This challenging project was executed adhering to stringent safety and quality standards, in a brown
field environment inside the live 400 KV substation. The project successfully overcame the constraints
of working in live panels to interface with existing system.
Supply Installation, Testing & commissioning of 800 MVA, 400/220kV Auto transformer.
Modification ,Testing & commissioning of 400 KV GIS bay
Modification ,Testing & commissioning of 220 KV GIS bay
Supply Installation, Testing & commissioning of 220 KV GIB duct (total length 96Mtr)
Modification, Testing & commissioning of in bay watch system
Supply, Installation, Testing & commissioning of New Transformer Monitoring system by
integrating with existing TMS system
Supply, installation, testing & commissioning of 400 KV 1CX2500 Sqmm cable (520Mtr Total
length).
Modification of existing Live Protection and SCS system
The project team also had the onus of close coordination with the client M/s Kahramaa Qatar & Project
Consultant M/s Energo Projekt to complete the interfacing works with existing live equipment.