Professional Documents
Culture Documents
Requirements
Contents
1. Scope of Works
2. Specification
3. Drawings
4. Supplementary Information
Scope of Works
CONTENTS
2.Current status
The unoccupied conductor triad of 400 kV Vezhen double circuit OHTL in the section from
line gantry tower of Plovdiv s/s to tower 445A with a length of 1.925 km will be used for
construction of the new 400 kV OHTL. This section is built with towers designed for ACO-400
type conductor consisting of three wires per bundle. The suspension towers are of type НМ
for two 400 кV OHTLs and special type СЕН2, whereas the tension towers are two per stake
of the currently available types 20.N and 70.N. Outlines of the suspension towers are shown
in drawings № 099-TL1-05DD-01-0101A1-00_МС-1HM and № D104-01C4-02-0A. Sheet 1
and 2 of № D104-01C4-04-0A represent the tension towers in front view.
From tower 445A to line gantry tower of Maritsa Iztok s/s, the new 400 kV OHTL will run on
an entirely new route as described in chapter I.3 of these Technical Specifications.
4. Scope of procurement
The scope of this procurement includes the following works:
- New tower route and midpoint staking;
- Foundation spotting;
- Excavations for foundation laying, installation and and leveling of tower foots according
to the stress-strain properties of the soil beneath each individual tower;
- Concrete delivery and casting and foundation laying for the new towers, including
formwork assembly and removal activities;
- Delivery and installation of earth rods on the new towers;
- Foundation backfilling and compacting;
- Delivery and assembly of the new towers, preparation and raising once the cast
concrete has stiffened to its design strength;
- Delivery and completion of suspension strings for conductors and ground wires with
roller supports and suspending them on the towers;
- Deployment of lead cables for each tension section and ensuring that the crossing
facilities are secured;
- Delivery, pulling, adjustment and installation of conductors and ground wires, including
installation of tension strings for conductors and ground wires;
- Delivery and installation of suspension clamps;
- Delivery and installation of conductor spacers in the spans according to attached
assembly diagrams;
- Installation of jumpers on all tension towers;
- Delivery and installation of HV warning signs and marking all towers of the 400 kV OHTL
with date and number;
- Measurement of contact joints and earth connections;
- Visual inspection of the new line, route clearing and finial works on the new tower sites.
1.4. Towers
The new towers to be used for construction of the 400 kV line are designed for АСО-400 type
conductors consisting of three single wires per bundle, bolted design with hot‐dip galvanized
coating for anticorrosive protection in accordance with БДС EN ISO 1461:2009 or equivalent.
Steel grades S355J0 and S235J0 as per БДС EN 10025-2 are used for different details of the
new towers to enable structural optimization. The following tower structures are used:
− СНД1 – suspension structure for conductors 1x3x3АСО400 + 2xC-70 (one triad of
bundle conductors АСО-400 and two ground wires С-70). It is used for normal weight
and wind conditions and its outline is shown in drawing № D104-01F1-01-0A;
− СНД2 – suspension structure for conductors 1x3x3АСО400 + 2xC-70 (one triad of
bundle conductors АСО-400 and two ground wires С-70). This is a more heavy-duty
tower compared to СНД1 and its outline is shown in drawing № D104-01F2-01-0A;
− СЕН1,2 – suspension tower for one or two bundle conductors АСО-400. It ensures
the necessary vertical clearances to crossing infrastructure where a suspension point
higher than 32 m is required. Its outline is shown in drawing № D104-01F5-01-0A;
− 20.NN – angle tension structure for conductors 1x3x3АСО400 + 2xC-70 (one triad of
bundle conductors АСО-400 and two ground wires С-70). Its outline is shown in №
D104-01F3-01-0A;
− 60.NN – angle tension structure for conductors 1x3x3АСО400 + 2xC-70 (one triad of
bundle conductors АСО-400 and two ground wires С-70). Its outline is shown in
drawing № D104-01F4-01-0A.
− In addition to the above structures, the existent towers of 400 кV Vezhen OHTL are
also used as follows:
− 70.NN - angle tension structure for conductors 1x3x3АСО400 + 2xC-70 (one triad of
bundle conductors АСО-400 and two ground wires С-70) with existent numeration
453А;
− 70.N - angle tension structure for conductors 1x3x3АСО400 + 2xC-70 (one triad of
bundle conductors АСО-400 and one ground wire С-70) with existent numeration
448А;
− 20.N - angle tension structure for conductors 1x3x3АСО400 + 2xC-70 (one triad of
bundle conductors АСО-400 and one ground wire С-70) with existent numeration
445А, 446А, 447А, and 451А;
− СЕН2 – suspension structure for two bundle conductors АСО-400 with existent
numeration 445А,В and 446А,В;
− 1Н.М - suspension tower for two triads of bundle conductors АСО-400 and two
ground wires С-70 with existent numeration 452.
The same will be reused and positions #311, 312 and 485 of tower 445A will be replaced
along with their bolted connections. These are shown in drawing № D104-01F6-01-0A. The
total weight of new structure profiles is 91.5 kg inclusive of fittings.
The weights of new structures to be used to build the line are specified in Appendix 2. The
weight of shaped steel elements and reinforcement fittings for tower 445А are specified in the
Bill of Quantity for the new 400 кV OHTL.
Appendix 3 indicates the new towers distribution on the line route.
1.5. Conductors, ground wires, fiber optic cable and optical connectivity
1.5.1. Conductors
A triad of bundle АСО-400 with electromechanical properties according to БДС 1133-89 or
equivalent shall be installed. The required quantity is specified in Appendix 4.
Single subconductors in bundle shall be spaced at 400 mm from each other and in an
equilateral-triangle arrangement. Their equidistant positions in the span shall be ensured by
means of triple spacer dampers whose indicative distribution and number in a span are
shown in Appendix 5. Double spacer dumpers shall be used for jumper conductors.
The new line conductors shall be pulled using the mechanical stress method according to IEC
TR 61328 and IEC TR 62263-2005 or their equivalents. All machinery, equipment, facilities
and safety gear must conform to the above standards and enable flawless conductor
installation. It is not allowed to deploy conductors in a random tension section on the ground.
Conductor installation shall be carried out by running a lead cable through the entire tension
section and then pulling the bundle conductor attached to the end of lead cable. All three
subconductors in bundle shall be pulled simultaneously and applying the same tensile force.
A set of pulling machines designed to strain three or more conductors simultaneously shall be
used for this purpose. It is not allowed for a bundle to touch the ground or crossing
infrastructure while being pulled and strain adjusted as well as to exceed the rated tensile
force of its particular tension section. For precise adjustment of roller supports suspended on
towers, they shall be mounted at the same level as suspension and tension clamps to which
the conductor will be attached.
Redundant conductor that remains wound on the drum after installation shall be used to make
jumpers on tension structures instead of being installed in line sections.
Conductor adjustment shall be made as prescribed in the relevant straining tables for the
weather conditions specified in the longitudinal profile.
The phasing diagram of the new power line is shown in drawing № D104-01C3-12-0A.
1.7. Fittings
Given the type of tower structures used for the new power line, both new and existent
ones, the realized wind and weight spans and prescribed maximum normal stress in
conductors and ground wires, different indicative complete sets of tension and suspension
insulator strings are foreseen.
1.7.1. Conductor fittings
The following complete sets of insulator strings are used for the new 400 kV OHTL:
− Single suspension insulator string designed to bypass the conductors around the
body of tension towers, complete with 2х25 kg of weights. It is shown in drawing №
D104-01C3-04-0A;
− Single suspension insulator string for special suspension towers. This string is similar
to the above one but has no weights attached to it;
− V-suspension insulator string for suspension towers type СНД. It is shown in drawing
№ D104-01C3-03-0A;
− Single and double tension insulator string. This one is used for tension towers in
approaches to end substations. It is shown in drawing № D104-01C3-01-0A;
− Triple tension insulator strings for tension towers along the line route. It is shown in
drawing № D104-01C3-02-0A.
The required quantities per string type are specified in Appendix 9.
Pursuant to the approved and effective Environmental Impact Assessment Report (EIAR), it is
necessary to install bird (stork) guards above all suspension strings as well as bird diverters
along the steel ground wire.
The bird guard design is shown in drawing № D104-03C3-08-0A.
Bird diverters shall be installed on the steel ground wire at distances of 20 m along the spans
between towers 57 and 68.
The requirements for complete string set fittings are described in clause 5.5 of these
Technical Specifications.
The required type of grounding devices for the new towers is specified in Appendix 11.
No new earth rods will be installed on the existing towers of 400 kV Vezhen OHTL to be used
for the new 400 кV line.
1.9. Signs and plates
Electric shock hazard signs shall be mounted on all new towers as well as on the existent
ones of 400 кV Vezhen OHTL. These shall be enameled and fixed to special mounting plates
bolted to the tower sections 3 meters above terrain level.
All towers shall be numbered, dated and labeled with dispatch name. Black font on yellow
background shall be used for the signs according to a sample agreed with Employer.
3. Temporary works
These activities include construction of temporary roads and approaches as well as
construction works (assembly and disassembly works on temporary gantry structures, 20 kV
OHTL, etc.) to secure the crossing locations (roads, railways, etc). The crossing infrastructure
is shown in Appendix 10. A separate safety notice is provided for each crossing location that
requires such notice; temporary traffic safety arrangements will be applied in all locations
where the new line crosses roads which are part of the national road network. These
arrangements are imperative to Contractor. It is incumbent on Contractor to bear all costs for
traffic coordination and/or stoppage on crossing roads, disconnection of MV and HV power
lines (incl. cabling were necessary), railway occupation and other similar measures. Those
crossing locations for with no safety notice is issued must be secured by Contractor with
temporary wooden gantry structures, bucket trucks, traffic signs, road marking, etc.
Delivered Plant and Materials shall be incorporated in accordance with Ordinance № РД-02-
20-1 of 5.02.2015 on rules and procedure for incorporation of building products at
construction sites in Bulgaria.
They shall have equal or superior parameters to those specified in the applicable
standards or their equivalents.
The delivered Plant and Materials shall conform to the applicable standards listed in Appendix
30.
5.1. Towers
Lattice steel towers for this construction site shall be ordered for manufacture and delivery
according to the detailed design documentation and sectional standards No 0151737-83 and
No 0179782-87. All design documentation will be provided to Contractor.
All size deviations in tower geometry and all tolerances for bolted connections must be within
the limits set in the above sectoral standards.
Towers will be made of square-shaped iron according to БДС EN 10056-1 or equivalent, U-
profiles according to DIN 10026 (or equivalent), and S235JR and S355JO structural steel for
profiles and plates according to БДС EN 10025 or equivalent. All structural components of
lattice steel towers shall be hot-dip galvanized in factory environment according to БДС EN
ISO –1461:2009 or equivalent.
Bolts shall be of resistance class and sizes corresponding to design documentation.
Their threaded section shall not enter into the bolted connection (the thread of a bolt shall not
enter into its load-bearing stem).
Steel grades and bolt types to be used per tower type are given in the following table:
Type of lattice Bolts, resistance
Structural steel for profiles and plates, grade
steel towers class
СНД1 S235JR and S355JO 8.8 and 5.6*
СНД2 S235JR and S355JO 8.8 and 5.6*
СЕН1 and S235JR 5.6
СЕН2
20.(16-28).NN S235JR and S355JO 8.8
60.(16-28).NN S235JR and S355JO 8.8
Note: Positions marked with * refer to tamper-proof bolts.
The manufacturer of lattice steel towers shall mark each of them with a unique serial number
consisting of an alphanumerical code that corresponds exactly with the design drawing
identifications for each individual component of a tower.
Position numbers on steel components shall be stamped by a press machine or other suitable
technique so that they remain clearly visible after being hot-dip galvanized. All bolts shall be
complete with 1 nut, 1 washer and 1 lock washer. All bolts, nuts and washers shall be hot-dip
galvanized.
All new towers shall have security bolts (theft-proof) installed up to 3 meters above
terrain level. Tamper-proof bolts shall be of size, resistance class and anticorrosive
protection according to design documentation.
Towers shall be transported, assembled and erected in a way that ensures minimum damage
to their anti-corrosive coating. The damage tolerance is 1.5% of the total tower area. Materials
to recover any damaged anticorrosive coating shall be foreseen and provided by Contractor.
5.2. Concrete
Concrete for foundation laying shall conform to БДС EN 206:2013+A1:2016/NA:2017 or
equivalent. It must not be mixed on site but should only be delivered from a concrete mixing
station. The concrete grade for foundation laying shall correspond to design specifications
stated in the drawings. Chemical admixtures, e.g. for setting acceleration, freeze-thaw
resistance and other purposes, may only be added to the concrete mixture upon agreement
with representatives of Employer and the company supervising the line construction process.
Concrete should only be transported using specialized mixer trucks to guarantee its
properties. It shall undergo tests according to БДС EN 12390-2:2009 or equivalent. The
concrete sampling method and interval shall be according to БДС EN 206 and БДС EN
206/NA or their equivalents. The concrete delivery shall be accompanied by certificates of
operational properties and performance. Test and transfer protocols shall be made available
to Employer or construction oversight representatives upon request for quality tracking
purposes.
5.3. Conductors and ground wires
5.3.1. Conductors
The main standard applicable to conductors delivered for this project is БДС 1133-89 (or
equivalent) (hereinafter referred to as “The Standard”).
New conductors shall be of type АСО-400 according to the above Standard. Their design
and technical specifications are given in Appendix 31.
Aluminum subconductors shall be made of rolled wire with characteristics as per БДС EN
1715-1:2008 or БДС EN 1715-2:2008 or their equivalents.
Hot-dip galvanized steel wires shall be in full conformity with БДС 5875-73 (or equivalent) for
grade МС, second group.
No intertwined, broken, flattened, kinked or scored subconductors are admissible. Conductor
layers shall be wound in opposite directions, with outer layer in clockwise direction. Their
bundled core shall be entirely covered with neutral grease whose start-dripping temperature is
not less than 65 °С.
Aluminum and steel wires shall be connected via butt-welded joint or cold welding. Welded
joints shall be at least 15 m apart. The welded joints of steel wire shall be covered with
anticorrosive material.
The electrical resistivity of conductors must not exceed the limits according to Appendix 1 of
the Standard.
The weight of complete conductor shall correspond with the rated weight according to table 1-
4 of Appendix 1of the Standard. The outer diameter of conductor shall be as defined in the
Standard, i.e. 27,24 mm.
Delivered conductors shall have service lifetime of not less than 45 years.
Their lengths shall be as prescribed in the Standard or its equivalent.
Conductors must be new, manufactured not more than two years prior to construction start
and in conformity with the technical specifications and testing methods, acceptance, marking,
packaging and transportation requirements of the Standard or its equivalent.
Recovery of damaged subconductors is only allowed using АСО 400 repair sleeves after
agreement with Employer and the construction oversight company.
Design specifications:
− Transparent front door with safety glass;
− Openable front and rear door with locking systems;
− Removable side panels;
− Bottom and top cable inlets;
− Cable clamping buses;
− Cabinet earth point;
− Designed for 9” patch panels;
− External influence protection rating IP 31;
− Cable inlets/outlets with sealed bushings;
6.1.2. FATs:
The following FATs with Employer ’participation will be conducted:
Finished hot-dip galvanized steel wires will be subject to FATs with the same scope as above.
One series of FATs will be performed.
Test protocols for wires of size 11 mm shall be provided along with the technical proposal.
6.4.2. FATs:
FATs will be carried out in the presence of Employer. They shall be conducted in accordance
with БДС EN 60794 or equivalent in the following scope:
− Optic fiber test: БДС EN 60793-1 or equivalent.
− Protective tube test (dimensions, tensile and elongation strength, electrical
resistance).
− Wires before stranding: БДС EN 61232:2003 or equivalent.
− Tensile performance: БДС EN 60794-1-2, method Е1 or equivalent
− Attenuation: БДС EN 60794-1-40 or equivalent
6.6. Insulators
Polymeric insulators delivered for this project shall be tested in accordance with БДС EN
61109:2008 or equivalent, БДС EN 62217:2013 or equivalent and related standards.
The technical proposal shall be submitted with design test and type test protocols for
insulators in the following scope:
6.6.1. Design tests:
Each tenderer shall support their technical proposal with a report of all conducted design tests
whose scope shall be according to Table 1 and Table 2 of БДС EN 61109:2008 as well as in
conformity with БДС EN 62217:2013 or equivalent;
6.6.2.Type tests:
Each tenderer shall support their proposal with a report of all conducted type tests whose
scope shall be according to Table 1 of БДС EN 61109:2008 or equivalent.
Before proceeding to shipment, Contractor shall arrange FATs with the participation of
Employer’s representatives. The type test shall include:
6.6.3. FATs:
These will be carried out in the presence of Employer’s representatives and with scope
according to section 12 of БДС EN 61109:2008 or equivalent.
6.6.4. Routine test:
Clause 13 of БДС EN 61109:2008 or equivalent. Employer’s representatives will be present
during the test of up to 2 % of the total quantity for delivery.
6.8. Fittings
Fittings delivered for this project shall be tested in accordance with БДС 6195 or БДС EN
61284 or their equivalents. Each tenderer shall support their technical proposal with type test
protocols for the following fittings and with a scope as listed below.
6.8.1.2. FATs:
- Visual inspection
- Dimensional check
- Galvanization
- Mechanical (deformation and destruction)
6.8.2.2. FATs:
- Visual inspection
- Dimensional check
- Galvanization (steel parts)
- Mechanical (bolted connections)
- Mechanical (stress-strain)
6.8.4.2. FATs:
- Visual inspection
- Dimensional check
- Galvanization
6.8.5.2. FATs:
- Dimensional check
- Galvanization
6.8.7.2. FATs:
- Visual inspection
- Dimensions, material and weight check
- Protective coating
- Breaking point of bolts
- Bolt tightening
- Suspension weight
- Clamp fastening
The FATs applicable to clause 6.8 will be performed in the presence of Employer’s
representatives. They will focus on 10 randomly selected samples from each type of fittings.
Table of Contents
1. PREAMBLE
2. SPECIFICATIONS
Appendix 43 - Main technical specifications of tension clamp for conductor type АСО-400
Appendix 45 -Main technical specifications of suspension clamp for conductor type АСО-400
Appendix 47 - Main technical specifications of swing suspension clamp for ground wire
The Tenderer shall complete all attached Specifications (Appendices from 30 to 53).
The Contract Works shall comply with the Specifications decribed in the Appendices from 30
to 53.
Appendix 30
Note:
The materials must comply with the standards or their equivalents. It’s Tenderer’s
responsibility to provide a proof of equivalence, including compatibility with the requirements
of the specified standards.
Appendix 31
6 Number of Al wires = 54
Notes:
Please complete the table with values according to БДС 1133-89 without referring to
tolerances.
Appendix 32
Optic fibers = 24
pcs.
Appendix 34
Main technical specifications of OPUG cable
1 Outer diameter mm ≤ 15
4 Hybrid type - Y
6 Water resistance - Y
7 Flame retardancy - Y
11 Non-metal structure - Y
Appendix 35
Main technical specifications for polymeric insulator
Item Unit Employer’s Tenderer’s
#
requirements offer
1. - - -
Insulator materials:
1.1. - Epoxy reinforced with E-
- Core rod
CR fiber glass
mm ≥10,500
Creepage distance
- Socket
Type of insulator-to-ground end fitting
- Ball
Type of insulator-to-current carrier fitting
mm = 20
Size of end fittings, БДС HD 474 S1:2004 (IEC
60120)
- HCR steel
Metal parts
- Hot-dip galvanized
- Galvanized
- Zinc coating thickness μm
≥80
кV ≥770
Power-frequency withstand voltage - wet
кV ≥1,425
Lightning impulse withstand voltage
with arc protection fittings
1 Material - Steel
Note:
Connection sizes of clevises are fixed and specified in the Specifications under section
“Fittings for insulator strings”.
Appendix 41
1 Material - Steel
Note:
Connection sizes of clevises are fixed and specified in the Specifications under section
“Fittings for insulator strings”.
Appendix 42
1 Material - Steel
Note:
U-bolt-to-tower connection sizes are fixed and specified in drawings № D104-01C3-04-0A
and № D104-01C3-03-0A.
Appendix 43
1 Material - Aluminum/aluminu
m alloy, steel
Note:
Connection sizes of swing suspension clamps are fixed and specified in detail drawing №
D104-01C3-08-0A.
Appendix 48
Note:
1. Loads marked with “*“ are applied to the suspension-string-to-link attachment point.
2. Connection sizes of C-link are fixed and specified in the Technical Specifications
under section “Fittings for insulator strings”.
Appendix 52
4 Protection rating - IP 56
0
5 Ambient temperature C - 40 ÷ + 70
TABLE OF CONTENTS
Section 1: Information
Section 2: List of Drawings
Section 1: INFORMATION
1. INTRODUCTION
The route of the 400 kV Overhead Transmission Line between TPP Maritsa Iztok 2 (s/st MI)
and s/st Plovdiv–on the territory of the Republic of Bulgaria, has been determined by ESO
EAD in details and all tower sites have been marked. The total length of 400 кV OHTL is
92.985 km.
2. SHORT DESCRIPTION
2.1. TOWERS
The towers to be used for construction of the 400 kV line are designed for ACO-400 type
conductors consisting of three single wires per bundle, bolted design with hot-dip galvanized
coating for anticorrosive protection in accordance with БДС EN ISO 1461:2009 or equivalent.
Steel grades S355J0 and S235J0 as per БДС EN 10025-2 are used for different details of the
new towers to enable structural optimization. The following tower structures are used:
• CHД1 - suspension structure for conductors 1x3x3ACO 400 + 2xC-70 (one triad of
bundle conductors ACO-400 and two ground wires C-70). It is used for normal weight and
wind conditions and its outline is shown in drawing № Dl04-01F1-01-0A;
• CHД2 - suspension structure for conductors 1x3x3ACO 400 + 2xC-70 (one triad of
bundle conductors ACO-400 and two ground wires C-70). This is a more heavy-duty tower
compared to CHДl and its outline is shown in drawing № D104-01F2-01-0A;
• CEH1,2 - suspension tower for one or two bundle conductors ACO-400. It ensures
the necessary vertical clearances to crossing infrastructure where a suspension point higher
than 32 m is required. Its outline is shown in drawing № D104-01F5-01-0A;
• 20.NN - angle tension structure for conductors 1x3x3ACO 400 + 2xC-70 (one triad of
bundle conductors ACO-400 and two ground wires C-70). Its outline is shown in №
D104- 0lF3-01-0A;
• 60.NN - angle tension structure for conductors 1x3x3ACO 400 + 2xC-70 (one triad of
bundle conductors ACO-400 and two ground wires C-70). Its outline is shown in drawing №
D104-01F4-01-0A.
In addition to the above structures, the existent towers of 400 кV Vezhen OHTL are also used
as follows:
• 70.NN - angle tension structure for conductors 1x3x3ACO 400 + 2xC-70 (one triad of
bundle conductors ACO-400 and two ground wires C-70) with existent numeration 453A;
• 70.N - angle tension structure for conductors 1x3x3ACO 400 + 2xC-70 (one triad of
bundle conductors ACO-400 and one ground wire C-70) with existent numeration 448А;
• 20.N - angle tension structure for conductors lx3x3ACO 400 + 2xC-70 (one triad of
bundle conductors ACO-400 and one ground wire C-70) with existent numeration 445A,
446A, 447A, and 45lA;
• СЕН2 - suspension structure for two bundle conductors ACO-400 with existent
numeration 445 A,B and 446A,В;
• lH.M - suspension tower for two triads of bundle conductors ACO-400 and two ground
wires C-70 with existent numeration 452.
The same will be reused and positions #311,312 and 485 of tower 445A will be replaced
along with their bolted connections. These are shown in drawing № D104-01F6-01-0A. The
total weight of new structure profiles is 91.5 kg inclusive of fittings.
The weights of new structures to be used to build the line are specified in Appendix 2. The
weight of shaped steel elements and reinforcement fittings for tower 445A are specified in the
Bill of Quantity for the new 400 kV OHTL.
Appendix 3 indicates the new towers distribution on the line route.
All towers shall be corrosion protected, following the instructions of the Anticorrosion
protection system for new steel-lattice towers.
The fittings for the completion of the insulator sets will be in accordance with the approved
practice in Bulgaria:
• Suspension clamps for phase conductor and earthwire C-70 – of “dead line” type;
• Tension clamps and joints for phase conductors - of compression type
• Tension clamps and joints for earthwire C-70 - spiral type;
Tension clamps for earthwire OPGW type - spiral type;
Pursuant to the approved and effective Environmental Impact Assessment Report (EIAR), it is
necessary to install bird (stork) guards above all suspension strings as well as bird diverters
along the steel ground wire.
The bird guard design is shown in drawing № D104-03C3-08-0A.
Bird diverters shall be installed on the steel ground wire at distances of 20 m along the spans
between towers 57 and 68.
Those information’s are shown in the Аppendices listed below and are part of Tender
Documentation:
Appendix 1 - Quantity of Materials for New Tower Foundations
Appendix 2 - Quantity of steel and fittings for the new towers
Appendix 3 - Distribution of new towers on the line route
Appendix 4 - Quantity of Conductor ACO-400
Appendix 5 – Distribution of spacers in span
Appendix 6 - Quantity of OPGW
Appendix 7 - Quantity of Spacers for OPGW
Appendix 8 - Quantity of C-70
Appendix 9 - Quantity of Conductor and Ground Wire Fittings
Appendix 10 - Crossing infrastructure
Appendix 11 - Type of tower earthing system
Appendix 1
foundation pit,
spread./transp
3
Water uptake,
Backfilling, m
3
Slope grade
Foundation
Foundation
Tower type
concrete, m
2
plaster, m
Cement
3
Tower
ort, m
type
Soil
3
%
#
m
1 20.28.NN Ф2 Stiff soil 1:0.3 42,50 232,30 10,00 189,80 42,00
2 СНД1 Ф2 Stiff soil 1:0.3 25,00 95,00 10,00 70,00 25,00
3 СНД1 Ф2 Stiff soil 1:0.3 25,00 95,00 10,00 70,00 25,00
4 СНД1 Ф4 50% water uptake 1:0.3 36,20 120,00 10,00 84,00 36,00
5 СНД2+3 Ф6 50% water uptake 1:0.3 51,00 148,00 10,00 97,00 51,00
6 СНД1 Ф4 50% water uptake 1:0.3 36,20 120,00 10,00 84,00 36,00
7 20.22.NN Ф1 Stiff soil 1:0.75 32,40 325,50 10,00 293,10 32,00
8 СНД1-3 Ф2 Stiff soil 1:0.3 25,00 95,00 10,00 70,00 25,00
9 20.19.NN Ф1 Stiff soil 1:0.75 32,40 325,50 10,00 293,10 32,00
10А СЕН 1 +12 Ан Stiff soil 1:0.75 22,00 248,30 10,00 226,30 22,00
10B СЕН 2 +12 Ан Stiff soil 1:0.75 22,00 248,30 10,00 226,30 22,00
11 20.28.NN Ф1 Stiff soil 1:0.75 32,40 325,50 10,00 293,10 32,00
12 60.25.NN Ф3/Ф7 Stiff soil 1:0.3 49,10 211,00 10,00 162,00 49,00
13 СНД1 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
14 20.25.NN Ф1 Stiff soil 1:0.75 32,40 325,50 10,00 293,10 32,00
15 СНД2+6 Ф3 Stiff soil 1:0.75 30,20 165,00 10,00 135,00 30,00
16 СНД2+6 Ф3 Stiff soil 1:0.75 30,20 165,00 10,00 135,00 30,00
17 СНД2+6 Ф3 Stiff soil 1:0.75 30,20 165,00 10,00 135,00 30,00
18 СНД2+3 Ф5 50% water uptake 1:0.75 43,00 193,00 10,00 150,00 43,00
foundation pit,
spread./transp
3
Water uptake,
Backfilling, m
3
Slope grade
Foundation
Foundation
Tower type
concrete, m
2
plaster, m
Cement
3
Tower
ort, m
type
Soil
3
%
#
m
19 СНД2+3 Ф5 50% water uptake 1:0.75 43,00 193,00 10,00 150,00 43,00
20 20.28.NN Ф2 50% water uptake Reinforcement 42,50 202,20 10,00 160,20 42,00
21 СНД2+6 Ф3 Stiff soil 1:0.75 30,20 165,00 10,00 135,00 30,00
22 20.22.NN Ф1 Stiff soil 1:0.75 32,40 325,50 10,00 293,10 32,00
23 СНД1-6 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
24 20.19.NN Ф1 Stiff soil 1:0.75 32,40 325,50 10,00 293,10 32,00
25 СНД2 +3 Ф3 Stiff soil 1:0.75 30,20 165,00 10,00 135,00 30,00
26 60.28.NN Ф1/Ф6 Stiff soil 1:0.75 24,00 240,00 10,00 216,00 24,00
27 СНД1-3 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
28 СНД1-3 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
29 60.19.NN Ф1/Ф6 Stiff soil 1:0.75 24,00 240,00 10,00 216,00 24,00
30 СНД1 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
31 СНД1 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
32 СНД1 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
33 СНД1 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
34 СНД1 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
35 СНД2+3 Ф3 Stiff soil 1:0.75 30,20 139,00 10,00 119,00 30,00
36 СНД1 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
37 СНД1 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
38 20.25.NN Ф2 Stiff soil 1:0.25 42,50 216,10 10,00 173,60 42,00
39 СНД1 Ф1 Stiff soil 1:0.25 20,60 80,00 10,00 60,00 20,00
40 СНД2+3 Ф3 Stiff soil 1:0.25 30,20 102,00 10,00 72,00 30,00
41 СНД1 Ф1 Stiff soil 1:0.25 20,60 80,00 10,00 60,00 20,00
42 СНД2+3 Ф3 Stiff soil 1:0.25 30,20 102,00 10,00 72,00 30,00
43 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
foundation pit,
spread./transp
3
Water uptake,
Backfilling, m
3
Slope grade
Foundation
Foundation
Tower type
concrete, m
2
plaster, m
Cement
3
Tower
ort, m
type
Soil
3
%
#
m
44 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
45 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
46 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
47 СНД2+6 Ф6 50% water uptake Reinforcement 51,00 152,00 10,00 101,00 51,00
48 СНД2+6 Ф6 50% water uptake Reinforcement 51,00 152,00 10,00 101,00 51,00
49 20.25.NN Ф2 50% water uptake Reinforcement 42,50 202,20 10,00 160,20 42,00
50 СНД1 Ф3 50% water uptake Reinforcement 30,20 109,00 10,00 79,00 30,00
51 СНД1-3 Ф3 50% water uptake Reinforcement 30,20 109,00 10,00 79,00 30,00
52 СНД1 Ф3 50% water uptake Reinforcement 30,20 109,00 10,00 79,00 30,00
53 СНД1 Ф3 50% water uptake Reinforcement 30,20 109,00 10,00 79,00 30,00
54 СНД2+3 Ф6 50% water uptake Reinforcement 51,00 152,00 10,00 101,00 51,00
55 СНД1 Ф3 50% water uptake Reinforcement 30,20 137,00 10,00 94,00 30,00
56 СНД1 Ф1 Stiff soil 1:0.25 20,60 80,00 10,00 60,00 20,00
57 СНД1-3 Ф1 Stiff soil 1:0.25 20,60 80,00 10,00 60,00 20,00
58 СНД1-3 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
59 20.25.NN Ф2 Stiff soil 1:0.25 42,50 216,10 10,00 173,60 42,00
60 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 66,00 25,00
61 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 66,00 25,00
62 20.22.NN Ф2 Stiff soil 1:0.25 42,50 216,10 10,00 173,60 42,00
63 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
64 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
65 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
66 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
67 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
68 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
foundation pit,
spread./transp
3
Water uptake,
Backfilling, m
3
Slope grade
Foundation
Foundation
Tower type
concrete, m
2
plaster, m
Cement
3
Tower
ort, m
type
Soil
3
%
#
m
69 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
70 СНД2 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
71 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
72 20.25.NN Ф2 Stiff soil 1:0.25 42,50 216,10 10,00 173,60 42,00
73 СНД2 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
74 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
75 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
76 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
77 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
78 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
79 СНД2 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
80 СНД2 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
81 20.25.NN Ф2 Stiff soil 1:0.25 42,50 216,10 10,00 173,60 42,00
82 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
83 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
84 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
85 СНД2 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
86 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
87 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
88 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
89 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
90 20.22.NN Ф3 Stiff soil 1:0.25 45,80 227,20 10,00 181,40 45,00
91 СНД1-6 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
92 СНД1-3 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
93 СНД1 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
foundation pit,
spread./transp
3
Water uptake,
Backfilling, m
3
Slope grade
Foundation
Foundation
Tower type
concrete, m
2
plaster, m
Cement
3
Tower
ort, m
type
Soil
3
%
#
m
94 СНД1 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
95 СНД1-6 Ф1 Stiff soil 1:0.75 20,60 139,00 10,00 119,00 20,00
96 60.22.NN Ф2/Ф6 Stiff soil 1:0.25 32,70 158,00 10,00 126,00 32,00
97 СНД2+3 Ф3 Stiff soil 1:0.25 30,20 102,00 10,00 72,00 30,00
98 СНД2+3 Ф3 Stiff soil 1:0.25 30,20 102,00 10,00 72,00 30,00
99 СНД1 Ф1 Stiff soil 1:0.25 20,60 80,00 10,00 60,00 20,00
100 СНД2+6 Ф3 Stiff soil 1:0.25 30,20 102,00 10,00 72,00 30,00
101 СНД1 Ф1 Stiff soil 1:0.25 20,60 80,00 10,00 60,00 20,00
102 СНД2+3 Ф3 Stiff soil 1:0.25 30,20 102,00 10,00 72,00 30,00
103 СНД2+3 Ф3 Stiff soil 1:0.25 30,20 102,00 10,00 72,00 30,00
104 20.25.NN Ф2 Stiff soil 1:0.3 42,50 232,30 10,00 189,80 42,00
105 СНД2+3 Ф3 Stiff soil 1:0.3 30,20 108,00 10,00 78,00 30,00
106 СНД1-3 Ф1 Stiff soil 1:0.3 20,60 85,00 10,00 65,00 20,00
107 СНД1-3 Ф1 Stiff soil 1:0.3 20,60 85,00 10,00 65,00 20,00
108 СНД1-3 Ф1 Stiff soil 1:0.3 20,60 85,00 10,00 65,00 20,00
109 20.28.NN Ф2 Stiff soil 1:0.3 42,50 232,30 10,00 189,80 42,00
110 СНД2+6 Ф3 Stiff soil 1:0.3 30,20 108,00 10,00 78,00 30,00
111 СНД1 Ф1 Stiff soil 1:0.3 20,60 85,00 10,00 65,00 20,00
112 СНД2+3 Ф3 Stiff soil 1:0.3 30,20 108,00 10,00 78,00 30,00
113 СНД2+3 Ф4 Stiff soil 1:0.3 36,20 120,00 10,00 84,00 36,00
114 СНД2+6 Ф4 Stiff soil 1:0.3 36,20 120,00 10,00 84,00 36,00
115 СНД2+3 Ф4 Stiff soil 1:0.3 36,20 120,00 10,00 84,00 36,00
116 СНД2+3 Ф4 Stiff soil 1:0.3 36,20 120,00 10,00 84,00 36,00
117 СНД2+3 Ф3 Stiff soil 1:0.3 30,20 108,00 10,00 78,00 30,00
118 СНД2+3 Ф3 Stiff soil 1:0.3 30,20 108,00 10,00 78,00 30,00
foundation pit,
spread./transp
3
Water uptake,
Backfilling, m
3
Slope grade
Foundation
Foundation
Tower type
concrete, m
2
plaster, m
Cement
3
Tower
ort, m
type
Soil
3
%
#
m
119 20.25.NN Ф2 Stiff soil 1:0.3 42,50 232,30 10,00 189,80 42,00
120 СНД1 Ф1 Stiff soil 1:0.3 20,60 85,00 10,00 65,00 20,00
121 СНД1 Ф1 Stiff soil 1:0.3 20,60 85,00 10,00 65,00 20,00
122 СНД1 Ф1 Stiff soil 1:0.3 20,60 85,00 10,00 65,00 20,00
123 СНД1 Ф1 Stiff soil 1:0.3 20,60 85,00 10,00 65,00 20,00
124 СНД1 Ф1 Stiff soil 1:0.3 20,60 85,00 10,00 65,00 20,00
125 СНД1 Ф1 Stiff soil 1:0.3 20,60 85,00 10,00 65,00 20,00
126 СНД1 Ф5 Stiff soil 1:0.3 43,00 134,00 10,00 91,00 43,00
127 20.25.NN Ф2 Stiff soil 1:0.3 42,50 232,30 10,00 189,80 42,00
128 СНД1 Ф6 Stiff soil 1:0.3 51,00 148,00 10,00 97,00 51,00
129 СНД1 Ф6 Stiff soil 1:0.3 51,00 148,00 10,00 97,00 51,00
130 СНД1 Ф6 Stiff soil 1:0.3 51,00 148,00 10,00 97,00 51,00
131 СНД2+3 Ф7 Stiff soil 1:0.3 59,80 162,00 10,00 103,00 59,00
132 СНД2+3 Ф7 Stiff soil 1:0.3 59,80 162,00 10,00 103,00 59,00
133 СНД1 Ф6 Stiff soil 1:0.3 51,00 148,00 10,00 97,00 51,00
134 СНД1 Ф5 Stiff soil 1:0.3 43,00 134,00 10,00 91,00 43,00
135 СНД1 Ф5 Stiff soil 1:0.3 43,00 134,00 10,00 91,00 43,00
136 СНД1 Ф5 Stiff soil 1:0.3 43,00 134,00 10,00 91,00 43,00
137 20.25.NN Ф2 Stiff soil 1:0.3 42,50 232,30 10,00 189,80 42,00
138 СНД1 Ф5 Stiff soil 1:0.3 43,00 134,00 10,00 91,00 43,00
139 СНД1 Ф5 Stiff soil 1:0.3 43,00 134,00 10,00 91,00 43,00
140 СНД1 Ф5 Stiff soil 1:0.3 43,00 125,00 10,00 91,00 43,00
141 СНД2+3 Ф7 Stiff soil 1:0.3 59,80 162,00 10,00 103,00 59,00
142 СНД2+3 Ф7 Stiff soil 1:0.3 59,80 162,00 10,00 103,00 59,00
143 СНД1 Ф5 Stiff soil 1:0.3 51,00 134,00 10,00 91,00 51,00
foundation pit,
spread./transp
3
Water uptake,
Backfilling, m
3
Slope grade
Foundation
Foundation
Tower type
concrete, m
2
plaster, m
Cement
3
Tower
ort, m
type
Soil
3
%
#
m
144 СНД2+3 Ф7 Stiff soil 1:0.3 59,80 162,00 10,00 103,00 59,00
145 СНД2+3 Ф7 Stiff soil 1:0.3 59,80 162,00 10,00 103,00 59,00
146 СНД2+3 Ф7 Stiff soil 1:0.3 59,80 162,00 10,00 103,00 59,00
147 20.25.NN Ф6 Stiff soil 1:0.3 70,10 279,70 10,00 209,60 70,00
148 СНД2+6 Ф4 Stiff soil 1:0.3 36,20 120,00 10,00 84,00 36,00
149 СНД1 Ф2 Stiff soil 1:0.3 25,00 95,00 10,00 70,00 25,00
150 СНД1 Ф2 Stiff soil 1:0.3 25,00 95,00 10,00 70,00 25,00
151 СНД1 Ф2 Stiff soil 1:0.3 25,00 95,00 10,00 70,00 25,00
152 СНД2+3 Ф4 Stiff soil 1:0.3 36,20 120,00 10,00 84,00 36,00
153 20.25.NN Ф3 Stiff soil 1:0.25 45,80 227,20 10,00 181,40 45,00
154 60.28.NN Ф3/Ф6 Stiff soil 1:0.3 45,50 203,00 10,00 158,00 45,00
155 60.25.NN Ф4/Ф7 Stiff soil 1:0.3 56,30 224,00 10,00 168,00 56,00
156 СНД2+6 Ф4 Stiff soil 1:0.3 36,20 120,00 10,00 84,00 36,00
157 СНД2+6 Ф4 Stiff soil 1:0.3 36,20 120,00 10,00 84,00 36,00
158 20.25.NN Ф2 50% water uptake Reinforcement 42,50 202,20 10,00 160,20 42,00
159 СНД1 Ф2 Stiff soil 1:0.3 25,00 95,00 10,00 70,00 25,00
160 СНД1-6 Ф2 Stiff soil 1:0.3 25,00 95,00 10,00 70,00 25,00
161 20.19.NN Ф4 50% water uptake Reinforcement 49,30 224,00 10,00 175,00 49,00
162 СНД1-3 Ф1 Stiff soil Reinforcement 20,60 84,00 10,00 64,00 20,00
163 20.22.NN Ф2 50% water uptake Reinforcement 42,50 202,20 10,00 160,20 42,00
164 СНД2+3 Ф3 Stiff soil Reinforcement 30,20 109,00 10,00 79,00 30,00
165 20.25.NN Ф2 50% water uptake Reinforcement 42,50 202,20 10,00 160,20 42,00
166 СНД1 Ф1 Stiff soil 1:0.25 20,60 80,00 10,00 60,00 20,00
167 СНД1 Ф1 Stiff soil 1:0.25 20,60 80,00 10,00 60,00 20,00
168 СНД1-3 Ф1 Stiff soil 1:0.25 20,60 80,00 10,00 60,00 20,00
foundation pit,
spread./transp
3
Water uptake,
Backfilling, m
3
Slope grade
Foundation
Foundation
Tower type
concrete, m
2
plaster, m
Cement
3
Tower
ort, m
type
Soil
3
%
#
m
169 СНД1-3 Ф1 Stiff soil 1:0.25 20,60 80,00 10,00 60,00 20,00
170 СНД1-3 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
171 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
172 СНД1-6 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
173 20.19.NN Ф4 Stiff soil 1:0.25 49,30 238,50 10,00 189,20 49,00
174 СНД1-3 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
175 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
176 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
177 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
178 СНД2+6 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
179 СНД2+6 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
180 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
181 СНД2+6 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
182 СНД2+6 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
183 20.25.NN Ф2 Stiff soil 1:0.25 42,50 216,10 10,00 173,60 42,00
184 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
185 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
186 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
187 СНД2 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
188 60.28.NN Ф3/Ф6 Stiff soil 1:0.25 45,50 191,00 10,00 146,00 45,00
189 20.28.NN Ф2 Stiff soil 1:0.25 42,50 216,10 10,00 173,60 42,00
190 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
191 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 66,00 25,00
192 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 66,00 25,00
193 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
foundation pit,
spread./transp
3
Water uptake,
Backfilling, m
3
Slope grade
Foundation
Foundation
Tower type
concrete, m
2
plaster, m
Cement
3
Tower
ort, m
type
Soil
3
%
#
m
194 СНД2 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
195 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
196 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
197 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
198 20.22.NN Ф2 Stiff soil 1:0.25 42,50 216,10 10,00 173,60 42,00
199 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
200 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
201 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
202 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
203 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
204 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
205 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
206 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
207 20.25.NN Ф3 50% water uptake Reinforcement 45,80 213,00 10,00 168,00 45,00
208 СНД1-6 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
209 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
210 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
211 СНД1-6 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
212 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
213 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
214 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
215 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
216 20.19.NN Ф2 Stiff soil 1:0.25 42,50 216,10 10,00 173,60 42,00
217 СНД1-3 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
218 СНД2 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
foundation pit,
spread./transp
3
Water uptake,
Backfilling, m
3
Slope grade
Foundation
Foundation
Tower type
concrete, m
2
plaster, m
Cement
3
Tower
ort, m
type
Soil
3
%
#
m
219 СНД2 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
220 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
221 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
222 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
223 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
224 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
225 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
226 20.25.NN Ф2 Stiff soil 1:0.25 42,50 216,10 10,00 173,60 42,00
227 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
228 СНД2+6 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
229 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
230 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
231 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
232 СНД2+6 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
233 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
234 20.28.NN Ф3 Stiff soil 1:0.25 45,80 227,20 10,00 181,40 45,00
235 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
236 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
237 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
238A СЕН 1 +20 Aн Stiff soil 1:0.25 22,00 75,20 10,00 64,20 11,00
238B СЕН 2 +20 Aн Stiff soil 1:0.25 22,00 75,20 10,00 64,20 11,00
239 СНД2+6 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
240 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
241 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
242 20.25.NN Ф2 Stiff soil 1:0.25 42,50 216,10 10,00 173,60 42,00
foundation pit,
spread./transp
3
Water uptake,
Backfilling, m
3
Slope grade
Foundation
Foundation
Tower type
concrete, m
2
plaster, m
Cement
3
Tower
ort, m
type
Soil
3
%
#
m
243 СНД2+6 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
244 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
245 СНД2+6 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
246 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
247 СНД1-3 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 66,00 25,00
248 СНД1 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
249 СНД1-3 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
250 20.19.NN Ф3 Stiff soil 1:0.25 45,80 227,20 10,00 181,40 45,00
251 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
252 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
253 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
254 60.25.NN Ф4/Ф7 Stiff soil 1:0.25 56,30 217,00 10,00 161,00 56,00
255 СНД2+3 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
256 СНД2+6 Ф4 Stiff soil 1:0.25 36,20 115,00 10,00 79,00 36,00
257 СНД1-6 Ф2 Stiff soil 1:0.25 25,00 90,00 10,00 65,00 25,00
258 20.25.NN Ф5 Stiff soil 1:0.25 58,40 245,20 10,00 186,80 58,00
259A СЕН 1 +12 Вн 100% water uptake Reinforcement 32,20 161,70 10,00 129,50 32,20
259B СЕН 2 +12 Вн 100% water uptake Reinforcement 32,20 161,70 10,00 129,50 32,20
260 60.25.NN Ф4/Ф8 100% water uptake 1:0.25 67,00 243,00 10,00 176,00 67,00
TOTAL: 8 709,30 35 268,50 2 630,00 26 651,20 8 621,40
Appendix 2
Total weight,
Total weight,
single tower,
single tower,
foundations,
foundations,
Tower type
Tower type
Weight of
Weight of
Weight in
Weight in
Bolts,
Bolts,
pcs.
pcs.
kg
kg
kg
kg
kg
kg
kg
kg
#
#
1 20.19.NN 6 13 105,94 954,85 608,50 88 015,73 1 СНД1 93 9 392,12 314,50 265,70 927 425,76
2 20.22.NN 6 14 656,31 954,85 668,60 97 678,53 2 СНД1-3 18 8 583,12 314,50 246,50 164 594,12
3 20.25.NN 19 16 290,63 954,85 728,70 341 509,42 3 СНД1-6 8 8 138,61 314,50 234,30 69 499,26
4 20.28.NN 6 18 026,54 954,85 785,10 118 598,95 4 СНД2 9 10 054,30 366,80 266,80 96 191,11
5 60.19.NN 1 14 630,83 1 110,00 656,90 16 397,73 5 СНД2+3 61 10 706,19 366,80 286,50 692 928,89
6 60.22.NN 1 16 414,70 1 110,00 712,10 18 236,80 6 СНД2+6 22 11 524,10 366,80 300,80 268 217,33
7 60.25.NN 4 18 282,53 1 110,00 773,20 80 662,93 7 СЕН 1 +12 2 12 041,46 988,86 451,20 26 963,04
8 60.28.NN 3 20 257,49 1 110,00 826,50 66 581,96 8 СЕН 2 +12 2 12 496,31 988,86 470,40 27 911,15
TOTAL FOR TENSION TOWERS: 827 682,06 9 СЕН 1 +20 1 15 061,49 988,86 535,60 16 585,95
10 СЕН 2 +20 1 15 516,34 988,86 554,80 17 060,01
TOTAL FOR SUSPENSION TOWERS: 2 307 376,62
GRAND TOTAL
Total quantity of steel for suspension towers, kg: 2 307 376,62
Total quantity of steel for tension towers, kg: 827 682,06
Total quantity of steel for construction site, kg: 3 135 058,67
Appendix 3
# Tower type # Tower type # Tower type # Tower type # Tower type # Tower type # Tower type
1 20.28.NN 31 СНД1 61 СНД1 91 СНД1-6 121 СНД1 151 СНД1 181 СНД2+6
2 СНД1 32 СНД1 62 20.22.NN 92 СНД1-3 122 СНД1 152 СНД2+3 182 СНД2+6
3 СНД1 33 СНД1 63 СНД2+3 93 СНД1 123 СНД1 153 20.25.NN 183 20.25.NN
4 СНД1 34 СНД1 64 СНД1 94 СНД1 124 СНД1 154 60.28.NN 184 СНД1
5 СНД2+3 35 СНД2+3 65 СНД1 95 СНД1-6 125 СНД1 155 60.25.NN 185 СНД1
6 СНД1 36 СНД1 66 СНД1 96 60.22.NN 126 СНД1 156 СНД2+6 186 СНД1
7 20.22.NN 37 СНД1 67 СНД1 97 СНД2+3 127 20.25.NN 157 СНД2+6 187 СНД2
8 СНД1-3 38 20.25.NN 68 СНД1 98 СНД2+3 128 СНД1 158 20.25.NN 188 60.28.NN
9 20.19.NN 39 СНД1 69 СНД2+3 99 СНД1 129 СНД1 159 СНД1 189 20.28.NN
10A,
B СЕН 1, 2 +12 40 СНД2+3 70 СНД2 100 СНД2+6 130 СНД1 160 СНД1-6 190 СНД1
11 20.28.NN 41 СНД1 71 СНД1 101 СНД1 131 СНД2+3 161 20.19.NN 191 СНД1
12 60.25.NN 42 СНД2+3 72 20.25.NN 102 СНД2+3 132 СНД2+3 162 СНД1-3 192 СНД1
13 СНД1 43 СНД2+3 73 СНД2 103 СНД2+3 133 СНД1 163 20.22.NN 193 СНД2+3
14 20.25.NN 44 СНД2+3 74 СНД1 104 20.25.NN 134 СНД1 164 СНД2+3 194 СНД2
15 СНД2+6 45 СНД2+3 75 СНД1 105 СНД2+3 135 СНД1 165 20.25.NN 195 СНД2+3
16 СНД2+6 46 СНД1 76 СНД1 106 СНД1-3 136 СНД1 166 СНД1 196 СНД2+3
17 СНД2+6 47 СНД2+6 77 СНД1 107 СНД1-3 137 20.25.NN 167 СНД1 197 СНД1
18 СНД2+3 48 СНД2+6 78 СНД1 108 СНД1-3 138 СНД1 168 СНД1-3 198 20.22.NN
19 СНД2+3 49 20.25.NN 79 СНД2 109 20.28.NN 139 СНД1 169 СНД1-3 199 СНД1
20 20.28.NN 50 СНД1 80 СНД2 110 СНД2+6 140 СНД1 170 СНД1-3 200 СНД1
21 СНД2+6 51 СНД1-3 81 20.25.NN 111 СНД1 141 СНД2+3 171 СНД1 201 СНД1
22 20.22.NN 52 СНД1 82 СНД1 112 СНД2+3 142 СНД2+3 172 СНД1-6 202 СНД1
23 СНД1-6 53 СНД1 83 СНД1 113 СНД2+3 143 СНД1 173 20.19.NN 203 СНД2+3
24 20.19.NN 54 СНД2+3 84 СНД2+3 114 СНД2+6 144 СНД2+3 174 СНД1-3 204 СНД2+3
# Tower type # Tower type # Tower type # Tower type # Tower type # Tower type # Tower type
25 СНД2 +3 55 СНД1 85 СНД2 115 СНД2+3 145 СНД2+3 175 СНД1 205 СНД1
26 60.28.NN 56 СНД1 86 СНД1 116 СНД2+3 146 СНД2+3 176 СНД2+3 206 СНД1
27 СНД1-3 57 СНД1-3 87 СНД2 +3 117 СНД2+3 147 20.25.NN 177 СНД2+3 207 20.25.NN
28 СНД1-3 58 СНД1-3 88 СНД2+3 118 СНД2+3 148 СНД2+6 178 СНД2+6 208 СНД1-6
29 60.19.NN 59 20.25.NN 89 СНД2+3 119 20.25.NN 149 СНД1 179 СНД2+6 209 СНД1
30 СНД1 60 СНД1 90 20.22.NN 120 СНД1 150 СНД1 180 СНД1 210 СНД1
1. Conductor АСО-400
Length of OHTL from line gantry of Plovdiv s/s to Maritsa Iztok s/s 92 985 m
From tower 453В to line gantry of Plovdiv s/s 48 m
Total length: 93 033 m
Number of phase conductors per OHTL: 3 бр.
Number of subconductors in bundle per phase: 3 бр.
Percentage of the length for sags and jumpers 3%
Total length of single conductor ACO-400 to be delivered: 862 416 m
Appendix 5
DISTRIBUTION OF SPACERS IN SPAIN
QUANTITY OF OPGW
Wound
Tension
from Section 3% for Process Total length Type of Towers on which junction boxes
section to tower # Drum Nº
tower # length,m sag, m allowance length, m (on OPGW will be installed
Nº
drum), m
Gantry of
1 48 80
Plovdiv 453 50 130
2 453 451 204 220 150 370
3 451 448 709 740 150 890 Gantry of Plovdiv s/s
3 350 1
4 448 447 264 280 150 430 Tower 445А
5 447 446 398 410 150 560
6 446 445А 307 320 150 470
7 445A 1 335 350 150 500
8 1 7 2 265 2 340 150 2 490
9 7 9 630 650 150 800
ACS 68-5.5
4 200 2 Tower 12
10 9 11 422 440 150 590
11 11 12 158 170 150 320
12 12 14 327 340 150 490
13 14 20 2 185 2 260 150 2 410
4 500 3 Tower 24
14 20 22 795 820 150 970
15 22 24 459 480 150 630
16 24 26 718 740 150 890
2 040 4 Tower 29
17 26 29 963 1 000 150 1 150
18 29 38 3 409 3 520 150 3 670 3 670 5 Tower 38
19 38 49 4 458 4 600 150 4 750 4 750 6 Tower 49
20 49 59 3 692 3 810 150 3 960 4 110 7 Tower 59
21 59 62 1 130 1 170 150 1 320 1 470 8 Tower 62
Wound
Tension
from Section 3% for Process Total length Type of Towers on which junction boxes
section to tower # Drum Nº
tower # length,m sag, m allowance length, m (on OPGW will be installed
Nº
drum), m
22 62 72 3 832 3 950 150 4 100 4 100 9 Tower 72
23 72 81 3 479 3 590 150 3 740 3 740 10 Tower 81
24 81 90 3 436 3 540 150 3 690 3 690 11 Tower 90
25 90 96 1 876 1 940 150 2 090 2 090 12 Tower 96
26 96 104 2 898 2 990 150 3 140 3 140 13 Tower 104
27 104 109 1 548 1 600 150 1 750 1 750 14 Tower 109
28 109 119 3 685 3 800 150 3 950 3950 15 Tower 119
29 119 127 2 731 2 820 150 2 970 2 970 16 Tower 127
30 127 137 3 462 3 570 150 3 720 3 720 17 Tower 137
31 137 147 3 375 3 480 150 3 630 3 630 18 Tower 147
32 147 153 2 126 2 190 150 2 340
33 153 154 382 400 150 550
4 610 19 Tower 158
34 154 155 223 230 150 380
35 155 158 1 152 1 190 150 1 340
36 158 161 784 810 150 960
37 161 163 534 560 150 710 2 490 20 Tower 165
38 163 165 646 670 150 820
ACS 68-5.5
39 165 173 2 524 2 600 150 2 750 2 750 21 Tower 173
40 173 183 3 362 3 470 150 3 620 3 620 22 Tower 183
41 183 188 1 708 1 760 150 1 910 1 910 23 Tower 188
42 188 189 187 200 150 350
3 920 24 Tower 198
43 189 198 3 320 3 420 150 3 570
44 198 207 3 205 3 310 150 3 460 3 460 25 Tower 207
45 207 216 3 030 3 130 150 3 280 3 280 26 Tower 216
46 216 226 3 779 3 900 150 4 050 4 050 27 Tower 226
47 226 234 2 893 2 980 150 3 130 3 130 28 Tower 234
Wound
Tension
from Section 3% for Process Total length Type of Towers on which junction boxes
section to tower # Drum Nº
tower # length,m sag, m allowance length, m (on OPGW will be installed
Nº
drum), m
48 234 242 2 746 2 830 150 2 980 2 980 29 Tower 242
49 242 250 2 866 2 960 150 3 110 3 110 30 Tower 250
50 250 254 1 487 1 540 150 1 690
2 x ACS 68-
51 254 258 1 454 1 500 150 1 650
3 980 31 Gantry of ME s/s
5.5
52 258 260 340 360 150 510
Gantry of ME
53
260 s/s 44 50 80 130
Total length of OPGW type ACS 68-5.5, km 104 160 Total number of
junction boxes for 30 pcs
Total length of OPGW type ACS 68-5.5 without optic fibers, km 3,98 the construction site:
Appendix 7
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
1 20.28.NN 1 2 - - - 6 - - 2 2
2 СНД1 - - 3 - - - 1 1 - -
3 СНД1 - - 3 - - - 1 1 - -
4 СНД1 - - 3 - - - 1 1 - -
5 СНД2+3 - - 3 - - - 1 1 - -
6 СНД1 - - 3 - - - 1 1 - -
7 20.22.NN 1 2 - - - 6 - - 2 2
8 СНД1-3 - - 3 - - - 1 1 - -
9 20.19.NN 1 2 - - - 6 - - 2 2
10 СЕН 1, 2 +12 1 2 - - - - 1 1 - -
11 20.28.NN 1 2 - - - 6 - - 2 2
12 60.25.NN 1 3 - - - 6 - - 2 2
13 СНД1 - - 3 - - - 1 1 - -
14 20.25.NN 1 2 - - - 6 - - 2 2
15 СНД2+6 - - 3 - - - 1 1 - -
16 СНД2+6 - - 3 - - - 1 1 - -
17 СНД2+6 - - 3 - - - 1 1 - -
18 СНД2+3 - - 3 - - - 1 1 - -
19 СНД2+3 - - 3 - - - 1 1 - -
20 20.28.NN 1 2 - - - 6 - - 2 2
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
21 СНД2+6 - - 3 - - - 1 1 - -
22 20.22.NN 1 2 - - - 6 - - 2 2
23 СНД1-6 - - 3 - - - 1 1 - -
24 20.19.NN 1 2 - - - 6 - - 2 2
25 СНД2 +3 - - 3 - - - 1 1 - -
26 60.28.NN 1 3 - - - 6 - - 2 2
27 СНД1-3 - - 3 - - - 1 1 - -
28 СНД1-3 - - 3 - - - 1 1 - -
29 60.19.NN 1 3 - - - 6 - - 2 2
30 СНД1 - - 3 - - - 1 1 - -
31 СНД1 - - 3 - - - 1 1 - -
32 СНД1 - - 3 - - - 1 1 - -
33 СНД1 - - 3 - - - 1 1 - -
34 СНД1 - - 3 - - - 1 1 - -
35 СНД2+3 - - 3 - - - 1 1 - -
36 СНД1 - - 3 - - - 1 1 - -
37 СНД1 - - 3 - - - 1 1 - -
38 20.25.NN 1 2 - - - 6 - - 2 2
39 СНД1 - - 3 - - - 1 1 - -
40 СНД2+3 - - 3 - - - 1 1 - -
41 СНД1 - - 3 - - - 1 1 - -
42 СНД2+3 - - 3 - - - 1 1 - -
43 СНД2+3 - - 3 - - - 1 1 - -
44 СНД2+3 - - 3 - - - 1 1 - -
45 СНД2+3 - - 3 - - - 1 1 - -
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
46 СНД1 - - 3 - - - 1 1 - -
47 СНД2+6 - - 3 - - - 1 1 - -
48 СНД2+6 - - 3 - - - 1 1 - -
49 20.25.NN 1 2 - - - 6 - - 2 2
50 СНД1 - - 3 - - - 1 1 - -
51 СНД1-3 - - 3 - - - 1 1 - -
52 СНД1 - - 3 - - - 1 1 - -
53 СНД1 - - 3 - - - 1 1 - -
54 СНД2+3 - - 3 - - - 1 1 - -
55 СНД1 - - 3 - - - 1 1 - -
56 СНД1 - - 3 - - - 1 1 - -
57 СНД1-3 - - 3 - - - 1 1 - -
58 СНД1-3 - - 3 - - - 1 1 - -
59 20.25.NN 1 2 - - - 6 - - 2 2
60 СНД1 - - 3 - - - 1 1 - -
61 СНД1 - - 3 - - - 1 1 - -
62 20.22.NN 1 2 - - - 6 - - 2 2
63 СНД2+3 - - 3 - - - 1 1 - -
64 СНД1 - - 3 - - - 1 1 - -
65 СНД1 - - 3 - - - 1 1 - -
66 СНД1 - - 3 - - - 1 1 - -
67 СНД1 - - 3 - - - 1 1 - -
68 СНД1 - - 3 - - - 1 1 - -
69 СНД2+3 - - 3 - - - 1 1 - -
70 СНД2 - - 3 - - - 1 1 - -
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
71 СНД1 - - 3 - - - 1 1 - -
72 20.25.NN 1 2 - - - 6 - - 2 2
73 СНД2 - - 3 - - - 1 1 - -
74 СНД1 - - 3 - - - 1 1 - -
75 СНД1 - - 3 - - - 1 1 - -
76 СНД1 - - 3 - - - 1 1 - -
77 СНД1 - - 3 - - - 1 1 - -
78 СНД1 - - 3 - - - 1 1 - -
79 СНД2 - - 3 - - - 1 1 - -
80 СНД2 - - 3 - - - 1 1 - -
81 20.25.NN 1 2 - - - 6 - - 2 2
82 СНД1 - - 3 - - - 1 1 - -
83 СНД1 - - 3 - - - 1 1 - -
84 СНД2+3 - - 3 - - - 1 1 - -
85 СНД2 - - 3 - - - 1 1 - -
86 СНД1 - - 3 - - - 1 1 - -
87 СНД2 +3 - - 3 - - - 1 1 - -
88 СНД2+3 - - 3 - - - 1 1 - -
89 СНД2+3 - - 3 - - - 1 1 - -
90 20.22.NN 1 2 - - - 6 - - 2 2
91 СНД1-6 - - 3 - - - 1 1 - -
92 СНД1-3 - - 3 - - - 1 1 - -
93 СНД1 - - 3 - - - 1 1 - -
94 СНД1 - - 3 - - - 1 1 - -
95 СНД1-6 - - 3 - - - 1 1 - -
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
96 60.22.NN 1 3 - - - 6 - - 2 2
97 СНД2+3 - - 3 - - - 1 1 - -
98 СНД2+3 - - 3 - - - 1 1 - -
99 СНД1 - - 3 - - - 1 1 - -
100 СНД2+6 - - 3 - - - 1 1 - -
101 СНД1 - - 3 - - - 1 1 - -
102 СНД2+3 - - 3 - - - 1 1 - -
103 СНД2+3 - - 3 - - - 1 1 - -
104 20.25.NN 1 2 - - - 6 - - 2 2
105 СНД2+3 - - 3 - - - 1 1 - -
106 СНД1-3 - - 3 - - - 1 1 - -
107 СНД1-3 - - 3 - - - 1 1 - -
108 СНД1-3 - - 3 - - - 1 1 - -
109 20.28.NN 1 2 - - - 6 - - 2 2
110 СНД2+6 - - 3 - - - 1 1 - -
111 СНД1 - - 3 - - - 1 1 - -
112 СНД2+3 - - 3 - - - 1 1 - -
113 СНД2+3 - - 3 - - - 1 1 - -
114 СНД2+6 - - 3 - - - 1 1 - -
115 СНД2+3 - - 3 - - - 1 1 - -
116 СНД2+3 - - 3 - - - 1 1 - -
117 СНД2+3 - - 3 - - - 1 1 - -
118 СНД2+3 - - 3 - - - 1 1 - -
119 20.25.NN 1 2 - - - 6 - - 2 2
120 СНД1 - - 3 - - - 1 1 - -
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
121 СНД1 - - 3 - - - 1 1 - -
122 СНД1 - - 3 - - - 1 1 - -
123 СНД1 - - 3 - - - 1 1 - -
124 СНД1 - - 3 - - - 1 1 - -
125 СНД1 - - 3 - - - 1 1 - -
126 СНД1 - - 3 - - - 1 1 - -
127 20.25.NN 1 2 - - - 6 - - 2 2
128 СНД1 - - 3 - - - 1 1 - -
129 СНД1 - - 3 - - - 1 1 - -
130 СНД1 - - 3 - - - 1 1 - -
131 СНД2+3 - - 3 - - - 1 1 - -
132 СНД2+3 - - 3 - - - 1 1 - -
133 СНД1 - - 3 - - - 1 1 - -
134 СНД1 - - 3 - - - 1 1 - -
135 СНД1 - - 3 - - - 1 1 - -
136 СНД1 - - 3 - - - 1 1 - -
137 20.25.NN 1 2 - - - 6 - - 2 2
138 СНД1 - - 3 - - - 1 1 - -
139 СНД1 - - 3 - - - 1 1 - -
140 СНД1 - - 3 - - - 1 1 - -
141 СНД2+3 - - 3 - - - 1 1 - -
142 СНД2+3 - - 3 - - - 1 1 - -
143 СНД1 - - 3 - - - 1 1 - -
144 СНД2+3 - - 3 - - - 1 1 - -
145 СНД2+3 - - 3 - - - 1 1 - -
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
146 СНД2+3 - - 3 - - - 1 1 - -
147 20.25.NN 1 2 - - - 6 - - 2 2
148 СНД2+6 - - 3 - - - 1 1 - -
149 СНД1 - - 3 - - - 1 1 - -
150 СНД1 - - 3 - - - 1 1 - -
151 СНД1 - - 3 - - - 1 1 - -
152 СНД2+3 - - 3 - - - 1 1 - -
153 20.25.NN 1 2 - - - 6 - - 2 2
154 60.28.NN 1 3 - - - 6 - - 2 2
155 60.25.NN 1 3 - - - 6 - - 2 2
156 СНД2+6 - - 3 - - - 1 1 - -
157 СНД2+6 - - 3 - - - 1 1 - -
158 20.25.NN 1 2 - - - 6 - - 2 2
159 СНД1 - - 3 - - - 1 1 - -
160 СНД1-6 - - 3 - - - 1 1 - -
161 20.19.NN 1 2 - - - 6 - - 2 2
162 СНД1-3 - - 3 - - - 1 1 - -
163 20.22.NN 1 2 - - - 6 - - 2 2
164 СНД2+3 - - 3 - - - 1 1 - -
165 20.25.NN 1 2 - - - 6 - - 2 2
166 СНД1 - - 3 - - - 1 1 - -
167 СНД1 - - 3 - - - 1 1 - -
168 СНД1-3 - - 3 - - - 1 1 - -
169 СНД1-3 - - 3 - - - 1 1 - -
170 СНД1-3 - - 3 - - - 1 1 - -
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
171 СНД1 - - 3 - - - 1 1 - -
172 СНД1-6 - - 3 - - - 1 1 - -
173 20.19.NN 1 2 - - - 6 - - 2 2
174 СНД1-3 - - 3 - - - 1 1 - -
175 СНД1 - - 3 - - - 1 1 - -
176 СНД2+3 - - 3 - - - 1 1 - -
177 СНД2+3 - - 3 - - - 1 1 - -
178 СНД2+6 - - 3 - - - 1 1 - -
179 СНД2+6 - - 3 - - - 1 1 - -
180 СНД1 - - 3 - - - 1 1 - -
181 СНД2+6 - - 3 - - - 1 1 - -
182 СНД2+6 - - 3 - - - 1 1 - -
183 20.25.NN 1 2 - - - 6 - - 2 2
184 СНД1 - - 3 - - - 1 1 - -
185 СНД1 - - 3 - - - 1 1 - -
186 СНД1 - - 3 - - - 1 1 - -
187 СНД2 - - 3 - - - 1 1 - -
188 60.28.NN 1 3 - - - 6 - - 2 2
189 20.28.NN 1 2 - - - 6 - - 2 2
190 СНД1 - - 3 - - - 1 1 - -
191 СНД1 - - 3 - - - 1 1 - -
192 СНД1 - - 3 - - - 1 1 - -
193 СНД2+3 - - 3 - - - 1 1 - -
194 СНД2 - - 3 - - - 1 1 - -
195 СНД2+3 - - 3 - - - 1 1 - -
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
196 СНД2+3 - - 3 - - - 1 1 - -
197 СНД1 - - 3 - - - 1 1 - -
198 20.22.NN 1 2 - - - 6 - - 2 2
199 СНД1 - - 3 - - - 1 1 - -
200 СНД1 - - 3 - - - 1 1 - -
201 СНД1 - - 3 - - - 1 1 - -
202 СНД1 - - 3 - - - 1 1 - -
203 СНД2+3 - - 3 - - - 1 1 - -
204 СНД2+3 - - 3 - - - 1 1 - -
205 СНД1 - - 3 - - - 1 1 - -
206 СНД1 - - 3 - - - 1 1 - -
207 20.25.NN 1 2 - - - 6 - - 2 2
208 СНД1-6 - - 3 - - - 1 1 - -
209 СНД1 - - 3 - - - 1 1 - -
210 СНД1 - - 3 - - - 1 1 - -
211 СНД1-6 - - 3 - - - 1 1 - -
212 СНД1 - - 3 - - - 1 1 - -
213 СНД1 - - 3 - - - 1 1 - -
214 СНД2+3 - - 3 - - - 1 1 - -
215 СНД1 - - 3 - - - 1 1 - -
216 20.19.NN 1 2 - - - 6 - - 2 2
217 СНД1-3 - - 3 - - - 1 1 - -
218 СНД2 - - 3 - - - 1 1 - -
219 СНД2 - - 3 - - - 1 1 - -
220 СНД2+3 - - 3 - - - 1 1 - -
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
221 СНД1 - - 3 - - - 1 1 - -
222 СНД2+3 - - 3 - - - 1 1 - -
223 СНД2+3 - - 3 - - - 1 1 - -
224 СНД1 - - 3 - - - 1 1 - -
225 СНД1 - - 3 - - - 1 1 - -
226 20.25.NN 1 2 - - - 6 - - 2 2
227 СНД1 - - 3 - - - 1 1 - -
228 СНД2+6 - - 3 - - - 1 1 - -
229 СНД2+3 - - 3 - - - 1 1 - -
230 СНД2+3 - - 3 - - - 1 1 - -
231 СНД1 - - 3 - - - 1 1 - -
232 СНД2+6 - - 3 - - - 1 1 - -
233 СНД2+3 - - 3 - - - 1 1 - -
234 20.28.NN 1 2 - - - 6 - - 2 2
235 СНД2+3 - - 3 - - - 1 1 - -
236 СНД1 - - 3 - - - 1 1 - -
237 СНД2+3 - - 3 - - - 1 1 - -
238 СЕН 1, 2 +20 1 2 - - - - 1 1 - -
239 СНД2+6 - - 3 - - - 1 1 - -
240 СНД2+3 - - 3 - - - 1 1 - -
241 СНД2+3 - - 3 - - - 1 1 - -
242 20.25.NN 1 2 - - - 6 - - 2 2
243 СНД2+6 - - 3 - - - 1 1 - -
244 СНД2+3 - - 3 - - - 1 1 - -
245 СНД2+6 - - 3 - - - 1 1 - -
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
246 СНД2+3 - - 3 - - - 1 1 - -
247 СНД1-3 - - 3 - - - 1 1 - -
248 СНД1 - - 3 - - - 1 1 - -
249 СНД1-3 - - 3 - - - 1 1 - -
250 20.19.NN 1 2 - - - 6 - - 2 2
251 СНД2+3 - - 3 - - - 1 1 - -
252 СНД2+3 - - 3 - - - 1 1 - -
253 СНД2+3 - - 3 - - - 1 1 - -
254 60.25.NN 1 3 - - - 6 - - 2 2
255 СНД2+3 - - 3 - - - 1 1 - -
256 СНД2+6 - - 3 - - - 1 1 - -
257 СНД1-6 - - 3 - - - 1 1 - -
258 20.25.NN 1 2 - - 3 3 - - 2 2
259 СЕН 1, 2 +12 1 2 - - - - 1 1 - -
260 60.25.NN 1 3 - 3 3 - - - 2 2
Gantry ME s/s - - - 3 - - - - 1 1
Existing section
Gantry Plovdiv s/s - - - 3 - - - - 1 1
453А 70.25.NN - - - 3 3 - - - 2 2
452 1H.28.M 1 1 1 - - - - 1 - -
451A 20.22.N 1 3 - - 3 3 - - - 2
450A CEH2 +12 2 - - - - - - 1 - -
450B CEH2 +12 1 - - - - - - - - -
449A CEH2 +12 2 - - - - - - 1 - -
449B CEH2 +12 1 - - - - - - - - -
Ground
Single Single Ground wire
V-shape Single Double Triple Ground wire wire OPGW
suspension suspension C-70
Tower Nº Tower type suspension tension tension tension OPGW C-70 tension
for upper for lower swing
string string string string С block tension set
bracket bracket clamp
set
448A 70.19.N3 1 3 - - - 6 - - - 2
447A 20.28.N3 1 3 - - - 6 - - - 2
446A 20.25.N3 1 3 - - - 6 - - - 2
445A 20.28.N3 1 3 - - - 6 - - - 2
TOTAL: 61 123 634 12 12 294 214 217 96 106
Note:
The individual sting types and sets with fittings are given in the following drawings:
Single suspension string, upper and lower D104-01C3-04-0A Ground wire C-70 swing clamp D104-01C3-08-0A
V-shape suspension string D104-01C3-03-0A Ground wire OPGW С block D104-01C3-06-0A
Single tension string D104-01C3-01-0A Ground wire C-70 tension set D104-01C3-07-0A
Double tension string D104-01C3-01-0A OPGW tension set D104-01C3-05-0A
Triple tension string D104-01C3-02-0A
Ground
Single Single Ground wire Ground wire
V-shape Single Double Triple wire OPGW
suspension suspension C-70 OPGW
Tower Nº Tower type suspension tension tension tension C-70 tension
for upper for lower suspension suspension
string string string string tension set
bracket bracket set set
set
452 1H.28.M 1 1 1* - - - 1 - - -
451A 20.22.N - - - - 1 1 - - - -
451B 20.22.N - - - - 1 1 - - 2 -
450A CEH2 +12 - 1 - - - - - - - -
450B CEH2 +12 - - - - - - - - - -
450C CEH2 +12 - 1 - - - - 1 - - -
449A CEH2 +12 - 1 - - - - - - - -
449B CEH2 +12 - - - - - - - - - -
449C CEH2 +12 - 1 - - - - 1 - - -
448A 70.19.N3 - - - - - 2 - - - -
448B 70.19.N3 - - - - - 2 - - 1 -
447A 20.28.N3 - - - - - 2 - - -
447B 20.28.N3 - - - - - 2 - - 1 -
446A 20.25.N3 - - - - - 2 - - -
446B 20.25.N3 - - - - - 2 - - 1 -
445A 20.28.N3 - - - - - 2 - - -
445B 20.28.N3 - - - - - 2 - - 1 -
TOTAL to be dismantled: 1 2 2 1 9 3 0 6 0
TOTAL to be installed: 0 3 1* 2 1 9 0 0 0 0
CROSING INFRASTRUCTURE
445А 1 Planned paved circular road of Plovdiv km 107 108 Unpaved road
101+873
2 3 Irrigation channel 109 110 20 kV Dragoyna OHTL
2 3 Gas pipeline 109 110 Paved road PDV 1213
2 3 Irrigation channel 110 111 Unpaved road
2 3 Unpaved road 111 112 Unpaved road
4 5 Irrigation channel 113 114 Unpaved road
5 6 Unpaved road 113 114 20 kV Dragoyna OHTL
Span Crossing infrastructure Span Crossing infrastructure
TABLE OF CONTENTS
8. MISCELLANEOUS
D104-01C3-12-0A - Phase sequence-A3
D104-03C3-01-0A - Phase sequence - A3
D104-03C3-08-0A - Bird protective rod-A3
D104-01F6-02-0A - Strengthening of foundations on tower No 445A OHTL Vezhen