r=
al
SAIPEM
~ ae tomo
AvKhobar
Contract 80 1140589
Sabjece EXECUTION OF
Sagan geal a ging te dS
ipedly eoseneeee Egat Jo
ria jal tite) oa
Rep ay jl La
(Sy aT ANY a
ferapr ase ese gs
NATIONAL CONTRACTING €O.LTB.
AL KHOBAR 1982
SAUDIARABIS
Tel No, aoe
elf No, 846138828127
maids conde oma
Comat No LADS (Reinet qu in any compos)
INERAL CONSTRUCTION ACTIVITIES (CIVIL. BUILDING, MECHANICAL, |
ELECTRICAL INSTRUMENTATION, TELECOMMUNICATION, FAINTING AND INSULATION)
UTILITIES AND OFFSITE PROJECT (HOSP)
‘anaes
ONSH. PORTE. MONIT.
Requests Cece
et 1384971 Rev os
‘Stheol Conmengsment Cate
Scheduled Completion Date
ri tres for PDF seg:
Shrraya Hejanadispem om
Biya larasaipecom
Tr. Depe_= 1 PO-SAUDI ARABIA
‘rears Offs 0 PO - SAUDI RHOBAR
be 12 brome Hana
‘Email dress Savana jai con
aer= Cet 18 Yeas ig
‘aon Woes
sation
wal costtucrnco,
inom tro
fe enn amasirsom san
| (nd ii oe andr es ur san sate Hy)
sosiam A Saeseom san
hundred ney for thousand seven ua 9)
| {handed it
“We herey ava yaw te preset Cont fr th proviso tind ud be, th you unk a ene
| seconnc wah he enna confines ttt hbo,
‘his Conac. toque nah he ancondtona aecelance het, cones the ene and only agreement betwen
Contactor até Subcontaciar rea Io the povinnn a dead heen, One span my ther pes
‘ay medications th kms does of ti Cental be sadn wrkng byte Contactor and Sal
‘ny be vad upon writen acceptance.
‘This WORK CONTRACT cones the xeon ofthe EXECUTION OF GENERAL CONSTRUCTION ACTIVITIES
(CIVIL, BUILDING, ‘MECHANICAL, ELECTRICAL, INSTRUMENTATION, -TELECOMMUNICATION,
PAINTING AND INSULATION) RELEVANT TO RABIGII RPII= UTILITIES AND OFFSITE PROJECT (UOSP)
(cna vera tase Scope of Wore
‘We, SNAMPROGETTI SAUDI ARABIA CO. LTD, a onponyestblihed pd exiting underthe sf Kington
of Sot Arab, with egtered cd ea fice in PO. Bor 02S. AI Khobar 1982 an ented andr comme
‘epntaton No 252012876 (hereiner feed he CONTRACTOR’)
ey ard you
NATIONAL CONTRACTING COMPANY 11D. comp cabled an exiing nde the avs oF Kingdom of
Siu Azsbia with registred and head oes in A Kota PO Box No, A Kok 31952, Saud Arabi aod
‘existe nr commer sri Ni 20S00U6hreaf refered ae he "SU-CONTIACTOR)
‘The rent WORK CONTRACT forth provisions onal ur jet, that SUB-CONTRACTOR ade to
exci aceadunce athe ems ont et ber bb
‘The press WORK CONTRACT, tater with he ucondonlseceptance ht, consi the ere and ons
arcementheween the PARTIES resin to the ponsons deserter any oto ev
‘presentation wheter expesed, verbal a nied, ean indcenet a ager of Rind ot are
Any modieaion othe lems and conto of this WORK CONTRACT sal be fd io weting by
Now therefor, in comsiderton fhe tal oveans sd present einer vied shen ied a
foo:
ART." WORK CONTRACT DOCUMENTS ACCEPFANCE AND PRIORITY
Sbjct ote provishn ta the muds and expressions we ec sal hive the eang sd he nerpctaton a
signed th i Gener! Ten a Crs aa ots WORK CONTRACT and with eee Clase
‘Werk Coat Dir” Acceptance Gane Tams & Condition” tached.
11 The WORK CONTRACT DOCUMENTS sl cons of i fllowing dacs ining on Sth PARTIES, and
tach dovener sal evel oer the tor withthe ew
[General Ten and Conditions for WORK CONTRACT DOCUMENTS. High Compleiy ~ oe