Ref No: 2012/HAKS/Asset/RSC_28/NHAI/1214 16" November, 2012
To,
‘The Project Director,
Project Implementation Unit.
National Highways Authority of india,
Mangalore,
Project: Package 28- Four Laning of Kundapur - Surathkal section from Km 283+300 to km368+080
(Section 1) and Mangalore-Kerala Border [km 375+300 to km 3764700 (i.e. Nature citcle to
Mahaveer circle) and km 3#700 to km 17+200 (Le. Mahavir circle to Kerala border) (Section Il)
of total length 90.08 km in the State of Karnataka under NHDP Phase- Ill on BOT (Toll) basis
Sir,
‘Sub: Road inventory and Asset Updation Survey-Commencement-information-Reg,
Ref Clause 2.2.5 of ToR of Road Safety Consultant's Agreement.
‘The Road Safety Consultant is programmed to conduct Road inventory and Asset Updation survey using
“HAWKEYE 2000 Professional Network Survey Vehicle” for the above mentioned project on 28.11.2012
The survey is proposed to be conducted through M/s Indian Road Survey & Management Pvt. Ltd
Chennai
The Project Director is requested to advise the Independent Engineer and the Concessionaire to
co-operate and co-ordinate with the team conducting the Survey.
This is for your kind information and necessary action
Assuring our best of services and co-operation.
With Regards,
OP Ravanan B.Sc., B.E., P.E.,
Assistant Vice-President (HAKS).
Encl: Methodology of IRSM
Copy to:
1. The General Manager (T), Road Safety Cell, National Highways Authority of India, New Delhi
2. The Chief General Manager(T), Regional Office, NHAI, Bangalore.
3. The Team Leader, Mis Aarvee Associates Pvt, Ltd., Kannarpady, Kadekar-Post, Udupi,
Karnataka,
4. The Project Manager, Mis Navayuga Udupi Tollway Pvt, Ltd.,Padubidri, Udupi Dist &Taluk,
Karnataka.
Mr. Abhishek Tiwari, Project Manager, IRSM, Chennai-40,Functional Data Collection For Haks Engg 8
5. Methodology:-
Data Collection Methodology ~Advance Data Collection equipment
Functional Data Collection Using IRSM Hawkeye 2000 Professional
Network Survey Vehicle
IMAGE:- IRSM HAWKEYE 2000 PROFESSIONL NETWORK SURVEY VEHICLE
The existing Road asset inventory location and condition will be assessed
using a Network Survey Vehicle (NSV). The NSV is an automated data
collection system that picks up the required data in one pass of the road at
normal traffic speed. As to this, it requires no traffic management. The
components of the NSV that are used to collect the attributes are described
below.
Commercial in confidenceFunctional Data Collection For Haks Engg 3
totum bn i
suarainten
IMAGE:- HKWKEYE 2000 CONFIGURATION
IRSM’s NSV is equipped with a fully integrated Hawkeye 2000 data collection
system, consisting of a multi-laser profiler, digital imaging system and a
Gipsitrac unit whose outputs are all linked via a highly accurate distance
measuring instrument.
Capable of producing outputs that include data of road distance, GPS
(PGPS), hidefinition video images, roughness, rutting, texture and
geometry.
The Hawkeye Processing Toolkit software ensures that the survey database
can be reviewed, edited and processed quickly and efficiently. The data
from each module can be compared against other results and exported to
most common GIS and asset management systems
Commercial in confidenceFunctional Data Collection For Haks Engg 10
IMAGE:- OFFICE BASED HAWKEYE PROCESSING & ANALYSIS
‘The Hawkeye 2000 Network Survey Vehicle is capable of undertaking the following
analysis:
Road Network Condition cracks and defects with size
Roadside Assets e.g; bridges, culverts sign boards etc
Road Safety analysis,
Geometry detail
Dimensional detail
Correct location of roadside furniture
Asset/Inventory’ locations and subjective condition of the same:
GPS co-ordinates for all logged images:
This equipment will provide the basis and starting point to analyze road conditions
in true sense seeing the real - time picture of the road by the decision maker as the
Hawkeye system captures every snap of a road alignment with all its assets which
will enable benchmarks to be set and informed decisions can be made from that
point forward.
‘APPLICATION:
+ Network and project level road and asset collection surveys
+ Routine pavement monitoring surveys
+ Roadside inventory and asset management
+ Road geometry and mapping surveys
+ Road Safety Assessment
‘The vehicle can be operated at highway speed. Further the data collected will be in
compressed form.All data is processed in an integrated system and is exportable to
.SHP and HDM4 format. The data can also be delivered in xls files, data bases.
Further from the collected data various relevant parameters may also be analyzed
and recorded. The digital form of raw data and reports can be stored for longer
time for further studies.
Commercial in confidence7 IRSM & ARRB
IRSM is a Joint venture Company of ARRB Group-Australia. IRSM established in 2008.
IRSM follows all the procedures of ARRB and also have full access to ARRB facilities and
technical expertise. [RSM staff is qualifiad and also trained in ARRB facilties.
ARRB has completed over 300 network level road condition surveys for a range of clients, including
state road authorities, international customers, local government and private industries. The proposal
‘combines the benefits of enhanced technology and highly qualified and experienced personnel from
IRSM who have gained specific knowledge and have successfully used digital imaging technology to
collect concition and inventory parameters for in excess of 3000kms in the past two years. ARRB Is 60
years Old Company and ARRB employs almost 250 staff who form a mult-discipinary pool of highly
{Qualified research professionals, experienced engineers, and specialist technical and support staff.
RRB has a national and international reputation for transport and infrastructure solutions through:
research
consulting services
leading-edge products
workshops and conference
information services (Le. library and publications)Functional Data Collection For Haks Engg 13
Annexure A
Visual Rating @ 10 meter interval from cameras for Pavement Distress
Severity Levels Exont Levels
Tongitudinal Cracks 1 (6no.| Extensive
Raveling 1 (Significant Voids) Tow 3% Few
2 (large patchy areas > 50% loss) Medium | 3.7% | intermittent
3 (loss binder stone in depth) High 820% | Frequent
>20% | Extensive
Patching ¥ (Minimal Distress) Low 20% | Extensive
‘Shoving 1 (15mm) Low 0.8% Few
2 (15-50mm) Medium | 0.3-5% | Intermittent
3 (650mm) High 5-14% | Frequent
>14 | Extensive
Flushing/Bleeding 1 (6-10 % Bitumen) Low 15% Few
2 (11-25% Bitumen) Medium | 6-15% | intermitent
8 (>25% Bitumen) High 16-40% | Frequent
41-75% | Extensive
Depression 1 (1m2) igh 0.6-2% | Intermittent
35% | Frequent
35% | Extensive
13 | Corrugation 1 (e15mm) Tow 21% Few
2 (15-50mm) Medium | 1-15% | Intermittent
3 (>50mm) High 16-30% | Frequent
30 Extensive
14 | Remark
Annexure B
Rating Form @ 10 Meter Interval for Asset Inventory Video Rating process.
Rating Form @ 10 Meter Interval Video Rating process
Paramoters [Attributes | Value
‘Comments
Start! and End Geo- | Conerete Bridge
Relerenca of Bride Abutment | Fly-Ove
1 Latitude (dog)
2- Longitude (deg)
3 Altude (m)
1 Direction From Text Siaring of SuNey
%_Direaton To Tox End of Survey
3 Road Type ‘CC Cement Concrete
BT- Bituminous
G -Gravel
E - Earthen
a Brldge Type Culvert
Type of sion Regulatory
Geo-Reterence Informatory
1+ Latitude (609) Warning
2- Longitude (deg)
3-Altitude (m)
GLAD.
£00 008
Commercial in confidence \2\
OF
CE
qFunctional Data Collection For Haks Engg
18
Cariageway type
Divided
Undivided
Solid divided medan
‘No separation
Trea Type
urar
Semi-Urban
Urban
No. af Lanes
One
Two
Three
Four or More
Tare wiihe for Tanee
coving through talie
Wide >325
Medium <3.25
Narrow <2.75
76
Paved Shoulder
Wietr
Paveds=2amm
Paved »1me2.4m
Paved >Ometm
None
Unpaved — Shoulder
wien
Unpaveds=2.4m
Unpaved =1me2.4m
Unpaved >0m