You are on page 1of 12
020 Revi 162012-240 OWNERS MANUAL Dock leveller www joading-systems.com “2 5262015 12:52PM 15-020 Rev162012-240, ps ww ting-yems come send ‘61 Provenive maintononce aMi/aaaNi00| 3.2 Prevemiva maintenance 230M/253M100/235NG 353. Armin maintenance. 37° Alignment 38 Outofoperaon 39 Dissembly, removal and processing 2 3 a 4 5 24 Genet. 8 22 Regulatve / non regulative use an) 23 Safety precautions with regard tothe dock lovl 5 24 Obigotory annul inspection nnn ‘ 2 Deteription of the dock leveller... 7 2.1 Detaiption of he systom.. : 2 33 Aeom i = 7 Ey = 7 36 Maintenares works me io 2ef2 =e oa 352003 1228 © 020 _Revi 162012 - 240 hap www oading systems com’ webtin,send 241 1 General 1.1 Use of the manual Tis manus! devcibes how the Loading Systems dock aves are to be operated. Which ‘afaty measures are to bo observed, inuuing 8 deaerption of the dock lvl a= wall o> how daects may be slved, This description has been mae for the Us bythe operator of the dock ‘vale, and indicates that after reading the manual you shal be capable of ‘perating the dock loveler, however not authorised to salve dock evel elated Seah, With reghre to tacrialdefauts you ae to contacts quai Loacing Stems engine Text layout: Text atc Information to which ent attention so be given Text n ble: eportane nformaton, e Symbols wed the posubie sk sf damaging the dock eveler of ak regarding occuring elas shoul {he nseuctons nt be observed tothe eter ‘Should tex be procoded by this symbol, his inceatos a wartng against the sk of physica ZA rece seer srme, we tn ing maweg | inicy speci he instructors not be obrerved tote eter 1.2. Operator / Technician Uso ‘he user is aach person handling the dock ev, in any way. (Operator: the operators each perton who t,under normal cumstances, inveved win Randing the dock lever The operator to be famvar with a ‘Sipulaonsregaring sfey ae doting n tha manus. The operator ot to porform any repair activites ono tothe dock evel Tectnicim: be wchian i Loading Spams tecnica (o a clan's tecnica for whom the cnt har obtain appro rm LestngSyea e “Quai te perform tac opus en otf he oe ver He’/ he ‘iolied to peroom mecunicl and of aco tach repers to the Spent) snd / or maeeanance ace, 1.3. Guarantee The guarantee condone, ancien the General Cantons of Sales and/or Guarartoe, shal be deemed legal nul and void shou 1." “Maintanance works and /orrepats have been performed whist not observing the Inervctone tthe ete, 2. Assam / rai werks have nox been performed bya Loacing Sytem 3. Other than origina Loacng Systems pare pars have been used 4 Nonjudicly, unjust and / or negigent hanging of the materiale delivered may be 5. The dock levellr has been used for other purposus than for which it hae boon esigned and constructed, gine eG tee a 22262018 122 PM 2Se-020 Revt 162012 -240 apsoronding estan come send24 LG roromesvsreus.com 1.4 After Sales Should defi or probs acu or how'd you hve any questions, please contact Leading Systems: wn leading sper com) you ae cling fom the UK pose cl +48 (}1484 61 400 Ifyou ae caling fom the Neterands loss call +31 (320 225 250 you are caling frm Beg pase call +32 (3) 203 9692 Iyou ar caling rm Germary plese cat 449 (09 33999 69 30 Hjou ar alg from France please cal 33 (0) 60 03 $9 59 Hiyou ar callng rm the Czech Republic posse cl 1420 602448 299 Iiyou are cling rom Stovala pease cal 421 9 & 664.498 Hiyou are cling rom Pole pons cl +861) 847 81 91 1.5. Declaration of Conformity and CE-marking Looting Systems Iterations! BY, Leodswg 1, 8243 PH LELYSTAD, tho Nother erewith declares ather own espensiby shat the products "Dock lover 2528 2321 2924100 ‘Dock leveler 289M, 293) 255M100, 233NG omuiy ith he Desctiassgauing Macinsry {Brocive 200622/6C, as pr the Int modeation) ‘Comy osha conditions of he following adonal EEC deste ecromagnetc Compatibility Dracive2004/108/EEC sd subsequent amendments; {ow Votage Drectve 2006/95/EEC ond subsequent armenian ~ Fulycomelynith the harmonian ECDiractv: EN 1398: 2009 Bee 5 = F020 1252 Ua KevtnecuiZ~ 200 tip: waconding-systems.comwebfin seni/24, 1G sateunocou soceisnun 2 Safety 24 Gena Notwithstanding all safety measures as ensured by Loading Systems the flowing aspects {roto be taken nto constrain = Dung ‘te eperation of the dock lovler, the surroundings ae tobe observed if posse (ne snot w insert any objects between, urderesth o into the dock level ‘movng pars of the dock level + Each Deron sto ensure a certain distance dung the movement ofthe surface of the dock evel. + The directon ofthe movement ofthe surface of the dock lveller shoud not be bockad nerd to snaure ro moverect. + After ‘an emergency stop, ta dock lvallar may only be “released” when the e ‘operator knows why the emergency sop occured 1 any Loading Systems cannot be held lable for any handing oF works, which have been Performed by 2 nonuthorsed, non-qualified cnet auficentyqusied tna, oper ot ‘ecm Regulative / non-regulative use Suey precutons Pro wo operating th dock evel fr the fist time, the operator ite read the fu ontans ofthe pertaining manual. ‘he dock var to be used in accordance withthe instructions. Ary other vse could rent m unpredictable ercumstancet or occurences and ls theretore sicty Toxbessor,

You might also like