V-5250
PH-9200 Heater Treater
Pre Heater
T-5300
Crude Oil Storage
Tank
Liquid From
gas Process E-5180 A CAP. 10000 BBLS
Gas
Boot
E- 5180 B
Transfer To
Badak
V-5020
From Well Around Oil separator
Mutiara Central
Plant
P-5030 A/B/C
Crude oil
V-5200 Transfer pump
Heater Treater T-5040/50/60/70/80/90
1000 BBLS
Gas To Flare
PAMAGUAN STATION
PT-22.98 Psig
Slot 1,2,4,5,6 V-7680
VLP Gas Prod separator
VLP Header
L-1380
TO MCP
LP Header
L-1370
Slot 3
PT-23.20 Psig
V-7200
LP Gas Prod separator C-
7400 1501- Utara For Gas Lift
PT- 634.19 Psig
1502- Selatan For Gas Lift
AG
Slot 7 gas go to slot 4 oil
Polution Control
Disposal
PROCESS FLOW DIAGRAM MUTIARA-08 STATION
Gas To Flare
V-8325
KO.Drum V-8160
Cap. 4600 bbls
Cap 20 MMSCFD Max 65.5 Psig
Slot 11- 18
Gas
Boot
V-3450
Oil Test separator T-3702 Transfer To MCP
Oil Test Header
Cap.5000 BBLS
T-3700 & T-3701
V-3470
Test Tank P-3750 A/B/C
Oil Test separator Cap 100 BBLS Max. RPM 1400
Disch. Press 650 Psig
PROCESS WATER DISPOSAL ( Polution Control)
In MCP
To Gas System
Break Drum
V-1410
Vent
V-1430
V-1480
CPI
GFU
P-1440 A/B
Injection to Well
T-9890
Prod. Water Tank
Booster Pump
9900 A/B
Water Injection Pump
MT- P - 9880 A/B/C