You are on page 1of 15
ky ci suc mis og sas COMMERCIAL COMPLEX (4B+G+M+14F) SQUARE 2 DCBé MONITORING REPORT Doc. Ref: ACC-NICC-DR-MR-SQ2 Rev 00 OF SHORING SYSTEM @ SQUARE 2 (COMMERCIAL COMPLEX) sh (Wy ool | estseen | asowoall FAW |II| 5 REV DATE DESCRIPTION | PREPARED | CHECKED VERIFIED: APPROVED pene MONITORING REPORT ae ~ De Nat Dupicale, Contraled Copy # Stamped a Red. COMMERCIAL COMPLEX (4B+G+M#14F) SQUARE 2 DCB a TABLE OF CONTENTS 4. INTRODUCTION 3 2. PURPOSE OF THIS DOCUMENT 3 3. SHORING SYSTEM 3 4. MONITORING SysTEM 4 5. MONITORING DURATION 4 6. MONITORING RESULTS 5 ANNEXURES SHORING LAYOUT AND CROSS-SECTIONS ANNEXURE - A SURVEY TARGET POINT LAYOUT ANNEXURE - B MONITORINH GRAPHS ANNEXURE - C Leg Cine MONITORING REPORT CEng) Doe. Ref.: ACC-NICC-DR-MR-SQ2 Rev 00 Page2of6 ‘Do Not Bupleale, Controled Copy i Stamped in Red. COMMERCIAL COMPLEX (4B+G+M+14F) SQUARE 2 ‘ ‘ DCB a 1. INTRODUCTION ‘The purposed project is aimed to construct commercial complex (4B+G+M+14F) for National Industrial Contracting Company (NIC). The project sites are located at ‘Square? plot no. 14330018 in Fareej Abdul Aziz area at Musherib, Doha. te fare Fig 1: Project Location ‘Ammico had designed and installed an anchored diaphragm wall shoring system at the subject project 2. PURPOSE OF THIS DOCUMENT As a part of Ammico's liabilty, the monitoring of shoring system is on progress since the commencement of excavation works. This report presents the monitoring results and the evaluation of these results. 3. SHORING SYSTEM Diaphragm wall shoring had been designed and installed at the project site. 640mm thick panels had been supported by ground anchors except the north side of the site, Due to the existing Qatar Rails tunnel, cantilever 1,500mm thick diaphragm wall panels had been installed on this side. The shoring details are as follows; Section Shoring Detail Top Level | Ex. Level | Support System (QNHD) | (QNHD ‘Section-1A__ | 640mm diaphragm wall +6.0 12.45 _ | layer of anchors ‘Section-1A"__| 640mm diaphragm wall +6.0 =12.45 _ | 3 layer of anchors ‘Section 1A*_| 640mm diaphragm wall +60 ~12.45 _| 4 layer of anchors ‘Section 1AP_| 640mm diaphragm wall 46.0 =14.4_ | Sia Section 1B _ | 640mm diaphragm wall 46.0 12.45 ‘Section 18-P_| 640mm diaphragm wall +6.0 =1447 Section 2 | 100mm diaphragm wall +60 12.45. “4, MONITORING REPORT Doo. Ref.: ACC-NICC-DR-MR-SQ2 Rev 00 Do Not Duplicate, Coniraled Copy # Stamped in Red, a niasiacu COMMERCIAL COMPLEX (48+G+M#14F} Seren SQUARE 2 ! DCB The as-built shoring layout and the sections are available at Annexure A 4. MONITTORING SYSTEM The monitoring at Square-2 is performed by survey targets marked on the exposed face of diaphragm wall panels at multiple layers. A survey target is consisted of a reflective target with precision cross hairs that give accurate readings in three dimensions. The reference locater shall be fixed on a vertical wall to monitor settlement of the structure. Conventional total stations will be used to take readings. 60m Target There are 36 numbers of targets and the distributions of these targets are as follows; Section | Target ID | Level Section | Target iD _| Level Al +3.00 ‘AB | #328 : iA _[~-3.00 ABA | 3.01 Section 18 a2 43.31 ABB | -6.00 2A | -3.00 ‘ABC | -891 AS 43.22 Ad 133.01 Section 1BP | —~asa_| -3.00 AOA | -3.01 Ad 43.36 Ag | -3.00 AAA 2.91 peseseual AEC) 859 7 ‘AaB | 9.00 AiO | #3.02, SectonitAl AS $3.24 ‘Aion | 3.02 RSA | -3.01 ‘A10B | 602 ‘ASB | -8.99 iC | -8.01 ‘6: 43.27 Ai2 | 43.29 Section 1A’ REA | 278 AizA [3.00 ‘AGB | 8.96 Sedion 1AP AM | 43.20 ‘AT 43.28 AIS | 93.20 Section 1 AIA| 273 Section 2 Aig | 43.52 ‘A7B | ~-6.02 AA [3.1 The location of these target points on the shoring layout drawing is available at Annexure A. MONITORING DURATION Initial survey readings are recorded after the installation of survey targets and the monitoring of these target points have been commenced on April progressed with a variable frequency. The frequency was week! MONITORING REPORT ‘Ammico] Doc. Ref: ACC-NICC-DR-MR-SQ2 Rev 00 Pogeis.of8 ‘Do Not Duplicate, Contoled Copy i Stamped in Red. SQUARE 2 COMMERCIAL COMPLEX (48+G+M+14F) DCBé After the completion of enabling works at site, Ammico had handed over the site to Main Contractor and the monitoring responsibility had been novated to Main Contractor. However, it has been noticed later on that Main Contractor was mainly focused with their civil works either than the monitoring of shoring, Hence, Ammico have decided to continue the monitoring, 6. MONITORING RESULTS The monitoring graphs are provided at Annexure C. The comparison of these results is as follows; ‘ ] Predicted Allowable Survey | Max Registered Horizontal | Horizontal | Neighbor/Adjacent Target. Movement as per | Movement ‘Structure Movement (mm) | Mpeetne anh on 15.93 40 Road 15.45 40 Road 797 40 Road 875 60 Empty Plot 1278 60 Empty Plot Sag A9C 3.00 Ape A “as per the report ACC-NICC-DR-S1-SHP Trev 0 r Se . eon anes ‘0 Contra MONITORING REPORT Doo, Ref: ACC-NICC-DR-MR-SQ2 Rev 00 Do Net Dupleste, Contoled Cony W Stamped in Red. SQUARE 2 COMMERCIAL COMPLEX (48+G+M+14F) DCB& ASB 671 ee Predicted Allowable Survey | Ma Registered Horizontal Horizontal | NeighboriAdjacent Target Movement as per | Movement | Structure Movement (mm) | “Design (mm)* (mm) 5.00 : 12:78 60 Empty Piot 1077 | At2A 4.47 Att 1204 18.08 40 Road ASB a “as per the report ACC-NICC-DR-S1-SHPT.rev 0 ; Predicted ‘Allowable survey | MaxResistored | icrzontal | Horizontal | NeighborAdjacent Target | yovorentinm) | Movementas per | Movement Structure vemer Design (mm)" (mm) rer 671 Ata 724 34.70 40 Road “as per the report ACC-NICC-DR-1500-P2-DW02,rev 0 The allowable horizontal movements are determined based on the sensitivity of the neighborfadjacent structures. The general concept is as follows; High sensitive structure > 15mm. Road with underground utilities —- 40mm Empty Plot — 60mm Less sensitive structure (apartment, villa, substation, etc) —» 25mm. MONITORING REPORT Doo. Ref.: ACC-NICC-DR-MR-SQ2 Rev 00 Page 6 of 6 Do Not Duplicate, Controlied Copy W Stamped in Red. (\, cnneconsasnas COMMERCIAL COMPLEX R4Gvo14) SQUARE 2 DCB ANNEXURE - A SHORING LAYOUT & CROSS-SECTIONS MONITORING REPORT Doc. Ref.: ACC-NICC-DR-MR-SQ2 Rev 00 ‘Annexure ‘Do Not Duplicate, Contaled Copy F Stamped in Red. RESIDENTIAL & COMMERCIAL ‘COMPLEXAT SQUARES ‘Sheng ayo Fan FS [eae ome 1 a E i nat Sa Sein [tarts | Bit Dori] Frosh | onsets in| Sar Oy | Pestenhe ne 1 % at 700 * “2 w [2 "28 ‘080 788 * = * "as ies 708 + es eis (2 75 200 700 * ‘ee’ [3 "a8 1050 788 * 0 1 "as 7aa5 708 rs | we [2 “2s 370 701 * 2) 3 "a8 80 7 2 wo 1 “as 00 7a “ 2s RESIDENTIAL & COMMERCIAL at = 7 a a = ‘COMPLEXAT SQUARES Hi 25 100 t# | 2s one Sg Secons vee [2 725 7a 708 * es cee 3 "as 50 78 4 | ee a COMMERCIAL COMPLEX (4B+G+M+14F} SQUARE? ; DCB a ANNEXURE - B SURVEY TARGET POINTS LAYOUT MONITORING REPORT Do Wot Dupieate, Cantrolied Copy W Stamped in Rod. oes, a, RESIDENTIAL & COMMERCIAL COMPLEX T SQUARE-2 RS i RESIDENTIAL & COMMERCIAL COMPLEX aT SQUARE-2 naam Hn semnsby 6 ag tt ag sks COMMERCIAL COMPLEX (48+G+M+14F) AY sv wconmecaovonen DB ANNEXURE - C MONITORING GRAPHS MONITORING REPORT RR cna eR Soe rev 0 Anexie ‘Do fot Duplicate, Cantratied Copy W Stamped in Red. NBK SQUARE 2 a0 z 0 go z z z 5 52 2 6.00 z 12.00 ace Be. aa BE <0 Bam Be Be aco S400 2 ooo 2 ooo 5 ooo Hicrease 20-aPR19 4JUL19 17-SEP-18 1-DEC- Ta Shaya va-0icie_1a-eera ti-Nowi8 TO-vAN-20 SSREBT® BMAY-19_SAUGT®1-NOV-I9 _900AN-20 Ron) teas en 14.027 25900) 500 . 280 3 400 E o.00 20 E gen E cm 5 io 83 200 Bon B00 B00 5 000 & ono 00 § Sheers goaPate eWve I7SeP-18 TbEOTe Bo Weoie Suave savade1-Nov-re s0-JAN-20 2s-auea8 22-06T-19 21-DEC19 ro.FeB-20 © Matsa Gerard 2 ATA L(-3,00)(3.61m) OA4AL(-2.91) (11.18) ee 3° ae 400 12.00, z 5 a Be om 3x20 E" 5 Bgeco WE coo 5 emo ge" we B 00 he 0 4 Base Siree) SMAY-I@ SAUe18 —t-NOVTeao-vaN-20 ago saver 2oer-18 1-DEC1 ———«S0~UAN-20 242166331) (11) © a-aua-19 1-Nov-19 30-JAN-20 oA L.8.95) (261mm) pare —e—AB L(-9.00) (5.3m) 9.00 z =e oe 5 gan Ee 2m Bare Zen 5s gg ge WE 300 Be ge B a0 Bsc a thas gevULie —_Te-OcT-18 26-0E@-18 200 200 Ue atigcon oaraae SEARS® JUNI8 20-AUG18 @NOVIO _BOUAN-20 SPERTS.S-WAY-T@ _a-AUG-191-NOV-18 SOIAN-20 eA 1682 (em) Tatar tan sam) ‘200 z m0 z 120 00 3 2 16.00 Ee 5 2m Been Eso BSc FB oo aS 82 5 a Zea too et) 3 00 WARIS 9JUN-T@—B8-AUG-18 ENOVTE 2v-JAN20 SFEGIS. SAVIO SAUGTO TNOV-I9 90-1AN-20 SSFEBI@-SMAY-I9 @AUGT® NOVI G0-UAN-20 —eAatg.29 00770) = Asa 400 048mm Hara 279 (80m) - toon 20 5 om 3 an ase: ge Be coo ag ge om BS on 5, a Bon i 200 1BeMAY 1! 1 1 18 26. 49 0.00 = 5 ME eeu te aaoer ao S-AUG-19 17-SEP-19 1-NOV-18 T6-DEG-19 S0-UAN-20 20-JANI9 G-APR-19 19-JUN-I9 2-SEP-18 16-NOV-19 30-JAN-20 —oA-3a1(.00) (447m) —e-A58 L:8098) (141mm) 78 L602) (13. 04mm) en BOOHER £0 Comiractins. NBK SQUARE 2 TS0CT18 26-NOV-18 7-JAN-20 e820 69.00) (4.12m 2000 1500 200 ZB wm i Z Be 1200 = z 500 Be = ne 2. HE om a sw 500 8 00 S0uAN-IO ScAPRCI9 V@-dUNAI0 2-8EP10 1ONOVA 3 om B om Soe eae Nee Nyt ea SE ReNe TeAUG18 1-NOV-19 25-AUG-187-OCT-19 21-NOV19 S.JAN-20 maLguaypernay = A-9B L(-3.00) (10.82) 2 A-11 (3.29) (6.6mm) 3 — 600 _ 1500 sce Hh 8 00 Eco E ao Bao 8 300 g g 300 00 g 8 ovo 20-JAN-19 5-APR-19 19-JUN-19 2-SEP-19 16-NOV-19 30-JAN-20 ba 2O-JAN-19 S-APR-19 19-JUN-18 2-SEP+18 16-NOW-19 30-JAN-20 sau 2oct19 Sects a0 AN-20 te Aan uaa0 (7mm) ensaimraes Sn 28.20) 160m) ce = 7 From = 2 vw S150 Eso 5 ovo 3 200 5 & 4 & 8 - W600 eon ies gue dem 8 oe. 8 3.SEP-19 2a HLA 7-0CT-18_av-DEC-9 ae eae 2VFEBIG TMAYIG 2-JULG8 4-OGTAS TeDECATS 2-66 4600/1245) 10 49.00 4857) aa 2100 vo0 z im 0 zw 3 ism 2. any oes E gem Z° oe QB Zs00 BS 100 ge 2 = 200 B o00 Siem Pate APPEBIN SAMAYSIE S-AUGQSI91-MOVHID SOUR 2) OT avd BAUGT®TNOVI0 SOTAN-20 — BMAY-19 T-JULT® GO-AUG-18 29-007-10 26-DEC18 aac 8.91 (88mm) —A10a 4802 (10.62nm) 1819.29 (671mm) 1200 ners =" Jw ¥ so F a0 3. Ble S eco g Gis 2 aco ae 2 to a 5 Boo a a SPEBTD S-WAYsI9 saUGHS T-NOW=9 s0-uaN20 og SPEST® SMAYI9 SAUGAO — T-NOVAI8 — SO-JAN-20 ice tcae eae @ 2ser-10 NOV ae0E6-18 eA A U8.) (FOr) eee a stente ottnta ttt tase 7 40 00 z z ie 3 om 5 cw go QZ 200 Be. gE BE «00 zoo Bow gen 5 ans a 8 GPEST@ SMAYT9-SAUGH9TNOV-I8 S0-UAN-20 000 00 gorauete490GTI8 —_ay-NOW=I9—_tH-uAN-B0 Oe a eee eee ee ——A.98 4300) (671mm) TE aoe on mm) Se allen waa terme

You might also like