INTEGRAL COACH FACTORY, CHENNAL-38
[| __________________| _\cR/MD/SPEC-167-A
\CHEDULE OF REQUIREMENTS FOR ISSUE STATUS:01
FRP PANELS (USING POLYSTER RESIN) REV. No.0?
USED IN RAILWAY PASSENGER Date : 07-09-2006
COACHES
AMENDMENT SLIP NO. : 01 Dated.19-12-200 PAGES :1 OF 1
PAGE| CLAUSE | EXISTING REVISION _
ya | NEW ~ ~
CLAUSE ¥,) All interior surfaces must be finished with
ADDED - ‘material of good blending and good slow
2.0 ageing properties to provide a pleasant,
vai, highquality interior for ease of cleaning
and maintenance
vi.) All internal panel surfaces shall be smooth
finished with modern low flammability, low
smoke emission, and low toxicity materials.
All internal panels shall be resistant to
graffiti, scuffing, vandalism, and cleaning
agents, Rounded corners or covings shall be
provided wherever mutually perpendicular
flat plane surfaces abut.
i NEW 42.3: As far as possible, fastening devices,
CLAUSE fixings and securing screws shall not be
ADDED - visible from within the vehicle.
423&
424 4.2.4: ‘The gaps between all interior panels, seat
shell shall be minimized. ‘The effect of
thermal expansion should be taken into
account and unsealed gap should not
exceed Imm in depth where feasible.
CONTROLLED BY | PREPARED BY | VERIFIED BY APPROVED BY
es met.
. te qa O4
SSE/D/MS sMEmsD | DY.CME/DESIGN CDEMECH