Global CW report for the site 30639 PO 13 hybrid

The design
2- The concrete cushion:

concrete cushion to keep the foundation clean

1st foundation 2nd foundation 3 rd foundation 4 rd foundation


3- the steel installation and anchor bolts fixation :

1st foundation 2nd foundation 3 rd foundation 4 rd foundation


4- the concrete pouring:

1st foundation 2 nd foundation 3 rd foundation 4 rd foundation


5- the backfilling :

1st foundation 2 nd foundation 3 rd foundation 4 rd foundation


6- site cleanup :
30639 PO13 TE Report
2. DG installation
3. Batteries’ system

4. ICC installation
5. A/C installation
6. Clean Up