You are on page 1of 10
501-946 hap nding stems com web. en46 G OWNERS MANUAL Industrial door wow. loading-systems.com 9 202013 12:8 PM e601 946 perio adingyatems com welin sed LG sotone sons con — 1:4 Use of the manual $2 Opeator/ Teciidan $3 Ghaantos enn Ya tee Slew 11S Dectration of Conformity and CE-marking 2 Safety. 21 Gone nn 22. Regilave/ nor tegulatve wien 23 Setyprecovns wth rou i th So 2.4 Oblgetory annual inspection. 3 Description of the door 2.1 Description ofthe system. 22 Tedmeal dat 33 Asem, installa 34 Operation 35 Trowbleshooting 26 Maintenance wars 29 Abgwments 29 Outof operation Uae the. besings cod rolls ard Contact Loading Stans shoul He bowing wopect the bowing fle on possble| ols be damaged ‘image. Trspect te Hinges on paBle damage) Contact Loachg Stems shoudl the Faget | serie if rosie be damaged Inspect the dows Balance (ranal|Cortact Loadig Systems should whe bar, peraton) upon portal opening, move further in top oF gmat postion mintontonal [~The Gearing valan” aiey haul Be easy] Contact Leading Sytors should Be Downg orotate when he doors dosed roles not be rot aay Ta rotate tors aas2013 stp 01-946 Inp:rwafonding systems omen. send 46 LG tosome sre com ers c00t 3.7 Alignment Upon assombly the door syst shall be aligned as such that the stings comply with the agreed upon fequrements The user not to inate ary mocifstons to the sett, Should ary mocifeaton be applcabe ta atr stage, Loading Sytem toe contacted after which these shal be mediied by Loading Syste, ‘Should any moddfcations be performed with regard to the setings a set by Loading Systoms, either by the user or by any third pary, wrmination of the guarantee by Lbeaing Systems could be raul of unauthorized modifications. 3.8 Out of operation In order t be able 10 perform mirtennce wots thy technian or should the dor [gl totem ve out of order for longer period of tne, tho power eto be caconnected G | ireoiest's ior siscies! operat dao ony) snd sould quent be sfepuatded {SE sgnmstunintnded and vosthoned we @ 39 Disassembly, removal and processing The manufacure of the door has been as such thatthe dssssombly shall need to be parormed by qualied Loading Sytemt’ personnel. Loading Systems cannot be hel fable nd or respon for any urine or resrost descembiyw partormed by Wied partis With tegard to the movers as sod for the producton of the system no spect {kcumances or procedures need tobe taken ho consceraton wih ogurd to removal procesing. All paru ae to be femovad in accordance with the at that tne val Srvironmental regu ton. We ke care 0 3262015 12:54 OM.

You might also like