Pulau Jawa (Thant, et.al., 2008), Miosen Tengah terdiri dari lapisan perselingan
ground motion synthesis (Makrup dan Jamal, tuff-breksi, batuapung breksi, dasit tuff, dan
2016), dan pembuatan peta PGA pada empat andesit tuff, dan batulempung tufaan. Formasi
kota besar di Jawa menggunakan EzFrisk Nglanggran diendapkan secara tidak selaras di
(Elistyawati dan Palupi, 2016). Beberapa atas Formasi Semilir berumur Miosen Awal
kajian di atas akan diperkaya lagi dengan studi hingga Miosen tengah yang terdiri dari breksi
ini. gunungapi, aliran breksi, aglomerat, lava, dan
Pada makalah ini menyajikan hasil studi tuff. Selanjutnya diendapkan Formasi
analisis probabilistik kegempaan (PSHA) di Sambipitu (tuff, serpih, batulanau, batupasir,
daerah Yogyakarta dengan mempertimbangkan dan konglomerat). Formasi Kepek (marl dan
beberapa sumber gempa yang ada di Indonesia lapisan batugamping), Formasi Wonosari
(fault, background, dan subduksi) dan logic (batugamping terumbu, kalkarenit, dan
tree atenuasi yang disinyalir akan memberikan
kalkarenittufaan), Formasi Sentolo berumur
kontribusi dalam percepatan di batuan dasar
dan sebagian di permukaan. Data yang Miosen hingga Pliosen (batugamping and
dipergunakan dalam analisis adalah database batupasir marly). Di atasnya diendapkan secara
dari pihak GEM dan diolah menggunakan tidak selaras dengan material gunungapi
perangkat lunak OpenQuake. Adapun sasaran Gunung Merapi berumur Kuarter hingga saat
dalam penelitian ini, yaitu: ini, proses sedimentasi dibawa oleh sungai-
a. Menentukan nilai PGA batuan dasar dengan sungai berhulu di lereng dan mendominasi di
sumber gempa di Indonesia. Cekungan Yogyakarta berupa breksi gunungapi,
b. Menentukan nilai PGA permukaan dengan aliran lava, tuff, batupasir tufaan, dan lahar.
menggunakan data N-SPT rerata tanah Pasir halus yang kaya unsur besi yang telah
permukaan. dibawa oleh sungai-sungai ke laut diendapkan
kembali oleh angin sebagai gumuk-gumuk
2 LOKASI PENELITIAN pasir di sepanjang pesisir selatan cekungan ini.
Selanjutnya endapan aluvial yang berumur
Provinsi Daerah Istimewa Yogyakarta secara Quarter terdiri kerikil, pasir, lanau, dan
geografis terletak pada 7°33’ - 8°15’ LS dan
191
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
lempung di sepanjang sungai besar dan dataran mekanisme lokal menunjukkan terjadinya zona
pantai. patahan dan ke bawah geser pada Patahan
Struktur geologi berupa patahan yang Opak (Gbr. 2). Kota Yogyakarta mempunyai
terletak diantara Cekungan Yogyakarta dan seismisitas yang cukup tinggi dan aktif serta
Pegunungan Selatan ini diketahui melalui memiliki percepatan tanah puncak yang
survei gaya berat (Untung, Udjang, dan nilainya bervariasi dari 0.038 sampai 0.531g
Ruswandi, 1973). Patahan tersebut berupa (Kirbani, Prasetya, dan Widigdo, 2006)
sesar mendatar dikenal sebagai sesar Opak disajikan pada Gbr. 3.
yang berarah NE-SE dengan N 235o E/8o,
dimana blok bagian barat relatif turun terhadap
blok bagian timur (Rahardjo et. al., 1995).
Lebar zona patahan sekitar 2.5 km. Selain
sesar Opak, juga terdapat patahan yang lain
yang hampir berarah Timur-Barat menuju
daerah Gantiwarno. Menurut interpretasi
Patahan Opak merupakan patahan aktif, namun
tidak diketahui jenis pergerakannya (Kertapati,
Soehaimi, dan Djuhanda, 1992). Sistem
Patahan Opak juga telah diidentifikasi arah
patahan berarah utara – selatan dan baratlaut –
tenggara di sekitar Patahan Opak (Sudarno,
1997). Berdasarkan data pemboran geoteknik
dan survey geolistrik juga diinterpretasikan
Gbr. 2 Peta Distribusi Gempa Bumi dan Tektonik
sistem patahan yang tertimbun endapan Yogyakarta (USGS dan BMKG, 2006)
gunungapi Merapi yang berarah utara – selatan
dan timur – barat yang merupakan kelanjutan
dari Patahan Opak ke arah Cekungan
Yogyakarta (MacDonald dan Partners, 1984).
3 METODE
Gbr. 1. Peta Geologi Daerah Penelitian
3.1 PSHA
Daerah pesisir Jawa Selatan adalah bagian Probabilistic Seismic Hazard Analysis (PSHA)
dari busur depan yang sering mengalami merupakan suatu pendekatan probabilistik
guncangan gempa. Gempa bumi lebih banyak mengenai kegempaan yang terdiri atas
memiliki besaran dari Mw 4-6 dan beberapa probabilitas magnitude, jarak, dan atenuasi.
Mw > 6. Catatan seismik tersebut mengung- Magnitude ini didasarkan pada sejarah dan
kapkan kejadian struktur garis patahan yang potensi terbesar yang ada pada struktur sumber
bergerak ke arah timur laut - barat daya dan gempa tersebut. Sementara jarak berkontribusi
pada kemungkinan tiap-tiap koordinat pada
barat laut-tenggara. Secara umum indikasi
struktur geometri sumber gempa terhadap titik
192
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
tinjauan. Sementara atenuasi itu dipengaruhi 3.3 Data Kegempaan
oleh tipe sumber gempa yang ada pada
Dalam studi ini dilakukan pengumpulan data
analisis. Secara umum rumus yang digunakan
pada PSHA adalah sebagai berikut: gempa mainshock di Indonesia tahun 1900
hingga 2016 dari GEM. Data gempa tersebut
mempertimbangkan completeness time tiap
(1) magnitude. Alasan data tersebut yang
Dimana fM(m) dan fR(r) adalah probabilitiy digunakan adalah untuk dapat dibandingkan
density function magnitude dan jarak (Kramer, dengan hasil analisis pada Peta Gempa
1996). Indonesia 2017. Sumber gempa dikelompokan
menjadi 3, yaitu sesar, subduksi yang meliputi
inter dan intraplate serta background. Data
3.2 OpenQuake
sumber gempa subduksi megathrust dan sesar
OpenQuake merupakan perangkat lunak tidak dapat dilihat pada Tabel 1.
berbayar dengan komunitas yang luas. Skenario GMPE/ atenuasi yang dipakai
OpenQuake-engine merupakan perangkat sebagai perbandingan dinamakan (1) GMPE
lunak bersifat open source yang digunakan Pusgen, diberi nama demikian untuk
untuk menghitung bahaya dan risiko gempa mengingat analisis yang telah dilakukan
dan dikembangkan oleh Global Earthquake instansi tersebut, dan (2) GMPE Cummins,
Model. Perangkat ini berjalan pada sistem yaitu nama seorang peneliti dari ANU yang
operasi yang beragam, mulai Windows, Linux membuat perbandingan GMPE ini. Adapaun
logic tree dari GMPE ini dapat dijabarkan
(Ubuntu) dan Macintosh. Penelitian ini
sebagai berikut: untuk GMPE Pusgen dalam
menggunakan server Pusgen yang dijalankan menganalisis sumber gempa dangkal (fault dan
pada Linux. Perangkat lunak ini mempunyai background) adalah BooreEtAl2014,
kelebihan yaitu repositori kodenya bersifat CampbellBozorgnia2014, ChiouYoungs2014,
umum serta dapat diunduh pada alamat analisis gempa interslab (subduksi dangkal)
http://github.com/gem/oq-engine. Eksekusi adalah AbrahamsonEtAl2015Sinter, Atkinson-
perangkat ini menggunakan terminal pada Boore2003Sinter, ZhaoEtAl2006Asc, dan ana-
sistem operasi tersebut (GEM, 2016). lisis sumber gempa intraslab (subduksi dalam)
Analisis studi ini menggunakan salah satu adalah dengan AtkinsonBoore2003SSlab,
kemampuan OpenQuake, yaitu classical YoungsEtAl1997SSlab, AbrahamsonEtAl-
hazard analysis dimana mengacu pada usulan 2015SSlab dengan masing-masing bobot
peneliti sebelumnya (Cornell, 1968; McGuiree, adalah 0.33, 0.33, dan 0.34. Sementara itu,
1976) yang diformulasikan oleh Field, Cornel, untuk periode ulang yang akan dianalisis ialah
dan Jordan (2003). Pada analisis ini output probabilitas terlampaui 2% dalam 50 tahun
yang mampu dihasilkan adalah berupa hazard (kala ulang 2,475 tahun).
curve dan peta bahaya. Namun, makalah ini
hanya akan menyajikan peta bahaya gempa.
193
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
194
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Tabel 2. Sumber Gempa Fault Sebagai Parameter Masukan
Slip- Sense-
ID Structure Name Dip Top Bottom L Mmax
Rate Mechanism
Main Segment mm/yr (km) (km) (km) (km) (Mw)
Cimandiri
1 Cimandiri 0.55 Reverse-slip 45S 3 18 23 6.7
Fault
Cimandiri Nyalindung-
2 0.4 Reverse-slip 45S 3 18 30 6.5
Fault Ciheber
Cimandiri
3 Rajamandala 0.1 Strike-slip 90 3 18 45 6.6
Fault
Lembang
4 Lembang 2 Strike-slip 90 3 18 29.5 6.8
Fault
Baribis-
Kendeng
5 Subang 1 Reverse-slip 45S 3 18 33 6.5
Fold-Thrust
Zone
Baribis-
Kendeng
6 Cirebon-1 0.1 Reverse-slip 45S 3 18 15 6.5
Fold-Thrust
Zone
Baribis-
Kendeng
7 Cirebon-2 0.1 Reverse-slip 45S 3 18 15 6.5
Fold-Thrust
Zone
Baribis-
Kendeng Karang
8 0.1 Reverse-slip 45S 3 18 22 6.5
Fold-Thrust Malang
Zone
Baribis-
Kendeng
9 Brebes 0.1 Reverse-slip 45S 3 18 22 6.5
Fold-Thrust
Zone
Baribis-
Kendeng
10 Tegal 0.1 Reverse-slip 45S 3 18 15 6.5
Fold-Thrust
Zone
Baribis-
Kendeng
11 Pekalongan 0.1 Reverse-slip 45S 3 18 16 6.5
Fold-Thrust
Zone
Baribis-
Kendeng
12 Weleri 0.1 Reverse-slip 45S 3 18 17 6.5
Fold-Thrust
Zone
Baribis-
Kendeng
13 Semarang 0.1 Reverse-slip 45S 3 18 34 6.5
Fold-Thrust
Zone
Baribis-
Kendeng
14 Rawa-Pening 0.1 Reverse-slip 45S 3 18 18 6.5
Fold-Thrust
Zone
Baribis-
Kendeng
15 Demak 0.1 Reverse-slip 45S 3 18 31 6.5
Fold-Thrust
Zone
195
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Slip- Sense-
ID Structure Name Dip Top Bottom L Mmax
Rate Mechanism
Main Segment mm/yr (km) (km) (km) (km) (Mw)
Baribis-
Kendeng
16 Purwodadi 0.1 Reverse-slip 45S 3 18 38 6.5
Fold-Thrust
Zone
Baribis-
Kendeng
17 Cepu 0.1 Reverse-slip 45S 3 18 100 6.3
Fold-Thrust
Zone
Baribis-
Kendeng
18 Waru 0.05 Reverse-slip 45S 3 18 64 6.5
Fold-Thrust
Zone
Baribis-
Kendeng
19 Surabaya 0.05 Reverse-slip 45S 3 18 25 6.5
Fold-Thrust
Zone
Baribis-
Kendeng
20 Blumbang 0.05 Reverse-slip 45S 3 18 31 6.6
Fold-Thrust
Zone
21 Ciremai 0.1 Strike-slip 90 3 18 20 6.5
22 Ajibarang 0.1 Strike-slip 90 3 18 20 6.5
23 Opak 0.75 Strike-slip 60E 3 18 45 6.6
Merapi-
24 0.1 Strike-slip 90 3 18 28 6.6
Merbabu
25 Pati Thrust 0.1 Strike-slip 90 3 18 69 6.5
Gbr. 4 Sumber Gempa Untuk Analisis Studi Ini Terdiri Atas (a) Sumber Gempa Berasal dari Fault (b)
Sumber Gempa Megathrust. Untuk Sumber Gempa Background Terdapat pada File Input Openquake yang
Terdiri Atas Sumber Dangkal dan Dalam (Gem, 2016)
196
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
oleh Kara dan Gunduz (2010). Hasil nilai N-SPT rerata 30 m di bawah permukaan
perhitungan dapat dilihat pada Tabel 3. tanah di bawah 15, maka hasil percepatan
Tampak dari tabel tersebut, karena dominan maksimal di permukaan akan selisih tipis
site class-nya adalah SD dan SE disebabkan maksimal 10% dari PGA di batuan dasar.
197
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Apabila data yang tersedia berjumlah
banyak dan mempresentasikan daerah
permukaan, maka dapat dibuat mikrozonasi.
Untuk sementara pada penelitian ini hanya
tersedia 41 titik, oleh karenanya daerah yang
dapat dibuat mikrozonasinya adalah meliputi
area tersebut saja. Hal ini dapat dilihat pada
Gbr. 5 (a) (b) dan (c).
Kisaran yang ada adalah 0.431-0.720g
untuk logic tree Pusgen dan 0.405 hingga
0.709g untuk logic tree Cummin. Apabila
dibandingkan dengan hasil studi dari
(a) (Elistyawati & Palupi, 2016), maka penelitian
ini menghasilkan lebih tinggi nilai PGA batuan
dasarnya.
Berdasarkan Peta Gempa Indonesia 2017,
nilai yang muncul tidaklah sama persis dengan
studi ini, hal ini dikarenakan adanya
pertimbangan aspek lainnya yang diambil oleh
para pihak-pihak yang berkompeten dan
berkepentingan dalam studi ini. Dengan
demikian, maka perencanaan pengembangan
infrastruktur yang mempertimbangkan aspek
kegempaan dalam pendesainannya dapat
mengacu pada analisis studi ini. Pada Gbr. 5
(b) menunjukkan nilai PGA di daerah Bantul
memiliki nilai yang lebih tinggi dibanding
sekitarnya antara 0.6g hingga 0.7g dipengaruhi
adanya keberadaan patahan Opak. Nilai PGA
ini berada di atas satuan geologi residual
vulkanik muda.
5 KESIMPULAN
198
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
DAFTAR PUSTAKA Seismic Hazard Analysis and Spectral Matching in
Time Domain. American Journal of Civil
Elistyawati, Y., & Palupi, I. R. 2016. Seismic Hazard Engineering, 4(6), 298–305.
Analysis with PSHA Method in Four Cities in Rahardjo, W., Sukandarrumidi, & Rosidi, H. 1995. Peta
Java. Journal of Physics: Conference Series, Geologi Gersistem Jawa Lembar Yogyakarta,
776(1), 12119. IOP Publishing. Jawa, Skala 1:100.000, Edisi 2. Pusat Penelitian
GEM. 2016. The OpenQuake-Engine User Manual. Dan Pengembangan Geologi.
Global Earthquake Model (GEM) Technical Sudarno, I. 1997. Kendali Tektonik terhadap
Report 2016-06, 193. Pembentukan Struktur pada Batuan Paleogen dan
https://doi.org/10.13117/GEM.OPENQUAKE.MA Neogen di Pegunungan Selatan, Daerah Istimewa
N.ENGINE.2.0/01. Yogyakarta dan Sekitarnya. Bandung: Geology
Kertapati, E. K., Soehaimi, A., & Djuhanda, A. 1992. Postgraduate Program, Institut Teknologi
Peta Seismotektonik Indonesia. Bandung: Pusat Bandung.
Penelitian dan Pengembangan Geologi. Surono, T., & Sudarno, I. 1992. Peta Geologi Bersistem
Kirbani, S. B., Prasetya, T., & Widigdo, F. M. 2006. Indonesia Lembar Surakarta dan Giritontro,
Percepatan Getaran Tanah Maksimum Daerah Skala 1:100.000. Pusat Penelitian Dan
Istimewa Yogyakarta 1943–2006. Jurnal Pengembangan Geologi, 1.
Geofisika, Himpunan Ahli Geofisika Indonesia, Thant, M., Kawase, H., Pramumijoyo, S., Hendrayana,
Edisi, (1), 19–22. H., & Adi, A. D. 2008. Focal Mechnisms of
Kramer, S. L. 1996. Geotechnical Earthquake Subduction Zone Earthquakes Along The Java
Engineering. United State of America: Prentice Trench: Preliminary Study for The PSHA for
Hall. Yogyakarta Region, Indonesia. The 14th World
MacDonald, S. M., & Partners. 1984. Greater Conference on Earthquake Engineering October,
Yogyakarta Groundwater Resources Study. Report 12–17.
of Groundwater Development Project (P2AT), Untung, M., Udjang, K., & Ruswandi, E. 1973.
Directorate General of Water Resources Penyelidikan Gaya Berat di daerah Yogyakarta-
Development, Ministry of Public Works, Wonosari, Jawa Tengah. Publikasi Teknik Seri
Government of the Republic of Indonesia, Sir M Geofisika, No 3.
MacDonald & Partners in Association with Van Bemmelen, R. W. 1949. The Geology of Indonesia,
Binnie & Partners, Hunting Technical Se. Vol. 1A. Government Printing Office, the Hague,
Makrup, L., & Jamal, A. U. 2016. The Earthquake 732.
Ground Motion and Response Spectra Design for
Sleman, Yogyakarta, Indonesia with Probabilistic
199
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Pada hari Kamis tanggal 26 September 2019 jam 06:46:44 WIB, telah terjadi gempa bumi dengan
magnitude Mw 6.5. Epicenter terletak pada koordinat 3.43 °LS - 128.46°BT terletak di Pulau Seram, Maluku
pada kedalaman 10 km (BMKG 2019). Untuk meninjau secara langsung kondisi geoteknik area terdampak
gempa bumi maka dilakukan kunjungan lapangan pada tanggal 11 s/d 14 Oktober 2019. Penulis masih
mengkaji jenis lubang-lubang / kawah yang ditemukan. Dari kesaksian masyarakat, lubang-lubang / kawah
yang ditemukan lebih bersifat semburan air / lumpur yang terjadi pada saat gempa bumi. Ada juga
lubang-lubang / kawah yang terjadi disertai rekahan yang menjalar ke lubang berikutnya.
Kata Kunci: gempa Maluku 26 September 2019, kunjungan lapangan, lubang-lubang / kawah
ABSTRACT: On Thursday September 26 2019 at 06:46:44 IWST, an earthquake with a magnitude of Mw 6.5
occurred. The epicenter is located at coordinates 3.43 ° S - 128.46 ° E, located on Seram Island, Maluku at a
depth of 10 km (BMKG 2019). Field visit was conducted from 11 to 14 October 2019 to directly discuss the
geotechnical situation of the earthquake affected. The author is still studying the types of holes / craters found.
From the community testimonies, the holes / craters that were found were more of mud / water burst which
occurred at the time of the Earthquake. There are also holes / craters that occur accompanied by fractures that
spread to the next hole.
Keywords: Maluku Earthquake of 26 September 2019, field visit, holes / craters
200
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
meliputi gempa utama. Tingginya nilai yang Terjadi pada Saat Gempa Bumi Maluku 26
seismisitas suatu daerah ditandai Sept 2019.
dengan semakin banyaknya titik pada Jadi total lubang di area tersebut, sebanyak 10 titik.
peta persebaran seismisitas) di Maluku
201
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 7a.
202
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
4 SEISMISITAS DI SEKITAR PULAU
AMBON
Tabel 1 (lihat setelah Referensi) menunjukan
seismisitas gempa diatas Mw 4, yang terjadi
sejak tanggal 25 September 2019 (sehari
sebelum Gempa bumi 26 September 2019 lalu).
Sedangkan Gempa yang dibawah Mw 4 sudah
terjadi lebih dari 1820-an kali terjadi (BMKG
Per 21.00 WIT Tanggal 24-okt-2019).
Gbr. 8. Rock Fall (Batu besar jatuh) Akibat Gempa
Bumi 26 September 2019 lalu di Desa Liang,
Maluku Tengah.
Tabel 1. Tabel Gempa Maluku diatas Mw = 4, sejak tanggal 25 Sept 2019 s/d mid Okt 2019
(SUMBER: IRIS, BMKG dan USGS
Date Time Location / Region
Latitude Longitude Mag. Depth
(UTC) (UTC) (Shows interactive Source
(‘- = LS) (BT) Mw km
Tanggal Waktu map)
9/25/19 10 km S of
46:44.6 -3.4500 128.3471 6.5 18.16 IRIS
Kairatu, Indonesia
30 km W of Piru,
9/25/19 35:59.9 -3.0865 127.9211 4.4 40 IRIS
Indonesia
USGS
9/25/19 16:13 -2.8600 127.9300 4.3 46 Ceram Sea
website
USGS
9/25/19 23:46 -3.4500 128.3500 6.5 18 Seram, Indonesia
website
USGS
9/25/19 11:35 -3.0900 127.9200 4.4 40 Seram, Indonesia
website
10 km S of Pelau,
9/26/19 39:59.5 -3.6093 128.4829 5.4 10.98 IRIS
Indonesia
15 km ESE of
9/26/19 28:41.5 -3.6627 128.4554 4.2 10 IRIS
Tulehu, Indonesia
USGS
9/26/19 5:28 -3.6600 128.4600 4.2 10 Seram, Indonesia
website
USGS
9/26/19 0:39 -3.6100 128.4800 5.4 11 Seram, Indonesia
website
10/1/19 USGS
11:42 -4.8300 130.5100 4.5 85 Banda Sea
website
14 km SSE of
10/3/19 41:19.5 -3.6426 128.5230 4.7 10 IRIS
Pelau, Indonesia
USGS
10/3/19 8:41 -3.6400 128.5200 4.7 10 Seram, Indonesia
website
4 km WSW of
10/10/19 39:48.2 -3.6504 128.2157 5 54.4 IRIS
Passo, Indonesia
USGS
10/10/19 4:39 -3.6500 128.2200 5 54 Seram, Indonesia
website
USGS
10/11/19 15:01 -4.6900 125.3300 4.7 486 Banda Sea
website
USGS
10/16/19 2:25 -3.3600 130.6200 4.7 17 Seram, Indonesia
website
Berikut ini adalah Gbr. 9 yang berbasiskan magnitude gempa bumi (dalam Mw). Disini
data-data BMKG (Lampiran A). Sumbu x di terlihat, banyak episenter gempa yang terjadi
Grafik dalam Gbr. 9 adalah jarak dalam hanya berjarak 4 km s/d 25 km dari titik
kilometer (logaritmik) dan sumbu y adalah Imejiner Tengah (tepat antara Tulehu dan
203
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Natsepa). Dan magnitude Gempa-Gempa ini
ialah Mw = 1.75 s/d Mw = 4.0.
204
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
5 DATA-DATA PETA GEOLOGI UPDATE plot/overlaping diatas Peta Riset JICA 2011,
Dilakukan literature review (referensi) sejak Sumber:http://open_jicareport.jica.go.jp/pdf/12039
awal Oktober 2019, dimana ditemukan 939.pdf - dari JICA Open file)
referensi-referensi berikut ini:
a. Paper oleh Lewerisa Richard Lewerissa,
Sismanto Sismanto, Ari Setiawan and 6 KESIMPULAN DAN REKOMENDASI
Subagyo Pramumijoyo, 2018, The Akibat gempa bumi 25 September 2019, di
Study of Geological Structures in Suli Maluku ditemukan lubang-lubang / kawah,
and Tulehu Geothermal Regions peristiwa rock fall di desa Suli dan Liang.
(Ambon, Indonesia) Based on Gravity Pembentukan lubang / kawah tersebut
Gradient Tensor Data Simulation and terasosiasi dengan fenomena semburan air dan
Analytic Signal - Geosciences 2018, 8, pasir halus (sand boil). Untuk mengevaluasi
4; www.mdpi.com/journal/geosciences. pembentukan lubang tersebut maka perlu survei
b. Laporan ringkasan dari Japan geolistrik dan pemboran (SPT) serta uji CPTu.
International Agency – West Japan Banyak Episenter gempa yang terjadi hanya
Engineering Consultants, Inc. 2011 – berjarak 4 km s/d 25 km dari titik Imejiner
JICA Preparatory Survey for Tulehu Tengah, dan magnitude gempa-gempa ini ialah
Geothermal Power Plant Final Report Mw = 1.75 hingga 4.0. (Gbr. 9.).
(Summary Report) – September 2011 – Rekomendasi lainnya:
Open Report for PT. PLN (Persero). a. Agar team HATTI / asosiasi lainnya
Republic of Indonesia. Sumber: (HAKI, IAGI dll) dapat melakukan
http://open_jicareport.jica.go.jp/pdf/12 kunjungan lapangan juga ke Suli, Liang
039939.pdf (dari JICA Open file). dan tempat-tempat lainnnya seperti di
c. Laporan / artikel lainnya seperti di Pulau Haruku, Pulau Seram dll. di
sebutkan di referensi di akhir laporan ini Kotamadya Ambon dan di Kabupaten
(Setelah Kesimpulan). Maluku Tengah.
Selanjutnya lokasi semburan air (x) yang b. Perlu ditindak lanjuti penyelidikan
didekat Desa Suli, Jemaat GPM Tial, yang
Seismisitas / Kegempaan di Pulau
berada di bantaran floodplain kali /sungai
Wayari (Gbr. 1) bias di-plot / overlapping di Ambon, Maluku, khususnya dibagian
atas peta sesar-sesar yang berada di Pulau timur Pulau Ambon dimana terjadi
Ambon bagian timur (Gbr. 12.). ribuan kali gempa bumi kecil (Lampiran
A sesuai data BMKG)
c. Direkomendasikan untuk memakai peta
Geologi yang lebih update dan akurat
sesuai referensi dari Richard
Lewerissa, dkk (2018) dan JICA (2011)
serta didatangkannya ahli Geologi
Struktur ke Maluku, untuk meneliti area
seperti yang disebutkan dalam Gbr. 12
diatas, untuk melakukan pemetaan sub-
surface yang lebih detail lagi dari sistem
patahan (sesar) dibawah Pulau Ambon,
Pulau Haruku dan Pulau Seram
Gbr. 12. (Referensi peta geologi dan open report / Penulis mengucapkan terima kasih kepada:
Laporan terbuka JICA: alamat sumbernya adalah: a. Dr. Adrin Tohari, M.Eng (Geotechnical
http://open_jicareport.jica.go.jp/pdf/12039939.pdf (dari Engineer dari Landslide Research
JICA Open file)) Lokasi semburan air (x) yang Group Research Center for
didekat Desa Suli, Jemaat GPM Tial, yang berada Geotechnology, Indonesian Institute of
di bantaran floodplain kali /sungai Wayari dengan Sciences / LIPI) atas masukan dan
overlapping di peta sesar-sesar yang berada di diskusi dari beliau selema
Bagian Timur Pulau Ambon (Lokasi x di- mempersiapkan tulisan ini; dan rekan
205
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
b. Martinus Abednego MSc PhD juga atas
masukan dan diskusi selama
mempersiapkan paper ini
DAFTAR PUSTAKA
LAMPIRAN A
206
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
207
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRACT: The Palu earthquake with a magnitude of 7.5 Mw occurred on September 28th, 2018 at 18:02
WITA time. Palu-Koro Fault experienced a strike with a mechanism of "strike slip". Earthquake epicentre is
located 72 km north of the city of Palu with an earthquake depth of 10 km. This earthquake triggered a tsunami,
a shift in the fault (rupture) along The Palu-Koro Fault and its secondary fault, and the occurrence of extensive
and massive landslides in the Petobo, Jono Oge, Sibalaya, Balaroa and Lolu villages. One important element
in responding to disasters is conducting comprehensive studies related to the phenomena caused by disasters
as study material to understand the phenomena that occur, post-disaster handling and disaster mitigation in the
future. This report presents the results of a survey of several locations affected by the earthquake in the city of
Palu on September 28th, 2018 (6:03 pm local time), such as in the Balaroa and Petobo areas. Studies in the
form of groundwater geohydrology analysis with resistivity methods and studies of aged river maps at several
locations are reported in this paper.
Keywords: liquifaction, earthquake, resistivity, geohydrology
1 INTRODUCTION
Earthquakes are natural disasters that have a One important element in responding to
devastating impact and occur suddenly causing disasters is conducting comprehensive studies
damage to infrastructure and the earth's surface related to the phenomena caused by disasters as
and loss of life. Damage to the earth's study material to understand the phenomena
infrastructure and the surface varies according that occur, post-disaster handling and disaster
to earthquake intensity and local geological mitigation in the future. This report presents
conditions. The location is close to the preliminary results of the monitoring and
epicentre, the damage was immediate and survey of several earthquake-affected locations
resulted in the destruction of infrastructures in the city of Palu on September 28th, 2018
such as collapsed buildings, broken bridges and (6:03 pm local time), such as in the Balaroa,
other infrastructure damage. The indirect or Petobo, Jonoyoge and Sibalaya areas. The study
secondary damage caused by the earthquake, in the form of soil resistivity analysis at several
for example there was a fire, landslides, water locations is reported in this paper.
pipes and broken gas, electricity supply
disruptions, floods, and others.
208
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2 CONDITION OF AREA STUDY
209
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
mountains) as seen along the coast of Palu Bay 2.4.1 Groundwater Condition Before
in the west. Palu Region is characterized by the Earthquake
main form of the valley (graben) where the
Groundwater in the Groundwater Basin of Palu
centre of the city is located in the middle of the
(Palu CAT) is a physical phenomenon that
valley.
requires spatial analysis. Groundwater in Palu
CAT is one of the sources of clean water
suppliers for residents in Palu and in some
Regencies of Donggala and Sigi. Increase in
number of population and development of
various sectors such as domestic, industrial,
service, agriculture, and other sectors in Palu,
directly or indirectly demand provision of clean
water sources are increasing. On the other hand,
it is faced with the phenomenon of groundwater
as a limited resource according to space and
time. If this isn't anticipated then degradation of
Fig. 2. Geology Condition Map of Palu quantity and groundwater quality 8989 will
continue to improve. This condition will
The geological structure of this area is based increase if accompanied by a wrong
on the results of a study by the Indonesian understanding of the groundwater
earthquake map revision team (Irsyam, M. et phenomenon, besides being the impact of
al., 2010) The active geological structure that human development and activities.
passes through Palu is in the form of PKF (Palu- Groundwater potential in each
Koro Fault) and MF (Matano Fault) both of hydromorphology and hydrogeology unit is
which are many active faults found around the determined by the characteristics of the aquifer
Palu valley. The Palu-Koro Fault (PKF) has a in each aquifer system (Zeffitni, 2013).
North-South direction while some of it has a
Southwest-Northeast direction. The active
faults that are directed towards North-South are
active faults due to the rejuvenation of old
structures that can be reactivated, while the
faults that are directed Southwest-Northeast are
very active structures today. Geologically, the
physiography of Palu is related to the structural
processes that occur as well as the types of
rocks that make up Palu, where the left and right
sides of Palu are the main fault lines, namely
the Palu-Koro Fault and the area is composed
of rocks that are harder than the material
making up the valley.
210
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2.4.2 Level of Free Groundwater Potential in the east, namely in the Districts of East Palu
Based on Groundwater Characteristics in and South Palu.
Alluvial Plain Hydromorphology Unit
The characteristics of free groundwater are the 2.4.3 Ground Water Condition after
basis for estimating groundwater potential Earthquake
determined by parameters: phreatic level, The results of a temporary study conducted by
groundwater fluctuation, permeability value, conducting boreholes at several points and
quantity, and groundwater quality. The phreatic direct interviews with people who inhabit the
level of depth in Palu ranges from shallow to Palu and Sigi Valleys. The groundwater level
moderate. The shallower phreatic face is 1.38 m along the Gumbasa irrigation channel has
interchangeable in the western part of the West changed completely, where the face of the
Palu District and the phreatic level. While 2.70 ground before the earthquake is very shallow
m can be found in the eastern part of Gumbasa where it is located around 2-4 m in the lower
District. Phreatic face level fluctuations in Palu area (west) of the irrigation channel.
are generally low (<1.0 m). The lowest phreatic For the Palu, groundwater level conditions
level of facial fluctuations in the western part of have not changed much. Where the results of
the CAT is in the District of West Dolo 0.48 m drill holes at several locations and in the wells
while the highest in the eastern part of the CAT of residents who inhabit the Palu Valley show
is in the District of Biromaru 0.85 m. that the groundwater level has not changed
Permeability value used in this study is the much.
value of free aquifer permeability and based on Many communities reported that people who
the results of pumping test data analysis and used deep wells (confined aquifers)
drilling data of the Public Works Office of experienced a significant increase in water
Central Sulawesi Province (2000). The volume after the September 2018 Palu
distribution of aquifer permeability is generally Earthquake. While people who used shallow
high with values > 45 m/day or an average of wells reported that many experienced wells
53.09 m/day. The level of quantitative potential whose pipes were jammed due to being filled
of free groundwater ranges from small to with mud and many whose pipes were bent and
medium. The level of potential small class broken. This is due to the lateral movement of
(<1.0 l/s) only occupies the eastern part of the the earthquake and the pressure of the ground
CAT, namely the District: East Palu, South pore water that rises to the surface caused by the
Palu, and Dolo. The level of potential grade is earthquake carrying material so that it enters the
moderate (1.0-5.0 l/s) turns out to cover the community well pipes. This is also known as a
entire western CAT and only 40% in the eastern sand boiling process and can cause liquefaction
(Biromaru and Gumbasa). The quality of if it occurs massively.
groundwater in Palu CAT is generally good.
The level of potential groundwater is generally
in the medium-high class. In the area of East 3 LIQUEFACTION DISASTER
Palu are in the medium-low class because the MITIGATION
analysis of the data is only based on the area
included in the Palu CAT. Likeness and lateral movement of land right
Based on the results of data analysis of free after the 2018 Palu Earthquake, major damage
groundwater characteristics, it can be was reported at four locations, namely Balaroa,
determined the level of free groundwater Petobo, Jono Oge, and South Sibalaya. These
potential. The potential of free groundwater areas are located from 1-7.2 km from the Palu-
covers all of the Palu CAT in alluvial plate Koro Fault. Although data is still being
hydromorphology units. The level of potential collected and compiled, it is currently believed
of high-grade groundwater in the east is in that damage at this location is mainly due to
Biromaru District and in the west is in West liquefaction followed by lateral movements.
Palu and Marawola Districts. The level of Liquefaction is a phenomenon in which
groundwater potential is in the eastern part of granular deposits lose strength and stiffness and
the Dolo and Gumbasa Districts. In the western change from solid to liquid due to increased
part of the distribution in the Districts of South pore pressure caused by cyclic shocks (Jefferies
Palu, West Dolo and South Dolo. The level of and Been, 2015). The liquefaction phenomenon
potential low-grade groundwater is only found is the impact of an earthquake in an area
211
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
composed of loose sand layers with shallow liquefaction with the term "Nalodo" which
groundwater levels (< 9.0 m) and is influenced means sinks are sucked up by mud so they
by the intensity, duration, and earthquake avoid these "Nalodo" risk areas. Liquidation
shaking and the distance from the epicenter. effects in the form of oscillation of soil layers
According to Youd (1984 and 1992), soil also occur in the Sigi Regency, causing damage
layers that are vulnerable to liquefaction are in to buildings and road infrastructure. Thus, the
relatively limited geological areas. Liquidity word "Nalodo", in general, refers to the impact
usually generally occurs in alluvial fan of liquefaction in the form of soil mass flow and
deposits, alluvial plains, beaches, former lakes oscillation movement.
and estuaries, liquefaction due to earthquakes
can cause four types of soil failure, in the form
of:
a. Loss of bearing capacity in flat areas
b. Ground oscillation movements where the
surface slope is <0.1%
c. Lateral spreading where the surface slope
is between 0.1% and 5.0%
d. Flow type ground motion (flow
slide/failure) where the slope of the soil is
more than 5%.
212
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
life due to landslides in Palu can be attributed The resistivity cross-image was obtained using
to four landslides that occurred, three of which the RES2DINV program for automatic 2-D
came from lateral distribution under the inversion of the apparent resistivity obtained in
Gumbasa Canal (Petobo, Jonoyoge, and the field. The inversion scheme is based on the
Sibalaya), and the fourth in Palu (Balaroa) least square method with smoothness
where waterways were smaller dividing dry constraints with quasi-Newton optimization.
land at higher altitudes than failed fertile city The optimization of the iteration process is
land (Fig. 5A, C). adjusted until the difference between the
measurement data in the field (observation) and
the calculation model of the apparent resistivity
values are as minimal as possibly indicated by
the value of the smallest square root or root
mean squared (RMS).
213
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
4.2 Petobo Liquefaction
During the 2018 Palu earthquake, two
interesting major events were observed, namely
the liquefaction event which was followed by
massive lateral spreading. This incident caused
the affected villages to be buried and moved
(Fig. 9). According to the Center for
Groundwater Resources and Environmental
Geology, most of the Palu Region has very high
liquefaction potential with a liquefaction
potential index (LPI)>15 with shallow
groundwater level <12 m. However, many
aspects of geotechnical engineering after an
earthquake are interesting to investigate to find
the actual causes and mechanisms that occur.
Deeper Investigations and Research are
important to support the government in the
Fig. 7. 2 Line of 2-D Electrical Resistivity relocation and reconstruction stages.
Tomography Test at Balaroa Petobo is a residential area that suffered
heavy damage due to liquefaction. This area is
The mechanism of land collapse in the about 7.2 km east of the Palu-Koro Fault.
village of Balaroa which is located about 1 km
west of the Palu-Koro Fault can be illustrated as Although this area has a slightly sloping ground
shown in Fig. 8a. Where the beginning of the at the surface, the mass movement from the top
ground movement (crown) is located on Jalan slope to the bottom is triggered by liquefaction.
Gunung Gawalise, while the end is located on
Jalan Balaroa. The area affected is housing with
an area of impact around 34.5 Ha with a
circumference of 2.5 km. An aerial view of the
damage in Balaroa is presented in Fig. 8d.
Direct observations on Jalan Gunung Gawalise
where the peak of the landslide began showed
that an avalanche took place in the form of a
landslide with a slope height after a landslide of
around +10 m (Fig. 8b). While the liquid flow
(Nalodo) triggered by the earthquake began to Fig. 9. Petobo Satellite Image After The
appear at a distance of about 60 m from the Earthquake and 2-D Electrical Resistivity
crown of Fig. 8d, where this liquid flow causes Tomography and Topography Test Track
the house in the location to sink and move as far
as 300-600 m from the original location.
Fig. 10 below shows the resistivity cross-
section obtained from iteration 12 with an RMS
error value of 1.5%. This resistivity cross-
section reaches a depth of 70.4 m with a
resistivity range value of 5.61 – 2,387.5 Ωm.
Resistivity values of 5.61 - 42.196 Ωm in
shallow aquifer layers with depth distribution
ranging from 3-12 m. In addition, it can also be
predicted slip fields marked by resistivity
contrast seen at the bottom (between red and
yellow). At this location, it was also found the
phenomenon of shallow aquifers that were
Fig. 8. (a) Model of The Mechanism of The widespread that caused an increase in the level
Collapse of Balaroa Liquidation Collapse, (b) of soil saturation in the area. The source that
Land Slide on The Crown, (c). Digital Elevation causes shallow aquifers can be caused by
Model of Balouroa Contour, (d). Image of
Liquefaction Aerial Flow After 15 Days of The infiltration from the Gumbasa irrigation
Palu Earthquake channel above, or it could also be the influence
of aged river seepage, the Niga River whose
dukes once flowed in the Petobo subdistrict, but
214
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
were closed due to sediment siltation and
eventually disappeared due to settlement
development. This high level of saturation is an
indicator of increasing liquefaction potential in
this area.
5 CONCLUSION
Fig. 10. Result of 2 Line of 2-D Electrical Based on the results of the analysis from this
Resistivity Tomography Test initial survey, several phenomena have been
identified at the study location, including:
Petobo is a residential area that suffered a. The results of the resistivity test at lane 1
heavy damage due to liquefaction. This area is (Balaroa) show the occurrence of the
about 7.2 km east of the Palu-Koro Fault. Even phenomenon of a distressed aquifer that
though this area has a slightly sloping ground at breaks, causing an increase in water
the surface, the mass movement from the top content in the soil layers above. This
slope to the bottom is triggered by liquefaction. phenomenon is one indicator causing the
The drainage length is about 2.1 km with a occurrence of liquefaction in this area.
width of about 1.0 km. the total affected area While the resistivity test results in Petobo
reaches 180 ha of the total area of Petobo do not show any broken aquifer, so it can
around 1,040 ha. be concluded that the influence of
The mechanism of land collapse in the shallow surface water can be derived
Petobo subdistrict can be described as shown in from infiltration from the Gumbasa
Fig. 11a. Where the initial ground motion irrigation channel or can also come from
(crown) is located in the western area close to aged river channels that have been closed
the Gumbasa irrigation primary canal Fig. 10b. due to sedimentation and landfill for
while the tip (toe) is located near Dewi Sartika settlement land settlement the citizens.
Street. The affected area is housing with a total b. Further research needs to be done on
area of about 180 ha with a total number of groundwater modelling in the Balaroa
affected around 744 houses. An aerial view of and Petobo liquefaction areas so that
the damage at Petobo is presented in Fig. 11c. sources and influences of groundwater
From direct observation on the crown of the can be known to contribute to the process;
Petobo liquefaction area, where in the crown liquefaction in the two regions.
area there is a lateral movement of land
followed by an avalanche with a slope height
after a landslide of about +6 m. While the REFERENCES
liquefaction flow (Nalodo) triggered by the
earthquake began to appear at a distance of Gunther, T and Rucker, C. 2012. Electrical Resistivity
about 110 m from the crown of Fig. 11d in a Tomography (ERT) in Geophysical Application –
massive sand boiling storm. where debris from State of The Art and Future Challenges.
the liquefaction flow is expected to go hand in Schlumberger Symposium – 100 Years of Electrical
Imaging. Paris.
hand when massive sand boils occur. Debris
Hall, R. & Wilson, M.E.J. 2000. Neogene Sutures in
flow is continued by free aquifers that have Eastern Indonesia. Journal of Asian Earth Sciences:
come out to the surface of the ground. 18. 781-808.
Irsyam M, dkk. 2010. Peta Zonasi Gempa Indonesia.
Kementerian Pekerjaan Umum. Jakarta.
215
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Kyle Bradley, dkk. 2019. Earthquake-Triggered 2018 adat-sulawesi-tengah.html. Diakses Tanggal 28
Palu Valley Landslides Enabled by Wet Rice September 2019.
Cultivation. Journal of Nature Geoscience, Sukamto, dkk. 1973. Peta Geologi Regional Lembar
doi:10.1038/s41561-019-0444-1. 2019. Palu Skala 1: 250.000. Bandung: Pusat Penelitian dan
M Jefferies, K Been. 2016. Soil Liquefaction: A Critical Penelitian Geologi (P3G).
State Approach. Taylor & Francis Group. T. Leslie Youd. 1995. Liquefaction-Induced Lateral
Mongabay, Situs Berita Lingkungan. Ground Displacement. Brigham Young University,
https://www.mongabay.co.id/2019/04/10/jejak-tua- Provo, Utah, 1995 - Third International Conference
di-area-likuifaksi-sulawesi-tengah. Diakses Tanggal on Recent Advances in Geotechnical Earthquake
28 September 2019 Engineering & Soil Dynamics.
MR Daryono, 2016. Paleoseismology Tropis Indonesia Ungureane, C, Priceputu, A, Bugea, A. L and Chirica A.
(dengan Studi Kasus di Sesar Sumatra, Sesar 2017. Use of Electric Resistivity Tomography (ERT)
Palukoro-Matano, dan Sesar Lembang). Disertasi for Detecting Underground Voids on Highly
Program Doktor. Institut Teknologi Bandung. 2016. Anthropized Urban Construction Sites. Procedia
Oldenborger, G.A, Routh, P.S. and Knoll M.D. 2005. Engineering Vol. 209: 202-209. doi:
Sensitivity of Electrical Resistivity Tomography Data 10.1016/j.proeng.2017.11.148.
to Electrode Position Errors. Geophysical Journal Widyaningrum, R. Penyelidikan Geologi Teknik Potensi
International Vol. 162, Issue 1(1):1-9. doi: Likuifaksi Daerah Palu, Provinsi Sulawesi Tengah,
10.1111/j.1365-246X.2005.02714.x. Pusat Air Tanah dan Geologi Lingkungan. Bandung:
Rumah Adat Sulawesi Tengah Lengkap, Gambar dan Badan Geologi.
Penjelasannya. Zeffitni. 2011. Identifikasi Batas Lateral Cekungan Air
https://www.senibudayaku.com/2018/01/rumah- Tanah (CAT) Palu. Jurnal Smartek Vol. 9 No. 4.
Nopember 2011: 337 – 349.
216
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRACT: Prosedur Ground Motion Selection & Modification (GMSM) merupakan komponen yang sangat
penting dalam penerapan analisis Non Linear Response History Analysis (NLRHA) untuk menunjukkan
bahwa perancangan mampu mencapai target kinerja yang ditentukan. Prosedur NLRHA diaplikasikan dalam
beberapa kondisi khusus antara lain: 1) perancangan bangunan baru dengan sistem struktur alternatif (tidak
tercantum dalam daftar sistem struktur preskriptif); 2) perancangan bangunan baru dengan sistem isolator atau
damping; 3) evaluasi kinerja bangunan eksisting. Penentuan prosedur GMSM yang tepat tentunya menjadi
salah satu syarat utama untuk mendapatkan hasil evaluasi NLRHA yang benar. Oleh karena itu, setiap aspek
dalam prosedur GMSM harus dikaji berdasarkan pemahaman yang jelas tentang tujuan evaluasi NLRHA.
Sehubungan dengan proses pemutakhiran SNI 1726 dalam mengadopsi ketentuan ASCE 7-16, makalah ini
bertujuan mengupas prosedur GMSM berdasarkan ketentuan SNI 1726:2019 dilengkapi dengan hasil
penerapan prosedur untuk contoh kasus bangunan tinggi di Jakarta.
Keywords: ground motion selection & modification / pemilihan dan modifikasi gerak tanah, analisis riwayat
waktu
1 APLIKASI GMSM DALAM NLRHA beberapa komponen struktur dari hasil NLRHA
yang diambil dari makalah teknis yang
Kehadiran gedung tinggi dengan sistem dipublikasikan dalam International Journal of
struktur non-preskriptif memerlukan kajian High-Rise Buildings Sukamta (2012). Dalam
performance-based, hal mana umumnya figur-figur tersebut, terlihat adanya variabilitas
dilakukan dengan prosedur NLRHA. Dalam antar-rekaman dari respons struktur baik secara
prosedur NLRHA, nonlinearitas dari bentuk pola maupun besaran nilai.
komponen-komponen struktur dimodelkan
secara eksplisit dan hasil yang dipakai untuk
evaluasi harus berasal dari analisis respons 2 EVALUASI SEISMIK SECARA
riwayat waktu. Prosedur analisis tersebut ELASTIK
membutuhkan gerak tanah riwayat waktu Dokumen-dokumen yang mengatur prosedur
sebagai input pembebanan. Prosedur GMSM NLRHA, baik ASCE 7-16 maupun PEER-TBI,
yang baik dan benar dibutuhkan untuk mencantumkan ketentuan bahwa evaluasi
memperoleh input pembebanan gerak tanah NLRHA harus dilengkapi dengan evaluasi
yang sesuai untuk analisis NLRHA, yang mana tambahan menggunakan model linear elastik,
dapat menangkap rata-rata maupun variabilitas meskipun masing-masing dokumen memiliki
antar-rekaman dari respons struktur secara perbedaan prosedur untuk evaluasi analisis
akurat. linear tersebut. Kriteria desain menggunakan
Kinerja komponen-komponen struktur dapat evaluasi linear elastik tersebut seringkali
dievaluasi secara langsung terhadap kriteria menentukan perancangan komponen-
penerimaan yang ditetapkan berdasarkan hasil komponen struktur pada gedung.
eksperimen laboratorium terhadap kinerja ASCE 7-16 pasal 16.1.2, bagian Linear
komponen terkait. Gbr. 1 & 2 menampilkan Analysis, mencantumkan, “In addition to
contoh evaluasi kriteria penerimaan untuk nonlinear response history analysis, a linear
217
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
analysis in accordance with one of the performance evaluation for a moderate level of
applicable procedures of Chapter 12 shall also motion, termed SLE, with a goal of limited
be performed. The structure’s design shall meet damage. Although compliance with the
all applicable criteria of Chapter 12.” prescriptive requirements of ASCE 7 Chapter
Berbeda dengan ASCE 7-16, Guidelines 12 is not specifically required by these
PEER-TBI pasal 5, tidak mengharuskan Guidelines, the Authority Having Jurisdiction
pemenuhan persyaratan preskriptif dalam might still require such compliance, although
ASCE 7 bab 12, melainkan merekomendasikan permitting some exceptions to be taken to the
evaluasi kinerja untuk gempa Service Level procedures when approved by the peer
Earthquake (SLE), yang didefinisikan sebagai reviewer(s)...”
gempa dengan perioda ulang 43 tahun. Untuk
mengikuti ketentuan PEER-TBI, dibutuhkan
suatu respons spektrum Uniform Hazard
Spectrum (UHS) menggunakan analisis situs
spesifik. Gbr. 3 menunjukkan contoh spektrum
hasil analisis situs spesifik untuk wilayah pantai
barat US untuk perioda ulang 43 tahun dan
2475 tahun, dimana perbandingan nilai respons
spektral untuk perioda ulang 43 tahun terhadap
2475 tahun adalah sekitar 25%. Meskipun
demikian, Guidelines TBI juga mengakui
adanya kemungkinan pihak otoritas jurisdiksi
tertentu yang mengharuskan pemenuhan
ketentuan preskriptif dalam ASCE 7 bab 12, Gbr. 1. Regangan pada Corewall Hasil NLRHA
termasuk ketentuan geser dasar minimum. (Sumber: Sukamta et al. 2012)
Penjelasan tersebut disampaikan dalam
Appendix C.1 dari dokumen TBI yang dikutip,
“These Guidelines refer to the ASCE 7-16
requirements for many details of the design
process, including selection and modification
of ground motions and nonlinear response
history analysis (Chapter 16). However, these
Guidelines also recommend several exceptions
and modifications to the ASCE 7 requirements,
including the acceptance criteria for evaluating
MCER response. Another important exception
taken by these Guidelines is that, rather than
requiring an elastic seismic evaluation of the
structure in accordance with ASCE 7 Chapter Gbr. 2. Putaran Sudut pada Balok Perangkai Hasil
12, these Guidelines instead recommend NLRHA. [source: Sukamta et al. 2012]
Gbr. 3. Spektrum Respons Spesifik Situs Wilayah Los Angeles untuk Perioda Ulang 43 Tahun (Kiri) &
Perioda Ulang 2475 Tahun (Kanan). (Sumber: Zareian & Zhong (2010))
218
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
219
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
220
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
4 TARGET RESPONS SPEKTRUM dapat menangkap respons struktur
Dalam SNI 1726:2019 pasal 11.2.1, target mempertimbangkan berbagai skenario gempa
respons spektrum gempa yang dipakai adalah secara menyeluruh (Gbr. 8). Figur tersebut juga
spektrum MCER pada permukaan tanah dengan menunjukkan perbandingan antara respons
redaman 5%. Dua metode dapat digunakan spektrum UHS dan CMS. Peraturan SNI juga
dalam membuat target respons spektrum, yaitu: mensyaratkan bahwa envelope dari seluruh
target spektrum CMS tidak boleh kurang dari
75% dari nilai spektral yang dihitung
4.1. Metode 1: Spektrum Tunggal Uniform menggunakan metode 1 (spektrum tunggal
Hazard Spectrum (UHS) dengan UHS).
Penyesuaian Risiko (pasal 11.2.1.1) Prosedur pembuatan spektra CMS dilakukan
Dalam SNI 1726:2019, sesuai dengan pasal 6.8, mengikuti makalah Baker, 2010, yang
untuk struktur pada semua kelas situs dengan ditunjukkan melalui Gbr. 9 - 12. Target
pengecualian kelas situs SF, spektrum MCER spektrum dikondisikan pada suatu perioda yang
ini didapat dengan mengalikan respons dipilih, T*, dimana nilai rata-rata magnitudo
spektrum desain (DBE) dengan faktor 1.5, di (M), jarak (R), dan epsilon (ε) ditentukan dari
mana spektrum desain tersebut dapat langsung hasil deagregasi PSHA yang terasosiasi dengan
dibuat sesuai pasal 6.4 menggunakan nilai-nilai Sa(T*). Epsilon (ε) didefinisikan sebagai nilai
parameter percepatan dan koefisien situs kelipatan standar deviasi untuk mengukur
spesifik yang sudah tersedia dalam peraturan besarnya perbedaan nilai ln(Sa) terhadap nilai
SNI 1726:2019 (Gbr. 13). Untuk kelas situs SF, rata-rata ln(Sa). Nilai T* harus ditentukan
pasal 6.9 mengharuskan penggunaan analisis mengacu pada karakteristik dinamik struktur
respons situs sesuai prosedur yang tercantum gedung yang dirancang. Selanjutnya, target
dalam SNI 1726:2019 pasal 6.10. spektrum dibuat dari Deterministic Seismic
Penggunaan spektrum tunggal UHS sebagai Hazard Analysis (DSHA) yang terasosiasi
target respons spektrum untuk basis seleksi dan dengan nilai M dan R tertarget berdasarkan
modifikasi gerak tanah merupakan pendekatan nilai rata-rata dan standar deviasi respons
yang cukup konservatif karena secara prinsip, spektrum (𝜇ln Sa(M,R,T) dan 𝜎ln Sa(T)) pada
spektrum UHS dibuat dengan mengambil semua perioda, menggunakan fungsi atenuasi
envelope dari hasil analisis hazard gempa (Ground Motion Prediction Equation – GMPE)
(PSHA dan DSHA) di setiap perioda. Dalam yang konsisten dengan persamaan GMPE untuk
kondisi riil, tentunya nilai respons percepatan pengembangan peta bahaya gempa Indonesia
pada kurva spektrum UHS untuk rentang 2017 Irsyam et al. (2017). Ordinat spektral
perioda struktur yang dikaji, mungkin target spektrum CMS pada semua perioda harus
disebabkan hanya dari sepasang gerak tanah dibuat menggunakan koefisien korelasi epsilon
individu. (𝜌) antar perioda yang dirumuskan oleh Baker
dan Jayaram (2008).
4.2. Metode 2: Dua atau Lebih Conditional
Mean Spectrum (CMS) (pasal 11.2.1.2)
Dalam SNI 1726:2019, dijinkan penggunaan
metode alternatif dalam membuat target
respons spektrum, yaitu dengan menggunakan
spektra CMS sebanyak dua atau lebih.
Meskipun CMS dapat menghasilkan estimasi
respons struktur yang memadai untuk satu
periode struktur akibat satu skenario gempa,
namun spektrum ini tidak dapat menangkap
respons struktur dalam rentan periode lain
akibat skenario gempa yang berbeda. Oleh
karena itu, CMS harus diaplikasikan dengan Gbr. 8. Spektrum UHS Tunggal dan Beberapa
penggunaan lebih dari satu spektrum, agar Spektra CMS. [source: ASCE 7-16 commentary]
221
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
222
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
menyaring dan menghasilkan informasi komponen East-West dari rekaman gempa
karakteristik (nilai magnitudo dan jarak Tohoku 2011. Gbr.16 menunjukkan prediksi
terhadap sumber patahan) gerak tanah yang nilai durasi signifikan (Ds5-75) terhadap
merepresentasikan kondisi kegempaan lokasi magnitudo berdasarkan 3 model regresi untuk 2
yang ditinjau untuk rentang perioda struktur nilai jarak yang berbeda, 80 km dan 10 km.
yang dikaji. Gbr.14 menunjukkan contoh hasil Berdasarkan informasi tersebut, pemilihan
analisis deagregasi (2475 tahun) untuk wilayah gerak tanah juga harus mempertimbangkan
Jakarta pada perioda T = 2.0 detik dan T = 5.0 pengaruh durasi.
detik.
223
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
identik diterapkan pada kedua komponen sehingga rata-rata respons spektrum arah-
pasangan gerak tanah). maksimum dari semua gerak tanah berada lebih
Pada ASCE 7-16, prosedur scaling dari 90% target respons spektra pada rentang
dilakukan dengan menskalakan spektrum arah- perioda yang ditetapkan. Nilai 90% dipakai
maksimum (maximum direction spectrum), untuk menghilangkan konservatisme yang
yang juga mencakup dua arah horisontal berlebihan jika rata-rata spekra diharuskan
komponen gerak tanah dan definisinya sudah lebih besar dari 100% target spektrum untuk
dijelaskan sebelumnya. Karena faktor skala setiap perioda pada rentang perioda yang
diterapkan secara langsung pada spektrum arah berlaku. Gbr.17 menunjukkan gambaran hasil
maksimum, dengan demikian, nilai faktor skala penerapan metode penskalaan amplitudo. Pada
yang identik berlaku pada kedua komponen Gbr.17 bagian kiri, terlihat berbagai spektrum
pasangan gerak tanah. Perubahan tersebut arah-maksimum (RotD100) dari serangkaian
diberlakukan untuk menjaga konsistensi gerak tanah dengan nilai rata-ratanya yang
dengan definisi ground motion akibat gempa dicocokkan dengan target spektrum. Sementara
yang tertera dalam bab 11 dari ASCE 7. Dalam figur bagian kanan menampilkan spektrum
ASCE 7-16, aspek yang dibahas dalam arah-maksimum individu untuk salah satu
prosedur modifikasi gerak tanah mencakup gerak tanah dengan dekomposisi spektrum
rentang perioda, metode penskalaan amplitudo, komponen horisontal pada dua arah.
dan metode pencocokan spektral.
7.3 Faktor Skala
7.1 Rentang Perioda untuk Modifikasi (RSNI Dalam peraturan tidak ditetapkan batasan
1726: 2019 pasal 11.2.3.1) faktor skala untuk modifikasi gerak tanah
Prosedur modifikasi rekaman gerak tanah untuk menggunakan penskalaan amplitudo. Watson-
dicocokkan dengan target respons spektrum Lamprey dan Abrahamson (2005)
harus dilakukan pada rentang perioda yang merekomendasikan penerapan ambang batas
ditetapkan dalam SNI 1726:2019 pasal terhadap faktor skala untuk gerak tanah yang
11.2.3.1, yaitu antara 0.2T1B - 2T1A, dimana diseleksi hanya berdasarkan data magnitudo,
T1A adalah perioda fundamental terbesar dan jarak, dan kondisi situs, tanpa adanya
T1B adalah perioda getar fundamental terkecil pertimbangan terhadap karakteristik dari gerak
untuk arah respons horisontal utama. tanah yang diseleksi. Nilai faktor skala yang
Pengecualian untuk batas ambang atas rentang umum digunakan, berkisar antara 2 sampai 4
perioda berlaku jika dapat divalidasi secara dan diambil berdasarkan pertimbangan
analitis, di mana batas ambang atas tersebut enjinering. Zareian dan Zhong (2010)
dapat diperkecil menjadi 1.5T1A. Metode yang merekomendasikan batasan maksimum untuk
dapat digunakan untuk melakukan validasi scaling factor sebesar 5.0 dalam studi kasus
perpanjangan perioda getar adalah dengan GMSM untuk gedung tinggi. Rekomendasi
menghitung waktu yang terjadi antar-siklus / batasan nilai faktor skala tersebut berkaitan
between-cyle pada rentang getaran bebas / free- dengan upaya mempertahankan karakteristik
vibration di bagian akhir hasil analisis NLRHA. gerak tanah yang representatif dengan kejadian
Pasal 11.2.3.1 juga mensyaratkan rentang gempa aktual.
perioda yang dipakai untuk modifikasi harus
sudah mencakup partisipasi massa 90% di
setiap arah horisontal utama.
224
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
respons pada ragam getar tinggi yang
merupakan kekurangan metode penskalaan
amplitudo (Gbr. 19 & 21). Metode ini juga
meminimalisir taraf modifikasi terhadap gerak
tanah sehingga dapat mempertahankan
variabilitas antar-rekaman dan karakteristik
dinamik dari gerah tanah asal sehingga dapat
Gbr. 18. Contoh Hasil Penskalaan Amplitudo mengatasi keterbatasan metode Tight Spectral
(Kiri) dan Pencocokan Spektral (Kanan). (Sumber: Matching (Gbr. 20 & 21). Berdasarkan
ASCE 7-16 commentary) informasi dari Magnusson Klemencic &
Associates (MKA) dan Arup - San Francisco
Office (personal communication, 2019),
7.4 Pencocokan Spektral (RSNI 1726: 2019 metode Mean Spectrum Matching sudah kerap
pasal 12.2.3.3) digunakan untuk proyek-proyek besar bertaraf
Prosedur alternatif pencocokan spektral sudah internasional. Di masa mendatang, dipercaya
dibakukan pada edisi ASCE 7-16. Persyaratan metode tersebut juga akan menjadi lazim
yang lebih berat diterapkan untuk prosedur ini digunakan di Indonesia.
dibandingkan prosedur penskalaan amplitudo
karena prosedur pencocokan spektral
menghilangkan variasi dalam spektra gerak
tanah dan juga berpotensi menurunkan nilai
rata-rata respons spektra. Dalam prosedur ini,
modifikasi gerak tanah harus dilakukan
sehingga nilai rata-rata respons spektra tidak
boleh kurang dari 110% target respons
spektrum pada rentang perioda yang berlaku.
Beberapa teknik untuk melakukan modifikasi
gerak tanah berbasis pencocokan spektral
tersedia pada laporan NIST GCR 11-917-15
(NIST 2011).
Gbr. 18 menunjukkan gambaran Gbr. 19. Contoh Hasil GMSM Menggunakan
perbandingan antara metode penskalaan Metode Penskalaan Amplitudo. (Sumber: Mazzoni
amplitudo dan metode pencocokan spektral et al. 2012)
jenis Tight Spectral Matching, dimana terlihat
variasi spektra gerak tanah tetap dipertahankan
jika modifikasi dilakukan dengan metode
penskalaan amplitudo. Sebaliknya, variasi
tersebut hampir tidak terlihat jika modifikasi
dilakukan dengan metode Tight Spectral
Matching.
Untuk mengatasi keterbatasan metode Tight
Spectral Matching, sebaiknya digunakan
metode Mean Spectrum Matching. Metode ini
sudah diterima oleh California Geological
Survey (CGS) dan Office of Statewide Health
Planning and Development (OSHPD). Metode
ini dilakukan dengan mencocokkan spektrum
rata-rata (gabungan spektrum individu) Gbr. 20. Contoh Hasil GMSM Menggunakan
terhadap target spektrum. Metode ini dapat Metode Pencocokkan Spektral Jenis Tight Spectral
memitigasi amplifikasi berlebih terhadap Matching. (Sumber: Mazzoni et al. 2012)
225
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
7.2 Langkah 2: Pemilihan Rekaman Gempa
Berdasarkan hasil analisis deagregasi untuk
wilayah Jakarta (2475 tahun) untuk perioda 0.2
dan 4.0 detik, didapatkan diagram pada Gbr.22
yang dijadikan basis melakukan seleksi
rekaman-rekaman gempa yang dinilai mewakili
kondisi kegempaan. Daftar rekaman gempa
yang dipilih disajikan dalam Tabel 1.
226
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
diupayakan untuk mengikuti rekomendasi mekanisme gempa yang diinginkan, beberapa
Zareian dan Zhong (2010), yaitu tidak melebihi pasang rekaman gerak tanah menggunakan
5. Namun, karena keterbatasan tersedianya faktor skala lebih dari 5.
rekaman gerak tanah strong motion dengan
Tabel 1. Gerak Tanah yang Diseleksi dan Diskalakan untuk Mendapatkan Respons Spektrum Rata-Rata Cocok
Dengan Target Respons Spektrum.
Scale Factor
Rrup Duration
Event Year Station Magnitude Mechanism (0.2T1B (0.2T1B –
(km) (sec)
- 2T1A) 1.5T1A)
SMART1
Taiwan 1986 7.3 Reverse 56.18 45 4.45 3.21
101
Compton
Landers, –
1992 7.28 Strike slip 161.23 45 4.39 4.20
USA Castlegate
St
Indio –
Hector
Riverside
Mine, 1999 7.13 Strike slip 74 100 4.27 3.36
Co Fair
USA
Grnds
Kocaeli, Hava
1999 7.51 Strike slip 60.05 150 4.99 4.23
Turkey Alani
Chi-Chi, Reverse
1999 CHY067 7.62 83.56 200 7.09 6.06
Taiwan Oblique
Muroran Interface
1968 HK003 8.2 290 90 5.54 4.77
, Japan Subduction
Tokachi
HKD083 Interface
-Oki, 2003 8.3 163.4 250 3.00 2.29
– Tsurui Subduction
Japan
Tokachi
HKD094- Interface
-Oki, 2003 8.3 156.5 250 4.70 3.62
Shihoro Subduction
Japan
Tohoku, CHB008- Interface
2011 9 369.5 300 3.13 2.53
Japan Urayas Subduction
Tohoku, KNG007- Interface
2011 9 418 300 6.12 4.86
Japan Fujisawa Subduction
Tohoku, FKS021- Interface
2011 9 234 300 5.11 4.15
Japan Kitakata Subduction
Gbr. 23 - 25 menunjukkan beberapa hasil modifikasi gerak tanah. Hal ini terlihat jelas
plot target respons spektrum, spektrum arah- dari hasil penskalaan dengan rentang perioda
maksimum pasangan rekaman individu, serta 0.2T1B s/d 1.5T1A (Gbr. 24) yang mencapai
rata-rata dari rangkaian gerak tanah tersebut kecocokkan terhadap target spektrum dengan
untuk penskalaan dengan rentang perioda lebih baik.
0.2T1B s/d 2.0T1A (Gbr. 23), 0.2T1B s/d Seperti yang sudah dibahas sebelumnya,
1.5T1A (Gbr. 24) dan kondisi tanpa skala (Gbr. target spektrum tunggal jenis UHS, khususnya
25). Dalam Gbr. 23, terlihat rata-rata respons yang dibuat menggunakan code-defined (RSNI
spektra secara umum sudah cukup mendekati 1726 pasal 6.4) dapat memberikan hasil
target respons spektrum. Namun, pada rentang evaluasi yang terlalu konservatif karena
perioda kurang dari 6 detik, terlihat nilai rata- spektrum UHS dibuat dengan mengambil
rata respons spektra melebihi target spektrum envelope dari hasil analisis hazard gempa
sekitar 30%, yang tentunya akan menghasilkan (PSHA dan DSHA) di setiap perioda. Hasil
hasil evaluasi yang sangat konservatif. Rentang yang lebih akurat dapat dicapai dengan
perioda yang digunakan dalam penskalaan penggunaan target spektrum UHS berdasarkan
memiliki pengaruh yang besar terhadap hasil analisis respons spesifik-situs (RSNI 1726
227
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
pasal 6.10). Gbr. 26 menunjukkan Nilai rasio spektrum rata-rata terhadap
perbandingan spektrum SSRS dengan spektrum spektrum target di setiap perioda ditunjukkan
berdasarkan peraturan, dimana spektrum SSRS dalam Gbr. 27, yang menunjukkan bahwa
tidak menunjukkan konservatisme berlebih dan proses modifikasi gerak tanah sudah memenuhi
lebih sesuai untuk digunakan sebagai target ketentuan RSNI 1726: 2019 pasal 11.2.3.2,
spektrum. Jika diinginkan hasil yang lebih dimana nilai rata-rata respons spektrum selalu
akurat, spektra CMS (sebanyak dua atau lebih) lebih besar dari 90% target respons spektrum
dapat digunakan sebagai target spektrum. pada rentang perioda yang berlaku. Hasil dari
Tentunya penggunaan spektra CMS akan penskalaan setiap pasang gerak tanah juga
meningkatkan waktu analisis dan upaya yang ditampilkan pada Gbr. 28 & 29 untuk masing-
dibutuhkan untuk memproses data pasca- masing komponen horisontal, yaitu arah North-
analisis secara signifikan. South (NS) dan East-West (EW).
228
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 27. Rasio Rata-Rata Respons Spektrum terhadap Target Respons Spektrum untuk Penskalaan Dengan
Rentang Perioda 0.2T1B S/D 2.0T1A (Atas) Dan Rentang Perioda 0.2T1B S/D 1.5T1A (Bawah).
229
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 28. Accelerogram Gerak Tanah Untuk Komponen Horisontal Arah North-South (NS) Tanpa Skala
(Kiri) Dan Terskala (Kanan)
230
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 29. Accelerogram Gerak Tanah untuk Komponen Horisontal Arah East-West (EW) Tanpa Skala (Kiri)
Dan Terskala (Kanan)
231
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Tabel 2. Gerak Tanah yang Diseleksi Dan Dimodifikasi Untuk Mendapatkan Respons Spektrum Rata-Rata
Cocok dengan Target Respons Spektrum.
Event Year Station Magnitude Mechanism Rrup Duration
(km) (sec)
Taiwan 1986 SMART1 101 7.3 Reverse 56.18 45
Landers, 1992 Compton – 7.28 Strike slip 161.23 45
USA Castlegate St
Hector 1999 Indio – 7.13 Strike slip 74 100
Mine, USA Riverside Co
Fair Grnds
Kocaeli, 1999 Hava Alani 7.51 Strike slip 60.05 150
Turkey
Chi-Chi, 1999 CHY067 7.62 Reverse Oblique 83.56 200
Taiwan
Muroran, 1968 HK003 8.2 Interface 290 90
Japan Subduction
Tokachi- 2003 HKD083 – 8.3 Interface 163.4 250
Oki, Japan Tsurui Subduction
Tokachi- 2003 HKD094- 8.3 Interface 156.5 250
Oki, Japan Shihoro Subduction
Chile 2010 Municip. San 8.8 Interface 332.8 190
Jose de Maipo Subduction
Tohoku, 2011 KNG007- 9 Interface 418 300
Japan Fujisawa Subduction
Tohoku, 2011 FKS021- 9 Interface 234 300
Japan Kitakata Subduction
8.3 Langkah 3: Modifikasi Gerak Tanah kecocokkan yang sangat baik terhadap 110%
Prosedur Mean Spectrum Matching terdiri dari target spektrum. Dibandingkan dengan metode
beberapa tahapan yang dapat dilihat pada penskalaan amplitudo, metode Mean Spectrum
Gbr.30-32. Tahap pertama adalah menentukan Matching ini dapat menghasilkan kecocokkan
spektrum rata-rata terhadap spektrum target
nilai spektrum rata-rata dari rangkaian gerak
dengan lebih baik sementara tetap
tanah asal (Gbr.30), kemudian dilanjutkan
mempertahankan variabilitas antar-rekaman
dengan menerapkan penskalaan amplitudo
dan juga karakteristik nonstasioner dari gerak
sehingga spektrum rata-rata dari rangkaian
tanah. Gbr.33 menyajikan rasio antara
gerak tanah berada dekat dengan target
spektrum rata-rata terhadap target spektrum dan
spektrum (Gbr.31). Tahap final prosedur terdiri
dari proses modifikasi setiap gerak tanah menunjukkan bahwa ketentuan SNI 1726: 2019
pasal 12.2.3.3 sudah terpenuhi.
menggunakan pencocokan spektral (Gbr. 32).
Dalam melakukan modifikasi menggunakan
Teknik pencocokan spektral yang digunakan
pencocokan spekral, perlu dipastikan bahwa
merupakan jenis time-domain menggunakan
bentuk dan polarisasi dari grafik percepatan,
algoritma RSPMatch 2009 yang dikembangkan
kecepatan, simpangan, dan grafik intensitas
oleh Abrahamson, di mana modifikasi gerak
Arias sebelum dan sesudah modifikasi, masih
tanah dilakukan dengan menambahkan wavelet
relatif serupa satu sama lain. Gbr.34
secara iteratif dan bertahap dimulai dari
menyajikan hasil perbandingan tersebut untuk
frekuensi tinggi sampai mencakup frekuensi
komponen arah EW dan NS untuk gerak tanah
rendah. Fungsi wavelet yang digunakan adalah
Chi-Chi. Gbr.35 menyajikan hasil penerapan
improved tapered cosine yang dapat
spectral matching untuk kedua arah komponen
menghasilkan nilai integrasi percepatan,
gerak tanah Chi-Chi.
kecepatan, dan simpangan menjadi nol
sehingga tidak dibutuhkan base line correction
Atik dan Abrahamson (2010).
Pada Gbr.32, terlihat bahwa spektrum rata-
rata gerak tanah termodifikasi memiliki
232
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 30. Respons Spektrum Gerak Tanah Asal. Gbr. 32. Respons Spektrum Gerak Tanah dengan
Pencocokan Spektral Rata-Rata.
Gbr. 31. Respons Spektrum Gerak Tanah dengan Gbr. 33. Rasio Spektrum Rata-Rata Terhadap
Penskalaan Amplitude. Target Spektrum.
233
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 34. Grafik Percepatan, Kecepatan, dan Simpangan Gerak Tanah dari Gempa Chi-Chi (Komponen
EW dan NS) untuk Gerak Tanah Asal (Biru) dan Gerak Tanah Termodifikasi (Merah).
234
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
keseluruhan jika ada. Pada dokumen TBI juga
dijelaskan bahwa input gerak tanah perlu
diaplikasikan pada level pondasi atau level
dasar struktur besmen (Gbr.36).
235
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
10 KESIMPULAN, REKOMENDASI, DAN REFERENCES
RISET MENDATANG
Sehubungan dengan upaya pemutakhiran Arup. 2019. Personal communication, August. San
peraturan gempa menjadi SNI 1726: 2019, Francisco.
makalah ini membahas ketentuan dan kriteria ASCE 7. 2016. Minimum Design Loads and Associated
Criteria for Buildings and Other Structures
terbaru dalam penerapan prosedur GMSM (ASCE/SEI 7-16). American Society of Civil
untuk NLRHA dari setiap aspek, termasuk Engineers. Reston. VA.
penentuan target respons spektrum, pemilihan Atik, L. & Abrahamson, N. An Improved Method for
gerak tanah, modifikasi gerak tanah, dan Nonstationary Spectral Matching. Earthquake
aplikasi gerak tanah pada model struktur. Spectra, Vol 26, No.3. pages 601-617. August. 2010.
Rangkuman prosedur GMSM sesuai RSNI Chandramohan, R., Baker, J. & Deierlein, G. 2016.
1726: 2019 disajikan berupa diagram flowchart Impact of Hazard-consistent Ground Motion
dalam Gbr. 37. Makalah ini juga menunjukkan Duration in Structural Collapse Risk Assessment.
Earthquake Engineering & Structural Dynamics. 45:
dua contoh penerapan GMSM untuk NLRHA 1357-1379
untuk wilayah Jakarta kelas situs E Huang, Y.N. et. al. 2008. Maximum Spectral Demands in
menggunakan target respons spektrum jenis the Near-Fault Region. Earthquake Spectra, Vol 24,
UHS dengan nilai percepatan spektral respons 319-341.
sesuai dengan peta gempa RSNI 1726: 2019 Irsyam, M. et. al. 2017. Development of New Seismic
Irsyam et al. (2017). Dalam contoh pertama, Hazard Maps of Indonesia 2017. Proceedings of the
modifikasi gerak tanah dilakukan 19th International Conference on Soil Mechanics and
Geotechnical Engineering. Seoul, South Korea.
menggunakan metode penskalaan amplitudo
Irsyam, M. et. al. 2017. Peta Sumber dan Bahaya Gempa
dan dalam contoh kedua, modifikasi gerak Indonesia Tahun 2017. Bandung, Indonesia: Pusat
tanah dilakukan menggunakan metode Mean Litbang Perumahan dan Permukiman, Badan
Spectrum Matching. Tentunya prosedur Penelitian dan Pengembangan, Kementrian Pekerjaan
GMSM serupa dapat juga diterapkan untuk Umum dan Perumahan Rakyat.
berbagai wilayah di Indonesia. Magnusson, K. & Associates. July 2019. personal
Untuk mendapatkan hasil rangkaian gerak communication.
tanah yang tepat untuk digunakan sebagai Mazzoni. et. al. 2012. An Improved Approach for
Ground Motion Suite Selection and Modification for
demand dalam melakukan evaluasi NLRHA Use in Response History Analysis. Proceedings of the
tanpa adanya amplifikasi berlebih, 15th World Conference on Earthquake Engineering.
direkomendasikan menggunakan target Lisboa.
spektrum berdasarkan hasil analisis spesifik- NIST, G. 2011. Selecting and Scaling Earthquake
situs atau penggunaan target spektra jenis CMS. Ground Motions for Performing Response-History
Perlu juga diperhatikan bahwa metode Analysis (GCR 11-917-15). National Institute of
modifikasi gerak tanah yang diterapkan akan Standards and Technology. USA.
memiliki pengaruh signifikan terhadap hasil PEER. 2017. Guidelines for Performance-Based Seismic
Design of Buildings version 2.03. Report No.
GMSM dan hasil evaluasi NLRHA. 2017/06. Pacific Earthquake Engineering Research
Untuk riset mendatang, perlu dilakukan Center, Berkeley, CA.
studi lebih lanjut mengenai penggunaan target Permukiman, P. P. D. P. T., & Wilayah, P. 2002. Standar
spektra jenis CMS dan juga pembuatan target Perencanaan Ketahanan Gempa Untuk Struktur
spektrum untuk evaluasi SLE yang Bangunan Gedung. SNI–1726-2002.
didefinisikan sebagai gempa dengan perioda Sukamta, D. & Alexander, N. 2012. State of Practice of
ulang 43 tahun (50% probabilitas terlampaui Performance-Based Seismic Design in Indonesia.
International Journal of High-Rise Buildings. Vol 1,
dalam 30 tahun). No. 3, 211-220.
Watson-Lamprey, J. & Abrahamson, N. 2006. Selection
of Ground Motion Time Series and Limits on Scaling.
Vol 26.5. Soil Dynamics and Earthquake
Engineering: 477-482.
Zareian, F. & Zhong, P. 2010. Ground Motion Selection
and Scaling for the Analysis of the Tall Building Case
Studies. PEER.
236
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Sebagai negara dengan tingkat risiko gempa yang tinggi, kestabilan konstruksi bendungan di
Indonesia akibat gempa perlu diperhitungkan. Berdasarkan Pd-T-14-A2004-A, desain bendungan urugan
perlu dievaluasi dengan Maximum Design Earthquake (MDE). Metode permodelan beban gempa yang biasa
digunakan untuk mengevaluasi keamanan bendungan urugan dengan beban MDE adalah koefisien gempa
dan gerak tanah. Setiap model beban gempa dapat digunakan untuk memperhitungkan deformasi yang
terjadi pada bendungan urugan akibat beban gempa dengan metode Makdisi-Seed (1978) dan Newmark
(1965). Studi ini mengkaji keamanan suatu bendungan urugan di Jawa Barat terhadap gempa dengan MDE
kala ulang 10,000 tahun. Hasilnya memperlihatkan bahwa masing-masing metode menunjukkan hasil yang
berbeda, namun masih memenuhi persyaratan keamanan.
Kata Kunci: bendungan urugan, beban gempa, deformasi, maximum design earthquake
ABSTRACT: As a country with high risk against seimic hazard, a considerably stability against seismic
loading on the construction of embankment dams in Indonesia must be conducted. Based on Pd-T 14-2004-
A, the embankment dam design should be evaluated Maximum Design Earthquake (MDE). Two seismic
load model frequently used to evaluate the embankment dam safety due to earthquake with MDE are
Seismic coefficient and ground motion. Each of the seismic load type is able to determine the deformation
of the embankment dam due to seismic load using Makdisi-Seed (1978) and Newmark (1965) method. In
this study the safety of a particular embankment dam in West Java is evaluated due to seismic load based on
MDE for 10,000 years return period. The result indicates that even though both seismic coefficient as load
and ground motion produce different results, however the safety requirements of the embankment dam using
those methods is still fulfilled.
Keywords: embankment dam, seismic load, deformation, maximum design earthquake
237
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2 INPUT DATA
Cross section of Embankment Dam is
displayed in Fig. 1., with each of material
properties shown in Table 1.
238
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
calculated using correlation between Gmax and
confining pressure σ m ) using pore value
function based on Eqn. (4).
239
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
4 METHODOLOGY
240
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Deformation due to earthquake for pseudo- accelorograms for Indonesia is unavailable due
static then calculated using Makdisi-Seed to lack of the data of ground motion in
(1978) method, and for dynamic response will Indonesia. Deterministic Seismic Hazard
be calculated using Newmark (1965) method. Analysis (DSHA) and Probabilistic Seismic
Deformation analysis recap for each method is Hazard Analysis (PSHA) can be performed for
displayed in Table 4. input to select the time history from another
region.
Table 4. Deformation Analysis Recap
Deformation (cm)
Reservo Pseudo-static Dyna
DAFTAR PUSTAKA – REFERENCES
N
ir water mic
o M M Tata Cara Perencanaan Ketahanan Gempa untuk
level M 6.5 Respo Struktur Bangunan Gedung dan Non Gedung. SNI
7.5 8.25
nse 1726:2012. Badan Standarisasi Nasional (BSN).
1 Empty 0.080 0.700 1.600 - Jakarta. 2012.
Interme Das, Braja. M, et al. 1993. Principles of Soil Dynamics
2 1.400 17.500 34.000 - Second Edition. United States of America
diate
Pedoman Analisis Stabilitas Bendungan Tipe Urugan
3 Normal 1.250 13.000 36.000 - Akibat Beban Gempa. Pd T-14-2004-A. Departemen
4 Flood 1.200 12.500 35.000 60.200 Permukiman dan Prasarana Wilayah. Jakarta. 2004.
Makdisi, F. I. and Seed, H. B. 1978. Simplified
Based on analysis, safety factor from procedure for estimating dam and embankment
pseudo-static method shows conservative earthquake-induced deformations. J. Geotech.
result, while dynamic response analysis shows Engrg., ASCE
that higher reservoir water level lowering Newmark, N. M. 1965. Effects of earthquakes on dams
seismic stability of embankment dam. and embankments. Geotechnique, 15: 139-160.
Hardin, B.O. and Richart, F.E. Jr. 1963. Elastic wave
Makdisi-Seed Pseudo-static analysis result velocities in granular soils. Journal of Soil
show that in every reservoir water level, the Mechanics and Foundations Division, ASCE, vol.
deformation of dam due to MDE load will 89.
occur, while Newmark dynamic response only Hardin, B.O. and Black, W.L. 1968. Closure to
indicates that deformation of dam due to MDE vibration modulus of normally consolidated clays.
will only occurs during flood state. Although, Journal of Soil Mechanics and Foundations
Division, ASCE, vol. 95.
in flood state, while safety factor obtained Kokusho T., Esashi Y. 1981. Cyclic triaxial tests on
from dynamic response analysis is higher than sands and coarse materials. X ICSMFE, Vol. 1.
Pseudo-static, deformation result from Kramer, L, Steven. 1996. Geotechnical Earthquae
dynamic response is higher than Pseudo-Static. Engineering. Prentice Hall, Inc.
Minimun deformation allowed to occur due Rollins K.M, dkk. 1998. Shear Modulus and Damping
to MDE seismic load is ½ of freeboard. Relation for Gravels. Geotechnical and
Geoenvironmental engineering, Vol. 24.
Freeboard for this embankment dam is Seed, H.B. and Idriss, I.M. 1970. Soil Moduli and
designed 5 m, indicating that based on both Damping Factors for Dynamic Response Analyses.
analysis result, the safety requirements of the Report EERC 70-20. Earthquake Engineering
embankment dam using those methods is still Research Center. University of California, Berkeley.
fulfilled.
6 RECOMMENDATION
Based on SNI 1726-2012 about Tata Cara
Perencanaan Ketahanan Gempa untuk Struktur
Bangunan Gedung dan Non Gedung, three
acceleorogram are needed to perform dynamic
response analysis. However, recommended
241
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRACT: Bandung basin, where the city of Bandung is located, known as an ancient lake. This area has
potentially a very high seismic wave amplification due to a very thick sedimentary layer. Site
characterization becomes an important factor for seismic hazard analysis for a city scale related to local site
effect. In this study, a microtremor array method was applied to subsurface profiling based on 1D S-wave
velocity structure. Data acquisition was conducted using triangular array, whereas data analysis used a
spatial autocorrelation (SPAC) method to calculate dispersion curves, and estimation of 1-D S-wave velocity
model was conducted using a genetic algorithm. The analysis result along a north-south direction shows that
Vs30 is in a range of 168.5 – 348.6 m/s that is classified into site class D (medium soil) in the northern part
and class E (soft soil) in the southern part of the Bandung basin. Engineering bedrock can be identified
based on sedimentary layer with Vs > 750 m/s, those are in a range of 67.97 to 268.73 m increasing
southward.
Keywords: microtremor array, S-wave velocity, engineering bedrock, site class
242
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
incomplete for Bandung area. In this study,
subsurface investigation in Bandung city was
conducted by using microtremor survey
method (MSM) to obtain the 1-D S-wave
velocity structure. This is the most possible
method to be applied in urban areas with
dense buildings and population, because it
does not use a seismic source in the field work
as that has been successful conducted in
Jakarta for identification of engineering
bedrock Ridwan et al. (2016) and
determination of site class for seismic hazard
assessment Ridwan et al. (2019) Mapping of
sedimentary basin was also worked by
Yamanaka and Yamada (2006) based on
estimation of 3-D S-wave Velocity model of (a)
the Kanto Basin, Japan.
The objective of this study is to obtain the
subsurface feature along the North - South
direction of Bandung basin based on S-wave
velocity estimation, derived from microtremor
array exploration. The result is presented as 1-
D S-wave velocity profile for deep and shallow
layer depth to estimate the site class and
engineering bedrock posisition. A cross section
along observation line resulting from 1-D S-
wave velocity correlation was also discussed.
243
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
take at least 1.5 hours while for small ones will profile and depth, therefore estimation of
be around 45 minutes Okada (1998; 2003). subsurface models can be conducted by
Microtremor data record derived by using inversion of the dispersion curve to the
triangular array configuration was designed to specified initial model. 1-D Vs profile for
be processed by using the Spatial shallow layers resulting from small array
Autocorrelation (SPAC) method. Calculation shown in figure 4. Calculation result of Vs30
of fundamental mode Rayleigh wave and site class at each site are represent in table
dispersion curves can be worked by averaged 1.
of SPAC coefficient on each pair of stations
via the first kind of zero order of Bessel
function, Jo, as ρ(ω,r) = Jo(ωr/v(ω)), where r is
the interstation distance, ω is angular
frequency, and v(ω) is the dispersion curve.
Profiling 1-D S-wave velocity was
estimated by using a genetic algorithm (GA) to
the dispersion curves for a specified initial
model. We refer to Yamanaka (1998) for the
parameters of GA used in the inversion. The
result of 1-D S-wave velocity structure reflect
subsurface profile at that site that can be also
(a)
used to construct 2-D profile along the
trajectory of the observation site on NS
direction of the study area.
3 ANALYSIS RESULT
The examples of microtremor data
measurements and data processing results are
shown in Figure 2 on the GSBU site which
includes the triangular array model used and
microtremor data records for each array (b)
configuration. All microtremor data records Fig. 2. (a) Array Configuration at GSBU Site
were analysed using the SPAC method in Using Three Triangular with Array Size 7.5, 15, 30
which the first step was find out the coherence m, (b) Example Microtremor Data Record for 7.5
between a pairs of stations to calculate the m (top), 15 m (centre), 30m (bottom).
SPAC coefficient. Furthermore, the calculation
of the phase velocity with respect to frequency
based on the resulted SPAC coefficient
through the Bessel function.
Subsurface profiling for all observation
sites for shallow layers are shown in Figure 3
in the form of profile Vs 1-D to a depth of 30
m. This result was obtained by using a
configuration of 3 small array triangles with
sizes 30-50-7.5 m where the resulted
dispersion curve has a frequency range of 10 – (a)
30 Hz. The six layer model of 1D Vs profile
represent GSBU site as shown in figure 3(d)
based on Vs30 calculations that is about 348.6
m/s and classified into medium soil.
In general, the resulted dispersion curves at
all observation sites have frequency in a range
of 2.3 - 20 Hz for large arrays and 2.3 - 20 Hz
for small arrays. Dispersion curves are a
functions of subsurface structures and different
frequency ranges reflect differences of soil (b)
244
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Since the position of the engineering
bedrock in the Bandung basin is very deep that
cannot be found from the results of shallow
layer survey, then microtremor array survey for
deep layer was also conducted to obtain the
sedimentary thickness over of the engineering
bedrock. The results of microtremor data
analysis from large array configuration show
the Vs profile to a depth of 300 m which is the
(c) engineering bedrock for Vs=750 m / s can be
detected at each observation site as shown in
figure 4. The subsurface profile at each site is
reflected by various Vs profiles that indicates
the condition of local soil. Identified
engineering bedrock at each site shows
different depths, where in the northern part of
it is very shallow at around 67.97 to m and
gradually increases southward. The deepest
part is found in the southern part of Bandung
at around Bale Endah area that is about 268.73
m.
(d)
Fig. 3. The Result of Data Prosessing Using SPAC
Method, (a) Averaged SPAC Coefisien Between
Two Stasion, (b) Picking of Phase Velocity with
Respect to Frequency (Dispersion Curve), (c)
Fitting of Dispersion Curve between Observation
and Calculated One, (d) 1-D Vs Profile Resulting
from Inversion with Smallest Misfit.
Figure 4. 1-D S-wave velocity profiles at the 10 survey sites for shallow layers down to a depth 30 m.
245
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Fig. 5. 1D S-wave velocity profiles at the 10 surveyed sites for deep layers to reach bedrock depth.
The variations of 1-D Vs profile in figure 2 presents the results of microtremor array
and 3 reflect the heterogeneity of the subsoil, measurements that consists of symbol of
it causes differences on sedimentary location, coordinates, depth of bedrock, Vs30,
thickness, Vs30 and site class. Table 1 site class and lithology unit refer to Silitonga
(1973).
Table 1Microtremor array observation sites and the analysis result of bedrock depth and Vs30.
Bedrock Vs30 Site
No. Site Longitude Latitude Lithology Unit
Depth (m) (m/s) Class
1 LEMB 107.624 -6.815 113.40 204.6 SD Sandy Tuff
2 PCLT 107.621 -6.840 87.15 268.1 SD Sandy Tuff
3 DGIR 107.623 -6.861 67.97 248.2 SD Sandy Tuff
4 CGDG 107.624 -6.875 80.55 276.1 SD Sandy Tuff
5 GSBU 107.619 -6.901 169.09 348.6 SD Pumiceous Tuff
6 KDIM 107.618 -6.914 180.18 342.2 SD Pumiceous Tuff
7 LDYA 107.620 -6.931 182.09 338.6 SD Pumiceous Tuff
8 BTNG 107.628 -6.954 205.33 309.5 SD Pumiceous Tuff
9 DKLT 107.616 -6.983 268.73 239.0 SD Lake deposits
10 BEND 107.622 -7.000 201.18 168.5 SE Lake deposits
Estimated 1-D Vs profile at each site was the city of Bandung revealed a basin known as
used to construct the 2-D Vs profile along N- Bandung basin. These results are quite match
S line. Figure 5 is a cross section resulting with the geological conditions of Bandung
from the construction 1-D Vs profile that basin where based on historical of geology the
show the lateral distribution of sedimentary Bandung basin is a former ancient lake.
layer over the estimated engineering bedrock
which is the thickness is increasing from
north to south of Bandung. The depth of
engineered bedrock identified in the northern
part especially at PCLT and DGIR sites are
very shallow at around 67.97 m, while in the
southern part at DKLT site reaches 268.73 m.
This morphology of engineering bedrock in
246
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Fig. 6. A cross section from the North to the South of city of Bandung that shows distribution of sediment
thickness over the engineering bedrock constructed based on 1-D S-wave velocity.
247
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
SNI-03-1726-2012. 2012. Guidelines of Earthquake Yamanaka, H. & Yamada, N. 2006. Estimation of 3D
Resistant Design for Building Structures. The S-wave Velocity Model of Kanto Basin, Japan,
National Standardization Agency of Indonesia, (in Using Rayleigh Wave Phase Velocity, Bulletin of
Indonesian). the Earthquake Research Institute, University of
Tokyo, 81: 295-301.
248
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Likuifaksi adalah suatu kondisi berubahnya perilaku tanah dari padat menjadi cair akibat
adanya beban dinamis. Akibat hal tersebut akan berdampak pada perilaku tahanan lateral pondasi tiang
pancang. Beberapa peneliti telah membuat kajian tentang tahanan lateral pondasi tiang pancang pada beban
statis. Kajian kajian tersebut menunjukkan bahwa pengaruh tahanan pondasi tiang akan sangat dipengaruhi
oleh jenis tanah, kedalaman pondasi, jepitan diujung pondasi tiang, beban vertikal yang bekerja pada tiang,
spasi tiang dalam grup dan lain sebagainya. Penelitian tahanan lateral tiang pancang akibat beban dinamis
masih sedikit. Dengan demikian akan sangat perlu adanya penelitian yang mengkaji perilaku tahanan lateral
tiang pancang pada tanah kepasiran akibat likuifaksi. Dalam artikel ini penulis akan menyampaikan metode
penelitihan model test kecil di laboratorium menggunakan shaking table, tentang perilaku tahanan lateral
tiang pancang ketika terjadi likuifaksi tanah. Perilaku tahanan lateral tiang diamati dengan memberi variasi
terhadap kedalaman tiang pancang, beban vertikal yang bekerja pada tiang pancang, percepatan tanah
maksimum, dan kepadatan tanah.
Kata Kunci: likuifaksi, kelompok tiang, tahanan lateral
ABSTRACT: Liquefaction is a condition that changes from solid soil to solid due to dynamic loads. As a
result of this will have an impact on the lateral resistance of the pile foundation. Some researchers have
made research on lateral resistance of pile foundations under static loads. The review study shows that the
foundation protection pillar will depend on the type of soil, level of foundation, pinch at the end of the pile
foundation, vertical loads used on the pile, spatial poles in the group and so on. Research on lateral pile
resistance due to dynamic load is still small. Thus it will be very necessary research that examines the
behavior of lateral stakes in sandy soil due to liquefaction. In this article the author will discuss the research
method of testing a small laboratory model using a shaking table, on how to control the resistance lateral
piles of soil liquefaction. Resistance lateral piles behavior is observed by varying the depth of the pile, the
vertical load acting on the pile, maximum soil acceleration and soil density.
Keywords: liquefaction, pile group, lateral resistance
249
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
sebagai akibat dari kenaikan tekanan air pori. ukuran dan bentuk yang beraneka ragam, baik
Kerusakan yang sering terjadi pada pondasi pada tanah kohesif maupun tanah non kohesif.
tiang selama gempa bumi telah memberikan Sifat suatu tanah banyak ditentukan oleh
kita pengertian tentang mekanisme interaksi ukuran butir dan distribusinya. Untuk
pondasi tiang dengan tanah pada saat mendapatkan hal hal tersebut dapat dilakukan
terjadinya likuifaksi. melalui analisa ukuran butiran. Dimana analisa
Pada desain pondasi tiang pancang akan ukuran butiran didapat melului uji ayakan dan
selalu diperhitungkan terhadap daya dukung hidrometer di laboratorium. Hasil analisa
aksial tekan tiang, daya dukung aksial tarik butiran ini disajikan dalam bentuk gambar
tiang, serta daya dukung lateral tiang. kurva distribusi ukuran butiran tanah. Kurva
Perhitungan kapasitas kapasitas tersebut distribusi butiran ini terdiri dari hubungan
diprediksi atau dihitung pada kondisi normal antara ukuran butiran dan prosentase butiran
belum terjadi perubahan kuat geser tanah yang lolos. Penelitian yang dilakukan
akibat likuifaksi. Tsuchida (1970) dan Numata, Mori (2004)
Broms (1964) telah membuat ide tentang telah menghasilkan grafik distribusi butiran
bagaimana memprediksi daya dukung lateral tanah yang diambil dari sejumlah tanah
tiang untuk tanah non kohesif yang seragan terlikuifaksi akibat gempa (Gbr. 2). Pada
untuk jenis tiang pancang kaku atau non kaku. gambar tersebut juga telah membuatkan grafik
Akan tetapi prediksi yang dilakukan oleh batasan dari gradasi butiran tanah
Broms tersebut digunakan pada tanah belum
mengalami likuifaksi
Maru (2017) telah mengembangkan
penelitian melalui eksperiman efek beban
vertikal pada tiang pancang, hasil
menunjukkan peningkatan tahanan lateral tiang
pancang 49% sampai dengan 107%,
dibanding tanpa beban vertikal.
Raju (2017) melalui pemodelan di Gbr.1. Grain Size Limit for Liquefaction
laboratorium, didapat pada tiang pancang grup Tsuchida, 1970
tahanan lateral tiang akan mengalami kenaikan
dipengaruhi oleh kenaikan kenaikan rasio l/d
dan s/d (dimana l adalah kedalaman tiang
pancang, d adalah diameter tiang pancang dan
s adalah spasi tiang pancang.
Dengan demikian akan sangat perlu adanya
penelitian yang mengkaji perubahan tahanan
lateral tiang pancang pada tanah kepasiran
akibat likuifaksi akibat beban dinamis dengan
mempertimbangkan parameter parameter
penting yang telah diteliti pada beban statis. Gbr. 2. Grain Size Limit for Liquefaction Atsunori
Numata , Shinichiro Mori. (2004)
250
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Indek Plastisitas IP<13%
Gbr. 5. Tahanan Lataral Batas dari Tiang Gbr. 8. Efisiensi Kelompok Tiang Pancang
Pancang Pendek dalam Tanah Non Kohesif Versus Rasio Spasi dan Kekakuan Relatif
(Broms 1964) Ketika Menerima Beban Lateral Shailesh (1997)
251
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Raju (2017) juga meneliti tentang pangaruh
spasi terhadap tiang pancang kelompok ketika
menerima beban lateral. Hasil disajikan dalam
Gbr. 9 dibawah ini.
252
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 12 menujukkan momen tiang pancang dapat dilihat dengan program G-Trace. Meja
saat terjadi beban dinamis dan beban statis. getar digerakkan hanya pada arah horizontal.
Dari gambar ditampilkan terjadi kenaikan Input motion berupa gerak sinusoidal
momen dari 36 KNm untuk beban dinamis dihasilkan dengan menggunakan motor
menjadi 100 KNm untuk beban gempa. listrik yang terhubung pada meja getar melalui
batang penghubung. Gerakan dihasilkan oleh
3 METODE PENGAMATAN PERILAKU motor listrik ditransmisikan ke batang
TAHANAN LATERAL TIANG penghubung melalui puli. Untuk pencatatan
PANCANG KELOMPOK SAAT frekwensinya dilakukan secara manual dengan
TERJADI LIKUIFAKSI dilakukan pencatatan waktu sampai dengan 10
kali putaran. Amplitudo (simpangan) dari
Pengamatan perubahan tahanan lateral tiang gerak sinusoidal dapat disesuaikan secara
pancang akibat terjadi likuifaksi dengan model manual dengan memindah-mindahkan posisi
test skala kecil di laboratorium digunakan tuas pengatur atau poros engkol.
shaking table satu arah. Adapun sketsa alat Untuk penelitian ini input gerak dapat
ditampilkan dalam Gbr. 13. diwakili dengan mengembangkan persamaan-
Pengamatan perilaku tahanan lateral tiang persaman
pancang dilakasanakan dengan memberikan x(t) Asint (1)
variasi terhadap kedalaman tiang pancang,
beban vertikal yang bekerja pada tiang F M .F sin(t 0 ) (2)
pancang, percepatan tanah maksimum, dan x Asin( t ) (3)
kepadatan tanah.
Dimana x adalah perpindahan pada saat t,
A adalah amplitudo perpindahan, ω
adalah frekwensi angular dari gerakan, t
adalah waktu, β adalah sudut tahap awal dalam
derajad dalam fungsi sinus. Dengan
menurunkan persamaan perpinadahan di atas
didapat suatu fungsi kecepatan sebagai berikut:
x A..cos( t ) (4)
253
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
c. Test konsistensi tanah lempung
yang terkandung didalam tanah
pasir, dimana IP tidak lebih 13%.
2. Tes selanjutnya adalah tes kerapatan
pasir untuk mendapatkan berat volume
kering pasir minimum ( d (min)) dan
berat volume kering pasir maksimum
(d( maks )). Tes ini dilakukan sesuai
dengan standar ASTM D 4253-83
untuk mendapatkan kerapatan relatif Gbr.14 Grafik Tren Percepatan Maksimum
maksimum pasir, sedangkan untuk yang dihasilkan Oleh Shaking Table
mendapatkan kerapatan relatif
minimum pasir dilakukan sesuai 6. Pengujian tanah pasir jenuh pada
dengan standar ASTM D 4254-83 shaking table dengan berbagai variasi
Bowles (1986). frekuensi getaran (f) dan variasi
3. Selanjutnya dilakukan uji geser amplitudo (A) untuk mendapatkan
langsung. Uji geser langsung dilakukan tingkat potensi likuifaksi. yang
sesuai dengan standar ASTM D3080 dilaksanakan menggunakan
Bowles (1986). Uji ini dilakukan untuk menggunakan bak yang diisi pasir
mendapatkan parameter kekuatan pasir jenuh digetarkan pada shaking table
(φ dan c) secara cepat. Sampel yang seperti Gbr. 13.
digunakan pada uji geser langsung 7. Pengujian perilaku tahanan lateral tiang
adalah pasir dengan beberapa variasi dimulai dengan menempatkan tiang
kepadatan. pancang kelompok pada bak pasir yang
4. Pengujian kapasitas dukung batas selanjutnya digetarkan pada shaking
vertikal (Pu) grup tiang pancang. table. Tipe Pondasi Tiang kelompok
Adapun pengujian ini dapat dilakukan dibuat dalam satu pile cap terdapat 4
dengan melakukan penetrasi tiang tiang pancang dengan diameter
pancang kedalam tanah lalu dicatat tertentu serta divariasi untuk berbagai
beban yang bekerja beserta penurunan kedalaman tiang pancang L = 1T, L =
yang terjadi. Yang selanjutnya 1.5T dan L = 2T, (dimana T adalah
ditentukan tahanan runtuhnya. kekakuan tiang untuk modulus tanah
5. Kalibrasi alat shaking table. Hal ini yang konstan dan L adalah
dalam rangka menentukan atau kedalaman tiang pancang). Material
mendapatkan percepatan maksimum tiang pancang digunakan dengan satu
yang didapat dengan memberi variasi bahan dan diameter tertentu. Pada
Amplitudo dan frekwensi. Adapun masing- masing type model pondasi
hasil dalam table 1. Sedang tren tiang Pancang dilakukan tes dengan
percepatan maksimum yang dpat dua variasi kerapatan relatif pasir (DR)
diberikan dalam Gbr. 14. medium dan loose, variasi tingkat
likuifaksi.
Tabel 1. Hasil Pengamatan Awal Terhadap
Percepatan Maksimum Yang Dihasilkan Shaking 8. Untuk mendapatkan pengamatan
Table tahanan lateral dalam grup tiang
pancang saat terjadi likuifaksi tanah
A T f Φ amaks didapat dari bacaan accelerometer yang
cm dt hz rad/s m/s2
g diletakan diatas pile cap. Perilaku
1.50 0.48 2.07 12.99 2.53 0.26 tahanan lateral pada saat terjadi
4.00 0.67 1.49 9.33 3.48 0.35
likuifaksi dapat dilihat pada
Acceleration Time History pada top
5.00 0.73 1.37 8.60 3.70 0.38
pile ditampilkan dalam Gbr. 15. Pada
8.00 0.78 1.28 8.02 5.14 0.52 gambar tersebut akan ditampil nilai
percepatan (a) pada top pile dalam
setiap waktu (t). Besarnya tahanan
lateral (Hmaks) adalah merupakan hasil
perkalian antara massa (m) yang
254
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
dikerjakan pada pile cap dikalikan 10. Pemodelan geoteknik untuk melakukan
percepatan maksimum (amaks) yang pengujian di laboratorium, perlu
terbaca dalam accelerometer (Hmaks = dilakukan pembuatan bahan percobaan
amaks m). yang biasanya dengan membuat
pemodelan dengan skala tertentu yang
akan dijadikan acuan ketika membuat
pemodelan, dan untuk pemodelan di
laboratorium, geoteknik telah memiliki
hukum hukum pemodelan yang
dilampirkan oleh Wood (2004) yang
dirangkum dalam tabel berikut:
DAFTAR PUSTAKA
255
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Learned. Proc. of ASCE TLEE 2009 Conference, Ueng, T. S., Sun, C. W., Chen, C. W. 2004. Definition
Oakland, CA. of fines and liquefaction resistance of Maoluo River
Das, B. M., 1983. Fundamental of Soil Dynamics. soil. Soil Dynamics and Earthquake Engineering,
Elsevier, New York. 24: 745-750.
Das, B. M., 1995. Mekanika Tanah (Prinsip-prinsip Youd, T. L. and Idriss, I. M., 2001. Liquefaction
Rekayasa Geoteknis). Erlangga, Jakarta. resistance of soils: Summary report from the 1996
Geoing, 2011. Geomechanical report on the location for NCEER and 1998 NCEER/NSF workshops on
construction “Warehouse for storage cables for evaluation of liquefaction resistance of soils.
cars”. Geotechnical Earthquake Engineering. Prentice Hall.
Gibbs, H. J. and Holtz, W. G., 1957. Research on A.S. Kiran, G. Ramasamy, and B.K. Maheshwari,2009,
Determining the Density of Sands by Spoon Lateral Capacity Of Piles In Liquefiable Soils, IGC
Penetration Testing. Proceedings, 4th International 2009, Guntur, INDIA
Conference on Soil Mechanics and Foundation Varun Maru, Prof. M. G. Vanza, 2017, Lateral
Engineering, Vol. 1. London, England:35-39. Behaviour Of Pile Under The Effect Of Vertical
Hakam, A. and Suhelmidawati, E., 2013. Liquefaction Load, Journal Of Information, Knowledge And
Due to September 30th 2009 Earthquake in Padang. Research In Civil Engineering, ISSN: 0975 – 6744|
Procedia Engineering 54 (2013) 140-146. NOV 16 TO OCT 17 | Volume 4, Issue 2 :482- 485
Ishihara, K., 1996. Soil Behaviour in Earthquake K.V.S.B. Raju, Vijay.P , Chandrashekhara A S, 2017,
Geotechnics, Oxford University Press, New York. Lateral Load Carrying Capacity of Pile Groups in
Numata, A. and Mori, S., 2004. Limits In The Gradation Sand, International Journal of Advances in
Curves Of Liquefiable Soils. 13th World Conference Scientific Research and Engineering (ijasre),Vol 3.
on Earthquake Engineering Vancouver, B.C., Reva University, Bangalore, India:270-278.
Canada August 1 - 6, 2004 No.1190 Shailesh R Ghandhi and S Selvan, 1997, Grups Effect
Perlea, V. G., Koester, J. P., and Prakash, S., 1999. How of driven piles Under lateral load, Journal of
Liquefiable are Cohesive Soils?. Proc. Second Int Geotechnical Geoenviromental Engineering, Vol
Conf on Earthquake Geotechnical Engg., Lisbon, 123 No 8, ASCE:701-709
Portugal, Vol. 2, 611- 618. American Society for Testing and Materials (ASTM).
Prakash, S. and Sandoval, J. A., 1992. Liquefaction of Piles Under Static Lateral Compressive Load.
low plasticity silts. Journal of Soil Dynamics and (Standard Method of Testing) D 3966 – 90.
Earthquake Engineering, Vol. 11 No. 7 pp. 373-397. Broms, B.B,(1964a), Lateral Resistane of Pile in
Soehaimi, A., 2008. Seismotektonik dan Potensi Cohesive soils, jounal of SMFED, Proc, ASCE,
Kegempaan Wilayah Jawa. Jurnal Geologi No.SM2:27-63
Indonesia, Vol. 3, No.4:227-240. Broms, B.B,(1964b), Lateral Resistane of Pile in
Tsuchida, H., 1970. Evaluation of Liquefaction Potential Cohesiveless soils, jounal of SMFED, Proc, ASCE,
of Sandy Deposits and Measures against No.SM3:123-156
Liquefaction Induced Damage. Proceedings of the Broms, B.B,(1965), LDesign of Laterally loaded Piles,
annual seminar of the Port and Harbour Research jounal of SMFED, Proc, ASCE, No.SM3:79-99
Institute, 1970, (3-1)-(3-33)(in Japanese).
256
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Pondasi helikal mempunyai potensi untuk diaplikasikan pada tanah lunak. Studi ini meneliti
perilaku pondasi helikal dibawah beban tekan, dengan menggunakan elemen hingga limit analisis yaitu
software OPTUMG2. Variasi yang digunakan adalah diameter pelat helikal yaitu 35 cm (L), 25 cm (M)
dan 15 cm (S), spasi antar pelat helikal yaitu 20 cm,30 cm dan 50 cm dan jumlah pelat. Hasil penelitian
menunjukkan bahwa semakin besar spasi pelat maka daya dukung pondasi juga bertambah besar. Untuk
spasi pelat yang sama, daya dukung pondasi helikal dengan 2 pelat besar (LL) lebih besar dari pondasi
helikal dengan 2 pelat LM dan 3 pelat (diameter mengecil) LMS. Studi juga menunjukkan daya dukung
semakin besar ketika jumlah pelat semakin banyak. Namun daya dukung pondasi 2 pelat LM lebih besar dari
3 pelat LMS. Visualisasi disipasi geser untuk LL menunjukkan bahwa untuk rasio spasi terhadap diameter
0.6-1.4 mekanisme keruntuhan adalah cylindrical shear. Demikian pula halnya untuk pondasi LM dengan
s/D1-2.5. Untuk pondasi LMS ketika spasi makin bertambah besar mekanisme keruntuhan cenderung
berubah dari cylindrical shear menuju individual bearing.
Kata Kunci: pondasi helikal, limit analisis, tanah lunak
ABSTRACT: Helical pile has potential application for the foundation construction on soft soils. This study
investigated behavior of helical pile under compressive load using finite element limit analysis i.e.
OPTUMG2. The variation of helical plate diameters are 35cm (L), 25cm(M) and 15cm (S) with helical
plate spacing of 20 cm, 30 cm, and 50 cm. In addition effect of number of helical plate was also analyzed.
The results show that helical plate spacing increases the bearing capacity. For the same spacing, two helical
plates (LL) have larger bearing capacity than two helical plates of different diameter (LM) and three helical
plates (LMS). Number of helical plate with the same diameter was found to increase bearing capacity i.e.
LLL>LL>L. However, two helical plates (LM) has larger bearing capacity than three helical plates of LMS.
For LL helical piles with various spacing used in this study i.e. spacing to diameter ratio (s/D) 0.6-1.4, this
study reveals that failure mechanism is cylindrical shear. Likewise is for those of LM helical piles with s/D
of 1-2.5. For LMS helical pile with s/D range from 0.8-2 the failure mechanism tend to change from
cylindrical shear towards individual bearing.
Keywords: helical piles, limit analysis, soft soil
257
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
This study investigated behavior of single Individual plate bearing method (Fig. 2a)
helical pile on soft soils using OPTUMG2, a assumes that bearing capacity consist of soil
geotechnical finite element limit analysis bearing capacity below the plate plus the
software developed by OPTUM Inc (2017). adhesion (friction) between the helical shaft
The study varied the number of plates, with soils (Perko, 2009). Thus the theoretical
diameter and spacing between the plates. ultimate helical pile capacity, Pu, can
calculated as :
1.1 Limit Analysis Pu q A n αHπD (1)
ult
Limit analysis was first developed by Drucker
et al (1951). The method assumes small Where :
deformation, a perfect plastic (Fig. 1a), as an qult = stress under each helical plate = 9 Su
approximation of true non-linier soil behavior Su = undrained shear strength
and an associate flow rule . p (Fig. 1b). It implies An = nth helical plate area
that plastic strains rate ij are normal to yield α = adhesion between soils and
surface f(ij). For this plasticity model foundation (2/3Su)
material, velocity and strain rate are required H = length from the ground surface to
instead of displacement and strain (Sloan, helical plate at the top
2013). d = diameter helical rod
Limit analysis consist of lower bound and
upper bound theorem. Lower bound theorem Cylindrical shear method (Fig. 2b) assumes
states that a body of elastic-plastic material that the whole soil volume between the helical
will not collapse under a stress field that plate is mobilized into one cylindrical unit
satisfies equilibrium, stress boundary condition (Mooney et al., 1985). The bearing capacity is
and yield condition. Whereas upper bound the summation of the stress at the bottom of
theorem states that for a displacement field helical pile, total shear strength formed by
that satisfies strain displacement relation, cylindrical soil with soil and adhesion of
associated flow rule and displacement helical pile with soil. Based on the assumption
boundary condition then the ratio of internal the theoretical helical capacity can be
work is higher or equal to that actually found determined as
at collapse. Hence the upper bound of collapse
load is obtained. The true collapse load is Pu q ult A1 T(n 1) sπ D avg αHπd (2)
between the lower bound and upper bound
solution. where:
qult = stress under bottom of helical plate
= 9 Su
T = Su = undrained shear strength
A1 = bottom helical plate area
n = number of plates
s = helical plate spacing
Davg = average diameter of helical plates
α = adhesion between soils and
foundation = 2/3Su
Fig. 1. Perfect Plastic Model (a) Associated Flow
Rule (Sloan, 2013) Theoretically when spacing to helical
diameter plate ratio (s/D) is large the
mechanism is individual bearing whereas the
1.2 Theoretical Helical Pile Capacity ratio is small then cylindrical shear mechanism
According to Prasad and Rao (1996) helical govern. Merifield (2010) stated that if s/D less
piles is a foundation which has one or more than critical s/D ≈1.6 than the failure
helical plates that welded to steel rods at mechanism is cylindrical shear whereas s/D
determined spacing. Generally bearing than critical s/D than individual bearing
capacity of helical pile can be calculated using mechanism govern.
individual plate bearing method or cylindrical
shear method.
258
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
E = 2 x 105 MPa and yield strength
fy= 345 MPa. The whole model is axy-
symmetry with helical rod is treated as
connector. Helical plate is modelled as circular
plate with properties of sectional area (S),
plastic section modulus (M) and moment of
inersia (I). Helical pile properties are shown in
Table 2.
The ground water table is located at the
ground surface. The soil consist of two layers
i.e. peat and Clay layer with the properties are
given in Table 2.
Helical pile is loaded with 1 kPa at the test
desk (area of 2083.8 cm2). Constant load was
modeled as multiplier load with distributed
type load.
Fig. 2. Individual Plate Bearing (a) and Cylindrical
Shear (Perko, 2009)
2 METHODOLOGY
259
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Table 3. Soil Properties plate than LM, it has greater bearing capacity
Mohr Coulomb (about 48 kN compared to 45.8 kN). It reveals
Parameter that addition of helical plate with smaller
Peat Clay
diameter does not contribute to bearing
Drained Undrained capacity.
H(m) 1.8 1.2 Fig. 7 shows comparison of LM and LL
γsat(kN/m3) 12 21 variation for various helical plate spacing. The
γunsat(kN/m3) 11 21 figure reveal that larger diameter results in
E(MPa) 0.3 - 3 50 larger bearing capacity.
ʋ 0.25 0.25 60
LL
Ф(ᵒ) 25 22 LM
LMS
C(kPa) 2 20 55
k(m/s) 10-4 10-6 )
N
k(
yt
ic50
ap
ac
3 RESULTS g
n
ir45
ae
B
3.1 Bearing Capacity Analysis
40
Results of the simulation with various helical
plate diameter, spacing and cumber of plate are
shown in Table 4. Bearing capacity is obtained 35
10 20 30 40 50 60
by multiplying the load multiplier with area of
desk test. Analysis was then conducted based Helical plate spacing (cm)
on the table as shown by Fig. 4 to Fig. 6. Fig. 4. Bearing Capacity Comparison
Table 4. Results
60
Load Bearing
ID Multiplier capacity (kN) ) 50
N
k(
40
(A) (B) tyi
ca
LL20 221.800 46.219 p
ac 30
LL30 240.300 50.074 g
in
ar
20
LL50 261.300 54.450 e
B
10
L 50 188.600 39.300
LLL50 306.500 63.868 0
20 30 50
LM 20 202.000 42.093 Helical plate spacing (cm)
LM 30 212.200 44.218 Fig. 5. Effect of Helical Spacing of LL Variation
LM 50 230.300 47.990
LMS 20 198.900 41.447 70
LMS 30 210.800 43.927
60
LMS 50 219.800 45.802
)
N 50
(k
tyi
Fig. 4 shows that reveals that, for the same ca 40
c
spacing, LL has largest bearing capacity ap
C 30
g
followed by LM and LMS. This trend applies n
ir
ae
to LL, LM and LMS.n general LL bearing B 20
260
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
60
LM
LL
) 50
kN
( 40
tyi
ca
p
ac 30
g
n
ir 20
a
e
10
B (a) (b) (c)
Fig. 8. Shear Dissipation for LL20, LL30 and
0
20 30 50 LL50
Helical plate spacing (cm)
261
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
4 CONCLUSIONS REFERENCES
Numerical modelling of helical pile behavior Drucker, D. C., Greenberg, W. & Prager, W.H. 1951.
on soft soil have been conducted. This study The safety factor of an elastic plastic body in plane
shows that bearing capacity increases as the strain. Trans. ASME. Journal of Applied
helical plate spacing increases. For the Mechanic.73:371-378.
Sloan, S. W. 2013. Geotechnical stability analysis.
variation used in this study, LL have larger Geotechnique. 63(7):531-572
bearing capacity LM and LMS. Bearing Merifield, R. S., 2011. Ultimate uplift capacity of
capacity also increases as number of helical multiplate helical type anchoors in clay. Journal of
plate of the same diameter increases i.e geotehcnical and geoenvironmnental Engineering
LLL>LL>L. Two helical plates (LM) has 137(7):704-716.63(7):531-572
larger bearing capacity than three helical plates Mooney, J.S., Adamczak, S., Clemence, S.P. 1985.
of LMS. For LL helical piles with various Uplift capacity of helical anchors in clay and silt. In
spacing used in this study i.e. spacing to Uplift behavior of anchor foundation in soil: ASCE:
diameter ratio (S/D) 0.6-1.4, this study reveals 48-71.
that failure mechanism is mainly cylindrical OPTUM Inc.2017. Optum computational engineering
Prasad, Y. V. S. N., & Rao, S. N. 1996. Lateral
shear. Likewise is for those of LM helical piles Capacity of Helical Pile in Clays. Journal of
with S/D of 1-2.5. For LMS helical pile as the Geotechnical Engineering, (11), 938–941
spacing (from 20 to 50cm) increases the failure Perko, H. A., & Wiley, J. 2009. Helical Piles : A
mechanisms tend to change from cylindrical Practical Guide to Design and Installation
shear toward individual bearing. Fadhilah, R. 2018. Pengaruh Variasi Jarak Pelat
Helical Terhadap Kapasitas Daya Dukung Tekan
Pondasi Helical Pile Pada Tanah Gambut Dengan
Metode Constant Stress Of Penetration. Skripsi
UNRI.
262
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Salah satu faktor penting dalam perencanaan jalan raya adalah daya dukung tanah dasar yang
sangat berpengaruh terhadap tebal perkerasan jalan. Metode yang dipakai untuk menentukan daya dukung
tanah dasar salah satunya adalah metode CBR (California Bearing Ratio) yang merupakan kuat hambatan
tanah/agregat terhadap penetrasi pada kadar air optimum. Kandungan air (Water Content / wc) dalam tanah
dapat berpengaruh besar terhadap nilai CBR. Penelitian ini bertujuan untuk menganalisis perubahan nilai
CBR terhadap kandungan air pada tanah dasar. Pelaksanaan penelitian dilakukan dengan mengambil sampel
tanah pada Jl. Pangeran Senopati, Kecamatan Jati Agung, Kabupaten Lampung Selatan. Kemudian
melakukan pengujian – pengujian di laboratorium. Pengujian CBR dimaksudkan untuk mengidentifikasi
stabilitas relatif dari tanah pada suatu kadar air dan berat isi kering tertentu. Hasil penelitian diketahui
bahwa pada nilai CBR yang maksimum didapat nilai kandungan air yang minimum, yaitu dengan nilai
CBR = 66.7% nilai kandungan air = 6.15%. Sementara pada nilai CBR minimum didapat nilai kandungan
air berada pada nilai yang maksimum, yaitu dengan nilai CBR = 48.3% dan nilai kandungan air = 7.81% .
Kata Kunci: daya dukung tanah, CBR, kandungan air
ABSTRACT: One of important factor in planning the highway is soil bearing capacity basic land influential
on thick road pavement. The method used to determine capacity basic land one of them is the method CBR
(California Bearing Ratio) that is strong ground resistance / aggregate to penetration in the water level
optimum. Water content,wc in soil can have a big influence on the CBR value. This research aims to analyze
changes in the CBR value of water content in subgrade. The research was carried out by taking soil samples
on Jl. Pangeran Senopati, Kecamatan Jati Agung, Kabupaten Lampung Selatan. Then do the tests in the
laboratory. CBR testing is intended to identify the relative stability of the soil at a certain moisture content
and dry weight content. The results of the study note that the maximum CBR value obtained is the minimum
water content value, which is the CBR value = 66.7% water content value = 6.15%. While the minimum
CBR value obtained the value of water content is at a maximum value, namely the CBR value = 48.3% and
the value of water content = 7.81%.
Keywords: soil bearing capacity, CBR, water content
263
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Nilai CBR (California bearing ratio) yang yang dipakai untuk pengujian terhadap
didapat dari material pada saat konstruksi kekuatan bahan agregat standar (standart
dilakukan dapat menjadi lebih rendah daripada material). Faktor utama yang mempengaruhi
nilai CBR yang didapat sebelumnya dari nilai CBR adalah tekstur, kadar air, dan berat
sampel pada penelitian tanah. Penyelidikan isi kering tanah. Pengujian yang dilakukan
tentang korelasi CBR dengan parameter lain, terutama tergantung pada jenis tanah yang
seperti kadar air, kekuatan geser, dan diuji. Kekuatan tanah dasar juga banyak
plastisitas telah banyak dilakukan. Black tergantung pada kadar air, makin tinggi kadar
(1962) telah melakukan penyelidikan tentang airnya semakin kecil kekuatan nilai CBR dari
korelasi antara CBR dan data plastisitas pada tanah tersebut.
tanah kohesif. Dari liquid limit, plastic limit, Uji CBR dapat dilakukan pada sampel tanah
dan kadar air dari tanah asli dapat diperkirakan asli (undisturbed sample) atau contoh tanah
nilai CBR nya. yang dipadatkan (compacted sample), juga
Penelitian ini dilakukan penyelidikan dapat dilakukan dilapangan secara langsung.
penurunan kekuatan akibat peningkatan kadar Perobaan yang dilakukan pada penelitian ini
air pada tanah dasar agar didapat suatu korelasi adalah jenis CBR soaked (perendaman) pada
antara kandungan air (water content) dengan tanah yang dipadatkan dengan kadar air
CBR laboratorium. Sehingga pada saat optimum (OMC / Optimum Moisture Content)
pelaksanaan konstruksi apabila didapat yang dipakai dari compaction standard test.
penurunan nilai CBR maka kandungan air dari
tanah tersebut dapat segera diketahui tanpa 2.3 Jenis CBR (California Bearing Ratio)
melakukan pengujian lagi di laboratorium.
Berdasarkan cara mendapatkan contoh lapis
pondasi nya, CBR dapat dibagi atas :
2 TINJAUAN PUSTAKA a. CBR (California Bearing Ratio) Lapangan
CBR Lapangan disebut juga CBR Inplace
2.1 Tanah (Field CBR) dan kegunaannya adalah
sebagai berikut:
Tanah didefinisikan sebagai material yang Untuk mendapatkan nilai asli
terdiri dari agregat (butiran) mineral-mineral
dilapangan, sesuai dengan kondisi lapis
padat yang tidak tersementasi (terikat secara
kimia) satu sama lain dan dari bahan-bahan pondasi dasar. CBR lapangan
organik yang tidak melapuk (yang berpartikel umumnya digunakan untuk
padat) disertai dengan zat cair dan gas yang merencanakan tebal lapis perkerasan
mengisi ruang-ruang kosong diantara partikel- yang lapisan lapis pondasi dasarnya
partikel padat tersebut (Das, 1995). sudah tidak akan dipadatkan lagi.
Pemeriksaan dilakukan dalam keadaan
2.2 CBR (California Bearing Ratio) kadar air tinggi (musim penghujan)
atau dalam kondisi terburuk yang
CBR (California Bearing Ratio) adalah suatu mungkin terjadi.
cara empiris untuk menentukan kekuatan tanah Untuk mengontrol apakah kepadatan
dimana konstruksi akan diletakkan. Prinsip lapis pondasi yang diperoleh sudah
percobaan ini adalah penetrasi dengan sesuai dengan yang diinginkan.
kecepatan tertentu pada berbagai sampel tanah Pemeriksaan seperti ini umumnya tidak
dengan tingkat kepadatan dan kadar air digunakan, dan metode yang dilakukan
tertentu. Percobaan CBR dimaksudkan untuk disini adalah dengan meletakkan piston
mengidentifikasi stabilitas relatif dari tanah pada kedalaman dimana nilai CBR
pada suatu kadar air dan berat isi kering (California Bearing Ratio) hendak
tertentu. Percobaan CBR laboratorium ditentukan lalu dipenetrasi dengan
dilakukan pada sampel tanah yang dipadatkan beban yang dilimpahkan melalui
dengan mold silinder. Nilai CBR dihitung Gandar Truck.
sebagai perbandingan kekuatan tanah dasar
264
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
b. CBR (California Bearing Ratio) Lapangan 3 METODELOGI PENELITIAN
Rendaman Pelaksanaan penelitian dimulai dengan
CBR Lapangan Randaman (Undisturbed mengambil sampel tanah pada Jl. Pangeran
Soaked CBR) berfungsi untuk mendapatkan Senopati Kecamatan Jati Agung Kabupaten
besarnya nilai CBR asli dilapangan pada Lampung Selatan, setelah itu melakukan
pengujian – pengujian di laboratorium. Sampel
keadaan lapis pondasi jenuh air dan lapis
tanah yang digunakan yaitu berupa tanah asli
pondasi mengalami pengembangan yang diambil sebanyak @ ±7 kg.
(Swelling) yang maksimal. Pemeriksaan ini Pengujian di laboratorium meliputi :
dilakukan pada musim kemarau dan pada pengujian kadar air dan CBR laboratorium.
kondisi lapis pondasi tidak dalam keadaan Gbr. 1. menampilkan diagram alir penelitian.
jenuh air.
Metode ini biasanya dilakukan untuk
menentukan daya dukung lapis pondasi Mulai
dasar yang tidak akan dipadatkan lagi,
biasanya terletak pada daerah yang badan
jalannya sering terendam air pad musim Pengambilan Sampel
penghujan dan kering pada musim kemarau.
c. CBR (California Bearing Ratio) Rencana
Titik CBR 1 OMC 1
CBR Rencana Titik biasanya disebut juga
sebagai CBR laboratorium (Design CBR)
adapun lapis pondasi dasar yang diperiksa
merupakan lapis pondasi dasar jalan raya CBR 2 OMC 2
baru yang berasal dari lapis pondasi asli,
lapis pondasi timbunan atau lapis pondasi
galian yang sudah dipadatkan sampai CBR 3 OMC 3
mencapai kepadatan 95% (max density)
dengan demikian daya dukung lapis pondasi
tersebut merupakan nilai kemampuan CBR 4 OMC 4
lapisan lapis pondasi yang memikul beban
setelah lapis pondasi dipadatkan.
Pemeriksaan ini dilaksanaknan
CBR 5 OMC 5
dilaboratorium dengan 2 metode (Setyo,
BG, 2000), yaitu :
CBR (California Bearing Ratio)
CBR 6 OMC 6
Laboratorium Rendaman (Soaked
Design CBR)
CBR (California Bearing Ratio)
Laboratorium Tanpa Rendaman Analisis Hasil
(Unsoaked Design CBR ).
Kesimpulan
Tabel 1. Parameter Tanah
Klasifikasi Tanah Nilai CBR
Jelek Sekali 0,00 – 3,00 % Selesai
Jelek 3,00 – 7,00 %
Gbr. 1. Bagan Alir Penelitian
Sedang 7,00 – 20,00 %
Baik 20,00 – 50,00 %
Baik Sekali > 50,00 %
265
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
4. HASIL DAN PEMBAHASAN Tabel 3. Hasil Pengujian CBR
Sampel CBR ( % )
4.1 Pengujian Pemadatan Tanah I 48,3
Hasil pengujian pemadatan tanah pada II 50
penelitian ini tersedia dalam Tabel. 4 berikut III 52
ini. Sedangkan tujuan pemadatan tanah pada
penelitian ini adalah untuk mengetahui IV 56,8
hubungan kadar air dengan berat isi kering V 62,3
pada waktu pemadatan, dan dari tanah yang
VI 66,7
sudah dipadatkan dapat diambil kadar air
optimum (OMC) yang dipergunakan untuk uji Sumber : Hasil Penelitian
CBR ( California Bearing Ratio ). Dari hasil pengujian diatas dapat diGbr.kan
Tabel 2. Hasil Pengujian Pemadatan Tanah
dalam grafik pada Gbr. 3. sebagai berikut:
266
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 4. Grafik Korelasi Nilai CBR Terhadap Gbr. 5. Grafik Gabungan CBR dan Kandungan Air
Kandungan Air (Water content) (Water content / WC)
Berdasarkan Gbr. 4. didapat dari korelasi Dari Tabel 5. dan Grafik 5. diatas dapat
nilai Kandungan Air (Water content / WC) dan dilihat bahwa semakin tinggi nilai Kandungan
CBR dapat dilihat bahwa pada nilai CBR yang Air (Watercontent / WC) maka semakin kecil
maksimum didapat nilai Kandungan Air nilai CBR laboratorium nya, pada sampel I
(Water content / WC) yang minimum, yaitu sampai IV terjadi kenaikan nilai Kandungan
nilai CBR = 66,7% nilai Kandungan Air
Air (Watercontent / WC) sedangkan tersebut
(Water content / WC) = 6.15% . Sementara
pada nilai CBR minimum didapat nilai terjadi penurunan dari nilai CBR sebelumnya.
Kandungan Air (Water content / WC) berada Walaupun demikian tidak berarti bahwa
pada nilai yang tinggi, yaitu CBR = 48,3% dan sebaiknya tanah dasar dipadatkan dengan
nilai Kandungan Air (Water content / WC) = kadar air rendah supaya mendapat nilai CBR
7.81% . yang tinggi, karena kadar air tidak akan tahan
konstan pada nilai yang rendah itu. Setelah
4.4 Gabungan Antara CBR dan Kandungan pembuatan konstruksi suatu bangunan, air
Air (Water content / WC) akan meresap ke dalam tanah dasar (dari
Tabel 5. dan Gbr. 5. Menampilkan data dan bawah, samping, dan atas) sehingga kekuatan
grafik gabungan antara CBR dan Kandungan dan nilai CBR nya turun sampai kadar air
Air (Water content / WC) didapat dari data – mencapai nilai yang yang konstan.
data sebelumnya kemudian ditarik garis
polynomial.
5 KESIMPULAN
Tabel 5. Gabungan Antara CBR dan Kandungan
Air (Water content / WC) Kesimpulan yang dapat diambil dari hasil
penelitian adalah :
Sampel CBR Kandungan Air a. Korelasi nilai CBR terhadap
Kandungan Air (Watercontent / WC)
I 48,3 7,81 dapat dilihat bahwa pada nilai CBR
II 50 7,22 yang maksimum didapat nilai
III 52 6,81 Kandungan Air (Watercontent / WC)
yang minimum, yaitu nilai CBR =
IV 56,8 6,73 66,7% nilai Kandungan Air
V 62,3 6,52 (Watercontent / WC) = 6.15% .
VI 66,7 6,15 Sementara pada nilai CBR minimum
didapat nilai Kandungan Air
Sumber : Hasil Penelitian (Watercontent / WC) berada pada nilai
yang tinggi, yaitu CBR = 48,3% dan
nilai Kandungan Air (Watercontent /
WC) = 7.81% .
267
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
b. Berdasarkan deskripsi tanah dilihat pada DAFTAR PUSTAKA
tabel parameter tanah, nilai CBR tanah
yang telah diuji ini termasuk kedalam Bowles, J.E.1991. Analisis dan Desain Pondasi.
Penerbit Erlangga, Jakarta.
klasifikasi tanah baik sampai baik sekali Das, B.M. 1995. Mekanika Tanah (Prinsip - Prinsip
yaitu berada pada nilai 20,00 – 50,00 % Rekayasa Geoteknis). Penerbit Erlangga. Jakarta
sampai > 50,00 %. Departemen Pekerjaan Umum, Pedoman Kostruksi dan
c. Kekuatan tanah dasar juga banyak Bangunan, Buku I Pekerjaan Tanah Dasar, No 003 -
tergantung pada kadar air, semakin tinggi 01 /BM/2006.
Hardiyatmo, Harry Christady.1991. Mekanika Tanah 1.
kadar airnya semakin kecil kekuatan nilai penerbit PT.Gramedia Pustaka Utama, Jakarta.
CBR dari tanah tersebut Gatot, S.Budi.2011. Pengujian Tanah Di Laboratorium.
Graha Ilmu.
SNI1738.2011. Pengujian CBR Lapangan
PENGHARGAAN
268
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Perencanaan pondasi memerlukan data propertis di lapangan melalui uji laboratorium kondisi
disturbed dan undisturbed. Pengujian dengan metode ASTM dan SNI untuk menentukan parameter sifat
fisik dan mekanis. Hasil pengujian sifat fisik didapatkan γ = 1.035 g/cm3 dan w = 452.063%, analisa
saringan 61.10%, serat organik dan 38.90% abu organik. Hasil LL = 191.91%, PL = 56.73% dan
PI = 135.18% serta Gs = 1.223. Hasil Proctor Test d maks = 0.401 g/cm3 dan OMC = 101.10%. Hasil kadar
abu = 12.66% dan kadar organik = 87.34%. Hasil pengujian sifat mekanis uji triaksial CU diperoleh
cu = 7.97 kN/m2 dan ø = 37.09°. Hasil konsolidasi dengan Po = 0 kg/cm2, eo = 3.212 dan H = 1.96 cm, pada
akhir percobaan dengan Pf = 8 kg/cm2, e = 2.047 dan Hf = 1.418 cm. Dari keseluruhan data hasil pengujian
jika dibandingkan dengan nilai parameter tanah gambut Desa Tanjung Leban, Propinsi Riau maka hasil nilai
parameter tanah gambut dari dua lokasi yang berbeda tersebut tidak memiliki perbedaan karateristik sifat
fisik dan mekanis secara signifikan.
Kata Kunci: tanah gambut, propertis fisik dan mekanis, parameter tanah, uji laboratorium
ABSTRACT: The foundation planning requires property data in the field through laboratory tests of
disturbed and undisturbed conditions. Testing using ASTM and SNI methods to determine the parameters of
physical and mechanical properties. The results of testing physical properties are obtained γ = 1.035 g/cm3
and w = 452.063%, sieve analysis 61.10% organic fibrous and 38.90% organic ash. Result of
LL = 191.91%, PL = 56.73%, PI = 135.18% and Gs = 1.223. Result Proctor Test d maks = 0.401 g/cm3 and
OMC = 101.10. Result ash content = 12.66% dan organic content = 87.34%. The test results of the
mechanical properties of the triaxial CU test were obtained cu = 7.97 kN/m2 and ø = 37.09°. Consolidation
results with Po = 0 kg/cm2, eo = 3.212 and H = 1.96 cm, at the end of the experiment with Pf = 8 kg/cm2,
e = 2.047 and Hf = 1.418 cm. From the whole test result data if compared with the parameters of the peat
soil of Tanjung Leban Village, Riau Province then the results of the peat soil parameter values from the two
different locations do not have significant physical and mechanical characteristics differences.
Keywords: peat soil, physical and mechanical properties, soil parameters, laboratory tests
269
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Porositas tanah gambut relatif tinggi umumnya Tabel 1. Jenis Metode Pengujian Sifat Fisik dan
berkisar 70% - 95%, nilai porositas besar Mekanis Tanah Gambut
menunjukan koefisien permeabilitas yang No Jenis Pengujian Metode Pengujian
besar Sukandarrumidi (2009). Menurut Mac
1 Pengujian bulk density ASTM D 2049
Farlene (1995) daya rembes awal yang tinggi
pada tanah gambut menyebabkan pemampatan Pengujian kadar air (water
2 ASTM D 2216-98
content)
awal yang terjadi sangat cepat. ASTM D 1140-00
Berdasarkan hasil tersebut dapat dijelaskan 3 Pengujian analisa saringan dan
parameter tanah gambut memiliki nilai yang ASTM D 422-63
jauh lebih rendah jika dibandingkan dengan Pengujian specific gravity
4 ASTM D 854-02
tanah lunak jenis lempung (clay). Dari hasil (Gs)
parameter nilai yang kecil, dengan alasan 5 Pengujian Atterberg limit ASTM D-4318-00
pertimbangan perencanaan pondasi bangunan Pengujian Standart Proctor
sipil, dibutuhkan ketersediaan data yang 6 ASTM D-698-00a
test
banyak, dalam hal ini dilakukan penelitian 7 Pengujian CU Triaxial ASTM D 2850-95
untuk mendapatkan parameter tanah gambut 8 Pengujian Konsolidasi ASTM D 2435-96
dari Desa Pergam yang merupakan lokasi Pengujian Kadar Abu dan
dominan tanah gambut melalui pengujian di 9 SNI 13-6793-2002
Kadar Organik
laboratorium dengan kondisi terganggu
(disturbed) dan tidak terganggu (undisturbed).
3 HASIL DAN PEMBAHASAN
2 METODE PENELITIAN
3.1 Hasil Pengujian Sifat Fisik Tanah
Dalam penelitian ini digunakan tanah gambut Gambut
Desa Pergam, Kecamatan Rupat, Kabupaten
Bengkalis, Propinsi Riau, dengan kondisi Adapun hasil pengujian sifat fisik tanah
tanah yang lembab dan berserat (fibrous peat gambut yang menunjukkan sifat karateristik
soil). Untuk bagan alir dalam penelitian dapat dasar dari tanah yang diuji adalah sebagai
dilihat pada Gbr. 1, sedangkan metode berikut:
penelitian di laboratorium yang dilakukan A. Hasil pengujian berat volume tanah asli (γ)
adalah pengujian sifat fisik dan mekanis tanah dan kadar air tanah (%w)
gambut, adapun untuk jenis dan metode Nilai berat volume tanah () didapatkan
pengujian yang dilakukan dapat dilihat pada sebesar 1.035 g/cm3, nilai tersebut cukup kecil
Tabel 1 sebagai berikut: jika dibandingkan tanah gambut Desa Tanjung
Leban sebesar 1.108 g/cm3, mengingat berat
volume air saja sebesar 1.00 g/cm3, kondisi
seperti ini menyebabkan tanah gambut
sebagian besar di 2 lokasi tersebut terapung di
atas air, yang menunjukkan bahwa kerapatan
dan kepadatan tanah gambut tidak seperti
tanah lain pada umumnya. Dari nilai berat
volume tanah () pada 2 lokasi tersebut, maka
kekuatan dan daya dukung tanah dalam
memikul beban sangat kecil.
Nilai kadar air (water content) yang
didapatkan sebesar 452.063%, nilai tersebut
lebih kecil jika dibandingkan tanah gambut
Desa Tanjung Leban sebesar 528.47%, kadar
air yang tinggi disebabkan tanah gambut
memiliki pori-pori tanah sangat besar yang
dapat menyimpan air dalam jumlah yang
sangat banyak, sehingga nilai berat volume
Gbr.1. Bagan Alir Penelitian tanah menjadi meningkat. Dokumentasi hasil
270
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
pengujian dilihat pada Gbr. 2. Berdasarkan keadaan tersebut di atas hasil
nilai pembacaan hidrometer pada puncak
meniskus larutan suspensi selalu tetap/selalu
sama dengan larutan air pada setiap waktu,
sehingga diameter ukuran butir tanah tidak
bisa didapatkan, hal tersebut sama terjadi pada
tanah gambut Desa Tanjung Leban Adapun
hasil pengujian ukuran butir melalui analisa
Gbr. 2. Hasil Pengujian Berat Volume dan Kadar
Air Tanah Gambut Asli saringan dilihat pada Gbr. 4.
Tidak terjadi
pengendapan pada
B. Hasil pengujian analisa saringan (Sieve Tanah Gambut
Analysis) dan analisa hidrometer
Pengujian analisis saringan metode kering
menunjukkan 4.78% tanah tergolong kerikil
(gravel) dan 56.31% pasir (kerikil dan pasir
bukanlah material asli yang terkandung,
melainkan sebenarnya adalah bahan organik
dan serat-serat pada tanah), serta 38.90%
tergolong lanau atau lempung (lanau dan
lempung bukanlah material asli yang
terkandung, melainkan sebenarnya adalah
bahan organik (abu organik/organic ash) dari
serat-serat yang telah terdekomposisi menjadi
tanah), seperti terlihat pada Gbr. 3. Adapun
persentase komposisi tersebut hampir sama
dengan tanah gambut Desa Tanjung Leban.
Dokumentasi hasil pengujian dilihat pada
Gbr.3.
271
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
D. Hasil pengujian batas-batas konsistensi homogen, hal ini didasarkan sifat tanah
tanah (Atterberg limit) gambut yang retensi terhadap air Tifani &
Untuk hasil uji Atterberg limit diperoleh nilai Febriani (2017).
batas cair (Liquid Limit) sebesar 191.91%, dan
batas plastis (Plastic Limit) sebesar 56.73%,
sehingga nilai indeks plastisitas tanah gambut
(Plasticity Index) sebesar 135.18% (110.07%
Tanjung Leban). Nilai indeks plastisitas tanah
gambut sangat tinggi, hal ini membuktikan
tanah gambut Pergam memiliki porositas yang
besar dibandingkan Tanjung Leban, sehingga
kemampuan tanah ini menyimpan air dalam
makroporinya juga cukup besar. Gbr. 7. Hasil Pengujian Proctor Test pada Tanah
Nilai indeks plastisitas tanah gambut yang Gambut
tinggi bukan berarti tanah tersebut bisa
dibentuk sesuai dengan sifat keplastisitasan Hasil pengujian pemadatan standar (Proctor
material tanah, pengaruh serat yang menyatu Test) tanah tersebut didapatkan nilai berat
pada unsur mikroskopik (butiran tanah) volume tanah basah (t) = 0.806 g/cm3 dengan
membuat tanah kehilangan sifat plastisitasnya nilai kadar air (w) = 101.10%, sehingga dari
Tifani & Febriani (2017). analisis berikut ditentukan nilai berat volume
Nilai batas plastis (plastic limit) sebesar tanah kering maksimum (d maks) dengan cara:
56.73% sebenarnya adalah nilai yang sangat
tinggi bagi tanah lanau dan lempung, b 0.806 g / cm3
(1)
dmaks 0.401g / cm3
sedangkan untuk tanah gambut nilai kadar air 1 w 1 1.011
tersebut tidaklah terlalu tinggi, hal ini
dikarenakan untuk membuat tanah gambut Dari nilai berat volume tanah kering
menjadi plastis dibutuhkan banyak air. Adapun maksimum (d maks) = 0.401 g/cm3 (0.449
dokumentasi hasil pengujian dapat dilihat pada Tanjung Leban) dengan kadar air optimum
Gbr. 6. (OMC) = 101.10% (95.32 Tanjung Leban)
didapatkan Perbandingan hasil grafik
pengujian pemadatan standar (Proctor Test)
pada Gbr. 8, dimana pengujian tersebut
dilakukan dengan menggunakan 6 (enam) buah
sampel uji.
272
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
(86.27 Tanjung Leban). Untuk tanah gambut Selanjutnya untuk hasil pengujian triaksial
Pergam dan Tanjung Leban memiliki nilai kondisi CU (Consolidated-Undrained) pada
kadar abu dan kadar organik yang hampir tanah gambut di gambarkan suatu grafik
sama. Adapun dokumentasi hasil pengujian Lingkaran Mohr yang menyatakan hubungan
dapat dilihat pada Gbr. 9. antara kuat geser/tegangan geser tanah (τ)
terhadap tegangan total yang bekerja pada
sampel uji selama pembebanan diterapkan (σ)
sampai sampel mengalami keruntuhan
(failure) sebesar 6.31 kg/cm2 (6.54 Tanjung
Leban). Dari grafik tersebut maka diperoleh
nilai kohesi undrained (cu) = 7.97 kN/m2 ~
0.08 kg/cm2 (6.03 kN/m2 Tanjung Leban) dan
nilai sudut geser dalam tanah (ø) = 37.09o
(38.12o Tanjung Leban), sehingga didapatkan
Gbr.9. Hasil Pengujian Kadar Abu dan Kadar nilai tegangan geser tanah (τ) = 4.85 kg/cm2
Organik pada Tanah Gambut (5.19 Tanjung Leban).
273
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
(pelepasan beban) nilai angka pori akhir (e) bersifat anisotropik di lapangan, mengingat
menjadi 2.047 (1.822 Tanjung Leban) dengan kuat geser tanah gambut yang nilainya selalu
tebal sampel akhir menjadi 1.418 cm, maka berubah sebelum mengalami keruntuhan.
penurunan akhir sampel tanah gambut akibat
tegangan (P) adalah sebesar 0.542 cm seperti
terlihat pada Gbr. 12 berikut: DAFTAR PUSTAKA
274
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Permasalahan konstruksi yang didirikan di atas tanah problematik banyak menimbulkan
kerugian. Hal itu berkaitan dengan kondisi parameter tanah problematik yang mempunyai daya dukung yang
rendah dan kompresiblitas yang cukup tinggi. Tanah problematik diantaranya adalah tanah lunak, gambut
dan clayshale. Secara umum permasalahan pada clayshale adalah apabila clayshale kontak langsung dengan
udara dan air (clayshale terekspos) dan permasalahan stabilitas lereng. Selain itu investigasi awal yang
kurang tepat, parameter yang dipakai dalam perencanaan tidak memperhitungkan perubahan karakteristik
akibat penggalian dan pelapukan yang terjadi pada clayshale. Contoh kerusakan konstruksi yang didirikan
pada batuan clayshale diantaranya adalah kelongsoran pada timbunan jalan Jalan Tol Cipularang yang
menghubungkan Jakarta dan Bandung pada tahun 2006. Deposit batuan clayshale di Indonesia tersebar di
beberapa daerah antara lain Jawa Barat, Banten, Jawa tengah, NTT, NTB, Sulawesi Selatan, Kalimantan
Timur, Sumatera Selatan dan daerah lainnya. Mengingat sebaran clay shale cukup luas maka kajian
karakterisasi dan alternatif penanganan pada konstruksi yang berada pada sebaran clayshale sangat
diperlukan dengan dimaksudkan untuk menganalisis secara lebih mendalam karakteristik fisik dan mekanik
clayshale khususnya pada ruas Jalan Tol Cipularang. Tujuan dari pengkajian ini dapat memberikan
ketepatan identifikasi terhadap karakteristik fisik dan mekanik pada tanah clayshale yang bisa memberikan
manfaat terutama dalam hal penentuan kriteria desain galian/timbunan tanah, kriteria faktor keamanan
struktur, metode pelaksanaan konstruksi, quality control & quality assurance, dan mitigasi kegagalan
struktur yang bisa diterapkan pada proyek lainnya. Adapun hasil kajian karakteristik clay shale meliputi pola
pelapukan uji sifat fisik yang meliputi hasil uji petrografi, Slake Durability, X-Ray Diffraction, pengujian
SEM), uji mekanis serta teknologi penanganannya.
Kata Kunci: clayshale, uji sifat fisik, uji sifat mekanis, stabilitas lereng, teknologi penanganan
ABSTRACT: Civil structures which are built causes on problematic soil causes many losses. These
difficulties related to the conditions of soil parameters which have low bearing capacity. Generally any clay
shale which directly contact with air and water create slope stability problem. In this case the problematic
soil include soft soil, peat soil and clay shale. In addition initial investigation that improperly conducted
resulting in accurate soil parameter. In addition design parameters used in design are not considered the
influence of excavation and weathering of clay shale. Example of structure damages that happened in clay
shale rock include landslide along The Cipularang Toll Road which happened in 2006. This toll road
connected Jakarta - Bandung. The deposits of clay shale rock in Indonesia are spread in several regions,
including West Java, Banten, Central Java, NTT, NTB, South Sulawesi, East Kalimantan, South Sumatra
and other regions. Considering that the clay shale is largely distributed a study on characterization and
alternative of construction method are considerably important. The purpose of this study is to analyze the
physical and mechanical characteristic of clay shale especially along The Cipularang Toll Road.
275
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
The objective of this study is to obtain accurate identification of characteristic of clayshale which can be
used to determine design criteria of excavation and earth embankment, factor of safety criteria, construction
method, quality control & quality assurance, and mitigation of structure damage which can be applied in
other projects. Results of this study include weathering pattern, physical and mechanical properties test. The
test include petrographic examination, Slake Durability, X-Ray Diffraction, SEM Testing. Other important
thing which shall be taken into account is selection technology to solve problem due to present of clay shale
formation.
Keywords: clayshale, physical properties test, mechanical properties test, slope stability, handling
technology
276
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
berukuran dari 0.001 – 0.1 mm. batuan ini disebut sebagai smectite) adalah mineral
bersifat mudah terfragmen dalam bentuk lempung yang lembaran-lembaran silikanya
lembaran-lembaran fragmen apabila diikat oleh gaya-gaya Van Der Waals yang
mengalami kontak langsung dengan udara sangat lemah dan kekurangan muatan negatif.
luar. Hal ini menyebabkan air dapat masuk di
antara lembaran-lembaran tersebut dan
Pada dasarnya keempat peneliti tersebut memisahkannya. Tanah-tanah yang
diatas memberikan definisi yang hampir sama mengandung mineral ini sangat berpotensi
tentang clayshale yaitu: untuk mengembang akibat kenaikan kadar air.
Clayshale merupakan batuan sedimen klastik,
berukuran halus – sangat halus (1/16 – 1/256
mm atau silt – clay) dan mempunyai sifat 2.3 Penyebaran Clayshale
menyerpih yang paralel terhadap bidang Deposit batuan clayshale di Indonesia tersebar
perlapisan, hal ini terjadi oleh proses atau di beberapa daerah antara lain Jawa Barat,
gaya-gaya mekanik yang terjadi pada proses Banten, Jawa tengah, NTT, NTB, Sulawesi
sedimentasi, umumnya mengandung bahan Selatan, Kalimantan Timur, Sumatera Selatan
organik dan mineral karbonat dalam jumlah dan daerah lainnya seperti ditunjukkan pada
kecil namun terkadang beberapa diantaranya Gbr. 1.
terdapat dalam jumlah yang melimpah,
terbentuk karena akumulasi dari fragmen /
hancuran-hancuran batuan yang telah ada
sebelumnya.
277
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Ketebalan 6 – 7 m
Warna abu-abu kehitaman,
abu-abu kecoklatan -
kekuningan. Kondisi lapuk 3.2 Pengujian Laboratorium Tanah
sedang, sebagian telah berubah
menjadi tanah. Sifat kaku – Pengujian laboratorium untuk contoh uji
keras. Struktur sedimen mud
Horizon B crack. Ukuran butir lempung. clayshale adalah analisis petrografi, slake
Sortasi baik. Tingkat durability, X-ray diffaction, SEM dan analisis
kebundaran baik. Komposisi kimia.
mineral fragmen dan matriks
berupa mineral lempung
dengan semen silika. Tabel 3. Jenis-jenis Pengujian laboratorium
Ketebalan 1 – 2 m terhadap Clayshale
Warna abu-abu kehitaman
- kekuningan. Kondisi lapuk Jenis pengujian
ringan, di mana terjadi Standar
dilaboratorium
perubahan warna pada
permukaan batuan. Sifat Analisis Petrografi SNI 7573:2010
batuan keras. Struktur sedimen Slake durability SNI 03-3406-1994
mud crack. Ukuran butir
Horizon C lempung. Sortasi baik. Tingkat
X-ray diffaction -
kebundaran baik. Komposisi SEM -
mineral fragmen dan matriks 5 Analisis kimia SNI 13-3608-
berupa mineral lempung
dengan semen silika. 1994
Orientasi fissure acak dan
tidak teratur dengan skala
orientasi kecil sehingga tidak
dapat diukur. Bentuknya Jenis Pengujian Standard
menyerupai sisik kulit ikan. Analsiis Petrografi
Slake durability SNI
X-ray diffraction SEM 7573:2010
3 METODELOGI Analisis kimia
3.1 Penyelidikan di Lapangan
Penyelidikan lapangan terhadap clayshale 4 HASIL dan PEMBAHASAN
dilakukan untuk mengambil sampel yang
selanjutnya akan dilakukan pengujian 4.1 Hasil Penyelidikan Lapangan dan
laboratorium. Sewaktu dilakukan pengambilan Laboratorium
sampel uji, dilakukan juga pengamatan terhadap Penyelidikan lapangan dan pengambilan
pola pelapukan dan fissure yang terjadi. Jenis- sampel untuk clayshale dilakukan dengan
jenis penyelidikan lapangan yang dilakukan dengan penyayatan tebing dan sumur uji
adalah sebagai berikut : untuk sampel pemukaan, serta pemboran
mesin untuk sampel yang dalam.
Tabel 2. Jenis-jenis Penyelidikan Lapangan Sampel yang telah diambil kemudian
terhadap Clayshale dilakukan pengujian untuk mengetahui
Jenis penyelidikan karakteristiknya. Berikut ini disajikan
Standar
lapangan rekapitulasi pengujian terhadap clayshale
Sumur uji SNI 03-6376-2000 yang telah dilakukan sebagai berikut:
Penyayatan
- 4.2 Kondisi Geologi Regional
tebing/bukit
Gbr. 1 memperlihatkan distribusi material
geologi di sepanjang Jalan Tol Cipularang.
Jenis penyelidikan Standar Jalan Tol Cipularang terletak pada daerah
lapangan yang didominasi endapan Breksi Volkanik
SNI 03-6376- (Qos), Miocene Djatiluhur Marl (Mdm) dan
Sumur uji Miocene Subang Clay (Msc). Dari gambar
2000
Penyayatan - tersebut terlihat bahwa seksi IV.1 terletak
tebing/bukit pada deposit Breksi Volkanik, Qos. Material
Breksi Volkanik ini merupakan material
fragmen yang berada dalam matriks. Ukuran
fragmen tersebut adalah antara kerikil–kerakal
278
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
sedangkan matriksnya terdiri dari pasir
volkanik yang bersifat porous. Material Breksi
Volkanik ini dapat dikatakan mempunyai
stabilitas batuan yang relatif baik.
Material Qos ini mengandung tufan yang
mudah menjadi lapuk akibat konsentrasi air
pada lapisan ini menjadi lempungan, sehingga
dapat berpotensi menjadi bidang perlemahan. Gbr.2 Distribusi Material Geologi Jalan Tol
Cipularang
76 +700 A
LS 6,6364650
BT 107,424740
1 A
91 + 250 B
2 B
95 + 800 B
LS 6,66190
3 BT 107,439030 A
4 95 + 900 A A
LS 6,657000
BT 107,431330
279
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
LOKASI/
NO PETA LOKASI HORIZON FOTO
KM
96 + 200 A
5 B
97 + 400 A
LS 6,670980
6 BT 107,441180
A
108 + 200 B
LS 6,898310
7 BT 107,695540
A
280
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Berikut adalah penjelasan masing-masing hasil
pengujian Laboratorium :
Kuarsa (2%) : Tidak berwarna, bentuk
A. Hasil Pengujian Analisis Petrografi membulat tanggung –
membulat, ukuran (0,05 –
0,5 ) mm, penggelapan
bergelombang.
Tabel 6. Analisis Petrografi untuk Lokasi Nama batuan : Breksi
Km 76 + 700 A Petrogenesa ; Batuan asal breksi
diinterpetasikan berasal
Nomor Sampel : 76 + 700 A dari batuan tuf breksi,
Kenampakan : Warna hitam, klastik, kemudian mengalami
Megaskopis sedikit berfragmen berupa alterasi (ubahan).
batuan volkanik jenis Kegunaan : Untuk urug.
obsidian ukuran diameter
(2 mm – 0,5 cm), terdapat
kesan berlapis,
komposisinya mineral 4.3 Kandungan Mineral Clayshale Jalan Tol
lempung sebagai matriks Cipularang
dan fragmen batuan.
Nama Megaskopis : Breksi terlapukkan.
Batuan
Kenamapakan : Sayatan tipis batuan
Mikroskopis menunjukkan tekstur
klastik, bentuk butiran
membulat tanggung –
menyudut tanggung,
ukuran butir dan fragmen
(0,05 – 2) mm, kemas
terbuka, komposisi terdiri
dari : mineral lempung Fotomikrografi Breksi.
mengalami oksidasi Keterangan : Fb - fragmen batuan (batupasir/ bps,
berwarna merah –
kehitaman menunjukkan batulempung pasiran/ lps, obsidian/ Ob), mineral
struktur aliran yang Mlp – mineral lempung, Op - mineral opak, Mk –
diinterpretasikan sebagai mika, Ku – kuarsa.
hasil hasil ubahan dari
gelas volkanik, fragmen Gbr. 3. Kandungan Mineral Clayshale Jalan Tol
batuan (batupasir, Cipularang
batulempung pasiran, dan
batuan berkomposisi gelas
volkanik), mineral opak,
mika, kuarsa.
Diskripsi
Mineralogi
Mineral lempung : Warna merah – kehitaman
(52%) sebagai matriks di dalam
batuan mengalami
oksidasi, didapatkan paling
dominan.
Fagmen batuan : Bentuk membulat tanggung
(40%) – menyudut tanggung,
ukuran (0,5 – 2) mm, Gbr. 4. Grafik Pengujian Slake Durability untuk
terdiri dari batupasir, Lokasi Km 76 + 700 A
batulempung pasiran, dan
fragmen batuan
berkomposisi gelas
volkanik. B. Hasil Pengujian Slake Durability
Mineral opak 3%) : Berwarna hitam, membulat
tanggung, ukuran (0,05 – Hasil pengujian slake durability pada sampel
0,5) mm. ini mendapatkan hasil very low, di mana
Mika (3%) : Tidak berwarna, bentuk sampel sudah rusak pada siklus pertama.
menyudut – pipih, ukuran
(0,05 – 0,5) mm,
penggelapan sejajar,
biasrangkap kuat.
281
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Tabel 7. Rekapitulasi Mineral Jalan Tol Cipularang
76 + 700 91 + 250 95 + 800 95 + 900 96 + 200 97 + 400 108 + 200
Lokasi (Km)
A B B A A A B
Mineral yang terkandung Kuarsa, Kuarsa, Kalsit, Kalsit, Kuarsa, Kuarsa, Halosit,
pirit, muskofit, kuarsa, kuarsa, muskofit, siderit, gutit
nakrit, hastingsi klinoklor, laumoniti anortit, kaolinit,
anortit t, anortit, albit t, albit kaolinit kalsit,
kaolinit anortit
282
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
4.4 Kandungan Kimia Clayshale Jalan Tol yang juga dikenal dengan nama bijih besi.
Cipularang Salah satu senyawa oksida dari besi ini
Kandungan kimia pada clayshale jalan Tol mempunyai sifat paramagnetik.
Cipularang jika dipresentasekan adalah sebagai
berikut :
4.5 Derajat Pelapukan dan Pola Fissure
Tabel 8. Persentase Kandungan Kimia Clayshale Clayshale Jalan Tol Cipularang
Jalan Tol Cipularang Semua jenis batuan yang tersingkap di
Unsur Persentase permukaan bumi akan mengalami proses
Kimia Kandungan Kimia pelapukan. Cepat atau lambatnya pelapukan
SiO2 36.3 - 59.5 tersebut dipengaruhi oeh atmosfer, aspek
Al2O3 13.65 - 30.5 kimia, biologis, tekstur dan struktur batuan
Fe2O3 3.78 - 14.82
serta komposisi mineralnya. Pelapukan
merupakan proses alamiah, bagi batuan
K2O 0.052 - 2.27
pelapukan adalah upaya untuk menyesuaikan
Na2O 0.11 - 3.81 dengan lingkungan ketika tersingkap di
CaO 0.015 - 8.99 permukaan bumi atau berada pada tingklatan
MgO 0.12 - 6 tertentu di bawah permukaan bumi di mana
TiO2 0.97 - 2.58 faktor-faktor yang mempengaruhi seperti
MnO 0.033 - 0.54 tersebut di atas masih berperan.
P2O5 0.12 - 0.63 Pada prinsipnya, pelapukan dapat
LOI 6.01 - 14.88 dikelompokkan dalam tiga tipe; yaitu
H2O 0.4 - 1.4 pelapukan secara fisika, kimia dan biologi.
Pelapukan secara fisika termasuk segala
Unsur kimia yang dominan pada analisis sesuatu yang menyebabkan penghancuran
kimia ini adalah SiO2 (silikon dioksida), yang batuan tanpa mengalami perubahan secara
juga dikenal sebagai silika (dari silex Latin). kimia dan mineralogi. Proses tersebut dapat
Silika ini telah dikenal sejak zaman dahulu meningkatkan luas permukaan reaktif sehingga
karena kekerasannya. Silika ini paling sering mendukung terjadinya dekomposisi batuan
ditemukan di alam sebagai pasir atau kuarsa, oleh reaksi kimia dengan air, oksigen dan
serta di dinding sel diatom. Pada sebagian karbon dioksida yang berlimpah di lingkungan
besar silikat, atom Si menunjukkan koordinasi permukaan. Rekasi kimia yang berasosiasi
tetrahedral, dengan 4 atom oksigen yang dengan pelapukan di antaranya adalah hidrasi,
mengelilingi sebuah atom Si pusat. Contoh hidrolisis dan oksidasi. Hidrasi adalah
yang paling umum adalah dilihat dalam bentuk penyerapan molekul air ke dalam struktur
Kristal kuarsa SiO2 silika. Pada masing – kristal suatu mineral. Hidrolisis merupakan
masing bentuk Kristal yang paling reaksi kimia yang menghasilkan atau
termodinamika stabil silika, rata – rata, semua mengambil ion H atau OH. Sedangkan
4 dari simpul (atau oksigen atom) dari tetra oksidasi adalah reaksi kimia dari suatu materi
hedra SiO4 dibagi dengan orang lain, dengan oksigen, merupakan cirikhas
menghasilkan rumus kimia bersih: SiO2. lingkungan aerasi dalam zona-zona pelapukan.
Unsur kimia yang kedua terbanyak muncul Aktifitas biologi baik secara langsung maupun
adalah Al2O3 (aluminium oksida). Nama tidak langsung memberikan kontribusi pada
mineralnya adalah alumina, dan dalam bidang pelapukan secara fisika maupun kimia.
pertambangan, keramik dan teknik material Sistem klasifikasi derajat pelapukan batuan
senyawa ini lebih banyak disebut dengan nama pada intinya merupakan suatu urutan dari
alumina. Aluminium oksida adalah insulator perbedaan derajat pelapukan batuan.
(penghambat) panas dan listrik yang baik. Perubahan di sini menyangkut perubahan sifat-
Umumnya Al2O3 terdapat dalam bentuk sifat keteknikannya (Dearman, 1976).
kristalin yang disebut corundum atau α- Intewrnational Association of Engineering
aluminum oksida. Al2O3 dipakai sebagai Geology (IAEG) Commision on Engineering
bahan abrasif dan sebagai komponen dalam Geological Mapping memasukkan sistem
alat pemotong, karena sifat kekerasannya. klasifikasi ini dalam deskripsi dan klasifikasi
Unsur kimia selanjutnya yang sering batuan dan tanah. Skema dasar sistem
muncul adalah Fe2O3 atau besi (III) oksida klasifikasi derajat pelapukan batuan
berdasarkan IAEG adalah sebagai berikut.
283
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Tabel 9. Skema Dasar Sistem Klasifikasi Derajat Berdasarkan pengamatan lapangan, derajat
Pelapukan Batuan Berdasarkan IAEG pelapukan clayshale pada ruas Jalan Tol
Istilah Derajat Pemerian Cipularang termasuk dalam batuan segar
Seluruh material hingga lapuk kuat (I – IV). Pola fissure yang
batuan telah berubah terbentuk sangat sulit untuk diukur dan
Tanah ditentukan arahnya karena acak dan tidak
VI menjadi tanah. Struktur
residu asli massa batuan dan teratur, karena clayshale pada lokasi ini
tekstur material batuan dipengaruhi oleh struktur geologi (sesar naik
telah hancur. dan mendatar).
Seluruh material
batuan tekah
Lapuk terdekomposisi dan/
V atau terdesintergrasi
sempurna
menjadi tanah. Struktur
asli massa batuan
masih dapat diamati.
Lebih dari 50 %
dari material batuan
telah terdekomposisi
dan/ atau
terdesintergrasi
Lapuk menjadi tanah. Batuan
IV segar atau batuan telah
Lapuk kuat
mengalami perubahan Gbr. 7. Pola Fissure Permukaan di Jalan Tol
warna dapat hadir Cipularang
sebagai suatu kerangka
sistem diskontinuitas
4.6 Permasalahan dan Alternatif Penanganan
atau sebagai inti batu
Clayshale
(corestone)
Kurang dari 50 % Secara umum permasalahan pada clayshale
material batuan telah adalah apabila clayshale yang yang kontak
terdekomposisi dan/ langsung dengan udara dan air (clayshale
atau terdesintergrasi terekspos) dan permasalahan stabilitas lereng.
menjadi tanah. Batuan Clayshale yang terekspos dapat mengalami
Lapuk
III segar atau batuan telah penurunan durabilitasnya secara cepat. Solusi
sedang mengalami perubahan untuk permasalahan tersebut adalah dengan
warna dapat hadir menghindari kontak clayshale dengan udara
sebagai suatu kerangka dan air secara langsung, salah satunya dengan
sistem diskontinuitas shotcrete.
atau sebagai inti batu
(corestone)
Telah terjadi
Lapuk perubahan warna pada
II permukaan material
ringan
batuan dan permukaan
diskontinuitas.
Tidak terlihat
adanya tanda-tanda
pelapukan material
Batuan
I batuan; kemungkinan
segar terdapat sedikit
perubahan warna pada Gbr. 8. Pekerjaan Shotcrete pada Lereng
permukaan
diskontinuitas utama.
284
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Pada permasalahan stabilitas lereng, 5.2 Kandungan Mineral Clayshale
alternatif penanganan yang dapat dilakukan
adalah pelandaian lereng dengan metode Berdasarkan hasil pengujian x-ray diffaction
piling. Pelandaian lereng berfungsi untuk yang telah dilakukan dapat diketahui
mengurangi gaya dorong (Gbr.8). Sedangkan kandungan mineral dari Jalan Tol Cipularang
metode piling digunakan untuk memperkuat yang sering muncul adalah kuarsa (pada
resistensi terhadap beban. Metode piling yang seluruh lokasi pengambilan sampel, kecuali
bisa digunakan berupa sheet pile atau bore pada lokasi Km 108 + 200 B). Mineral
pile. selanjutnya yang sering muncul adalah kalsit
dan kaolinit.
DAFTAR PUSTAKA
Gbr. 11. Pelaksanaan Pemasangan Bor Pile
American Society for Testing Materials. 1998. D4644-
87, Standard Test Method for Slake Durability of
Shales and Similar Weak Rocks.
5 KESIMPULAN Billing, M.P. 1982. Structural Geology. Second Edition,
Printed Hall Inc., USA.
5.1 Kondisi Geologi Regional Botts, M.E. 1986. The Effects of Slaking on the
Engineering Behavior of Clay Shales. Doctoral
Dari gambar distribusi material geologi di Thesis Submitted to University of Colorado, USA.
sepanjang Jalan Tol Cipularang terletak pada Davis, G.H. 1942. Structural Geology of Rock and
daerah yang didominasi endapan breksi Region. John Welley and Sons Inc., New York.
volkanik (Qos), Miocene Djatiluhur Marl Kerr, P.F. 1959. Optical Mineralogy. Third Edition,
(Mdm) dan Miocene Subang Clay (Msc). McGraw Hill Book Company Inc., New York.
285
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Lupini, J.F., Skinner, A.E. & Vaughan, P.R. 1981. The Thorne, C.P. 1984. Strength Assessment and Stability
drained residual strength of cohesive soils. Analyses for Fissured Clays. Geotechnique 34, No.
Geotechnique 31, No. 2 : 181-213. 3, 305-322.
Moore, R. 1991. The Chemical and Mineralogical Tika, Th. E. & Hutchinson, J.N. 1999. Ring Shear Tests
Controls Upon The Residual Strength of Pure and on Soil From the Vaiont Landslide Slip Surface.
Natural Clays. Geotechnique 41, No. 1 : 35-47. Geotechnique 49, No. 1, 59-74.
Prinz, M., Harlow, G., Peters, J. 1988. Rocks and Travis, R.B. 1955. Classification of Rock, Vol. 50, No.
Minerals, Simon and Schuster Inc., New York- 1, Colorado School of Mines, Goldon Colorado,
London-Toronto-Sydney-Tokyo. USA.
Rahardjo, P.P., Margono, M. & Widjaja, B. 2000. Study Widjaja, B. 2002. Faktor Adhesi untuk Perancangan
on Clayshale at Bukit Sentul Bogor. Pondasi Tiang Bor pada Clayshale.
Skempton, A.W. 1985. Residual Strength of Clays in Williams, H., Turner, F.J., Gilbert, C.M. 1982.
Landslide, Folded Strata and the Laboratory. Petrography an Introduction to Study of Rocks in
Geotechnique 35, No. 1, 3-18. Thin Section, W.H. Freeman and Company, New
Setianto, S.P dkk. 2004. Penelitian Stabilitas Lereng York.
Untuk Deposit Serpih. Puslitbang Jalan & Jembatan.
286
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Indonesia merupakan negara yang berada pada zona gempa bumi aktif. Sejak gempa bumi Aceh
tahun 2004 hingga gempa bumi Palu tahun 2018, telah terjadi beberapa kali fenomena likuifaksi. Fenomena
ini mengakibatkan tanah kehilangan kekuatannya yang diikuti dengan longsoran tanah, penyebaran tanah arah
lateral atau penurunan tanah yang besar. Penelitian ini bertujuan untuk mengetahui pengaruh pumice pada
potensi likuifaksi pasir mengandung pumice. Persen pumice yang digunakan adalah 10%, 30% dan 50% dari
berat kering pasir. Model uji dibentuk dengan kerapatan relatif 30% menggunakan metode dry pluviation.
Time-history percepatan merupakan beban siklik berbentuk gelombang sinus. Hasil uji shaking table
memperlihatkan bahwa kondisi likuifaksi belum terjadi pada amplitudo percepatan 0.35g dan durasi 7 detik.
Pada amplitudo percepatan 0.38g dengan durasi 60 detik, model uji pasir mengalami likuifaksi pada 7 detik
setelah uji dimulai. Analisis hasil rekaman transducer menunjukkan bahwa pasir dengan kandungan pumice
sebesar 50% secara signifikan mengurangi tekanan air pori sebesar 85%.
Kata Kunci: pasir, pumice, likuifaksi, shaking table
ABSTRACT: Indonesia is a country that is in an active earthquake zone. Since the Aceh earthquake in 2004
to the Palu earthquake in 2018, there have been several phenomena of liquefaction after earthquake event. This
phenomenon has resulted in soil loss of strength followed by flow slide, lateral spreading or large land
subsidence. This study aims to determine the effect of pumice on the liquefaction potential of pumice-
containing sand. The percent of pumice used is 10%, 30% and 50% of the dry weight of sand. The test model
was formed with a relative density of 30% using dry pluviation method. Acceleration time history is a cyclic
sine wave load. Shaking table test results show that liquefaction conditions have not occurred at an acceleration
amplitude of 0.35g and a duration of 7 seconds. At an acceleration amplitude of the 0.38g with a duration of
60 seconds, the sand test model underwent liquefaction at 7 seconds after the test began. Analysis of the results
of transducer records showed that sand with a 50% pumice content significantly reduced pore pressure by 85%.
Keywords: sand, pumice, liquefaction, shaking table
287
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
tidak hanya munculnya semburan pasir halus kecil dibandingkan dengan ukuran model tanah
bercampur air dari lubung-lubang tanah (sand sehingga sedikit berpengaruh pada perilaku
boil) dan pergerakan tanah arah lateral (lateral tanah, nilai-nilai pengukuran terdistribusi
spreading). Namun, fenomena perpindahan merata di dalam tanah, dan perubahan yang
massa yang besar juga terjadi akibat aliran pasir terjadi selama pengujian dapat diperoleh dari
halus seperti yang terjadi di Kota Palu (kasus peralatan yang dipasang di lokasi yang berbeda
Desa Petobo dan Ballaroa). (Ueng, 2006).
Kusumawardani dkk. (2014) menjelaskan Beberapa penelitian telah dilakukan dengan
bahwa pasir halus dengan kerapatan relatif (D ) menggunakan uji shaking table, diantaranya:
= 25% akan lebih mudah terlikuifaksi Hasmar (2007), Maheshwari et al. (2008),
dibandingkan dengan yang memiliki D = 60%. Özener et al. (2009), Pathak et al. (2010),
Liu et al. (2015) dan Orense et al. (2012) Pathak et al. (2013a), Pathak and Patki (2013b),
menyimpulkan bahwa pasir Toyoura dengan Varghese and Latha (2014), Baneerje et al.
kepadatan relatif 50% lebih mudah mengalami (2017), dan Mase (2017).
likuifaksi dibandingkan dengan pasir pumice
yang memiliki kepadatan relatif sebesar 25%.
Liu et al. (2015) mencampur pasir pumice 2 METODE PENELITIAN
dengan pasir sungai Mercer dengan
perbandingan volume 1:1. Hasil uji siklik
2.1 Material sampel
memperlihatkan bahwa kekuatan siklik dari
campuran pasir Sungai Mercer dan pumice Pada penelitian ini, material pasir diambil dari
lebih rendah dibandingkan dengan kekuatan Desa Maguwoharjo Kecamatan Depok
siklik pasir pumice untuk kerapatan relatif yang Kabupaten Sleman, Provinsi D.I. Yogyakarta.
sama. Menurut Soebowo dkk. (2007) dan Lee et al.
Penelitian ini bertujuan untuk mengetahui (2006), di lokasi ini pernah terjadi fenomena
pengaruh kandungan pumice pada pasir likuifaksi berbentuk sand boil saat gempa bumi
terhadap nilai rasio kelebihan tekanan air pori. melanda Yogyakarta tahun 2006.
Nilai rasio kelebihan tekanan air pori Pumice atau batu apung merupakan hasil
merupakan perbandingan antara kelebihan erupsi gunung api. Material pumice yang
tekanan air pori terhadap nilai tegangan efektif digunakan pada penelitian ini diambil dari Desa
pada kedalaman yang ditinjau. Kondisi Kebon Talo Kecamatan Ampenan Utara Kota
likuifaksi dianggap terjadi jika nilai rasio Mataram Provinsi Nusa Tenggara Barat.
kelebihan tekanan air pori mencapai angka satu. Endapan pumice yang terdapat di Pulau
Uji shaking table merupakan salah satu tipe Lombok berasal dari letusan Gunung Rinjani
uji eksperimental untuk mengevaluasi potensi beberapa ratus tahun yang lalu.
likuifaksi berdasarkan data pembacaan tekanan
air pori selama pengujian. Penggunaan shaking
table untuk memodelkan fenomema likuifaksi
dianggap dapat menggambarkan kondisi
sebenarnya di lapangan. Kelebihan shaking
table sebagai uji model diantaranya: amplitudo
besar dapat dikontrol dengan baik, input motion
dapat dimodelkan dari segala arah,
pengambilan data lebih mudah dilakukan, dan
model uji ini sangat baik digunakan untuk
memvalidasi model numerik atau untuk
memahami mekanisme keruntuhan (Prasad et
al., 2004).
Penggunaan model uji yang berukuran besar
seperti pada uji shaking table memberikan Gbr. 1. Distribusi Ukuran Butir Pasir dan Pumice
beberapa kelebihan, yaitu: pembebanan pada yang Digunakan pada Penelitian, Serta Zona
Potensi Likuifaksi Berdasarkan Kurva Tsucida
tanah dapat disimulasi mendekati kondisi di (1970)
lapangan, kondisi batas sedikit berpengaruh
pada model uji, lebih mudah untuk memasang Untuk mencapai tujuan penelitian, kurva
alat pengukur di samping model uji, ukuran alat gradasi pasir dan pumice yang digunakan pada
yang digunakan untuk pengukuran relatif lebih
288
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
penelitian ini dirancang untuk berada pada zona penjenuhan dan tempat memasang alat
berpotensi likuifaksi berdasarkan kurva gradasi pengukur tekanan air pori (pore pressure
Tsucida (1970). Gbr. 1 memperlihatkan transducer). Gbr. 2a memperlihatkan kotak
distribusi ukuran butir pasir dan pumice yang sampel yang akan digunakan pada penelitian
digunakan. Distribusi ukuran butir pasir berada ini.
pada zona paling berpotensi likuifaksi (antara
kurva a - a’), sedangkan distribusi ukuran butir
pumice berada pada zona berpotensi likuifaksi
hingga paling berpotensi likuifaksi (antara
kurva b – a’).
Untuk model uji pasir mengandung pumice,
persen pumice yang digunakan adalah 10%,
30% dan 50% dari berat kering pasir.
289
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Input motion yang digunakan pada uji tekanan air pori. Katup di ujung saluran keluar
shaking table adalah time history percepatan dari transducer dibuka sesaat, kemudian
yang dihasilkan pada proses equalize. Time ditutup kembali. File untuk satu kali
history ini direkam oleh accelerometer yang pembacaan tekanan air pori dibuat pada laptop.
berada di atas meja getar, dan meja dalam Setelah semua siap, Software DANCE mulai
kondisi tanpa beban. Time history percepatan diaktifkan, dan pastikan bahwa tekanan
pertama memiliki amplitudo sebesar 0.35g aktuator stabil di angka 3,000 psi. Tombol ON
terdiri dari 9 siklik dengan durasi waktu 7 detik. pada aktuator ditekan dan meja getar akan
Nilai amplitudo percepatan kedua adalah 0.38g bergerak sesuai perintah dari software
dengan jumlah siklik 120 dan durasi waktu 60 DANCE. Tabel 1 memperlihatkan rancangan
detik. model uji shaking table yang dilakukan.
Nilai peningkatan tekanan air pori yang
terekam oleh transducer harus dikalibrasi
2.3.2 Persiapan sampel sesuai dengan nilai yang digunakan saat
Sebelum meja getar bergerak, harus dipastikan kalibrasi transducer dan data logger.
bahwa kondisi transducer siap untuk mengukur
290
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Tabel 2. Sifat Fisik Pasir dan Pumice terekam oleh transducer sesaat setelah uji
No. Sifat fisik Pasir Pumice dimulai.
1. Berat jenis tanah, 2.69 2.28
Kadar air tanah,
2. (%) 26.33 114.37
w
3. Analisa gradasi
Kerikil (%) 3.67 22.23
Pasir (%) 89.32 69.75
Lanau dan
(%) 7.01 8.02
lempung
D50 (mm) 0.45 1.2
5.9 23.53
1.06 0.32
4. Atterberg limit NP NP
Gbr. 4. Kelebihan tekanan air pori yang terekam
5. Klasifikasi tanah SW-SM SP-SM
oleh transducer ( = 0.35g dengan durasi 7
Berat isi tanah detik)
6. (g/cm3) 1.59 0.54
kering,
Berat isi tanah Pada level ini, penambahan 30% pumice
7. (g/cm3) 2.01 1.16
basah, pada model uji pasir dapat mereduksi tekanan
8. Angka pori, e 0.69 3.22 air pori sebesar 71%.
3.2 Analisis hasil uji shaking table 3.2.2 Rasio kelebihan tekanan air pori untuk
amplitudo percepatan 0.38g
3.2.1 Rasio kelebihan tekanan air pori untuk Gbr. 5 menjelaskan kelebihan tekanan air pori
amplitudo percepatan 0.35g yang direkam oleh transducer pada elevasi 0.40
m dari dasar kotak sampel. Pada model uji
Uji shaking table pertama dilakukan pada pasir pasir, PPT merekam kelebihan tekanan air pori
menggunakan percepatan 0.35g dengan durasi maksimum sebesar 1.3 kPa setelah uji shaking
guncangan 7 detik. Pada uji pasir, tekanan air berlangsung selama 7 detik. Pada elevasi ini
pori yang terekam oleh transducer cenderung tegangan efektif model uji pasir adalah 0.84
mengalami peningkatan. Namun saat durasi kPa. Kondisi ini menggambarkan bahwa
guncangan telah selesai, nilai tekanan air pori likuifaksi terjadi sesaat setelah uji shaking
berkurang sesaat kemudian meningkat lagi dan dimulai. Pada model uji pasir mengandung 10%
mencapai nilai maksimum. pumice, setelah 4 detik uji shaking berlangsung,
Rasio kelebihan tekanan air pori ( ) PPT merekam kelebihan tekanan air pori
maksimum yang dihasilkan pada uji pasir sebesar 0.8 kPa. Tegangan efektif pada elevasi
adalah 0.84 dan nilai tegangan efektif pada ini adalah 0.78 kPa sehingga kondisi likuifaksi
elevasi ini adalah 0.83 kPa. Oleh karena pada juga dianggap terjadi pada elevasi ini.
aplikasi percepatan 0.35g belum menghasilkan
Pada saat t = 38 detik kelebihan tekanan air
fenomena likuifaksi pada model uji pasir, maka pori yang terjadi pada pasir dan pasir
uji shaking table dengan menggunakan mengandung 10% pumice adalah 1.1 kPa.
amplitudo percepatan ini hanya dilanjutkan
Menjelang uji shaking berakhir, pada t = 51
pada pasir mengandung 30% pumice. detik hingga t = 58 detik kelebihan tekanan air
Gbr. 4 memperlihatkan kurva kelebihan pori pasir dan pasir mengandung 10% pumice
tekanan air pori yang terekam oleh transducer adalah 1.0 kPa. Nilai kelebihan tekanan air pori
pada elevasi 0.40 m dari dasar kotak sampel.
pasir masih lebih tinggi hingga pengukuran
Pada model uji pasir, tekanan air pori berakhir.
maksimum sebesar 0.7 kPa tercapai setelah 9 Kelebihan tekanan air pori maksimum akibat
detik dari sejak uji dimulai, kemudian disipasi penambahan 10% pumice adalah 1.1 kPa yang
kelebihan tekanan air pori mulai terlihat 3 detik dicapai setelah 10 detik uji shaking
setelah uji shaking selesai. Pada model uji pasir berlangsung, dan penambahan 10% pumice
mengandung 30% pumice, peningkatan pada model uji pasir dapat mereduksi tekanan
kelebihan tekanan air pori sebesar 0.2 kPa air pori sebesar 15%. Kelebihan tekanan air pori
maksimum akibat penambahan 30% pumice
adalah 0.5 kPa yang dicapai setelah 6 detik uji
291
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
shaking berlangsung, dan penambahan 30% 4 KESIMPULAN
pumice dapat mereduksi tekanan air pori
sebesar 62%. Selanjutnya, kelebihan tekanan Berdasarkan pembahasan di atas, dapat
air pori maksimum yang diperoleh akibat
penambahan 50% pumice adalah 0.3 kPa, dan disimpulkan sebagai berikut:
penambahan 50% pumice ini dapat mereduksi a. Pasir memiliki berat volume lebih besar
tekanan air pori sebesar 85%. (1.59 g/cmᶟ) dari berat volume yang dimiliki
pumice (0.54 g/cmᶟ). Dan angka pori pumice
(3.22) lebih besar dari pasir (0.69), hal ini
menandakan bahwa rendahnya nilai berat
volume kering pumice disebabkan oleh
banyaknya rongga yang terdapat pada
partikel pumice.
b. Pada uji shaking table dengan amplitudo
percepatan 0.35g durasi 7 detik, model uji
pasir belum memperlihatkan kondisi
terlikuifaksi. Penambahan 30% pumice
mengakibatkan reduksi tekanan air pori
sebesar 71% pada model uji ini.
c. Pada amplitudo percepatan 0.38g, model uji
pasir mengalami likuifaksi pada t = 7 detik
setelah uji dimulai. Penambahan 10%
Gbr. 5. Pengaruh Variasi Pumice terhadap pumice pada pasir juga masih
Reduksi Tekanan Air Pori pada Elevasi 0.40 m
dari Dasar Kotak Sampel (D = 30% dan = memperlihatkan kondisi likuifaksi yang
0.38g durasi 60 detik) terjadi pada t = 4 detik setelah uji shaking
dimulai. Penambahan 50% pumice dapat
Gbr. 6 memperlihatkan kecenderungan mereduksi tekanan air pori pada model uji
reduksi tekanan air pori pada elevasi 0.40 m pasir mengandung pumice sebesar 85%.
dari dasar kotak sampel, yang diambil pada t = d. Persentase penambahan pumice (x) terhadap
10 detik hingga t = 20 detik. Seperti dijelaskan peningkatan kelebihan tekanan air pori (y)
sebelumnya, pada durasi ini penambahan menghasilkan model regresi linear. Pola
pumice sebesar 10%, 30% dan 50% dapat kecenderungan yang terbentuk adalah =
mereduksi tekanan air pori pada model uji pasir −0.0229 + 1.2898.
mengandung pumice sebesar 15%, 62% dan
85%. Pola kecenderungan yang terbentuk
akibat penambahan pumice merupakan regresi DAFTAR PUSTAKA
linear dengan persamaan = −0.0229 +
1.2898. Dengan x adalah persen pumice dan y Banerjee, R., Konai, S., Sengupta, A., & Deb, K. 2017.
Shaking Table Tests and Numerical modeling of
adalah peningkatan kelebihan tekanan air pori. Liquefaction of Kasai River Sand. Geotechnical
Geology Engineering. 35:1327-1340. DOI
10.1007/s10706-017-178-z.
Hasmar, H. 2007. Evaluasi Potensi Likuifaksi Akibat
Gempa Bumi Tektonik Lapisan pasir Jenuh Air
dengan Metode Shaking Table (Studi Kasus pada
Lapisan Pasir Kali Krasak Yogyakarta). LOGIKA
Vol. 4 No. 1. Januari 2007.
Kusumawardani, R. Suryolelono, K.B. Suhendro, B., dan
Rifa’i, A. 2014. The Loading Frequency Effects of
Yogyakarta’s sand Under Cyclic Triaxial Testing.
International Journal of Civil & Environmental
Engineering, IJCEE-IJENS, 14(02): 7-12.
Liu, L., Orense, R.P., and Pender, M.J. 2015. Crushing-
induced Liquefaction Characteristics of Pumice
Sand. NZSEE Conference.
Maheshwari, B.K., Kaynia, A.M., and Paul, D.K. 2008.
Gbr. 6. Kecenderungan Reduksi Tekanan Air Liquefaction Susceptibility of Soil in Himalayan
Pori terhadap Persentase Penambahan Pumice Region. The 14th World Conference on Earthquake
Engineering. October 12-17. Beijing. Cina.
Mase, L.Z. 2017. Experimental Liquefaction Study of
Southern Yogyakarta Using Shaking Table, Jurnal
Teknik Sipil Vol. 24 No.1: 11-18.
292
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Muntohar, A.S. 2014. Research on Earthquake Induced Advances in Geotechnical Earthquake Engineering
Liquefaction in Padang City and Yogyakarta Areas. and Soil Dynamics. 13. (2010)
Jurnal Geoteknik HATTI IX. 1(2014), ISSN 0853 – http://scholarsmine.mst.edu/icrageesd/05icrageesd/s
4810: 1-9. ession04/13
Orense, R.P., Pender, M.J., and O’Sullivan, A.S. 2012. Pathak, S.R., and Patki, M.A. 2013. Strain Criterion for
Liquefaction Characteristics of Pumice Sands. EQC Initiation of Liquefaction Using Shake Table Test.
Project 10/589. March. International Journal of Engineering Research &
Özener, P.T., Özaydin, K., & Berilgen, M.M. 2009. Technology (IJERT) Vol. 2 Issue 5. May
Investigation of Liquefaction and Pore Water Pathak, S.R., Kshirsagar, M.P., & Joshi, M.S. 2014b.
Pressure Development in Layered Sands. Bull Liquefaction Triggering Criterion Using Shake Table
Earthquake Engineering. 7: 199-219. DOI Test. International Journal of Engineering and
10.1007/s10518-008-9076-3. Technology (IJET) Vol. 5. No. 5. October-November
Pathak, S. R., Dalvi, R. S., & Katdare, A. D. 2010. 2013. pp. 4439-4449.
Earthquake Induced Liquefaction Using Shake
Table Test. International Conferences on Recent
293
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Dalam geologi teknik, lapisan clayshale dikenal sebagai lapisan yaitu lapisan batuan di daerah
pegunungan yang terbentuk dari batuan sedimen yang telah mengalami pembebanan dan tegangan yang besar
dalam massa proses tektonik pembentukannya dan keberadaannya sebagai lapisan batu lempung. Dengan
demikian clayshale mempunyai karakteristik yang sangat spesifik yaitu dalam keadaan normal keberadaannya
atau dalam keadaan segar menunjukkan nilai kekuatan geser yang besar, sebaliknya ketika mengalami
gangguan maka akan secara otomatis mengalami perubahan karakteristik properties-nya dan berdampak nilai
kekuatan gesernya menurun. Beberapa kasus dalam pembangunan konstruksi di daerah pegunungan termasuk
bangunan infrastruktur dan berada pada lapisan clayshale menunjukkan gejala ketidakstabilan. Gejala ini
dikarenakan dampak potensial terhadap perubahan karakteristik properties dari lapisan clayshale. Sebagai
bahan kajian adalah Jembatan Penggaron di Kabupaten Ungaran yang merupakan bagian dari Jalan Tol
Semarang-Solo yang dibangun di Provinsi Jawa Tengah, merupakan contoh kasus infrastruktur jembatan yang
berada di lapisan endapan clayshale. Berdasarkan hasil kajian terhadap perubahan karekteristik properties
clayshale, keberadaan Jembatan Penggaron memerlukan beberapa teknik penanganan yang terintegrasi dengan
struktur utamanya untuk mempertahankan stabilitasnya. Penanganan perkuatan pondasi tambahan pada pilar
dan abutmen jembatan dengan pertambahan struktur bored pile di sekelilingnya dan pertambahan perkuatan
dengan konfigurasi pemasangan sistem baris atau soldier pile serta upaya penanganan lain termasuk dengan
mengurangi potensi momen pendorongnya dilakukan.
Kata Kunci: geologi teknik, lapisan clayshale, lapisan batuan lempung, lapisan bahan rombakan, stabilitas
lereng, pergerakan tanah dan deformasi
ABSTRACT: In engineering geology, clayshale deposits which have been distinguished as bedrock layers in
the mountainous regions and have been also normally experienced by the high compression process during the
period of tectonic plate drive and settled as a claystone sediment. Accordingly, clayshale have the specified
character manners which is in its originally deposited or its fresh condition have showed a highly strength and
vice versa when disturbingly then will be straightly changes their characters properties which are dropping its
strength parameters. Many cases on building the constructions included infrastructure buildings over the
mountain area regions were detected and sited over clayshale deposits tend to unstable. Hence, its stability
related to the potentially impact regarded to the change of character manners of its clayshale manners. The
casualty case in Penggaron Bridge in Ungaran Region as part of Semarang – Solo Toll Roads which were built
in Central Java Province is one of example cases of Bridge have been built over clayshale deposit. Based on
the evaluation of the stability in relation with the indicated landslide evidence as an impact of the changes of
clayshale characters, the Penggaron Bridge needed the many ways of the integrated supported construction
types in order protecting the indicated landslides as an extended foundation using the surrounded bored pile
and bored pile in row configurations as soldier piles have been combined with the many ways solution on
decreasing the excess of driving moment impacts.
Keywords: engineering geology, clayshale layer, bedrock claystone layer, tectonic plates, claystones, stability
analysis, changes of character manners of clayshale
294
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
1 PENDAHULUAN mengalami perubahan karakteristik properties-
nya yang dapat menurunkan nilai kuat gesernya
Lapisan clayshale ini ditenggarai sebagai akibat mengalami degradasi seperti terekspos
lapisan batuan sedimen yang mempunyai udara atau kontak dengan air.
kekuatan daya dukung dan kuat geser tinggi
karena mengalami kompresi tekanan tinggi saat
pembentukannya selama proses tektonik 2 CLAYSHALE
berlangsung berupa endapan batu lempung.
(Attewell et al., 1976). Keberadaan lapisan
clayshale perlu diwaspadai karena dengan 2.1 Karakteristik Clayshale
adanya perubahan karakteristik properties Clayshale adalah lapisan yang terbentuk oleh
secara fisik dan kimia terutama diakibatkan batuan sedimen mengandung fragmen-fragmen
kontak dengan air atau udara maka kekuatan butiran halus berupa mineral lempung dengan
daya dukungnya dan kuat gesernya akan karakteristik properties-nya serta perilakunya
menurun secara signifikan. Seperti halnya yang sangat berbeda dengan kebanyakan tanah
berada di daerah Ungaran, Semarang, Jawa lempung pada umumnya (Attewell dan Farmer,
Tengah terdapat lapisan clayshale mempunyai 1976). Hal ini dikarenakan kandungan molekul
karaktersitik properties yang perlu kimianya mengandung unsur seperti
diperhatikan. Clayshale di daerah ini sudah montmorillonite, kaolinit dan illite. Keberadaan
menunjukkan dampaknya terhadap stabilitas lapisan clayshale dapat diperoleh termasuk
Jembatan Penggaron, yang merupakan salah penyebarannya dari informasi berdasarkan Peta
satu bagian dari Jalan Tol Semarang-Bawen. Geologi. Dari peta geologi ini dapat ditenggarai
Jembatan Penggaron ini sudah menunjukkan adanya formasi endapan sedimen kwarter
gejala adanya pergerakan yang ke arah Selatan- berupa batu lempung.
Tenggara dengan kedalaman bidang longsor Lapisan clayshale umumnya terbentuk dari
pada saat jalan tol ini dibangun pada tahun 2012 deposit sedimen endapan pantai yang telah
sehingga mengalami pergeseran yang mengalami kompresi tekanan tinggi akibat
mengkhawatirkan bila tidak ditangani segera. proses tektonik sehingga kondisi
Pergeseran Jembatan Penggaron ini keberadaannya di dalam lapisan tanah sangat
diakibatkan adanya bidang longsor yang teguh dan keras. Walaupun begitu akan mudah
merupakan perlapisan imajiner antara debris mengalami degradasi sehingga terjadi
vulkanik tufaan dengan lapisan clayshale di perubahan sifat dan karaktersitik properties
bawahnya yang membentuk longsoran bilamana mengalami penjenuhan dan/atau
translasi. Penanganan terhadap pergerakan terekspos dengan udara terbuka sehingga
Jembatan Penggaron dilakukan berdasarkan durabilitas dan kekuatannya akan menurun
urutan langkah kegiatan, pertama yang juga drastis.
dituangkan dalam tulisan ini adalah Setelah mengalami degradasi selanjutnya
mengevaluasi tentang mekanisme longsor yang menjadi lapisan tanah lempung dengan nilai
terjadi sehingga bidang longsornya daya dukung kuat gesernya menurun secara
berkembang semakin dalam selama kurang signifikan dengan sifat karakteristik kembang
lebih 5 tahun yang ditunjukkan dari hasil susut tinggi. Penurunan nilai daya dukung dan
pengamatan pergerakan lateralnya dari kuat gesernya disebabkan pada kondisi basah
pembacaan inklinometer. Pergerakan dimulai mengalami pengembangan dan pada saat
dari pergerakan tanah di lapisan atas yang terekspos udara mngalami proses degradasi
merupakan batas imajiner antara debris (Agung M. A. et al., 2017). Selanjutnya juga
vulkanik tufaan dengan lapisan clayshale dinyatakan bila saat kering, lapisan clayshale
dibawahnya sedalam 8.5 m. Selanjutnya ini akan menyusut sehingga timbul rekahan-
kedalaman bidang longsor berkembang rekahan yang mudah dilalui air. Dengan
menjadi 22 m selama lebih kurang 1 tahun, demikian clayshale sangat dipengaruhi oleh
berarti berada pada lapisan clayshale. siklus basah–kering (slaking influences) yang
Kedalaman bidang longsor ini semakin dalam berdampak pada perubahan antara
dan juga berada pada lapisan clayshale mengembang dan menyusut serta
mencapai hingga kedalaman 38-39 m. Dengan mempengaruhi perilakunya.
demikian dapat disimpulkan bahwa suatu Akibat proses pengembangan yang terjadi
konstruksi yang melalui lapisan clayshale perlu umumnya akan memberikan tekanan atau daya
diwaspadai agar lapisan clayshale ini tidak dorong vertikal karena proses mengembang
295
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
secara horizontal tertahan oleh tekanan keliling seluruh pondasinya yang merupakan kelompok
(confining pressure). Sebaliknya pada saat bored pile dengan diameter 1200 mm dengan
kering clayshale mengalami penyusutan dan jarak 2.5 x diameter menumpu pada lapisan
berdampak pada timbulnya keretakan. clayshale dengan nilai SPT > 40. Kedalaman
Bilamana siklus basah dan kering berulang pondasi jembatan ini termasuk untuk abutmen
maka akan mempengaruhi nilai kuat geser daya dan pilarnya berada pada kedalaman 16-18 m
dukungnya. dan berdasarkan analisa daya dukung berupa
tahanan ujung mampu mendukung beban
jembatan.
2.2 Permasalahan Stabilitas Clayshale Jembatan Penggaron dengan bentang total
Keberadaan clayshale dapat memunculkan 400 m ditumpu pada 2 abutmen, ABT-1 (arah
banyak permasalahan geoteknik sehingga Semarang) dan ABT-2 (arah Ambarawa) serta
berdampak pada penurunan stabilitas bangunan terdapat 9 pilar dan berada di tengah bentang
infrastruktur yang berada di atasnya. Bilamana dari P-1 s.d. P-9 di antara kedua abutmen
keberadaan lapisan clayshale pada daerah tersebut (Gbr. 1) yang berada pada lapisan
pegunungan maka akan mempengaruhi clayshale ini terindikasi adanya longsoran lama
stabilitas lerengnya dan berdampak pada yang cukup besar.
kelongsoran (Travelletti J. et al., 2011).
Demikian juga bila lapisan clayshale berada ABT-1 P2 P4 P6 P8 ABT-1
pada daerah dataran maka juga menimbulkan
permasalahan pada penurunan nilai daya P1 P3 P5 P7 P9
296
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Pada saat konstruksi Jembatan Penggaron mengindikasikan adanya longsoran progresif
pada 2011 diketahui bahwa tebing utara sebelah sebagai dampak longsoran lama.
utara abutmen A-1 s.d. pilar P-2 pernah terjadi
pergeseran dan turun hampir 5 m ke arah
selatan/tebing pada tahun 2004. Bukit yang 3.2 Pergerakan Pilar Jembatan
terpisah ini di bawah kawasan perumahan
menjadikan beban tambahan (momen 3.2.1 Longsoran Progresif
pedorong) terhadap stabilitas pilar P-3, P-4, P- Hasil pengamatan yang dilakukan oleh Pusat
5 dan P-6. Litbang Jalan dan Jembatan di tahun 2012
Pembuatan fasilitas saluran permukaan di sesaat setelah jembatan selesai dibangun
lokasi abutmen ABT-1 dan pilar P-1 dilakukan khususnya terhadap pilar P-3, P-4, P-5 dan P-6
untuk mengurangi beban akibat naiknya ini (Gbr. 4) menunjukkan bahwa terdapat
tegangan air pori. longsoran di kedalaman 8-9 m dan merupakan
dampak dari longsoran lama. Selanjutnya
sebagai pengamatan lanjutan terhadap pilar P-4
Longsoran purba dimana ABT 1 dan P1 berada
dan P-5 dari pembacaan pergerakan
inklinometer, pada kedalaman 8-9 m
menunjukkan deformasi yang cukup besar
selama 2 bulan pengamatan dari December
Longsoran purba
2011 s.d. Mei 2012 sebesar 80 mm (Muhroji,
bukit kecil terpisah
2012).
297
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
vulkanik setebal 9-10 m berada di atas
lapisan clayshale.
b. Kajian terhadap peta topografi
menunjukkan morfologi daerah jembatan
terlihat adanya longsoran lama yang
dibuktikan dengan adanya aliran alur
sungai alam yang selalu mengalir di
antara bukit yang telah bergeser akibat
mengalami longsor sebelumnya.
c. Pilar berada pada lapisan breksi vulkanik
tufaan dan daya dukungnya berada di atas
lapisan clayshale dengan nilai N-SPT >
Gbr. 5. Retakan pada Pilar yang Terjadi dan 40.
Didominasi Akibat Gaya Tarik pada Tiang (P-3, d. Pengamatan pergerakan inklinometer di
P-4, dan P-5) beberapa titik khususnya P-2, P-3, P-4
dan di beberapa area di selatan jembatan
mengindikasikan adanya pergerakan
yang signifikan dalam 1 bulan saat musim
hujan dari Oktober 2011-Mei 2012.
e. Sebagai contoh evaluasi terhadap
tinjauan pilar P-3 dan morfologinya,
diketahui adanya cekungan air seperti
yang terlihat pada Gbr. 8 (Eddie Sunaryo,
2012). Yang terbentuk di antara bukit
yang bergerak dengan built induknya.
Gbr. 6. Pergerakan Pilar ke Arah Selatan- f. Cekungan air ini dibuktikan dengan
Tenggara adanya aliran air pada daerah alur sungai
alam di bawah jembatan dan diperkuat
dengan keluarnya air pada beberapa
“horizontal drain” yang dilakukan di
bawah pilar P-3 dan P-4 (Gbr. 9).
g. Pembacaan hasil pengamatan
inklinometer yang dilakukan
menunjukkan bahwa pergerakan longsor
dimulai pada lapisan debris vulkanik
yang berada di lapisan clayshale (Gbr.
10). Dengan terganggunya lapisan
clayshale, maka terjadi pergerakan
lanjutan yang semakin dalam dari tahun
Gbr. 7. Ketidaklurusan Marka Jembatan ke tahun pada lapisan clayshale (Gbr. 11).
h. Di bagian atas pilar P-3 s.d. P-6 terlihat
adanya bukit yang diindikasikan dari
3.2.2 Analisis Stabilitas Jembatan Penggaron morfologinya sebagai pergeseran
terhadap Longsoran Progresif longsoran lama yang terpisah dari
Dengan memperhatikan hasil pemboran dan induknya dan dapat menjadikan
informasi serta kajian data sekunder, maka tambahan beban terhadap kedudukan
dapat diketahui lapisan stratifikasi tanah yang jembatan (Gbr. 12).
mendukung pilar-pilar dan kondisinya serta
progresifitas longsoran yang terjadi didasarkan
pada beberapa hal berikut ini:
a. Hasil interpretasi dari pendugaan
geolistrik menunjukkan adanya
perlapisan yang sinkron dengan hasil
pemboran yaitu lapisan debris breksi
298
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 10. Progres Bidang Longsor dari 2012-2013 4.2 Kronologis Longsoran
Selanjutnya dengan memperhatikan data
sekunder dan hasil pemantauan pergerakan
bidang gelincir yang berubah selama kurun
waktu lebih dari 5 tahun, dari 2012-2016 maka
perlu penanganan yang terintegrasi dengan
menerapkan beberapa kombinasi penanganan.
Longsoran yang pertama terjadi dianggap
sebagai longsoran translasi dengan bidang
longsor terdapat pada daerah perbatasan antara
debris vulkanik tufaan dengan lapisan clayshale
di kedalaman 8-9 m, rata-rata tepatnya di 8.5 m.
299
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
longsoran dangkal dengan menganggap breksi vulkanik tufaan), dengan kondisi MAT
longsoran yang terjadi di tahun 2012 saat tinggi maka diperoleh SF = 0.8.
Jembatan Penggaron selesai dibangun. Untuk
itu analisa stabilitas lereng metode
keseimbangan batas (limit equilibrium)
sebagai:
a. Longsoran translasi
b. Lapisan clayshale tidak mengalami
degradasi atau perubahan karakteristik
properties dan nilai kuat gesernya
300
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
vulkanik tufaan yang mengandung material UCAPAN TERIMA KASIH
berbutir dengan sedikit mineral lempung.
Longsoran merupakan bentuk translasi Ucapan terima kasih disampaikan pada semua
dengan bidang longsor terdapat pada pihak yang telah mendukung dan
interkontak lapisan ini dengan lapisan memperbolehkan data-datanya untuk
clayshale. Penjenuhan lapisan debris secara digunakan sebagai karya tulis di PIT-HATTI
langsung berdampak menurunkan SF dari SF = ke-23 ini:
1.25 menjadi SF = 0.8 dan berpotensi merubah a. Puslitbang Jalan dan Jembatan, Badan
karakteristik properties lapisan tanah di Litbang, Kementerian PUPR
bawahnya yang berupa lapisan clayshale. b. Direktorat Jembatan, Dirjen Bina Marga,
Dari pemantauan pembacaan pergerakan Kementerian PUPR
inklinometer terjadi pergerakan deformasi yang c. Direktorat Pembangunan Jalan, Dirjen
menunjukkan kedalaman bidang longsor Bina Marga, Kementerian PUPR
semakin dalam dari 8.5 m menjadi 22 m selama d. BPJT, Kementerian PUPR
1 tahun dan menjadi 38-39 m selama 5 tahun. e. Trans Marga Jateng, Semarang
Kondisi ini menunjukkan bahwa lapisan
clayshale sangat sensitif mengalami perubahan
karakteristik properties baik secara fisik DAFTAR PUSTAKA - REFERENCES
maupun kimia sehingga berdampak nilai kuat
gesernya menurun. Agung M. A. Putera, Sony Pramusandi dan B. Damianto.
2017. Identification and Classification of Clayshale
Characteristic and Some Considerations for Slope
5.2 Rekomendasi Stability, and Author Profiles Publication at:
https://www.researchgate.net/publication/316596271
Dengan memperhatikan hasil pembacaan Attewell and Farmer. 1976. Principle of Engineering
inklinometer selama 5 bulan yaitu dari Oktober Geology, First published 1976 by Chapman and Hall
2011-Mei 2016 diperoleh indikasi bahwa Ltd 11 New Fetter Lane, London EC4P 4EE © 1976
bidang longsor terjadi pada lapisan clayshale J. E. Attewell and L. C. Attewell, Wilts Fletcher &
dan dapat berubah secara signifikan Son Ltd, Norwich.
karakteristik properties dan nilai kuat gesernya. AttewellI. P. B. and W. Farmer. 1969. Clays and Clay
Oleh karena itu analisa stabilitas perlu dengan Shales, Principles of Engineering Geology pp 104-
181.
mengkondisikan perubahan karakteristik Eddie Sunaryo. 2012. Laporan Investigasi Jembatan
properties dan nilai kuat geser lapisan Penggaron dan Solusi Penanganannya, Pusjatan
clayshale. Bandung.
Dengan demikian maka analisa stabilitas Ega Yulia. 2012. Analisa Stabilitas dan Desain
perlu dilakukan tidak menggunakan metode Perbaikan Struktur Jalan, Universitas Guna Darma
kesimbangan batas tetapi dengan menerapkan Jakarta.
“metode elemen hingga”. Metode analisa Muhroji. 2012 dan 2016. Longsoran dan Monitoring
Jembatan Penggaron, Semarang – Jawa Tengah.
numerik ini perlu dilakukan karena dapat Paulus P. R. 2012. Kajian Longsoran Clayshale pada
digunakan untuk menganalisa beban dan Jembatan Penggaron, Diskusi Penanganan Jembatan
deformasi yang terjadi secara terintegrasi Penggaron, Semarang
termasuk dengan prinsip penanganan yang Rizka Adi. 2015. Karakteristik Mekanik dan Dinamik
dapat direkomendasikan. Clayshale terhadap Perubahan Kadar Air, ITS
Surabaya.
Travelletti J., P. Sailhac, J.P. Malet, G. Grandjean and J.
Ponton. 2011. Hydrological Response of Weathered
Clayshale Slopes: Water Infiltration Monitoring with
Time-Lapse Electrical Resistivity Tomography,
Hydrol. Process. Published online in Wiley Online
Library.
301
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Tol Bocimi STA.19+125 merupakan tanah lanau dengan kadar air tanah lebih tinggi dari kadar
optimum dari hasil uji kompaksi. Hal ini mempersulit untuk pemadatan dan membutuhkan waktu yang cukup
lama untuk penimbunan. Stabilisasi tanah dengan bahan kimia khususnya bahan slag dicoba untuk
memperbaiki terhadap kadar air tinggi dan meningkatkan nilai CBR. Slag merupakan limbah dari proses
produksi logam seperti baja atau ferronikel, slag yang digunakan merupakan Ground Granulated Blast
Furnace Slag (GGBFS) yang memiliki komposisi kimia yang tidak berbeda dengan bahan bahan mineral alami
lainnya dan juga termasuk bahan hidrasi seperti semen Portland semen. Dalam penelitian ini digunakan slag
baja dan slag feronikel dengan presentasi 5 dan 10% dari berat kering tanah. Hasil yang diperoleh campuran
tanah dengan slag baja 5% memberikan penurunan kadar air sebesar 16-17% dan peningkatan nilai CBR
sebesar 35% untuk slag Feronikel 10% penurunan kadar air sebesar 11% dan peningkatan nilai CBR 22.5%.
Untuk Slag baja 10% memberikan penurunan kadar air lebih kecil dibanding slag baja 5% dan slag Ferronikel
sebaliknya semakin banyak kadar slag semakin besar penurunan kadar air.
Kata Kunci: slag, nilai CBR
ABSTRACT: Based on the compaction test, the silty soil which is located at Bocimi Tol STA.19+125 has
natural water content larger than the optimum water content. Soil stabilization using chemical material is
conducted to stabilize the high water content and increase the CBR value. Slag is a residue material from iron
or nickel production, and it categorized as Ground Granulated Blast Furnace Slag ( GGBFS) where the
chemical composition similar to natural mineral ingredients and also include hydration material such as
Portland cement. In this study, the amount of slag use for stabilization is 5 and 10% from the dry weight of
soil. The results show that with 5% of iron, the water content reduced for 16-17% and the CBR increase to
35%. With 10% of ferronickel slag, the water content reduced by 11% and the CBR increase to 22.5%. But
the water content obtained from 10% of iron slag is smaller by 5% of iron slag. On the contrary, the larger the
amount of ferronickel, the water content could be decreased more.
Keywords : slag, CBR value
302
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2 LOKASI PENGAMBILAN SAMPEL UJI
303
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
tanah digunakan dengan variasi kadar slag baja
5% dan 10 % dari berat kering tanah.
304
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Parameter Results (%) Tabel 7. Nilai CBR dan Swelling Kondisi Soaked.
Alkalies (Na2O + 0.658 K2O) 0,40 CBR soaked pada
Tanah Uji Swelling
tumbukan 25 kali
Slag Ferronikel merupakan ground Tanah asli 1,77% 0,305%
granulated blast furnace slag, dari PT. Tanah + slag
3,16% 0,167%
Indoferro Cilegon, dengan kandungan kimia baja 5%
dalam Tabel 5. Tanah + slag
2,66% 0,217%
baja 10%
Tanah + slag
2,44% 0,212%
4 HASIL UJI PENCAMPURAN TANAH feronikel 5%
DENGAN SLAG Tanah + slag
2,78% 0,176%
feronikel 10%
Hasil uji pencampuran tanah dan slag
berdasarkan berat kering tanah dan kondisi Dari Tabel 7. Tanah dengan campuran slag
curing time berdasrkan penurunan suhu besi 5% memberikan nilai terbesar untuk CBR
campuran. dan nilai terkecil untuk swelling.
CBR Rata-Rata
Tanah Uji
Desain Kadar Air
Tanah asli 4% 53,28%
Tanah + slag baja 5% 5,4% 44,24%
Tanah + slag baja 10% 4,5% 45,38%
Tanah + slag feronikel 5% 4,3% 47,15%
Tanah + slag feronikel 10% 4,9% 44,57%
305
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
kuat tekan, memperkecil swelling dan
pengurangan kadar air lebih besar
dibandingkan penambahan slag baja
10%;
d. Dari seluruh variasi tanah lanau dengan
penambahan slag baja dan slag
feronikel, penambahan slag baja 5 %
memberikan nilai terbaik.
APLIKASI LAPANGAN
306
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Penyelidikan tanah pada proyek “X” menunjukan perbedaan konsistensi tanah yang signifikan,
dan menunjukan adanya lensa dikedalaman El.-18.00 m sampai El.-23.00 m. Friction pile dengan spun pile
50 cm menjadi pondasi yang dipilih pada proyek tersebut ditambah dengan preboring berdiameter 35 cm
untuk melewati lensa. Desain Pallowable tiap tiang sebesar 110 ton tercapai pada kedalaman tiang El.-32.00 m.
Dampak dilakukan preboring hampir 80% tiang hanya mencapai 195 ton pada kedalaman tiang desain, atau
kurang 25 ton dari syarat minimal penekanan 2xPallowable= 220 Ton. Dengan mengacu pada teori setup time,
kapasitas daya dukung friction pile akan menjadi optimum pada 500–1000 jam setelah penekanan awal.
Penekanan kembali dilakukan pada tiang-tiang yang tidak mencapai 2xPallowable secara acak sampai tekanan
300 ton. Hasilnya terjadi penurunan tiang rata-rata 5.90 mm < 25.00 mm syarat settlement. Selain itu juga
dilakukan loading test dan PDA test dengan hasil kapasitas tiang berkisar 230–351 Ton. Pada kasus ini setup
time memberikan efisiensi sebesar 30%.
Kata Kunci: penyelidikan tanah, preboring, tiang tekan, setup time, PDA test, loading test.
ABSTRACT: Soil investigation on the project “X” shows a significant difference in soil consistency and a
lens in the depth El.-18.00 m to El.-23.00 m. Friction pile is using 50 cm spun pile is the choice of
foundation, added with 35 cm diameter preboring is needed to pass through a lens. The Pallowable design of
each pile is 110 tons with the design depth of the pile at El.-32,00 m. The impact of preboring is that 80% of
the jacking piles only reach 195 tons at the depth of design pile, or less than 25 Tons from the minimum
requirement of 2xPallowable pressure. Referencing to the setup time theory that the friction pile capacity will
be optimum at 500 to 1000 hours after initial jacking. The pile that does not reach 2 x Pallowable are rejacking
at random pile, and the pressure is continued to 300 ton. The result of re-jacking piles that are a decrease of
an average of 5.90 mm, lesser than 25 mm settlement terms. That also carried out a loading test and PDA
test, and the results of the pile capacity ranges from 230-351 Tons. In this case, the setup time provides an
efficiency of 30%.
Keywords: soil investigation, preboring, jacking pile, setup time, PDA test, loading test.
307
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 1. Site Plan Pondasi Tower 1, Tower 2, dan
Podium Proyek “X”
Penyelidikan tanah di lokasi ini menjadi
menarik untuk dikaji lebih jauh karena hasil
penyelidikan tanah akhir dari proyek ini
melibatkan 3 perusahaan penyelidikan tanah.
Penyelidikan tanah yang dilakukan 3
perusahaan tersebut dilakukan pada waktu
yang berbeda-beda, tetapi dengan lokasi
borehole yang berdekatan. Hasil borlog yang
disajikan oleh ketiga perusahaan penyelidikan
tanah pun dapat dikatakan cukup dinamis.
Oleh karena itu dalam melakukan perencanaan
pondasi pada proyek ini dilakukan berbagai
macam opsi dan metode pelaksanaan untuk
mendapatkan desain pondasi yang seefisien
mungkin. Berikut adalah borlog komparasi Gbr. 2. Hasil Komparasi Borlog Proyek “X” dari 3
penyelidikan tanah: Perusahaan Kontraktor Penyelidikan Tanah
Dari gambar di atas dapat dilihat bahwa
lapisan bearing layer (lapisan pendukung)
terdiri dari clayey silt, silty clay, sandy silt,
hard, dengan nilai N-SPT ≥ 50 blows/ft
dijumpai pada kedalaman yang bervariasi
16.50 m, 17.50 m, dan 20.00 m hanya sebagai
lensa dengan tebal 0.50 – 2.00 m sehingga
tidak dapat dijadikan dudukan fondasi.
Berdasarkan hasil penyelidikan tanah, tiang
fondasi akan mengandalkan kekuatan friction.
Muka air tanah rata-rata ditemukan pada
kedalaman 1.40 m.
Mempertimbangkan kondisi struktur
bangunan dengan 4 Tower dengan 13 lantai
dan 2 lapis basement, dan kondisi tanah di
mana terdapat beberapa lapisan tanah keras
yang tidak menerus, yang terdapat pada
kedalaman yang bervariasi antara 17.00 m
sampai 60.00 m sehingga tiang hanya
mengandalkan tahanan friksi, maka
direncanakan menggunakan fondasi tiang
pancang (spun pile) dengan diam 50 cm
dengan daya dukung izin tiang sebesar 110
Ton dan Lefektif 29.00 m.
Perhitungan daya dukung tiang beban aksial
tekan dilakukan berdasarkan nilai N-SPT
menurut Reese & Wright (Ref. Manual
Fondasi Tiang, Dr. Paulus Pramono, 2004).
Qult = Qb + Qs = Ap qb + As fs (1)
Q ult
Qa (2)
SF
308
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Point bearing: Preboring menggunakan diam yang lebih kecil
in sand: qb = 65 N kN/m² < 4500 kN/m² dari dimensi tiang pancang dimaksudkan agar
in clay: qb = Nc cu < 4000 kN/m² kekuatan friksi terjaga, dan juga mengingat
perhitungan daya dukung tiang mengandalkan
Friction: kekuatan friksi. Pelaksanaan pekerjaan pondasi
in sand : fs = 3 N < 150 kN/m² menggunakan Hydraulic Static Pile Driven
in clay : fs = < 150 kN/m² (HSPD) / Jack – in pile, dimana tiang ditekan
sampai 2xPallowable.
Dimana: Sebelum melakukan pemacangan /
Qult = daya dukung tiang ultimate penekanan tiang secara masif, dilakukan
Qa = daya dukung tiang yang diizinkan pemancangan / penekanan pada beberapa
untuk beban aksial tekan indicator pile terlebih dahulu untuk
Qb = daya dukung ujung tiang ultimate memastikan perhitungan perencanaan sesuai
Qs = daya dukung friksi tiang ultimate dengan perhitungan dan sesuai dengan metode
qb = point bearing pelaksanaan yang direncanakan oleh
fs = friction perencana. Hasil dari pemancangan/penekanan
N = nilai N dari SPT tiang indicator pile menunjukan, bahwa daya
cu = nilai undrained cohesion tanah dukung tiang tekan rencana 110 Ton yang
Ap = luas penampang ujung tiang ditekan sampai 2xPallowable baru tercapai
As = luas selimut tiang dengan panjang tiang efektif / Lefektif 34.00 m
Nc = bearing capacity factor sampai 37 m, dari rencana panjang tiang
SF = faktor keamanan, SF = 3.0 efektif 29.00 m, artinya terjadi perbedaan
panjang tiang efektif / Lefektif antara 5.00 m
sampai 8.00 m.
Tabel 1. Summary Perhitungan Daya Dukung Perbedaan panjang tiang efektif / Lefektif
Tekan disebabkan metode pelaksanaan pemancangan
/ penekanan tiang yang didahului dengan
Effective
Pile Allowa preboring sampai kedalam El. -23.00 m agar
Buildi pile
Pile diameter Pile ble pile melewati lensa, yang berakibat kekuatan friksi
ng length
type / depth capacity berkurang. Agar pemilik proyek tidak
Area (rounded
dimensi Qa menambah biaya proyek yang dikarenakan
off)
harus menambah panjang tiang pondasi, maka
cm m m Ton perencana memperhitungkan setup time untuk
pelaksanaan pemancangan / penekanan tiang
secara keseluruhan.
Tower Spun Ø 50 32.00 29.00 110
Pile
309
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
2.2 Setup Time atau Soil Setup 3 METODE PELAKSANAAN
Ketika tiang dipancang di dalam tanah kohesif
yang jenuh, maka di dalam tanah akan Agar pelaksanaan pemancangan/penekanan
berkembang tekanan air pori yang tinggi. Bila tiang dengan memperhitungkan Setup Time
diam tiang semakin besar, maka kenaikan berjalan baik, maka pelaksanaan dilapangan
tekanan air pori juga semakin besar. Kenaikan harus mengikuti beberapa petunjuk teknis
tekanan air pori yang tinggi, adalah sebagian sebagai berikut:
akibat dari geseran dan perubahan bentuk a. Tetap memegang panjang efektif tiang /
tanah, dan sebagian lagi oleh kompresi radial Lefektif sepanjang 29.00 m dan harus
akibat masuknya tiang ke dalam tanah. dilakukan loading test dan PDA test
Tekanan air pori ini mengurangi tegangan pada beberapa tiang secara acak setelah
efektif yang bekerja pada tiang, sehingga 21 hari sejak pemancangan/penekanan
mengurangi kuat geser tanah. Pengurangan awal.
kuat geser ini, menurunkan kapasitas dukung b. Melakukan re-jacking pada 10% dari
tiang selama pemancangan/penekanan dan total jumlah tiang secara acak untuk
waktu-waktu pendek sesudahnya. Setelah memastikan kenaikan friksi setelah 21
pemancangan/penekanan, tekanan air pori akan hari sejak pemancangan/penekanan
berkurang melalui aliran radial dengan arah awal.
menjauhi tiang. Dengan berkurangnya tekanan c. Pelaksana / kontraktor / pengawas harus
air pori ini, tanah mengalami rekonsilidasi memberikan daily report pelaksanaan
(butiran tanah merapat atau memadat akibat jack in pile kepada perencana setiap hari
mengalirnya air pori), sehingga kuat gesernya untuk di review oleh perencana.
bertambah. Kenaikan kuat geser tanah ini,
menaikan kapasitas dukung tanah atau tiang.
Besarnya kenaikan kapasitas dukung tiang 4 HASIL PELAKSANAAN
bergantung pada sifat tanah, bahan tiang, dan
dimensinya. Sesuai yang dijelaskan pada Bab 1, bahwa
Besarnya kelebihan tekanan air pori setelah proyek ini terdiri dari 2 tower dengan jumlah
pemancangan bergantung pada kenaikan lantai yang sama, yaitu 13 lantai dan 2
tekanak air pori di sekitar tiang. Dengan basement, dimana antar tower dihubungkan
demikian, penurunan kelebihan tekanan air oleh podium dengan ketinggian 2 lantai. Maka
pori untuk tiang yang terbuka ujungnya akan hasil dari pemancangan/penekanan yang akan
memerlukan waktu yang lebih singkat dipaparkan pada Bab 4 ini akan mencakup
dibandingkan dengan tiang yang ujungnya keseluruhan area proyek. Dan hasil dari
tertutup. pemancangan/penekanan sesuai metode
pelaksanaan Bab 3 Poin a, hampir 80% tiang
tidak mencapai 2xPallowable pada panjang tiang
efektif / Lefektif. Mengacu pada pengaruh setup
time pada tiang setelah pemancangan
/penekanan awal, maka setelah 21 hari sejak
pemancangan/penekanan awal dilakukan re-
jacking pada 10% dari total tiang yang tidak
mencapai 2xPallowable dan ditekan kembali
sampai 2xPallowable bahkan sampai melebihi 2
xPallowable (300 ton), selain itu juga dilakukan
loading test pada 2 tiang, dan PDA Test pada 6
tiang, hasilnya adalah:
Gbr. 3. Variasi Kenaikan Kapasitas Dukung Tiang
dengan Waktu (Sodderberg)
310
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Tabel 1. Rangkuman Penurunan Tiang Saat Dilakukan Re-Jacking pada Tiang yang Tidak Mencapai 2x
Pallowable
Kapasitas Penurunan tiang
Elevasi
jacking pada (mm)
No No.Tiang
panjang tiang Sebelum Saat Saat Saat Saat
desain Rejacking 220 ton 300 ton 220 ton 300 ton
1 P-424 213 1590 1590 1583 0 -7
2 P-420 195 1905 1902 1900 -3 -5
3 P-397 195 1740 1738 1735 -2 -5
4 P-466 195 1965 1963 1958 -2 -7
5 P-472 195 280 276 276 -4 -4
6 P-499 195 98 96 89 -2 -9
7 P-549 195 1837 1831 1829 -6 -8
8 P-561 195 1742 1741 2738 -1 -4
9 P-545 195 2810 2808 2805 -2 -5
10 P-110 195 3844 3842 3839 -2 -5
Pemancangan / penekanan kembali dilakukan loading test setelah 21 hari sejak
dilakukan pada 10% tiang-tiang yang tidak pemancangan / penekanan awal.
memenuhi syarat ditekan sampai 2x
Pallowable = 220 ton, dan dilakukan setelah Tabel 4. Rangkuman Hasil PDA Test pada Tiang
21 hari sejak pemancangan/penekanan awal. yang Tidak Mencapai 2x Pallowable.
Hasilnya adalah terjadi penurunan dengan rata- PDA CAPWAP
rata 2.5 mm pada tiang-tiang tersebut, dan No. Bearing
penekanan diteruskan sampai 300 ton, atau No Total Frictio Toe
Tiang Capacity
melebihi dari syarat minimal 2x Pallowable dan (ton) n (ton) (ton)
(ton)
terjadi penurunan rata-rata 5.9 mm < 25 mm 1 P-23 222 225 205 20
syarat settlement. 2 P-98 230 232 211 21
3 P-96 226 228 205 23
Tabel 3. Rangkuman Hasil Loading Test pada P-
Tiang yang Tidak Mencapai 2x Pallowable. 4 230 233 213 20
158
Pile Kapasitas Jacking Log P - Log S 5 P-38 243 229 207 21
No. Pada Panjang Tiang Method (ton) 6 P-42 251 257 232 25
Desain (ton)
Hasil dari PDA Test pada 6 tiang yang tidak
mencapai 2x Pallowable pada awal
P7 195 270 pemancangan menunjukan kapasitas tiang
I7 195 240 berkisar antara 222 ton – 251 ton setelah 21
hari sejak pemancangan / penekanan awal.
Pile No. Davission Chin Mazurkiewic
Method Method z Method
5 KESIMPULAN
(ton) (ton) (ton)
Berdasarkan pemaparan pengaruh atau efek
P7 240 350 230 Setup Time pada kapasitas tiang friksi, maka
I7 235 280 230 untuk proyek “X” dapat disimpulkan:
Hasil analisis Loading Test dengan Metode a. Pengaruh Setup Time pada kapasitas
Log P–Log S, Metode Davission, Metode tiang friksi di Proyek “X” memberikan
Chin, dan Metode Mazurkiewicz menunjukan efisiensi sebesar 30%, sehingga
kapasitas tiang berkisar 230 Ton – 351 Ton. memberi dampak penghematan biaya
Kedua tiang tersebut adalah tiang yang tidak pada pemilik proyek.
mencapai 2x Pallowable saat dilakukan b. Pengaruh Setup Time hanya dapat
pemancangan/penekanan tiang awal, dan berdampak pada tanah yang didominasi
clay ataupun silt.
311
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
c. Perencana dapat memperhitungkan Das, Braja M. 2001. Principles of Foundation
kenaikan daya dukung akibat adanya Engineering 4th Edition. PWS Kent.
Setup Time dengan memodifikasi Fleming, W.G.K., Weltman, A.J., Randolph, M.F. and
perhitungan friksi. Elson, W.K. 2009. Pilling Engineering. New York:
John Willey and Sons.
Hardiyatmo, H.C. 2011. Analisa dan Perancangan
Foindasi 2. Yogyakarta: Gadjah Mada University
DAFTAR PUSTAKA Press.
Rahardjo, P.P. 2005. Manual Pondasi Tiang Edisi 3.
Bowles, J.E. I. 1993. Foundation Analysis and Design. Bandung: Geotechnical Engineering Center.
Mc Graw Hill.
312
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: StatRapid merupakan suatu teknik uji beban pondasi tiang yang relatif baru, yang dikembangkan
sebagai alternatif uji beban statik dan uji PDA. Dalam uji StatRapid ini, beban plat baja modular yang
dikombinasikan dengan sistem pegas dijatuhkan dari ketinggian tertentu, menumbuk dan menekan kepala
tiang ke dalam tanah. Durasi tumbukan dibuat cukup lama sehingga tiang berperilaku kuasi-statik. Masa beban
tumbukan yang diperlukan hanya 5% dari masa yang diperlukan untuk uji beban statik. Saat tumbukan terjadi,
gaya, pergerakan, dan percepatan kepala tiang diukur. Dari pengukuran tersebut perilaku beban vs penurunan
dan beban statik yang ditimbulkan dapat diturunkan. Makalah ini membahas metode dan interpretasi serta
perbandingan uji StatRapid ini dengan uji beban statis. Disimpulkan bahwa StatRapid merupakan sebuah
alternatif yang cukup baik bila diperlukan uji beban yang cepat dan handal.
Kata Kunci: StatRapid, statnamic, uji beban kuasi-satik, uji beban dinamik, PDA, uji beban statik
ABSTRACT: A relatively new pile capacity testing method named StatRapid comes as an alternative to pile
static loading test and PDA test. In this test, a combination of modular weight and spring assembly is dropped
from a certain height to push the test pile downward. The impact duration is long enough for the pile to behave
in a quasi-static way. The required falling weight is only 5% of the mass that would be required for a static
load test. The instance the weight dropped at the pile head, the force, the displacement, and the acceleration
are measured at the pile head. From these data, load-displacement behavior and the maximum static load
mobilized can be derived. This pile test method, interpretation, and comparison with static loading test are
discussed. It concludes that StatRapid is a good alternative when fast and reliable pile test is required.
Keywords: StatRapid, statnamic, quasi-static pile load test, dynamic loading test, PDA, static pile load test
313
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
bukan uji beban statik. Interpretasi uji PDA enjinir yang sangat berpengalaman untuk
jauh lebih sulit daripada uji Kentledge. Data uji menghasilkan interpretasi yang baik.
PDA perlu diolah dengan teori gelombang satu Penelitian dan pengembangan uji kapasitas
dimensi, dimana secara matematik komponen tiang yang dikembangkan oleh TNO di negeri
perlawanan dinamik tanah dieliminasi dan Belanda menghasilkan sistem uji Statnamic
komponen statik dihitung. Hasil perhitungan ini yang dapat mengatasi kesulitan interpretasi uji
kemudian dicocokan dengan sinyal yang PDA (Middendorp dkk, 1992). Prinsip uji
diperoleh dari pengujian. Proses ini dikenal Statnamic adalah durasi beban pukulan (impact
dengan nama signal matching. Dalam proses load) dipilih sedemikan rupa sehingga saat
tersebut diperlukan banyak parameter masukan, pukulan terjadi seluruh panjang tiang bergerak
diantaranya: dalam rentang kecepatan yang sempit dan
a. Parameter tiang berupa: modulus interaksi tiang tanah berprilaku kuasi statik
elastisitas tiang, kerapatan tiang, luas pada saat kecepatan tiang menjadi nol, yaitu
penampang tiang dan cepat rambat saat pergerakan tiang mencapai maksimum.
gelombang tekan. Tidak seperti dalam Dengan demikan interaksi tiang tanah dapat
tiang pracetak, cepat rambat gelombang dimodelkan sebagai sistem masa-pegas-damper
dan luas penampang tiang dalam tiang tunggal (bukan multiple seperti pada
bor dapat dikatakan merupakan pemodelan uji PDA) dan fenomena gelombang
parameter yang sulit seragam di dalam tekan yang terpantulkan bolak-balik di
tiang. Hal ini menimbulkan suatu tingkat sepanjang tiang dapat diabaikan (Chew dkk,
kesulitan tersendiri dalam melakukan 2017). Uji Statnamic dilakukan dengan
proses sinyal matching. menggunakan bahan peledak dengan modul
b. Parameter tanah berupa: rasio redaman ring-ring baja untuk reaksi ledakan (Gbr. 1).
(damping ratio), modulus kekakuan geser
tanah (shear modulus), parameter viskus
tanah, konstanta pegas sepanjang badan
tiang yang dapat menahan gaya tekan dan
tarik, konstanta pegas perlawanan ujung
tiang, quake yaitu parameter deformasi
plastis pegas, dan faktor slip (slider)
antara tanah dengan tiang. Semua
parameter tersebut tentunya bervariasi
dalam setiap jenis lapisan tanah yang
dijumpai. Semakin banyak lapisan tanah
yang dijumpai di sepanjang badan tiang,
semakin banyak parameter yang
diperlukan (Gouw, 1996).
Dapat dikatakan semua parameter tanah yang
diperlukan tidak tersedia dalam laporan
penyelidikan tanah. Untuk mengatasi hal itu,
pembuat alat PDA memasukkan database
parameter-parameter empiris ke dalam program
signal matching buatan mereka dan dengan
mengambil asumsi-asumsi tertentu perhitungan
dibuat mudah dengan melakukan iterasi di
dalam komputer, proses mana dikenal dengan
nama automatic signal matching, dengan nama
dagang antara lain: CAPWAP, TNOWAVE
dan ALLWAVE-DLT. Proses signal matching
ini sangat tergantung kepada asumsi dan
operator yang melakukan analisis dan tidak
jarang menghasilkan hasil yang bervariasi
cukup lebar, terutama sekali untuk pondasi
tiang bor (Viana & Santos, 2008, Herten dkk, Gbr. 1. Uji Statnamics (modifikasi dari TaiAn
Engineering)
2013, Stahlmann dkk, 2012). Diperlukan
314
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Penggunaan bahan peledak dalam uji Karena prosedur pembebanan yang relatif
Statnamic membuat uji ini agak sulit singkat, Statnamic dan StatRapid ini dikenal juga
mendapatkan ijin operasional di negara-negara dengan nama Rapid Load Test (RLT). Kedua
tertentu. Karena itu dikembangkanlah metoda teknik ini telah banyak digunakan di Eropa,
uji StatRapid dimana dorongan dari bahan Jepang, Taiwan, dan Singapore, dan telah
peledak diganti dengan menjatuhkan beban plat masuk dalam standar Jepang, Jerman, Belanda,
baja modular dari ketinggian tertentu. Dengan Eurocode EN ISO 22477-10 dan ASTM
menggunakan ambalan khusus durasi D7383-19 (Chew dkk, 2015).
tumbukan dibuat cukup lama sehingga tiang
berprilaku kuasi-statik dan tumbukan yang
dihasilkan hanya akan menghasilkan gaya 2 STADRAPID
tekan yang menekan kepala tiang ke dalam
tanah dan tidak terjadi gaya tarik yang dapat Prinsip dasar dari uji StatRapid ini sesuai
menimbulkan kerusakan pada kepala tiang. dengan persamaan gerak model derajat
Masa beban tumbukan yang diperlukan hanya kebebasan tunggal (single degree of freedom
5% dari masa yang diperlukan untuk uji beban model).
statik. Saat tumbukan terjadi, gaya, pergerakan,
dan percepatan kepala tiang diukur. Dari F(t) = m.a(t) + c.v(t) + k. u(t) (1)
pengukuran tersebut prilaku beban vs
penurunan dan beban statik yang ditimbulkan dimana: F(t) = gaya tumbukan pada waktu t
diturunkan. Gbr. 2 menunjukkan peralatan m = masa tiang
StatRapid yang sedang beroperasi. a(t) = percepatan pada waktu t
c = koefisien redaman
v(t) = kecepatan pada waktu t
k = konstanta pegas
u(t) = penurunan kepala tiang pada
waktu t
315
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Kecepatan v(t) didapat dengan menginte-
grasikan a(t) terhadap waktu. Saat kecepatan
v(t) = 0 yaitu saat tiang berhenti bergerak,
pergerakan tiang mencapai maksimum, u(t) =
umax, maka Pers. (2) menjadi:
316
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
7 menunjukkan perbedaan prinsip uji PDA, Uji StatRapid menghasilkan durasi beban
StatRapid dan uji beban statik. (impact load) lebih lama dari uji PDA karena di
dasar kerangka beban pemukul dipasang modul
ambalan pegas karet (Gbr. 8a) dan sistem rem
hidrolik (Gbr. 8b) untuk mencegah baja
pemukul memantul balik. Dalam prinsip fisika
ini berarti mengusahakan koefisien restitusi
serendah mungkin (mendekati nol).
Pergerakan kepala tiang saat tumbukan
terjadi dan sesaat setelahnya dimonitor dengan
menggunakan monitor laser (Gbr. 9a) dan
semua pembacaan load cells, akselerator dan
pergerakan kepala tiang, dicatat secara otomatis
dengan menggunakan pencatat data otomatis
(Gbr. 9b).
Kapasitas alat uji StatRapid yang ada di
pasaran saat ini mencapai 16MN atau 1600 ton.
Untuk uji tiang dengan kapasitas yang lebih
notasi: DLT = Dynamic Load Test, SRP = StatRapid, besar masih diperlukan uji beban statik atau uji
SLT = Static Load Test, z = kedalaman, = tekanan, beban bidirectional (Osterberg cell).
v = kecepatan, u = pergerakan (penurunan)
Gbr. 7. Skematik Perbandingan Uji PDA,
StatRapid dan Uji Beban Statik
317
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
3 UJI BEBAN STATIK VS STADRAPID 4 KESIMPULAN
Chew dkk (2017) dan Chew (2018), melakukan Dari bahasan di atas dapat disimpulkan bahwa:
studi banding antara uji beban statik (SLT) dan
uji StatRapid, hasil studi mereka disajikan dalam a. Uji kapasitas tiang dengan metoda
Tabel 1 dan Gbr. 10. StatRapid yang sudah banyak dipakai di
Dari Tabel 1 terlihat bahwa hasil uji Eropa, Jepang, Taiwan dan Singapore ini
StatRapid relatif sebanding dengan hasil uji memberikan hasil yang relatif serupa
beban statik (SLT). Gbr. 10 menunjukkan kurva dengan hasil uji beban statik atau uji
beban vs penurunan yang dihasilkan uji beban Kentledge.
StatRapid sangat mirip dengan hasil uji beban b. Uji StatRapid mempunyai dasar teori yang
statik (uji Kentledge). jauh lebih sederhana dari uji PDA atau uji
beban dinamik (DLT) yang memerlukan
persamaan gelombang yang rumit.
Tabel 1. Perbandingan SLT vs StatRapid (SRP) c. Dengan menggunakan metoda UPM
(Chew dkk, 2017) (unloading point method) interpretasi uji
Beban StatRapid mudah dilakukan dan memiliki
Jenis Tanah Penurunan (mm)
(MN) tingkat kepastian yang lebih baik dari uji
SLT SRP PDA (DLT) yang sering tergantung
kepada kemampuan dan pengalaman
Silty/Clayey operator dalam menjalankan program
2.1 3.7 4.0 signal matching.
Sand; Tiang
bor 600mm d. Uji StatRapid dapat menjadi salah satu
4.2 8.3 8.0 alternatif pengganti uji beban statik,
sedalam
24m terutama di lokasi yang sulit dicapai
6.3 15.7 12.4 untuk pengangkutan blok-blok beton
untuk reaksi uji Kentledge.
Soft clay e. Uji StatRapid memerlukan waktu yang
23m diikuti jauh lebih singkat dari uji beban statik
Silty Sand; 5.57 6.5 7.0 namun memerlukan persiapan yang lebih
tiang bor lama dari uji PDA.
1000mm 11.40 13.5 16.0 f. Uji StatRapid memerlukan biaya yang
sedalam leibh murah dari uji beban statik karena
48.6m hanya memerlukan beban sebesar 5%
dari beban reaksi yang diperlukan untuk
uji beban statik.
g. Uji StatRapid lebih mahal dari uji PDA
(DLT) karena memerlukan beban yang
lebih berat dan peralatan yang lebih
mahal. Namun memiliki tingkat
kepastian yang lebih baik.
DAFTAR PUSTAKA
318
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Chew, S.H. 2018. Rapid Load Test – from Theory to Stahlmann, J., Fischer, J. & Middendorp, P. 2012. Rapid
Practice in Singapore. Presentation Notes, National Load Test dan Dynamic Load Test – A Comparison.
University of Singapore. Singapore. Baugrundtagung 2012. German Geotechnical
Gouw, T.L. 1996. Uji Beban Dinamik – Dasar Teori dan Society.
Interpretasinya. Seminar on Foundation Problems Viana da Fonseca & Santos, A.J.A. 2008. Behavior of
’96. HATTI. Jakarta, 9-10 Des 1996. CFA, Driven and Bored Piles in Residual Soil
Herten, M., Baeler, M. Niederleithinger, E. & Georgi, Experimental Site. Int. Prediction Event. ISC. 2 Sep
S. 2013. Evaluation of Dynamic Load Testing on 2008. ISBN 978-989-95625-1.
Bored Piles. Pfahl-Symposium. Braunshweig.
Middendorp, P., Bermingham, P. & Kuiper. B. 1992.
Statnamic Load Testing of Foundation Piles. Proc. 4th
Int. Conf. Application Stress-Wave Thoery to Piles.
The Hague, Rotterdam, Balkema.
319
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Tiang lekatan penuh 100% daya dukungnya hanya mengandalkan lekatan antara tiang dengan
tanah. Fondasi tiang lekatan penuh selalu digunakan dalam kelompok tiang. Beban aksial kelompok tiang
dipertimbangkan berdasarkan kurva load displacement hasil uji pembebanan lapangan. Pengujian dilakukan
pada 3 tipe tiang yaitu tiang tunggal, individu dan kelompok. Komposisi kelompok tiang G2 (2x2) dan
G3 (3x3), jarak antar tiang 3 kali diameter tiang. Panjang tiang tertanam 11.5 m (L1). Kondisi elastis linier
(deformasi maksimum 1%) telah terjadi pada beban <10% Qult. Kondisi linier settlement tiang tunggal
masih terjadi hingga rasio beban (Ri) 40-80% Qult dan pada kelompok tiang hingga 60-80% Qult.
Deformasi kondisi linier settlement tiang tunggal < kelompok tiang, tetapi prosentasi beban ultimit
kelompok > tiang tunggal. Kapasitas ultimit tiang individu < tiang tunggal, akan tetapi immediate settlement
tiang individu > tiang tunggal. Reduksi kapasitas aksial kelompok mencapai 50%. Faktor keamanan
kelompok tiang full friction diambil 1/3 kondisi linier yaitu 5-6.
Kata Kunci: load displacement, tiang lekatan, uji pembebanan kelompok, kondisi linier, rasio beban.
ABSTRACT: 100% of bearing capacity of full friction pile relies on the friction between the pile and the
ground. Full friction pile foundations are always used in pile groups. The axial load of the pile group is
considered based on the load displacement curve from the field loading test results. Tests were carried out
on 3 types of piles, namely single pile, individual and group piles. The composition of the pile groups were
G2 (2x2) and G3 (3x3), the distance between the piles was 3 times the pile diameter. Embedded pile length
was 11.5 m (L1). Linear elastic conditions (maximum deformation of 1%) have occurred at the load of
<10% Qult. Linear settlement conditions of the single piles still occured up to a load ratio (Ri) of 40-80%
Qult and in the pile group up to 60-80% Qult. Deformation of conditions of linear settlement of the single
piles was <pile groups, but the percentage of the ultimate load of the pile group was > the single pile. The
ultimate capacity of the individual pile was < the single pile, but the immediate settlement of the individual
pile was > the single pile. Reduction of group axial capacity reaches 50%. The safety factor of the full
friction pile group taken was 1/3 of the linear conditions i.e. 5-6.
Keywords: load displacement, friction pile, group loading test, linear condition, load ratio.
320
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
fondasi ambles, gedung miring, tembok retak- adalah saat diberikan suatu beban tertentu
retak, dan lain sebagainya. terjadi penurunan yang terus menerus dalam
Hal ini menunjukkan apabila pembangunan waktu yang relatif singkat (failure). Kondisi
teknik sipil di area dengan kondisi tanah lunak ultimit pada penelitian ini berdasarkan kondisi
masih merupakan tantangan besar bagi para ultimit sebenarnya di lapangan saat pengujian.
peneliti di Indonesia, terutama dalam hal
Dengan alasan tiang uji merupakan tiang full
bagaimana membuat pembangunan di atas
tanah yang lunak menjadi lebih ekonomis dan friction yang belum diketahui perilaku
lebih mudah dilaksanakan. Masih diperlukan sepenuhnya.
banyak penelitian tambahan untuk membuat Penentuan kapasitas aksial ultimit tiang full
para ahli Indonesia lebih tertarik untuk friction dapat dilakukan dengan beberapa
membangun di atas tanah yang lunak tanpa metode seperti ditunjukkan Gbr. 1.
ragu-ragu dan khawatir akan mendapatkan Diantaranya Metode Tangent (Budhu, 2011),
masalah di kemudian hari. Metode Davisson (Davisson, 1973) dan
Metode Chin (Chin, 1970, dan juga Elsamee,
2012). Ketiga metode tersebut dibandingkan
2 TIANG LEKATAN PENUH dengan kondisi ultimit dengan real beban saat
keruntuhan terjadi pada saat uji pembebanan di
2.1 Daya Dukung Tiang Lekatan Penuh lapangan.
Daya dukung tiang lekatan tergantung pada
luas selimut tiang, yang merupakan fungsi dari
dimensi tiang. Apabila seluruh panjang tiang
tertanam hanya tertanam pada lapisan tanah
lunak saja maka disebut tiang lekatan penuh
(full friction pile) yaitu tiang yang 100% daya
dukungnya hanya mengandalkan lekatan antara
selimut tiang dengan tanah di sekeliling tiang
(Yudiawati dan Mochtar, 2019). Lekatan
tersebut didapatkan dari adhesi yang ada pada
tanah lempung yang merupakan fungsi dari
kohesi tanahnya (Tomlinson, 1957). Untuk
tanah gambut, daya dukung akibat lekatan
setebal lapisan gambut dapat diabaikan karena Gbr. 1. Kapasitas Ultimit Tiang Full Friction
gambut tidak memiliki kohesi, dibuktikan Tunggal; (a) Chin, (b) Davisson, (c) Tangent,
bahwa daya dukung fondasi tiang di tanah (d) Real Beban Runtuh
gambut lebih rendah daripada fondasi tiang di
lapisan soft clay (Jelisic & Leppanen, 2001). Tiang uji full friction tunggal dengan
Semua kondisi di lapangan tersebut juga panjang tertanam L1=11.5 m menghasilkan
telah lama dibuktikan oleh Tomlinson (1957) kapasitas ultimit berdasarkan real beban
dan juga oleh Vijayvergiya dan Focht (1972), runtuh sebesar 13.35 ton (real), Chin
yang semuanya berpendapat bahwa daya 13.33 ton, Davisson 8.40 ton dan Tangent
dukung ultimit tiang lekatan di dalam tanah 9.55 ton. Kapasitas dukung ultimit yang
kohesif hampir selalu lebih rendah daripada mendekati real beban runtuh adalah
daya dukung ultimit dari tiang tahanan ujung berdasarkan Metode Chin. Metode Tangent
dengan tiang yang dipancang sampai mencapai dan Davisson memberikan hasil kapasitas
tanah keras. ultimit yang jauh lebih kecil Metode Chin. Hal
Pengujian pembebanan langsung tiang uji ini menunjukkan apabila Metode Chin ternyata
paling sesuai kenyataan di lapangan. Di sini
full friction pada penelitian ini dilakukan ternyata Metode Tangent dan Davisson kurang
dengan memberikan beban bertahap sampai sesuai untuk digunakan pada tiang tipe full
dengan tercapainya keruntuhan tiang uji di friction.
lapangan. Hasil pengujian mendapatkan kurva Hasil uji pembebanan ultimit kelompok
load-displacement pada full friction pile tiang G2 (4 tiang dalam kelompok) dan G3 (9
berupa kapasitas aksial ultimit tiang dan tiang dalam kelompok) seperti diperlihatkan
immediate settlement tiang. Kondisi ultimit pada Gbr. 2.
321
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
menunjukkan kapasitas ultimit tiang tunggal,
tiang individu dan kelompok tiang juga
memberikan informasi besarnya settlement
pada kondisi linier dan non-linier dari kurva
load displacement yang dihasilkan dari uji
pembebanan lapangan jangka pendek.
Deformasi pada tiang dibatasi untuk
deformasi normal (elastis linier) sebesar 1%
(V.N. Murthy, 2002) dan beban ultimit
dianggap tercapai apabila pada suatu beban
tertentu maksimum penurunan total yang
Gbr. 2. Kurva Load Displacement Kelompok terjadi sebesar 10% diameter tiang (Singh,
Tiang; G2-L1 dan G3-L1 (s=3d) 2016). Gbr. 3 membagi deformasi tiang full
friction pada 4 bagian. Tahap awal adalah
Tabel 1 memperlihatkan kapasitas ultimit kondisi elastis linier pada 1% diameter tiang,
kelompok tiang dengan beberapa metode pada
sampel kelompok tiang G2 dan G3. tahap 2 yaitu kondisi linier dan tahap ke 3
kondisi non linier dan kondisi ke 4 adalah
Tabel 1. Kapasitas Dukung Ultimit pada kondisi menuju keruntuhan (failure/ultimate)
Kelompok Tiang (Yudiawati dan Mochtar, 2019).
Qultimit (ton)
Metode
G2-L1;3d G3-L1;3d
Metode Chin 26.66 66.66
Metode Davisson 22.80 53.00
Metode Tangent 23.20 47.00
Real beban runtuh 26.00 64.80
322
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Analisis kurva load displacement tiang kelompok tiang G2 (L1;3d) sama tetapi
tunggal full friction S-L1 seperti ditunjukkan immediate settlement pada kondisi elastis linier
Tabel 1. tiang yang lebih dulu diuji lebih kecil
dibanding tiang yang diuji setelahnya.
Tabel 1. Analisis Load Transfer Kurva Load Hal ini menunjukkan apabila keruntuhan tanah
Displacement Tiang Tunggal S (L1)
dan tiang disekitar tiang uji mempengaruhi
% % load displacement tiang individu lainnya.
Analisis dia Qult
Elastis Linier 1 10.26 Kapasitas ultimit tiang individu lebih kecil
Non Elastis Linier 3 47.19 dibanding tiang tunggal, immediate settlement
Non Elastis Non Linier 166.25 100 tiang individu juga relative lebih besar
Qult = 13.35 ton dibanding tiang tunggal.
Individual pile yang diuji pada kelompok
Load transfer friksi tiang S (L1)
tiang G3 (9 tiang dalam kelompok tiang)
termobilisasi elastis linier sebesar 10.26% Qult.
seperti ditunjukkan Gbr. 5. Posisi individual
Sedangkan pada kondisi elastis non-linier
pile pada kelompok tiang G3 (L1;3d) ini
sebesar 47.19% Qult. Umumnya metode
diwakili oleh 3 sampel tiang uji yaitu tiang tepi
konvensional allowable axial load 1/3 dari
(No.4), tiang tengah/center (No.5) dan tiang
kondisi linier tersebut. Hasilnya tiang tunggal
sudut (No.9).
S (L1) hanya mampu dibebani sekitar 15%
Qult. Kondisi ini menunjukan Faktor
Keamanan mencapai 6 - 7. Kondisi ini
mengakibatkan beban yang dapat diaplikasikan
pada tiang tunggal full friction akan sangat
kecil. Karenanya penggunaan tiang full
friction kurang disukai karena rendahnya daya
dukung ijin tiang untuk menahan beban kerja
pada pondasi sehingga jumlah tiang dalam
kelompok menjadi tidak ekonomis.
Individual pile yang diuji pada kelompok
tiang G2 (4 tiang dalam kelompok)
ditunjukkan Gbr. 4. Gbr. 5. Kurva Load Displacement Individual Pile,
Kelompok Tiang G2 (L1;3d) dan Kelompok Tiang
G3 (L1;3d)
323
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
IG2(L1;3d-2) IG2(L1;3d-4) individual pile group G2 (2x2) dan G3 (3x3)
Analisis % % % % pada penelitian ini sesuai dengan uji
dia Qult dia Qult pembebanan real individual friction pile pada
Non Elastis 4.6 40 2.22 76
Linier tanah Clayey Silt yang dilaporkan McCabe dan
Non Elastis Lehane (2006), bahwa kapasitas dukung tiang
Non Linier 343.13 100 303.50 100
pada posisi sudut lebih besar daripada tiang di
Qult IG2(L1;3d-2)= 10 ton posisi tengah kelompok tiang. Chellis (1961)
Qult IG2(L1;3d-4)= 10 ton
menyatakan bahwa pada kelompok tiang
Tiang individual pada kelompok tiang G2, adanya tiang individu lain di sekitarnya
pada kondisi linier menyumbangkan daya memberikan pengaruh kepada daya dukung
dukung sekitar 40 – 76% Qult, tergantung letak individual pile akibat overlapping gelembung
posisi tiang dan waktu pengujian. Tiang No. 4 tekanan pada masing-masing tiang.
yang diuji lebih dahulu memberikan hasil Tiang individu memiliki kapasitas aksial
kapasitas dukung yang lebih besar dibanding yang lebih kecil daripada tiang tunggal, akan
tiang No. 2 yang diuji setelahnya. Hal ini tetapi penurunan immediate terhadap
menunjukkan masih terlalu dekatnya jarak % diameter tiang lebih besar dibanding tiang
waktu pengujian memberikan pengaruh besar tunggal. Kapasitas aksial jika dibandingkan
pada kapasitas dukung tiang kondisi linier dengan single pile (13.35 ton) dengan tipe
yang tercapai. yang sama, individual pile posisi sudut/tepi
sebesar 30-36% sedangkan pada posisi center,
Tabel 3. Analisis Load Transfer Kurva Load reduksi hingga 44%. Terlalu dekat jarak waktu
Displacement Tiang Individual G3 (3x3) pengujian tiang individu inilah yang
IG3 IG3 IG3 diperkirakan mempengaruhi kapasitas ultimit
Analisis
(L1;3d-4) (L1;3d-5) (L1;3d-9) yang didapatkan. Seharusnya, pengujian antara
% % % % % % satu individual pile dengan pengujian
dia Qult dia Qult dia Qult
Elastis
berikutnya harus diberi jeda waktu yang cukup
1 33.2 1 17.2 1 38.5 (beberapa hari s/d seminggu) agar tanah di
Linier
Non sekitar tiang yang diuji dapat “sembuh”
Elastis 5.33 56.98 5.77 62.7 2.22 53.2
kembali.
Linier
Non Hasil analisis load transfer kurva load
Elastis
258 100 257 100 255.3 100
displacement kelompok tiang seperti disajikan
Non Tabel 4.
Linier
Qult IG3(L1;3d-4) = 9.30 ton Tabel 4. Analisis Load Transfer Kelompok Tiang
Qult IG3(L1;3d-5) = 7.50 ton (L1) Variasi Jumlah Tiang
Qult IG3(L1;3d-9) = 8.45 ton
G2(L1;3d) G3(L1;3d)
Tiang individual pada kelompok tiang G3 Analisis % % % %
pada kondisi linier menyumbangkan daya dia Qult dia Qult
dukung sekitar 53 – 62% Qult, tergantung letak Elastis Linier 1 9.60 1 13.77
Non Elastis 8.88 69.6 5.33 55.55
posisi tiang dan waktu pengujian. Tiang No. 4 Linier
yang diuji lebih dahulu memberikan hasil Non Elastis
Non Linier 150.5 100 90 100
kapasitas dukung yang lebih besar dibanding
tiang No. 2 yang diuji setelahnya. Hal ini Qult G2(L1;3d) = 26.00 ton
Qult G3(L1;3d) = 64.80 ton
menunjukkan masih terlalu dekatnya jarak
waktu pengujian memberikan pengaruh besar Seperti telah ditunjukkan pada Gbr. 5 dan
pada kapasitas dukung tiang kondisi linier Tabel 4 kapasitas ultimit kelompok tiang
yang tercapai. G2(2x2) lebih kecil daripada kelompok tiang
Pada kelompok fully friction pile meskipun G3(3x3). Peningkatan kapasitas aksial
jarak antar tiang >2.5d, pengaruh overlapping kelompok tiang G3(L1;3d) dibandingkan
tegangan masih sangat besar pengaruhnya G2(L1;3d) dengan penambahan jumlah tiang
terhadap kapasitas ultimit grup. Hasil uji 2.25 kali sekitar 250%. Kapasitas ultimit
324
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
kelompok tiang G3 jauh lebih besar dibanding 3 KESIMPULAN
G2, akan tetapi kurva load displacement pada
tiang kelompok G3 (3x3) memberikan Penentuan kapasitas ultimit menggunakan
immediate settlement yang lebih besar Metode Chin lebih mendekati kapasitas ultimit
dibandingkan kelompok G2 (2x2) hal ini berdasarkan beban runtuh sebenarnya di
dikarenakan beban real yang diberikan jauh lapangan. Effisiensi kelompok tiang full
lebih besar walaupun rasio bebannya sama. friction mencapai 50%. Pengaruh overlapping
Load transfer friksi yang termobilisasi pada tegangan individual pile dalam kelompok tiang
kondisi elastis linier sebesar 1% diameter tiang menyebabkan reduksi kapasitas ultimit
didapatkan pada kapasitas beban 9.6 - 13.77 masing-masing individual pile sekitar 25-40%
Qult. Hasil ini menunjukkan apabila pada dari kapasitas ultimit single pile.
kelompok tiang full friction, kondisi elastis Deformasi elastis linier tercapai pada rasio
linier hanya menyumbang kapasitas dukung beban sekitar 10% dan deformasi non elastis
sekitar 10%. Sedangkan pada kondisi non linier pada tiang tunggal sudah tercapai pada
elastis linier pada kelompok tiang G2 (L1;3d) rasio beban 40-80% dan kelompok tiang pada
sebesar 69.6% Qult dan kelompok tiang 40-80%. Deformasi pada tiang tunggal lebih
G3(L1;3d) sebesar 55.5% Qult. kecil dibanding kelompok tiang, tetapi
Pada metode konvensional pemberian prosentasi beban ultimit yang dihasilkan lebih
beban umumnya 1/3 dari kondisi elastis non besar kelompok tiang. Pada metode
linier tersebut. Hasilnya apabila menggunakan konvensional Faktor Keamanan ditentukan
metode konvensional pada G2 (L1;3d) akan berdasarkan 1/3 kondisi elastis non linier, pada
dibebani sekitar 23.2% Qult, dan pada tiang tunggal sebesar 6-7 dan pada kelompok
G3(L1;3d) akan dibebani sekitar 18.5% Qult. tiang 5-6.
Kondisi ini menunjukan Faktor Keamanan
yang digunakan pada kelompok tiang
mencapai 5-6. Hasil ini menunjukkan beban DAFTAR PUSTAKA
kerja akibat penambahan jumlah tiang dalam
Budhu. 2011. Soil Mechanics and Foundations, 3rd
kelompok sebesar n ≈ 2.25 n (n=jumlah tiang Edition, Hamilton Printing Company, US.
dalam kelompok) ternyata tidak meningkatkan Chelis. 1961. Pile Foundations Second Edition,
kapasitas beban kerja. Hal ini disebabkan McGraw-Hill Book Company, pp.704.
immediate settlement kondisi linier pada Chin, F.K. 1970. Estimation of ultimate load of piles not
carried to failure, Proceedings 2nd Southeast Asia
kelompok tiang dengan jumlah tiang lebih
Conference on Soil Engineering, 81-90.
besar akan jauh lebih besar. Kondisi ini Davisson, M.T. 1975. Pile Load Capacity, Proceedings
mengakibatkan beban yang dapat diaplikasikan Design Construction and Performance of Deep
pada tiang kelompok full friction akan sangat Foundation, American Society of Civil Engineers,
kecil. University of California, Berkeley
Jelisic, N., dan Leppänen, M. 2001. Mass Stabilization
Kondisi ini mengakibatkan beban yang of Peat in Road and Railway Construction, Swedish
dapat diaplikasikan pada tiang kelompok full Road Administration, SCC-Viatek Finlandia.
friction akan sangat kecil. Karenanya McCabe, B. A. and Lehane, B. M. 2006. Behavior of
penggunaan tiang kelompok full friction Axially Loaded Pile Groups Driven in Clayey Silt,
kurang disukai karena rendahnya daya dukung Journal of Geotechnical and Geoenvironmental
Engineering, ASCE, Vol. 132, No. 3, pp. 401-410
ijin tiang untuk menahan beban kerja pada Mochtar, I.B. 1985. An Experiment Study of Skin
pondasi sehingga jumlah tiang menjadi tidak Friction and Creep of Piles in Clay, Ph.D Thesis,
ekonomis. Department of Civil and Enviromental Engineering
University of Wisconsin, Madison, Wisconsin.
325
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Murthy, V.N.S. 2002. Geotechnical Engineering Offshore Technology Conference, Houston, TX,
Principles and Practices of Soil Mechanics and OTC 1718, pp. 865-874.
Foundation Engineering. Marcel Dekker Inc., New Wael N. Abd Elsamee, W, N, Abd. 2012. Evaluation of
York. the Ultimate Capacity of Friction Pile, Engineering,
Singh. 2016. Verification of Pile Load Capacity Using 2012, 4, 778-789.
Static Pile Load Test, CESDOC 2016. Yudiawati, Y., Mochtar, I.B., Mochtar, N.E. 2019. The
Tomlinson, M.J. 1957. The Adhesion of Piles Driven in Behavior of Load-Settlement Due to Long-Term
Clay Soils, Proc. 4th Int. Conf. Soil, ISSN No: 2319- Loading on Friction Pile Group in the Field.
3484, Volume 2, Issue 3. Doctoral Disertation, Department of Civil,
Vijayvergiya. V.N. and Focht, J. A.1972. A New Way Enviromental and Geo Engineering of ITS Surabaya,
to Predict the Capacity of Piles in Clay, 4th Annual Surabaya.
326
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Sejak dikeluarkan secara resmi tatacara perhitungan dan perencanaan struktur-geoteknik
khususnya ketentuan baru mengenai uji beban tiang aksial tekan, dampak langsung dalam praktik lapangan
seringkali masih diketemukan hal-hal yang membingungkan. Tulisan ini mencoba menguraikan secara garis
besar penggunaan peraturan SNI 8640-2017 mengenai kriteria batasan maksimum penurunan tiang dan
membandingkan dengan pekerjaan yang sama yaitu ketentuan evaluasi uji beban jika masih ditetapkan dengan
sebelum dikeluarkannya peraturan ini atau dengan menggunakan peraturan ASTM D1143. Usulan pendekatan
praktis perbaikan peraturan untuk masa mendatang disajikan dalam tulisan ini disertai contoh dari beberapa
hasil evaluasi pekerjaan uji beban tiang pada proyek-proyek berjalan.
Kata Kunci: uji beban, evaluasi
ABSTRACT: Since the Indonesian National Standard for geotechnical foundation engineering design has been
issued in particularly the new design procedure for axial compression pile load test, may directly impacted in
the construction practice and often create confusion. This paper elaborates in brief the use of the SNI 8640-
2017 related with the maximum limitation of pile settlement measurements and make study comparison with
former requirements prior this regulation is complied or when the ASTM D1143 is used. The proposed revise
recommendation of this matter for future implementation had been directly illustrated in the design examples
which had been selected chosen from several pile load tests evaluation of the current pile-foundation projects
Keywords: loading test, evaluation
327
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
a. 25 mm untuk tiang dengan ukuran telah ditetapkan dalam SNI 8460-2017
maksimum diameter 800 mm (lihat Gbr. 3) perlu segera dilakukan revisi
b. 4 % diameter untuk tiang berukuran lebih dengan sedikit modifikasi di dalam tata cara
tahap pemberian beban uji tiang supaya
besar dari 800 mm
diperoleh hasil evaluasi beban tiang rencana
c. Penurunan permanen setelah beban 200 yang sejalan dengan standar peraturan ASTM
% dilepaskan tidak boleh melewati batas D1143.
maksimum 12 mm
2 TATA CARA UJI BEBAN TIANG
Terdapat perbedaan mendasar mengenai AKSIAL TEKAN
batasan bacaan penurunan sebagaimana yang
lazim diberlakukan dalam praktik sehari-hari Mempelajari secara seksama tahapan tata cara
sebelum peraturan SNI 8460-2017 ini uji beban tiang pada kebiasaan praktik lapangan
diterbitkan yaitu dengan mengikuti persyaratan yang dilakukan di Indonesia dapat dijelaskan
yang sudah ditetapkan di dalam peraturan sbb:
standar pengujian negara Amerika Serikat, a. Uji beban tiang hampir selalu dilakukan
ASTM D1143, yaitu batasan rate penurunan
maksimum sebesar 0.25 mm/jam selama menggunakan metode kentledge dengan
pelaksanaan pengujian berlangsung. tahapan pemberian beban mengikuti
Latar belakang persyaratan bacaan tahapan beban 3-5 siklus tipe MLT
penurunan pada pengujian beban tiang pondasi (maintained load test) sistim Kentledge
diuraikan secara singkat dan garis besar, yang atau tiang reaksi, mengikuti tata cara
disajikan dalam bentuk contoh evaluasi uji pembebanan sesuai ASTM D1143-13
beban dari sebuah proyek, dengan sebagaimana dapat dijelaskan melalui
memperbandingkan hasil evaluasi penentuan
daya dukung tiang berdasarkan standar Gbr. 1 dan 2, masing-masing untuk
peraturan SNI 8460-2017 dengan peraturan hubungan beban 200 % & 250 % terhadap
ASTM D1143. Dalam banyak hal ketentuan durasi tahap pembebanannya.
SNI 8460-2017 sudah cukup realistis memadai b. Jika diperhatikan pada kolom catatan
pada variasi rentang ukuran diameter tiang, dinyatakan bahwa sebagai batasan bacaan
namun pada kasus-kasus tertentu misalnya maksimum rate penurunan tiang untuk
untuk tiang pancang pracetak PC dengan variasi setiap tahapan pembebanan sesuai ASTM
ukuran diameter yang relatif jauh lebih kecil
dari 800 mm, persyaratan SNI 8460-2017 D1143 adalah tidak boleh melewati
dianggap kurang menguntungkan perencanaan 0.25 mm/jam.
pondasi tiang.Usulan perbaikan persyaratan
penentuan batas penurunan maksimum yang
UJI BEBAN 4-SIKLUS 200 % AKSIAL TEKAN ASTM 1143
no Persen Beban uji Tipe Durasi Tahapan Pembebanan dalam
siklus Beban rencana (kN) Beban menit
1 0
25 A
0
0-10-20-30-40-50-60 (-70-80-90-100-110-120)
250
50 B 0-10-20-30-40-50-60
25 C 0-10-20
0 D 0-10-20-30-40-50-60
2 50 C 0-10-20
75
100
A
B
0-10-20-30-40-50-60 (-70-80-90-100-110-120)
0-10-20-30-40-50-60 200
75 C 0-10-20
50 C 0-10-20
0 B 0-10-20-30-40-50-60
3 50 C 0-10-20
100
125
150
C
A
B
0-10-20
0-10-20-30-40-50-60 (-70-80-90-100-110-120)
0-10-20-30-40-50-60
150
125 C 0-10-20
100 C 0-10-20
50 C 0-10-20
0 B 0-10-20-30-40-50-60
4 50
100
C
C
0-10-20
0-10-20
100
150 C 0-10-20
175
200
A
D
0-10-20-30-40-50-60 (-70-80-90-100-110-120)
0-10-20-30-40-50-60
dan dilanjutkan per jam
75
50
150 B 0-10-20-30-40-50-60
100 B 0-10-20-30-40-50-60
50 B 0-10-20-30-40-50-60
0 E 0-10-20-30-40-50-60
25
dan dilanjutkan per jam
NOTE:
A: 1 jam jika rate penurunan < 0.25 mm/jam, maksimum 2 jam
B: 1 jam
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
C: 20 menit
D: 12 jam jika rate penurunan < 0.25 mm/jam, maksimum 24 jam
E 2 jam sampai dicapai rate penurunan elastis < 0.25 mm/jam, maksimum 12 jam
Gbr. 1. Garis Besar Tahapan Beban Siklus 200% Sesuai ASTM D1143
328
23rd Annual National Conference on Geotechnical Engineering
UJI BEBAN AKSIAL TEKAN 5-SIKLUS 250% ASTM D1143 Jakarta - INDONESIA, 12-13 November 2019
no Persen Beban uji Tipe Durasi Tahapan Pembebanan dalam
siklus Beban rencana (kN) Beban menit
1 0 0
25 A 0-10-20-30-40-50-60 (-70-80-90-100-110-120)
50 A 0-10-20-30-40-50-60 (-70-80-90-100-110-120)
25 C 0-10-20
0 B 0-10-20-30-40-50-60
2 50 C 0-10-20
250
75 A 0-10-20-30-40-50-60 (-70-80-90-100-110-120)
100 A 0-10-20-30-40-50-60 (-70-80-90-100-110-120)
75 C 0-10-20
50 C 0-10-20
0 B 0-10-20-30-40-50-60
3 50 C 0-10-20
100 C 0-10-20
125 A 0-10-20-30-40-50-60 (-70-80-90-100-110-120)
200
150 A 0-10-20-30-40-50-60 (-70-80-90-100-110-120)
125 C 0-10-20
100 C 0-10-20
50 C 0-10-20
0 B 0-10-20-30-40-50-60
4 50 C 0-10-20
100 C 0-10-20
150 C 0-10-20
150
175 A 0-10-20-30-40-50-60 (-70-80-90-100-110-120)
200 D 0-10-20-30-40-50-60
dan dilanjutkan per jam
150 C 0-10-20
100 C 0-10-20
50 C 0-10-20
0 B 0-10-20-30-40-50-60
5 50 C 0-10-20
100
150
200
C
C
C
0-10-20
0-10-20
0-10-20
100
225 A 0-10-20-30-40-50-60 (-70-80-90-100-110-120)
75
250 D 0-10-20-30-40-50-60 (-70-80-90-100-110-120)
dan dilanjutkan per jam
200 B 0-10-20-30-40-50-60
150 B 0-10-20-30-40-50-60
50
100 B 0-10-20-30-40-50-60
50 B 0-10-20-30-40-50-60
0 E 0-10-20-30-40-50-60 (-70-80-90-100-110-120)
dan dilanjutkan
NOTE:
A:
B:
1 jam jika rate penurunan < 0.25 mm/jam, maksimum 2 jan
1 jam
25
C: 20 menit
D: 12 jam jika rate penurunan < 0.25 mm/jam, maksimum 24 jam
Gbr. 3. Batasan Penurunan Maksimum Tiang Sesuai SNI 8460-2017 (Tanuwidjaja, H.R.,2019)
329
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Merujuk kepada peraturan SNI 8460-2017 atau rate penurunannya adalah 0.26 dan
pasal 9.81 (lihat Gbr. 3), batasan 0.14 mm/jam. Untuk bacaan per 10 x 1
deformasi/penurunan tiang pada beban 200 jam 26.84, 26.88, 26.92, 26.96, 26.99,
27.02, 27.04, 27.06, 27.07, 27.09 mm
% adalah:
atau rate penurunannya adalah 0.06, 0.04,
25 mm untuk tiang dengan diameter 0.04, 0.04, 0.03, 0.03, 0.02, 0.02, 0.01 dan
maksimum 800 mm. 0.02 mm/jam.
4 % diameter untuk tiang > 800 mm. Pada tahap pengurangan beban dari
Deformasi/penurunan tetap tiang 200 % sampai dengan 0 % selama durasi
setelah dilakukan pelepasan beban dan pembacaan beban 3 x 10 menit pertama
(pengurangan beban dari 150 s/d 50 %)
pembebanan 200 % tidak boleh ditambah 6 x 10 menit terakhir untuk
melewati atau ≤ 12 mm). bacaan tetap 0 % diperoleh bacaan
Ada beberapa batasan bacaan penurunan penurunan tiang masing-masing adalah
maksimum dalam uji beban tiang aksial yang 25.66, 25.63. 25.6, 21.25, 21.21, 21.18,
dikutip dari daftar pustaka sbb : 15.49, 15.45, 15.43 mm atau dengan rate
a. Reese & Wang (2005), Sharma & penurunan untuk 3x10 menit pertama
adalah 0.03, 0.03, 0.04, 0.07, 0.04, 0.02
Prakash (1990): penurunan total mm/10 menit atau 10.23 mm/jam (untuk
maksimum adalah sebesar 38 mm dengan penurunan beban dari 150 % sampai
penurunan tetap sebesar 20 mm. dengan 50 %).
b. Terzaghi, K. (1942): penurunan total Dilanjutkan dengan bacaan penurunan
maksimum tidak boleh melewati batasan untuk 6 x10 menit terakhir pada kondisi
10 % dari ukuran diameter tiang. beban tetap 0 % adalah masing-masing
sebesar 5.93, 5.88, 5.84, 5.79, 5.76, 5.73
c. Tomlinson, (2017): pergeseran tanah
dan 5.72 mm (dapat dipakai sebagai
untuk memobilisasi friksi tiang penurunan tetap < 12 mm) atau dengan
maksimum diperkirakan 0.3 – 1 % rate penurunan 0.21 mm/jam < 0.25
diameter tiang. mm/jam.
Dari hasil evaluasi bacaan penurunan tiang
3 EVALUASI UJI BEBAN TIANG selama proses uji beban tiang dan jika
disesuaikan dengan kriteria batasan bacaan
Hubungan bacaan beban vs penurunan tiang penurunan maksimum sesuai SNI 8640-2017
selama proses waktu uji beban tiang aksial dapat diberikan kesimpulan bahwa pada saat
tekan untuk keperluan pokok bahasan dari beban 200 %, bacaan yang diukur adalah
tulisan ini, secara selektip telah diambil dari sebesar 27.09 mm >25.0 mm dan dinyatakan
sebuah laporan uji beban siklik tiang 5-siklus, tidak memenuhi syarat karena telah melewati
250 % (2.5 x beban rencana 1400 kN) lihat ketentuan batasan maksimum yang telah
Gbr. 4, yang diambil dari salah satu pekerjaan diberikan dalam peraturan tersebut. Sebaliknya
pondasi tiang PC Pile 450 x 450 mm pada dengan pengecualian hanya satu bacaan pada
proyek Landmark Pluit (Aksan Kawanda, saat awal bacaan dilakukan yang mempunyai
2012) sebagaimana terlihat pada Gbr. 4 berikut nilai rate penurunan 0.26 mm/jam yang sedikit
ini. Mengamati tabel hasil bacaan penurunan melewati batas bacaan yang diberikan di dalam
tiang selama uji beban berlangsung yang telah peraturan ASTM D1143 yaitu sebesar 0.25
disajikan secara sistimatis dalam bentuk mm/jam ; meskipun demikian dapat dianggap
tabelaris mengenai bacaan pengukuran beban masih dalam batas toleransi kesalahan dengan
vs penurunan tiang selanjutnya dapat margin of error 4 % < 5 %. Demikian halnya
disimpulkan hal-hal sbb: pada pembacaan lanjutan tercatat rata-rata dan
a. Pada beban 200 % rencana selama durasi berturut-turut secara konsisten besaran rate
pembacaan beban 12 x 60 menit penurunan bertendensi relatip menurun serta
diperoleh bacaan besarnya penurunan lebih stabil dengan nilai rate penurunan jauh
tiang yang masing-masing dibagi untuk lebih rendah dari nilai 0.25 mm/jam yaitu
bacaan per 12 x 10 menit adalah sbb: sekitar batas rentang 0.01 mm - 0.14 mm/jam.
untuk tahap penambahan beban : 26.38 , Tinjauan berikutnya terhadap bacaan
26.43, 26.48, 26.52, 26.56, 26.60, 26.64, penurunan pada tahap pengurangan beban
26.68, 26.71, 26.74, 26.76, 26.77, 26.78 sampai mencapai 0 % didapatkan nilai
330
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
penurunan tetap sebesar 5.72 mm yang lebih besarnya penurunan pada beban 200 % yang >
kecil dari 12 mm dan dengan rate penurunan 25.0 mm, rate penurunannya > 0.25 mm/jam
sebesar 0.21 mm yang lebih kecil pula dari nilai serta maksimum penurunan permanen setelah
0.25 mm/jam; masing-masing harga 5.72 dan beban dilepaskan 12.8 > 12.0 mm. Artinya
12 mm adalah batas bacaan maksimum yang beban rencana yang diinginkan (1400 kN)
ditetapkan dalam peraturan SNI 8640-2017. untuk mencapai faktor keamanan sebesar 2.5
Secara batasan penurunan dan rate penurunan tidak terpenuhi.
maksimum sesuai ASTM D1143, kondisi tiang
masih memenuhi syarat peraturan tersebut, 4 KESIMPULAN
b. Pada beban 225 % selama durasi bacaan
beban 6 x10 menit diperoleh bacaan Dari hasil bahasan yang telah diuraikan di atas
masing-masing adalah 32.29 , 32.35, selanjutnya dapat diberikan kesimpulan
32.42, 32.45, 32.49, 32.53 dan 32.53 mm sederhana termasuk saran perbaikan tata cara
atau rate penurunannya adalah 0.24 tahapan pemberian beban pada uji beban tiang
mm/jam yang masih lebih kecil 0.25 aksial tekan sbb:
mm/jam, secara prinsip pada tahapan a. Jika kita menggunakan acuan peraturan SNI
pembebanan ini tiang pondasi masih 8640-2017, pada pembebanan 200 % (2800
diklasifikasikan sebagai kondisi baik dan kN) dengan durasi bacaan 12 x 60 menit
masih memenuhi syarat ketentuan dalam
penurunan tiang yang diperoleh adalah
peraturan ASTM D1143 artinya dapat
diterima, dengan demikian kondisi beban sebesar 27.09 mm, yang lebih besar dari
225 % sejatinya harus dipertahankan batas maksimum 25 mm sebagaimana yang
dengan anggapan sebagai beban puncak ditetapkan SNI. Besarnya penurunan
untuk uji beban tiang aksial dalam contoh permanen tercatat dengan nilai maksimum
kasus ini, dan selanjutnya bacaan sebesar 5.72 mm, lebih kecil dari batas
penurunan tiang dapat dilanjutkan sampai maksimumnya yaitu 12 mm. Atas dasar
tahapan keseluruhan proses uji beban
argumentasi tersebut di atas, menurut
tiang aksial tekan sesuai peraturan ASTM
D1134 dituntaskan. ketentuan SNI 8640-2017 tiang pada
c. Pada beban puncak 250 % selama durasi kondisi beban 200 % tidak memenuhi syarat
bacaan beban 2 x 60 menit masing- dan tidak dapat diterima. (Pada proyek-
masing yang dibagi per 10 menit adalah proyek sesudah dikeluarkannya peraturan
34.98, 35.05, 35.19, 35.32, 35.48, 35.63, SNI 8640-17 ini, seringkali pekerjaan uji
35.76, 35.96, 36.13, 36.44, 36.59 dan beban tiangnya langsung dihentikan dan
36.77 mm atau rate penurunan 0.78
dinyatakan gagal setelah diketahui
mm/jam dan kemudian meningkat
menjadi 1.01 mm/jam yang lebih besar penurunan maksimumnya > 25 mm ?),
dari 0.25 mm/jam. Bacaan penurunan Menurut pendapat penulis pernyataan ini
lebih lanjut selama durasi 10 x 1 jam sangat membingungkan pada sebagian
berikutnya dicatat 36.97, 37.12, 37.34, besar orang awam seperti client/pemberi
37.50, 37.65, 37.84, 37.99, 38.19, 38.21, tugas atau pemilik bangunan yang tidak
38.35 mm dan mempunyai batas rentang mengerti teknis karena dari sudut pandang
rate penurunan dari 0.11-0.20 mm/jam
mereka hal teknis ini sudah diserahkan
yang masih lebih kecil dari harga
maksimum yang diizinkan yaitu sebesar kepada ahlinya dengan telah mengeluarkan
0.25 mm/jam . biaya pengeluaran yang tidak sedikit untuk
d. Pada bacaan dengan beban 0 % tercatat pekerjaan uji beban ini namun kenyataan
besarnya penurunan tetap tiang adalah yang didapat adalah sia-sia belaka karena
sebesar 12.80 mm > 12 mm. tidak dapat menghasilkan satu kesimpulan
apapun sesuai yang diharapkan. Jelas hal ini
Dalam hal ini yaitu keadaan pada (c) dan (d)
dengan jelas dapat dinyatakan bahwa kondisi sedikit “unfair” (kurang proportional).
tiang pada beban ini tidak memenuhi syarat b. Batasan bacaan pada beban 225 % (3150
atau tidak diterima (baik menggunakan kN) dapat dikatakan memenuhi syarat
peraturan SNI maupun ASTM) karena masing- stabilitas penurunan sesuai ASTM D1143
masing tidak memenuhi syarat maksimum
331
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
yaitu dengan rate penurunan tiang lebih Pada bacaan penurunan lebih dari
kecil dari 0.25 mm/jam. Seharusnya uji 25-30 mm atau pada tahapan beban lebih
beban dapat diteruskan sebagaimana besar dari 225 % bagian daya dukung tiang
biasanya hanya beban puncak yang semula dari tahanan friksi maksimum sudah
direncanakan sebesar 2.5 x 1400 atau 3500 terlampaui dan penambahan beban
kN tidak dapat tercapai. Beban puncak yang lanjutannya sudah mulai ditransfer melalui
diperoleh dalam kasus ini adalah sebesar mekanisme kuat tahanan ujung tiang yang
beban 225 % nya yaitu 3150 kN. akan menghasilkan penurunan
Selanjutnya grafik hubungan bacaan beban permanennya. Mungkin batasan penurunan
tiang vs penurunan dapat dipakai sebagai maksimum 25 mm SNI 8640, perlu direvisi
acuan untuk menghitung daya dukung tiang menjadi 25-30 mm, misalnya untuk
ultimit dengan metode yang lazim menghindari kegagalan awal (SNI) seperti
dipergunakan dalam praktik perencanaan hasil uji beban tiang pada contoh kasus ini.
pondasi tiang di Indonesia seperti metode f. Terkait dengan batasan jumlah halaman
Chin, Davisson dan Mazurkiewiecz. Atas dalam tata cara penulisan makalah ini
dasar asumsi ini selanjutnya dapat selanjutnya contoh serupa yang diambil
dipastikan estimasi beban tiang ultimitnya pada evaluasi hasil uji beban aksial tiang
adalah akan > 225 % x1400 atau 3500 kN pancang pada proyek yang baru selesai
atau mempunyai faktor keamanan > 2.0 , dilaksanakan (2019) di daerah Jakarta
dan dapat dinyatakan ok masih dapat di Barat, akan diuraikan dan disajikan dalam
terima laporan hasil uji beban ini sesuai bentuk presentasi langsung pada saat
beban yang direncanakan dari semula . penyampaian makalah ini.
c. Pada bacaan beban 250 % (3500 kN) baik
persyaratan SNI 8640-2017 dan ASTM
D1143-13 tidak dapat terpenuhi, karena DAFTAR PUSTAKA
penurunan maksimum mencapai nilai 36.77
Terzaghi, K. 1942. Discussion of the Progress Report of
mm dan rate penurunan maksimum tercatat the Committee on the Bearing Value of Pile
0.78-1.01 mm/jam, jelas kedua-dua nilai ini Foundations, Proceeding ASCE, 68, pp. 311-323.
sudah jauh melewati batas maksimum yang Prakash, S., and Dharma, S. 1990. Pile Foundations in
ditetapkan peraturan tersebut di atas yaitu Engineering Practice, 786 pp.Wiley-Interscience,
masing-masing 25 mm dan 0.25mm/jam. 768 pp.
d. Perlu dilakukan usulan perubahan Reese, L., Ishenhower, W., and Wang, S.,T. 2005.
Analysis and Design of Shallow and Deep
ketentuan mengenai batasan penurunan
Foundations, John Wiley 1st Ed., 608 pp.
maksimum tiang sesuai SNI 8460, pasal Aksan Kawanda. 2012. Laporan Pengujian Beban Statik
9.8.1; yaitu untuk diperbaiki atau diganti Aksial Tekan Tiang IP-16’, Geotech Engineering,
dengan mengacu kepada syarat baku yang Proyek Landmark Pluit, Jakarta.
lebih proportional sebagaimana telah ASTM D 1143. 2013. Standard Test Methods for Deep
ditetapkan dalam ASTM D1143 yaitu Foundations Under Static Compressive Load,
batasan maksimum dari rate penurunan American Society of Testing Materials.
Tomlinson, M., Woodward, J. 2017. Pile Design and
tidak boleh melampaui 0.25 mm/jam.
Construction Practice, CRP Press 6th Ed. 608 pp.
e. Besarnya pergeseran tanah maksimum yang Badan Standarisasi Nasional. 2017. Persyaratan
dibutuhkan untuk memobilisir friksi Perancangan Geoteknik, SNI 8640, 490 pp.
sebagai bagian dari daya dukung tiang pada Tanuwidjaja, H.R., Tanuwidjaja, E.,E., Santoso, G.K.
kasus ini faktanya dari data hasil uji beban 2019. Kajian Terhadap Kemampuan SDM
aksial tekan tiang ini dapat diestimasi Konstruksi Bangunan Tinggi di Indonesia,
Indobuildtech, Indonesia Building Technology
sebesar 25 - 30 mm > 25 mm (5- 6.7 % dari
Expo, 20-24 Maret 2019, ICE, BSD
diameter tiang), yaitu mulai tercapainya
besar rate penurunan tiang > 0.25 mm/jam.
332
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Pembangunan Jalan Tol Pejagan – Pemalang Seksi 3 dan 4 merupakan bagian dari jaringan
Jalan Tol Trans Jawa yang terbagi 2 konstruksi meliputi Seksi 3 dengan panjang ± 10.45 km dan Seksi 4
dengan total panjang ± 26.9 km. Studi kasus ini berada pada Seksi 3 di STA 290+840 yaitu pada Oprit
(timbunan di belakang Abutment) Jembatan Kali Gangsa. Tinggi timbunan pada lokasi oprit tersebut adalah
± 8 m dan dari hasil Soil Investigation yaitu uji sondir menunjukkan bahwa pada lokasi tersebut terdapat
tanah lunak (soft soil) dengan kedalaman mencapai 5 m, Sehingga pemilihan penanganan tanah pada lokasi
tersebut menggunakan PVD Preloading. PVD Preloading dimaksudkan untuk meningkatkan kuat geser
tanah pada tanah lunak di lokasi tersebut, timbunan preloading berfungsi sebagai beban vertikal sehingga
dapat mengalirkan air ke atas melewati PVD dan PHD. Namun pada aktual pelaksanaan PVD Preloading
dilapangan kurang baik pelaksanaannya. Dengan berjalan nya pekerjaan konstruksi timbunan terjadi longsor
pada ketinggian timbunan mencapai 8 m Setelah dilakukan pengecekan dengan uji bore log pada lokasi
longsor masih didapatkan lapisan tanah dengan nilai konsistensi rendah (soft soil) di bawah existing pada
lokasi yang dilakukan penanganan dengan menggunakan PVD Preloading. Penggunaan alternatif
penanganan setelah terjadi longsor diputuskan menggunakan Structure Pile Slab - Spun pile diameter
600 mm, alternative penanganan tersebut dilaksanakan karena pertimbangan waktu yang lebih cepat serta
mengatasi permasalahan kondisi tanah lunak.
Kata Kunci: pvd preloading, soil investigation, tanah lunak, structure pile slab-spun pile, oprit, jalan tol
ABSTRACT: The construction of Pejagan Pemalang Toll Road Section 3 and 4 is part of the Trans Java
Toll Road network which is divided into 2 Construction includes Section 3 with a length of ± 10.45 km and
Section 4 with a total length of ± 26.9 km. This case study is in Section 3 of STA 290+840, namely Oprit
(embankment behind Abutment) Kali Gangsa Bridge. The height of the embankment at the Oprit location is
± 8 m and results of the Soil Investigation ie sondir test indicate that at that location there is soft soil with a
depth of up to 5 m, So that the selection of improvement of soft soil at these location is by using PVD
Preloading. PVD Preloading is intended to increase the shear strength of soft soils in the location, the
preloading embankment functions as a vertical load, produce pore water pressure, then the pore water
pressure can dissipated more faster upward through the PVD dan PHD. However, the actual implementation
of PVD Preloading in the field is not good. As the construction of the pile progressed landslides occurred at
height reaching 8 meters. After checking with the Bore log test at the landslide location, a layer of soil with
low consistency value (soft soil) was still found below the existing at the location which was handled using
PVD Preloading. The alternative treatment has been decided using Structure Pile Slab – Spun pile diameter
of 600 mm, the alternative handling is carried out because of consideration of faster time and overcoming
problems of soft soil conditions.
Keywords: pvd preloading, soil investigation, soft soil, structure pile slab – spun pile, oprit, toll road
333
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
1 PENDAHULUAN
334
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Tabel 1. Parameter Tanah Oprit 1 3 ANALISA PERBAIKAN TANAH PADA
LERENG TIMBUNAN
No Soil Type k E ref MENGGUNAKAN BEBERAPA BARIS
(m/day) (kN/m³) kPa TIANG
1 Very Soft 4.50E-03 14 2000
2 Soft Clay 4.50E-03 15 3000 Berdasarkan hasil back analysis yang telah
3 Firm 4.50E-04 16 6000 dilakukan pada lokasi Oprit 1 maka diperlukan
4 Very Stiff 2.20E-05 18 25000 alternatif perbaikan tanah untuk mengatasi
5 Loose 2.20E-02 15 9000 masalah stabilitas tanah dan daya dukung
tanah dasar, serta penurunan tanah. Salah satu
6 Stiff 3.90E-04 17 13000
alternatif penanganan yang digunakan adalah
7 Very Stiff 2.20E-05 18 25000 menggunakan beberapa baris tiang pada lereng
8 Hard 4.30E-05 19 45000 timbunan.
9 Timbunan 1.00E-01 18 9000 Pemilihan beberapa baris tiang sebagai
AAAAAAAA AAAAAAAA
alternatif penanganan bertujuan untuk
meningkatkan daya dukung dan stabilitas tanah
A
y
A dengan cara memotong bidang sliding yang
x terjadi pada tanah dasar berdasarkan berat
tanah timbunan di atas tanah dasar.
Jenis tiang yang digunakan dalam analisis
ini adalah tiang Spun diameter 60 cm dengan
interval memanjang 2.1 meter dimodelkan
sebagai elemen plate dengan model elastik.
Penggunaan parameter tiang Spun
disesuikan dengan Spesifikasi PT Wijaya
Gbr. 4. Pemodelan back analysis kondisi longsor
Karya Beton, Tiang Spun diameter 60 cm kelas
pada timbunan preloading 2.0 m
beton A3.
Tabel 2. Parameter Tiang Spun Diameter 60 cm
Interval Memanjang 2.1 m
EA EI d W
(kN/m) (kNm2/m) (m) (kN/m)
2.53E+06 8.23E+05 0.627 0.524
335
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Gbr. 7. Pemodelan Penanganan Tiang Spun Gbr. 9. Nilai Safety Factor pada Penanganan
di Oprit 1 Tiang Spun Sebesar 1.1
Pada pemodelan penanganan menggunakan Setelah dilakukan penanganan
tiang spun di lereng timbunan, dilaksanakan menggunakan tiang spun pada lereng timbunan
pada elevasi timbunan 4.0 m. terjadi kenaikan faktor keamanan pada tanah
Berdasarkan pemodelan serta analisis yang dengan memotong bidang sliding tanah,
telah dilakukan, dapat dibandingkan besar nilai namun deformasi yang terjadi pada tiang
displacement dan safety factor yang terjadi masih menunjukkan nilai yang besar.
antara kondisi saat back analysis dengan Pada analisis dengan penanganan beberapa
kondisi saat menggunakan penanganan. baris tiang pada lereng timbunan didapatkan
Dari hasil perhitungan analisis pada Oprit 1 hasil settlement yang terjadi pada akhir
back analysis saat terjadi longsor kondisi konstruksi s/d 1 tahun sebesar 3.4 cm, namun
timbunan preloading 2.0 m nilai total nilai deformasi yang terjadi pada tiang masih
displacement sebesar 1.12 m dengan nilai menunjukkan nilai yang besar. pada sisi kanan
safety factor 1.08 dan pada hasil perhitungan sebesar 23 cm dan pada sisi kiri sebesar 32 cm.
back analysis dengan penanganan tiang spun
kondisi timbunan preloading 2.0 m nilai total
displacement sebesar 1.07 m dengan nilai 4 ANALISA PERBAIKAN TANAH PADA
safety factor 1.1. SLOPE TIMBUNAN MENGGUNAKAN
STRUKTUR PILE SLAB - SPUN PILE
336
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
337
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Cement-fly ash-gravel (CFG) merupakan salah satu metode perbaikan tanah yang diterapkan
dalam pembangunan Kereta Cepat Jakarta-Bandung. CFG terdiri dari kerikil, pasir, fly ash dan semen yang
kemudian dicampur dengan air menggunakan peralatan khusus. Lokasi studi kasus ini berada di Walini,
Bandung Barat, Jawa Barat. Penyelidikan tanah di daerah ini menunjukkan adanya lapisan tanah lempung
kelanauan dan mudstone ekspansif. Daya dukung tiang CFG pada pekerjaan ini dihitung berdasarkan standar
China JG 79-002 Technical Code for Ground Treatment of Buildings. Namun, dalam tulisan ini, daya
dukung dihitung menggunakan rumus empirik yang biasa digunakan untuk tiang bor di Indonesia. Hasil uji
Pile Driving Analyzer (PDA) digunakan sebagai verifikasi dalam penentuan daya dukung CFG
menggunakan korelasi empiris untuk tiang bor. Hasil PDA test menunjukan, secara umum, persamaan
empirik tiang bor dapat digunakan untuk CFG. Namun demikian, tahanan friksi hasil PDA lebih tinggi
daripada hasil persamaan empirik, sedangkan tahanan ujung menunjukkan hasil sebaliknya.
Kata Kunci: CFG, perbaikan tanah, pekerjaan tanah, daya dukung, tes PDA
ABSTRACT: Cement-fly ash-gravel (CFG) is one methods of soil improvement applied in the construction
of the High Speed Railway Jakarta-Bandung. CFG consists of gravel, sand, fly ash, and cement that
subsequently mixed with water using a particular equipment. The location of this case study is in Walini,
West Bandung, West Java. The soil investigations showed the presence of silty clay and expansive
mudstone. Bearing capacity of CFG piles was calculated according to the Chinese Standard, JG 79-002,
Technical Code for Ground Treatment of Buildings. However, in this manuscript, bearing capacity was
calculated using empirical formula that is commonly used for bored pile in Indonesia. Pile Driving Analyzer
(PDA) test results were used as verification in the evaluation of CFG bearing capacity using empirical
correlation for bored pile. PDA test results showed that, in general, bored pile empircal correlation can be
used for CFG. Nevertheless, CFG friction resistance based on PDA test was higher than that of empirical
equations, whereas the end bearing showed the opposite.
Keywords: CFG, soil improvement, earthworks, bearing capacity, PDA test
338
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
soft ground embankment, and retaining mixtures, pipe lifting-up to the pile top is
structure. conducted at a constant speed while
simultaneously pumping the mixtures.
During the construction of CFG pile, the
2 CFG METHOD CONSTRUCTION duct should always be buried in the mixture for
about 1 m to prevent the pile from breaking.
The construction flowchart of CFG piling The feeding quantities of each pile should not
work is shown in Figure 1 and the sequences be less than the design casting quantities.
in Fig. 2 below. To install the CFG, equipment
is mobilized to the site. After mobilization,
equipment will be assembled. Before
commencement of CFG piling works,
condition of the operations of equipment is
checked.
After the drilling machine position is set at
the location of pile installation, checking and
adjustment of the drill rod are conducted to
ensure it is vertical to the ground and in line
with the center of the pile location. During
drilling of the CFG pile, the verticality of the
drill rod (or sinking tube) of the driller is
strictly controlled and the deviation should not
exceed 1%.
Before construction, typical sections should
be selected for trial pile test allowing the best
mix proportion and slump of the mixture for
construction, mixing time, pipe lifting speed,
current upon hole termination of the vibratory
tube-sinking pile driver and other
technological parameters.
After the drill valve is closed, drilling
moves downward to the ground and start
drilling at an increasing speed. Drilling will be
carried out to the design depth. During drilling,
a recording of the ammeter and checking Fig. 1. Method Construction Flowchart of CFG
against the changes of the subsoil layer along Piling Work (Source: PT Insema Sunly
the pile length should be performed every 1 m Engineering)
of sinking or sudden change of the ammeter
After reaching the design depth, pump the
CFG mixture into the pipe until the core tube
is filled with the mixture. In pumping the
mixture, the pumping quantities of mixture
and tube lifting speed should be controlled in
accordance with the determined parameters of
the trial pile. Raw materials for mixture such
as cement, fly ash, gravel and additives should
also comply with the design requirements.
Mixture pumping should be continuous and
pump suspension due to lack of mixture is not Fig. 2. CFG Construction Method Sequences
allowed. (Source: PT Insema Sunly Engineering)
The pumping pipeline should be filled with
mixtures before the lifting of the drilling rod.
During construction, the pumping pressure, the
bend and the condition of the drill rod should
be checked to prevent the duct from blocking.
After the pumping pipeline is filled with the
339
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
3 GROUND CONDITION 4 CFG PILE BEARING CAPACITY
This area is located in Walini, West Bandung, In this manuscript, bearing capacity of CFG
West Java. Originally, this area has hilly pile is calculated using bored pile equations.
terrain consisting of forest and farmland. Fill Therefore, the ultimate bearing capacity of the
and excavation earthworks are planned to CFG is the summation from the end resistance
reach designed elevation of train track. and the friction as expressed in the following
Outcropped rock is exposed within parts of equation (Meyerhof, 1976; Vesic, 1977):
the gully. Soil in this location is dominated by
silty clay and mudstone. The discussion in this Qu = Qp + Qs (1)
manuscript is mainly focused on the highest
embankment location as shown in Fig. 3. where Qu is the ultimate bearing capacity of
the CFG pile, Qp is the end bearing capacity,
and Qs is the skin friction capacity.
In general, the end bearing capacity of CFG
pile can be calculated using the following
equation (Skempton,1951):
Qp = 9 * cu * A (2)
Qsc = Ʃ Ti . p. li (4)
Ti = α . cu-i (5)
340
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
5 PDA TEST RESULT
Pile Driving Analyzer (PDA) is a complete
full-system computer equipped with special
strain transducer and accelerometer to evaluate
the force and velocity when pile is struck by a
hammer.
In general, PDA testing is performed after
pile have enough strength to resist impact from
hammer, another anticipation can be done
using a cushion or lower the hammer stroke
and using a heavier hammer.
Fig. 5. Correlation Between Adhesion Factor (α)
In June 19, 2019, a PDA test was conducted
and cu/pa
in this case study location for a 7 m pile
From some of the equations above, the axial length. The results and the summary PDA test
capacity of CFG pile in case study location is are presented in Fig. 7 and Table 2.
conducted based on boring-log shown in Fig.
4. Note that allowable bearing capacity is
calculated as the ultimate bearing capacity
divided by the Factor of Safety (FoS). The FoS
of 2.5 is adopted in accordance with SNI 8460-
2017. Summary calculations and graphics of
axial CFG pile capacity with 50 cm of
diameter are shown in Table 1 and Fig. 6.
6 ANALYSIS
The comparison of empirical equations and
PDA test results in evaluating the bearing
capacity shows a difference of 3.85% (Table
3). This difference value is still smaller than
5%. Thus, it can be accepted to validate
bearing capacity calculations using empirical
equations for the bored pile. Nevertheless, it
should be noted that the skin friction from the
PDA test is higher than the empirical
equations, whereas the end bearing is the
opposite. Further analysis is being conducted
on other PDA test results to check the validity
of this pattern
Fig. 6. Axial Capacity of CFG Pile with 50-cm
Diameter
341
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Table 3. Comparison Bearing Capacity Between REFERENCES
PDA Test and Empirical Equations
Chen, Q., Zhao, M., Zhou, G., Zhang, Z. 2008. Bearing
PDA Test Empirical capacity and mechanical behavior of CFG pile
(kN) Equation (kN) composite foundation. J. Cent. South Univ. Technol.
(2008) 15(s2): 045−049.
Skin Friction 475 396
Irsyam, M. dan Kartawiria, A. 2005. Permasalahan
End Bearing 219 272 Geoteknik dalam Desain dan Pelaksanaan Pekerjaan
Ultimate Pondasi, Jembatan Ciujung, Jalan Tol Cipularang
694 668
Capaity Tahap II. Seminar dan Pameran HAKI, Agustus: Z1-
Allowabale Z10.
277 267 Irsyam, M., Sahadewa, A., Boesono, A., Soebagyo.
Capacity
2007. Pengaruh Strength Reduction Tanah Clay-
Shale Akibat Pelaksanaan Pemboran Terhadap Nilai
Daya Dukung Pondasi Tiang di Jembatan Suramadu
7 CONCLUSION Berdasarkan Analisis Hasil Tes OC. Jurnal Teknik
CFG is used as ground improvement method Sipil ITB Vol. 14 No. 2 Mei 2007 pp. 69-82.
in the construction of the High Speed Railway Technical Code for Ground Treatment of Buildings. JG
Jakarta-Bandung. CFG is made using an 79-2002. 2002. China Architecture Industry Press,
equipment that mixes gravel, sand, fly ash, Beijing.
cement, and water. Kulhawy, F.H. 1984. Limiting Tip and Side Resistance-
The location of this case study is in Walini, Fact or Fallacy, Analysis and Design of Pile
Foundations, ed. J.R. Meyer. ASCE. New York,
where soil stratigraphy is dominated by the N.Y: 80-98
presence of silty clay and expansive mudstone. Meyerhof G.G. 1976. Bearing Capacity and Settlement
Bearing capacity of CFG was calculated of Pile Foundations. ASCE JGED Vol. 102, No. GT
using empirical equations that are commonly 3, March: 196-228.
used for bored pile in Indonesia. PDA test Reese, L.C. dan O'Neill, M.W. 1988. Drilled Shafts:
results were used as verification in the Construction Procedures and Design Methods.
FHWA Publication No. FHWA-JI-88-042 atau
evaluation of CFG bearing capacity using ADSC Publication No. ADSC-TL-4, August: 564.
common empirical equation. In general, it is Reese, L.C. dan Wright, S.J., 1977. Drilled Shaft
shown that empirical equations for bored pile Manual-Construction Procedures and Design for
can be used to evaluate the bearing capacity of Axial Loading, Vol. 1, U.S. Dept. of Transportation,
CFG. Nevertheless, it should be noted that the Implementation Division. HDV-22. Implementation
Package 77-21, July: 140
skin friction from the PDA test is higher than Skempton, A.W. 1951. The Bearing Capacity of Clays.
the empirical equations, whereas the end Proceedings of Building Research Congress.
bearing is the opposite. Other PDA test results London, 1: 180-189.
are being analyzed to check the validity of this Persyaratan perancangan geoteknik. 2017. SNI
pattern 8460:2017. Badan Standardisasi Nasional.
Terzaghi, K. dan R. B. Peck. 1967. Soil Mechanics in
Engineering Practice. John Wiley and Sons.
Tomlinson, M.J. 1970. Adhesion of Piles in Stiff Clay.
ACKNOWLEDGEMENTS CIRIA, Report 26. London.
Vesic, A.S. 1977. Design of Pile Foundations. National
The authors would like to express their highest Cooperative Highway Research Program Synthesis
appreciation to Mr. Suryanto Supardi and Dr. of Practice No. 42. Transportation Research Board
Adang Surahman from CARS Dardela Joint Washington, D. C.
Operation (CDJO) for moral encouragement to Wang, W., Feng., Li. 2013. Analysis on bearing
capacity of CFG pile composite foundation in
complete this manuscript. The Baotou. Applied Mechanics and Materials Vols 353-
acknowledgment is also given to KCIC and 356 (2013): 337-340. © Trans Tech Publications,
HSRCC for supporting CDJO in providing Switzerland.
loading test data
342
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRAK: Penyelesaian persamaan diferensial pondasi tiang dengan beban lateral dan momen digunakan
metode analitik dan metode numerik beda hingga (Finite Difference Method) untuk memperoleh respon
pondasi tiang yaitu perpindahan, momen lentur, gaya geser yang ditinjau dalam kondisi normal dan kondisi
terlikuifaksi. Hasil yang diperoleh bahwa metode beda hingga dibandingkan terhadap metode analitik sangat
baik dengan perbedaan 0.78% untuk lendutan dan 0.15% untuk momen lentur. Respon pondasi tiang saat
terjadinya gempa dan likuifaksi secara signifikan menambah besar respon perpindahan, momen lentur (M)
dan gaya geser (V).
Kata Kunci: pondasi tiang, modulus reaksi tanah dasar, persamaan diferensial, metode beda hingga,
likuifaksi
ABSTRACT: The solution for differential equations in pile foundations with lateral loads and moment used
analytical method and finite difference method to obtain pile foundation respones which include
displacement, bending moment, shear forces observed under normal conditions and liquefaction conditions.
The results obtained that the finite difference method compared to the analytical method is very good with a
difference of 0.78% for deflection and 0.15% for bending moment. The response of pile foundations during
earthquakes and liquefaction significantly increases the displacement response, bending moment (M), and
shear force (V).
Keywords: pile foundations, modulus of subgrade reaction, differential equations, finite difference methods,
liquefaction
343
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
Bhattacharya (2008), Adhikari & Bhattacharya 2.2 Metode Analitik
(2008), Madabhushi (2010), Madabhushi & Sesuai Dinev (2012), analisis struktural
Haigh (2012), Garcia & Madabhushi (2018), pondasi tiang dengan beban lateral merupakan
Chowdhury & Dasgupta (2012 & 2019), dan suatu masalah nilai batas (BVP). Berdasarkan
penelitian lainnya. Pers. (1), dan modulus pondasi merupakan
Dalam kajian ini, penulis menganalisis fungsi kedalaman ks (x), maka dapat diperoleh
respon pondasi tiang pancang yang menerima persamaan berikut :
beban lateral dan momen akibat gaya gempa
pada kepala tiang, serta pengantar analisis
beban lateral pada pondasi tiang pancang pada d 4 y(x) k s (x) b
y(x) 0 (5)
tanah yang mengalami likuifaksi dx 4 E p Ip
(liquefaction). Penyelesaian persamaan
diferensial pondasi dengan beban lateral yaitu Nilai k s (x) sesuai Bowles (1997)
metode analitik dengan aplikasi perangkat
lunak MAPLE dan secara numerik k s (x) A s Bs x n (6)
menggunakan Metode Beda Hingga (FDM).
Untuk ujung pondasi bagian atas dengan
2 RESPON LATERAL PONDASI TIANG kondisi batas (boundary conditions)
dy
(0) 0 ;
2.1 Bentuk Umum Persamaan Diferensial dx
(7)
Persamaan diferensial pondasi elastis d3 y
E p I p 3 (0) F
diberikan oleh Hetenyi (1946), perluasan dx
untuk pondasi tiang sebagai balok pada
pondasi elastis yang menerima beban lateral
(H) dan sepasang gaya tekan Px yang bekerja
di pusat gravitasi dari potongan melintang
balok, sesuai Desai & Christian (1977), Poulos
& Davis (1980), Reese & Impe (2011), bentuk
persamaan diferensial pondasi tiang dengan
beban lateral adalah :
d4 y x d2 y x
E p Ip Px p W 0 (1)
dx 4 dx 2
Dimana :
E p I p = kekakuan lentur tiang, y(x) = lendutan
lateral tiang, x = jarak aksial sepanjang tiang,
Px = beban aksial, dan p = reaksi tanah per unit
panjang, W= beban terdistribusi sepanjang
tiang. Untuk momen lentur M, gaya geser V,
dan reaksi tanah p di sepanjang tiang dapat Gbr. 1. Pondasi Tiang Dengan Beban Lateral
ditentukan menggunakan hubungan berikut:
Dan pada ujung bawah pondasi dengan kondisi
d2 y
E p Ip 2 M (2) batas (boundary conditions)
dx d2 y
d3 y E p I p 2 (h) 0 ;
E p I p 3 V (3) dx (8)
dx
d3 y
d4 y E p I p 3 (h) 0
E p I p 4 p k s by (4) dx
dx
344
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
kemudian Persamaan Differensial Penentu dari 2R m 1 2R m
suatu fungsi itu dinyatakan dalam Pendekatan R m 1 y m 2 y m 1
Px x
2
Selisih Hingga atau suatu Pendekatan Aljabar
untuk suatu fungsi tertentu. Turunan pertama, R m 1 4R m R m 1
kedua, ketiga dan keempat dalam bentuk beda 4 m
y (16)
2Px x E s x
2
hingga
2R m 2R m 1
dy y m-1 y m1 y m 1 R m 1 y m 2 0
Px x
2
(9)
dx 2x
d 2 y y m-1 2 y m y m 1
(10)
dx 2 x 2
d 3 y - y m-2 2 y m-1 2 y m 1 y m 2
(11)
dx 3 2x 3
d 4 y y m-2 4 y m-1 6 y m 4 y m 1 y m 2
(12) x
dx4 x 4 x
d4 y d2M
E pIp (13)
dx 4 dx 2 m
Sesuai Desai & Christian (1977), Pers. (13) Gbr. 2. Pendekatan Beda Hingga Pada Pondasi
dalam bentuk persamaan beda hingga : Tiang Yang Dibebani Secara Lateral (Desai,
1977)
R m 1 y m 2 R m 1 2R m y m 1 Kondisi batas pada dasar pondasi
R m 1 4R m 2R m 1 y m Untuk pondasi tiang yang panjang, momen
lentur (M) dan gaya geser (V) pada dasar tiang
R m 1 2R m 1 y m 1 sangat kecil dan dapat diasumsikan nol.
d M
2
R m 1 y m 2 Momen lentur (M=0), memberikan
2 (14)
dx m x 4
y 1 2y 0 y1 0 (17)
Dan gaya geser (V=0)
Untuk x h / n adalah panjang segmen,
n adalah panjang segmen, dan R E p I p d3 y dy
Ro
3
Px 0 (18)
adalah kekakuan lentur tiang. Suku kedua ruas dx dx
kiri dari Pers. (1), dalam bentuk beda hingga Dalam bentuk persamaan selisih hingga :
Px x 2
2
Px d y Px y m 1 2y m y m 1 y 2 2y 1 2y1 y 2 y 1 y1 0 (19)
(15) Ro
dx 2 x 2
Kondisi Batas pada Kepala Tiang
Persamaan beda hingga sesuai persamaan Tiga kondisi yang mungkin pada bagian
diferensial dari Pers. (1) dengan subtitusi Pers. kepala pancang, yang tergantung pada kondisi
(14) dan Pers. (15) : alami pondasi tiang sebagai bangunan bawah
Kasus 1 : menerima gaya lateral (shear) Vt
dan momen lentur Mt :
y t 1 2y t y t 1 M t x 2 R t (20)
Dan
345
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
y t 2 2y t 1 2y t 1 y t 2 dan tidak berputar. Untuk modulus tanah dasar
dari Pers. (6), sesuai Bowles (1997)
Px x 2 2Pt x 3 (21)
t 1 t 1
y y k s (x) 200 50 x (28)
Rt Rt
Kasus 2 : menerima gaya lateral (shear) Vt
and kemringan (slope) St : Penyelesaian Analitis
Sesuai Pers. (5, 6), dan Pers. (28) maka
y t 1 y t 1 2xSt (22) diperoleh persamaan diferensial
Kasus 3 : menerima gaya lateral (shear) Vt
dan tahanan rotasional (rotational restraint)
d 4 y(x) 75.60 18.90 x
y(x) 0 (29)
Mt/St : dx 4 101600
y t 1 2y t y t 1 M t x Kondisi batas (BC) pada puncak kepala tiang
(23) untuk nilai x = 0, sesuai Pers. (7) :
y t 1 y t 1 2R tSt
346
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
347
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
modulus tanah dasar dengan fungsi
konstan dan kontinu.
b. Penyelesaian persamaan diferensial
pada pondasi tiang secara numerik
dengan pendekatan Metode Beda
Hingga (Finite Difference Methods),
memberikan penyelesaian yang akurat,
dan dapat digunakan untuk
menyelesaikan kondisi batas yang
rumit dan parameter beban serta
modulus tanah dasar dengan fungsi
yang konstan, kontinu maupun fungsi
diskrit.
c. Respon pondasi tiang saat terjadinya
Gbr. 7. Respon Lendutan Pondasi Tiang gempa dan likuifaksi secara signifikan
menambah besar respon perpindahan,
momen lentur (M) dan gaya geser (V).
d. Studi lanjut untuk respon lateral
pondasi tiang, dapat ditinjau kombinasi
Pasir lepas antara likuifaksi, lateral spreading,
ks = 1500 kN/m3
serta interaksi respon pondasi tiang
akibat beban lateral dan beban vertikal
Gaya Geser
Momen serta momen.
DAFTAR PUSTAKA
Pasir kepadatan sedang
ks = 5500 kN/m3
Abdel-Salam, AM., Abdel-Motaal, MA., Wahidy, MM.
(2014). Lateral displacement and pile instability due
Lempung padat to soil liquefaction using numerical model. Ain
ks = 20000 kN/m3
Shams Engineering Journal. pp. 1019–1032
Ashour, M., Norris, G. (2000). Modeling Lateral Soil-
Pile Response Based on Soil-Pile Interaction.
Journal of Geotechnical and Geenvironmental
Engineering. Pp 420-428.
Gbr.8. Respon Gaya Geser dan Momen Lentur Boariu, C. (2015). Soil Structure Interaction Calculus,
For Rigid Hydraulic Structures, Using FEM. Journal
Untuk analisis selanjutnya, perhitungan respon of Mechanical and Civil Engineering (IOSR-JMCE),
pondasi pada tiang pancang, jika tanah pada Volume 12, Issue 5 Ver. IV, pp 60-68
lapisan pertama yaitu pasir lepas (loose sand) Bowles, JE. (1997). Foundation Analysis and Design ,
dengan tebal 4,0 m mengalami likuifaksi fifth edition. McGraw Hill.
Broms B. (1964). Lateral resistance of piles in
(liquefaction) akibat goncangan gempa. Hasil cohesionless soils. Journal Soil Mech and Found
perhitungan dapat dilihat pada Gbr. 7 dan Gbr. Engng, ASCE; 90(SM3): pp. 123-156.
8. Berdasarkan hasil perhitungan tersebut Chowdhury, I, Dasgupta, SP. (2019). Earthquake
dengan membandingkan kondisi tanah Analysis and Design of Industrial Structures and
sebelum terlikuifaksi dan sesaat setelah Infra-structures. Springer Nature Switzerland.
mengalami likuifaksi, maka respon pondasi Cubrinovski, M. and Ishihara, K. (2004). Simplified
tiang pancang dalam hal ini perpindahan, method for analysis of piles undergoing lateral
spreading in liquefied soils, Soils and Foundations,
momen (M) dan gaya geser (V) meningkat Vol. 44, No. 25: pp. 119-133.
secara signifikan. Desai, CS., Christian, JT. (1977). Numerical in
Geotechnical Engineering. McGraw Hill.
Desai, CS., Zaman, M. (2014). Advanced Geotechnical
4 KESIMPULAN & SARAN Engineering, Soil–Structure Interaction Using
a. Penyelesaian persamaan diferensial Computer and Material Models. Taylor & Francis
pada pondasi tiang secara analitik, Group.
terbatas pada kondisi batas yang Dinev, D. (2012). Analytical solution of beam on elastic
Foundation by singularity functions. Engineering
sederhana dan parameter beban serta Mechanics, vol. 19, No. 6, p. 381–392.
348
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
George, A., Lovely, KM. (2015). Analysis of Pile Kavitha, PE., Beena, KS., Narayanan, KP. (2016). A
subjected to Lateral Loading in Clay modeled using review on soil–structure interaction analysis of
ANSYS. International Journal of Engineering laterally loaded piles. Innov. Infrastruct. Solut.
Development and Research (IJEDR). Volume 3, Khodair, Y., Abdel-Mohti, A. (2014). Numerical
Issue 4. Pp 414-417. Analysis of Pile–Soil Interaction under Axial and
Hamada, M., Wakamatsu, K., Shimamura, K. and Nire, Lateral Loads International Journal of Concrete
T. (2001). A study on the evaluation of horizontal Structures and Materials, Vol.8, No.3, pp.239–249.
displacement of liquefied ground, Proc. 26th JSCE Maktabipour MR., Motahari. MR. (2015). Analysis of
Earthq. Engrg. Symp.: pp. 649-652. Laterally Loaded Piles using Analytical and
Hetenyi, M. (1946). Beams on Elastic Foundation. Ann Numerical Methods. Current World Environment
Arbor, The University Michigan Press. Vol. 10, pp. 1043-1051
Ishihara, K, Yoshida, K. and Kato, M. (1997). Melerski, ES. (2006). Design Analysis of Beams,
Characteristics of lateral spreading in liquefied Circular Plates and Cylindrical Tanks on Elastic
deposits during the 1995 Hanshin-Awaji earthquake, Foundation, Second Edition. Taylor & Francis
Journal of Earthquake Engineering, Vol. 1, No. 1: Group, London, UK.
pp. 23-55. Poulos, HG., Davis, EH. (1980). Pile Foundation
Ishihara, K. and Cubrinovski, M. (2004). Case studies Analysis and Design. Rainbow Bridge Book Co.
of pile foundations undergoing lateral spreading in Prakash, S., Sharma, HD. (1990). Pile foundations In
liquefied deposits, State of the art paper, Fifth Int. Engineering Practice. John Wiley & Sons, inc.
Conf. on Case Histories in Geotechnical Reese, LC., Van Impe W. (2011). Single Piles and Pile
Engineering, New York.. Groups Under Lateral Loading. 2nd Edition. Taylor
Jones, G. (1997). Analysis of Beams on Elastic & Francis Group.
Foundations: Using Finite Difference Theory, Tiwari, K., Kuppa, R. (2014). Overview of Methods of
Thomas Telford. Analysis of Beams on Elastic Foundation. Journal of
Kalavathi GN, Muralidhar. (2015). Behavior of Piles Mechanical and Civil Engineering (IOSR-JMCE),
under Lateral Loading Soil Structure Interaction. Volume 11, Issue 5 Ver. VI, pp. 22-29.
Journal of Mechanical and Civil Engineering Tomlinson, M., Woodward, J. (2015). Pile Design and
(IOSR-JMCE) Volume 12, Issue 2 Ver. V PP 68-74. Construction Practice. Sixth Edition. CRC Press
Taylor & Francis Group.
349
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
ABSTRACT: The paper presents of Vertical Static loading tests of large diameter and deep boring piles
specifically performed on the construction site of Expo-2017, Nur-Sultan, Kazakhstan. The methodology of
definition for bearing capacity of the pile were briefly given. Bored piles of 31.5m length and 1000mm were
tested. The Vertical Static Load Tests were carried out for the following load configurations: Bi-directional
static loading test (by ASTM D8169) and Static compression loading test carried out in accordance to ASTM
D1143-07 and Static loading test carried out in accordance to GOST 5686-94. The results of testing by the
piles with the methods of Vertical Static Compression Load Test by ASTM – SCLT, Static Load Test by GOST
– SLT and Bi-Directional Static Load Test by ASTM D8169 - BDSLT are presented in this paper. The
capacities of the piles were predicted using the static pile load test data and compare with the conventional
interpretation methods. It was shown that the highest pile capacities prediction was obtained from the
Decourt’s extrapolation methods. The results predicted from De Beer, Fuller and Hoy and Butler and Hoy
interpretation methods were found to be in agreement. The method presented in the paper can serve as practical
guidelines to assess the capacities of bored piles installed in the field. This geotechnical investigation is
important for understanding the soil-structures interaction on difficult soil ground conditions related to the
construction sites.
Keywords: bi-directional static load test, pile capacity, soil-structure interaction, vertical static load test.
350
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
The thickness of sandy layer is between 10
m to 13 m. It shows that the fiction resistance
will dominate at this depth. Below the sandy
layer, a Gruse soil with an approximate
thickness of 12 dominate the area. Gruse soil is
a red soil like materials by which the original
rock is not recognizable Kusky (2003). The
weathering mechanical process is due by ice
wedging which dominates over chemical
process in cold climate. The base rock consists
of the highly fractured rock which is name by
Fig. 1. Plan for the Location of Boreholes at the Rock Debris soil. Table 1. shows the
Construction Site (Build – B1). Boreholes B28, Engineering properties of each section of the
B33 and B35 Cross-Hole Section Shows Fig.3. soil stratification. The magnitude of strength
parameters was presented in this Table 1.
351
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
352
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
(O-Cell jack) is a system of calibrated hydraulic
jacks combined into one module.
353
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
SG 40 × GEOKON 4911 Sister
Strain Gauges bar strain gauges
(10 levels)
Data Recording 1 × DATATAKER Model
Equipment DT515 data logger
(for pressure and
displacement)
1 × DATATAKER Model
DT80g data logger
(for Sister bar strain
gauges)
Data Recording 1 minute
Intervals
315
0 -2000 -4000 -6000 -8000-10000-12000
Calculated Load (kN)
Fig. 8. Schematic Diagram of Pile Layout for Bi-
Directional Load Test (BDSLT) Fig. 10. Calculated Load Distribution of Piles
(O-Cell-1 and O-Cell-2)
When preparing the O-Cell test, special
attention should be look into the detail of soil Average unit side shear between any two
mass structure of the construction site. The strain gauge levels of the pile was calculated by
location of the jack in the body of the pile will the change in load divided by the
depends on the soil properties to ascertain its circumferential area between the two strain
soil resistance. The decision to place the jack gauge levels. The maximum mobilized unit side
will affects the quality of the tests carried out, between the adjacent strain gauge levels were
since the determination of the load-bearing computed and are shown in the Table 3.
capacity components (along the lateral surface In test pile with O-Cell-1 shear distribution
and below the lower end) is normalized to the located at the pile section above the jack,
selection of an equal ratio of the lateral indicated an increase in unit skin friction from
resistance of the soil, along the upper element 76 kN/m2 to 481 kN/m2 at 200% of the working
to the resistance below the lower end of the load. For section below the jack, the shear
lower element of the experimental pile. Fig.9 distribution indicated an increase in unit skin
shows the arrangement of Bi-Directional Static friction from 190 kN/m2 to 458 kN/m2 at 200%
Load Test using O-cell on the site. of the working load. Similarly, for test pile of
Fig. 10 shows the results of strain-measuring O-Cell-2 the shear distribution located at the
transducers from the test. It presents the load pile section above the jack, shows an increment
distribution along the length of the piles and in unit skin friction from 83 kN/m2 to 477
indicates the lateral resistance of the pile with kN/m2 at 200% of the working load. For the pile
respect to the depth. The graph shows that even section below the jack, the shear distribution
at a maximum load, the pile is secured in indicated an increase in unit skin friction from
position by lateral resistance of the subsoil. 207 kN/m2 to 437 kN/m2 at 200% of the
Only a small part of the load accumulates to the working load. Both O-Cells test results are
pile edge. presented in Fig. 11. At maximum test load of
354
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
100% (14500 kN), the maximum displacements 200% (29000 kN), displacements of the piles
of the piles for O-Cell-1 is 7.30 mm and O-Cell- for O-Cell-1 and O-Cell-2 are 18.35 mm and
2 is 6.50 mm. At maximum working load of 14.40 mm respectively.
355
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
-15 ** Coefficients (ratio) of fixed settlement of 10 mm
Settelment (mm)
-10 has been taken (from BDSLT method);
-5
*** Coefficients (ratio) of fixed settlement of 14
Cell Bottom PTP-1
Cell top PTP-1 mm has been taken (from BDSLT method).
0 Pile Bottom PTP-2
Cell top PTP-2
5
10
0 400 800 1200 1600
Load (tonne)
Fig. 11. Results of Bi-Directional Static Load Test
Piles O-Cell-1 and O-Cell-2
356
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
4 CONCLUSION
This paper presented a brief descriptions of
innovation changes to the concept of
Kazakhstan pile foundation design. The
overlay of the curves showed that the
Fig. 13. Pile B Ultimate Capacity Prediction Using similarity of the results base from the
O-Cell-1 Data convergence of the graphs is observed only at
the initial stage of loading. The value tends to
diverge non linearly showing a change in the
trajectory of the SCLT curve. The
characteristic of the creeping stage of soil
resistance, is observed from the SLT and
SCLT tests. However, for the O-Cell curve
(at this stage of loading) is more representing
the characteristic of the elastic resistance of
the soil. When testing piles using the SCLT
method "from top to bottom", a design load
of 6000 kN corresponds to a settlement of
2.09 mm and at a maximum test load of
12000 kN the settlement obtain is 10.51 mm.
It should be noted that even with the
maximum test load, only the elastic operation
357
23rd Annual National Conference on Geotechnical Engineering
Jakarta - INDONESIA, 12-13 November 2019
of the pile in the ground is revealed with a Kusky, T.M. 2003. Geological Hazards. A
slight residual soil sediment after unloading Sourcebook, Greenwood Publishing Group Inc.
with a magnitude of approximately 1.4 mm. USA.
Pile Foundations. 2002. KAZGOR Design Academy.
When testing piles using the O-Cell test, a Almaty. SNIP RK 5.01-03-2002.
maximum test load of 29000 kN corresponds Zhussupbekov, A., & Omarov A. 2018. Piling
to a settlement of 18.35 mm for the O-Cell-1 Construction and Testing of Megastructures on
pile and 14.40 mm for the O-Cell-2 pile. Problematical Soil Ground of Kazakhstan.
During the testing of the piles, both elastic Proceeding 20th SEAGC- 3rd AGSSEA
and plastic deformation of the soil was Conference in conjunction with 22nd Annual
observed due to the greater test load on the Indonesian National Conference on Geotechnical
pile than experiencing in the SLT method. Engineering. Jakarta- Indonesia: 15-18.
Zhussupbekov, A.Zh., Lukpanov, R.E., & Omarov,
Conventional predicting test results shows A.R. 2016. Bi-directional Static Load Testing.
that Decourt’s extrapolation gives a Selected Paper from the Proceedings of the Fourth
conservative value of Ultimate pile capacity Geo-China International Conference: 35-42.
in comparison to other method. Zhussupbekov, A.Zh., Lukpanov R.E., & Omarov
A.R. 2016. Experience in Applying Pile Static
Testing Methods at the Expo 2017 Construction
REFERENCES Site. Scientific Journal Soil Mechanics and
Foundation Engineering. New-York, USA: 251-
256.
Standard Test Methods for Deep Foundations Under
Zhussupbekov, A.Zh., & Omarov A.R. 2016.
Static Axial Compressive Load. 2013. ASTM
Geotechnical and Construction of Pile Foundations
D1143 – 07.
in Difficult Soils Ground. Geotechnik-Tag in
Standard Test Methods for Deep Foundations Under
München Geotechnik Zusammen-wirken von For-
Bi-Directional Static Axial Compressive Load.
schung und Praxis. München: 41-48.
ASTM D8169.
Zhussupbekov, A.Zh., & Omarov, A.R. 2016. Modern
Butler, H.D., & H.E. Hoy. 1977. The Texas Quick-
Advances in the Field Geotechnical Testing
Load Method for Foundation Load Testing-User's
Investigations of Pile Foundations. The 15th Word
Manual. Report No. FHWA-IP-77-8.
Conference of Associated Research Centers for the
Chin, F. K. 1970. Estimation of Ultimate Load of
Urban Underground Space. Procedia Engineering.
Piles Not Carried to Failure. Proceedings, 2nd
Saint Petersburg, Russia.: 88-95.
Southeast Asia Conference on Soil Engineering:
Zhussupbekov, A.Zh., & Omarov, A.R. 2016.
81-92.
Geotechnical and Construction Considerations of
DeBeer, E. E. 1968. Proefondervindlijke Bijdrage tot
Pile Foundations in Problematical Soils.
de Studie van het Grensdraag Vermogen van Zand
Proceedings of the 8th Asian Young Geotechnical
Onder Funderingen op Staal. Tijdshift der Openbar
Engineers Conference (8 AYGEC). Astana,
Verken van Belgie, No. 6, 1967 and No. 4, 5, and
Kazakhstan: 27-32.
6.
Zhussupbekov, A.Zh., Omarov, A.R., Borgekova,
Decourt, L. 1999. Behavior of Foundations Under
K.B., Tanyrbergenova, G., & Ahazhanov, S.B.
Working Load Conditions. Proceedings of the 11th
2018. Comparison of the Pile Testing Results on
Pan-American Conference on Soil Mechanics and
EXPO-2017 (Kazakhstan). Proceedings of the
Geotechnical Engineering. Foz DoIguassu, Brazil,
International Conference “Geotechnics in
August 1999, Vol. 4: 453 - 488.
Belarus: Science and Practice”. Minsk, Belarus:
Fuller, F. M. & Hoy, H. E. 1970. Pile Load Tests
163-174.
Including Quick-Load Test Method Conventional
Zhussupbekov, A., Iwasaki, Y., & Omarov, A. 2018.
Methods and Interpretations. HRB 333: 78- 86.
The Experience Different of Piling Testing on
Methods for Field Testing by Piles. 1994. Gersevanov
Problematical Soil Ground of Astana, Kazakhstan.
Research Institute of Bases and Underground
International Journal for Computational Civil and
Structures (NIIOSP), Moscow. GOST 5686-94.
Structural Engineering, 14(4): 158-171
358