Professional Documents
Culture Documents
Owner’s Engineer
Contractor
Sub-Supplier
Project
[Housing Complex]
Inspection and Test Plan for Painting Works
NS2-DH01-P0UYK-770014 A 04 Pages
ID No: NS2-DH01-P0UYK-770014
NGHI SON 2 BOT THERMAL POWER PLANT Rev: A
(2x600 MW) Date: 14.05.2020
TITLE: INSPECTION AND TEST PLAN FOR PAINTING WORKS
Participation by
Drawing, Codes & Standards
No. Description of Inspection/Test Process Acceptance Criteria Reporting Format Sampling Frequency Remarks
and Check method
Sub-Con Contractor Owner
Drawing NS2-VD00-P0UYK-770001
The CO/CQ and delivery report of
Certificate of Origin/Certificate of Quantity (CO/CQ) materials must be available and in
1 Standard QCVN 16:2017/BXD NS2-DH01-P0UYK-770014-01 R R R
- Emulsion Paint according to approved NS2-DE00-
P0UYK-770005 MAR for KOVA Paint
Check method Report Review
Drawing NS2-YR01-P0UYK-770001
II General preparation work
Check method Visual, Moisture meter
1 Surface Preparation
NS2-YR01-P0UYK-770001; NS2-
Drawing
VD00-P0UYK-770001
III Construction and Workmanship
Visual, Moisture meter, Dry Film
Check method
Thickness Gauge
NS2-YR01-P0UYK-770001 Painting
III.1 Emulsion Paint Standard
Procedure, Item 6
Page 1 of 3
ID No: NS2-DH01-P0UYK-770014
NGHI SON 2 BOT THERMAL POWER PLANT Rev: A
(2x600 MW) Date: 14.05.2020
TITLE: INSPECTION AND TEST PLAN FOR PAINTING WORKS
Drawing, Codes & Standards
No. Description of Inspection/Test Process Acceptance Criteria Reporting Format Participation by Sampling Frequency Remarks
and Check method
Abbreviation P: Performance R: Report Review W: Witness Inspection H: Hold Inspection S: Surveillance Inspection Acc: Accept Rej: Reject N/A: Not Applicable
Page 2 of 3
Code: NS2-DH01-P0UYK-770014-01
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT Rev: A
Date: 14.05.2020
Date:
Sub-Contractor:
Start:
Finish:
Work title:
Area No:
Inspected Item:
Assessed by
Inspected Item Description Check method
Acc Rej N/A
I Check Receiving Inspection
Certificate of Origin / Certificate of Quality The CO/ CQ shall be available and in
1 Report Review
(CO/CQ) according to Painting Procedure
Certificate of Origin / Certificate of Quality The Code and Color in according to Painting
2 Visual
(CO/CQ) Procedure, Color Scheme
II General preparation work
1 Surface Preparation
- All dirt, dust efflorescence, oil, grease and
stains shall be removed; Visual/
1.1 Concrete Surface
- All hole shall be properly filled with proper Moisture Meter
material
- The substrate must be sound, clean, dry,
free from dust, oil, grease; Visual/
1.2 Plaster Surface
- Surface defects must be repaired, smooth, Moisture Meter
no crack
All instruments and tools must be full and
2 Instruments and Tools Visual
ready for construction
III Construction and workmanship
Relative humidity of surface and the air before
Visual/Moisture
1 Condition during application apply shall be complied to Manufacturer's
Meter
Instructions
…………………………………………………………………………………………………………………………………………………………………
Signature
Description Full Name
Owner
Contractor
Subcontractor
Page 3 of 3