Induction PDF
Induction PDF
com
Henley was the first
practitioner of IE. He
was a farmer who
make simple
observations about
farming methods and
ways of improving
them.
Industrial &
Manufacturing
Engineering(1909, (Pen
nsylvania State
University)
Taylor is known as the
“father of scientific
management”.
He broke the job into
elements and timed these
with stopwatch. Based on
these times he worked out a
bonus system.
He invents work-study
method during second world
war (1945) in USA.
How does it effect to the productivity?
Method Study
To
Simplify the job
&
Develop more economical
Methods to the job
Work
Study
Work measurement
To
Determine
How long it should take to
Carry out
Higher
Productivity
MAINTAIN
INSTALL
DEFINE
EVALUATE
DEVELOP
EXAMINE
RECORD
SELECT
Planning
Plant Layout
Workstation Design
Work Study
Quality
Maintenance
Merchandising(SD)
HRM
Inventory Management
Garment Price Lead time
Shirt
Jacket
Result jogger
In Market Approach
Manufacturing Cost = Selling Price – Profit
Variable Unchangeable
I hope
I got it
right
Reduce Cost
Limited Resource
› Time Study
› MTM/PMTS
› GSD
› SewEasy etc.
Sl. No Operation SMV
SMV :
Standard minute Value.
Standard Worker
The standard worker is that worker who has the consistency.
A qualified worker is one who has acquired the skill, knowledge and other attributes to
carry out the work in hand to satisfactory standard of quality, quantity and safety.
18
Variable
Constant
Variable
19
1. Machine allowances
2. Relaxation allowance
3. Contingency allowance
4. Policy allowance
5. Special allowance
Target is the amount of production, which should be
produced by an operator or a line that a
management desires.
Suppose;
20 x 08 x 60
Total operator------- 20
So. Target =-------------------------- x 85%
W/hour--------------- 08Hrs
15.65
SMV-------------------- 15.65
= 520ps
Expected eff.---------- 85%
= 65ps/Hr.
Lets do some exercise ….. Please use XL chart to calculate given DATA /
STATEMENT
Which are holding up production operations, or a lengthy operation, that
consumes a great deal of time. A bottleneck is the operation in any team
that has the lowest capacity of production.
22
A bottleneck may be arisen in the line for the
following reasons:
› More work content than other operators
› Unskilled or semi skilled operator in respect to
the operation
› Machine problems/breakdown
› Quality issues
› Operator Absenteeism
23
Apply the method study for work improvement.
› by improving the way the operator is handling the material and
doing the operation.
Make improvements by work aids (jig, guide, folder etc).
› Guide, Folder, attachment, Jigs etc. Using computerized UBTs and
other specialized machines.
Mechanize the manual work.
› Convert the manual work to machine work.
Change the positions of workers/better operator allocation.
› It may happen „B‟ grade operator is allocated to a bottleneck
operation where as „A‟ grade operator is working in another
operation; where B grade operator can work.
24
Investigate the modification to the machining specification.
Work in overtime
Additional machine/manpower
25
Observe time = Total cycle time/ No. Of cycle
Overproduction
1
Excess
Over Processing
8 2 Inventory
Rework 7 3 Waiting
Excess
Disconnectivity 6 4 Motion
5
Excess
Transportation
TOOLS &
TECHNIQUE
Input Conversion
Output
(Limited Resource) Process
MOTION ERGONOMICS
PDCA CYCLE
5’S
KAIZEN
Bottle Neck Operation
250
197 200 195
190
200
Capacity
150
98
100
50
0
Rehena Maksuda Nazma Nihar Selina
202
200
200
UCL 197
198
196
196 195
Capacity
CL
194
192
190
190 LCL
188
186
184
Rehena Maksuda Nazma+Kazol Nihar Selina
1 ASO Need three to four ASO No need to any Save three to four
for thread remove . ASO for thread ASO per line.
remove.
Therefore 1 person
Therefore 1 person makes 1.75 Pcs per hr.
makes 2 Pcs per hr
The Productivity ratio
is 1: 1.75
The Productivity ratio
is 1:2
shimul2k3ipe@gmail.com