Millennium Erectors Corporation

9445 Retiro St., Guadalupe, Makati City

Project : Oriental Gardens Makati (Lilac Tower) Report No. : 062


Location : Don Chino Roces Ave. corner Export Drive, Makati City Date : March 11, 2014
Contract Package Shift : Day
Working Time : from 7:00AM to 4:00PM Weather : Cloudy/L. Rainshower

Daily Construction Report


MANPOWER
Staff NO MH NO MH Equipments NO HRS.
1. Project Manager 1 8 1. Leadman 4 32 1. Cut off machine 1 8
2. QA/QC 0 0 2. Carpenter 1 8 2. Mini Dump Truck 1 8
3. Site Engineer 1 8 3. Mason 3 24 3. Circular Saw 1 8
4. Electrical Engineer 1 8 4. Tile Setter 1 8 4. Service Vehicle 1 8
5. Mechanical Coordinator 1 8 5. Welder 2 16 5. Power Washer 2 16

6. Cost Engineer 0 0 6. Laborer 47 376 6. Grinder 6 48


7. Safety Officer 1 13 Total 58 464 7. Auto level 1 8
8. Project Nurse 0 0 TRADECON 8. Mech.Concrete Vib. 2 16

9. CAD Operator 1 8 KALAYAAN 4 32 9. Transit 0 0


10. Timekeeper 1 10 ICC 20 160 10. Hammer Drill & Rotary 10 80

11. Foreman 1 8 ROSTRAM 5 40 11. Chipping Gun 1 8


Total 8 71 S&H 26 208 12. Welding machine 5 40
ARLO 18 144 13. Gondola 2 16

General Services NO MH YYD 4 32 14. Hand Drill 6 48

1. Spot Checker 2 26 V. ROQUE 12 96 15. Misting Machine 0 0


2. Electrician 1 13 G. S. GO 7 56 16. Cutting Tools 2 16
3. Electrical Aide 2 26 CARSON 0 0 17. Vacuum Cleaner 2 16

4. Line and Grade 0 0 CARDRIAN 0 0


5. L&G Helper 1 13 POLYGON 0 0

6. Warehouse Man 1 13 STELSEN 3 24


7. Warehouse Aide 1 13 SCHINDLER 6 48
8. Pump Tender 1 13 Total 105 840
9. Utility 3 39 SUBCON
Total 12 156 FIVE STAR 2 16
CHER 37 296

Operator NO MH FRANCISCAN 2 16
1. Driver 1 13 BIO 101 3 24

Total 1 13 MIGHTY 50 400


FMPI 12 96

Total 316 2528 Prepared by :

NO MH ___________________________

Description of Activities Performed Today: MEC


GRAND TOTAL 395 3232
1. Masonry works @ GF to 33rd floor

2. Painting works Interior @ 29th/31st floor


3. Installation/Rectification of tiles @ 9th - 33rd floor Received by:

4.Puchlisting @ 9th-32nd floor

5. Ceiling works @ 9th - 32nd floor


6. Painting works @ common areas DAAA
Millennium Erectors Corporation
9445 Retiro St., Guadalupe, Makati City

Project : Oriental Gardens Makati (Lilac Tower) Report No. : 002


Location : Don Chino Roces Ave. corner Export Drive, Makati City Date : August 24, 2011
Contract Package Shift : Night
Working Time : from to Weather :

Daily Construction Report


MANPOWER
Staff NO MH General Services NO MH Operator NO MH
1. Project Manager 1. Time Keeping 1. Driver

2. Superintendent 2. Warehouse 2. Tadano Oprt.


3. Site Engineer 3. Line & Grade 3. Backhoe Optr.

4. Quality Control 4. Electrician 4. Mini Loader Optr


5. Office Engineer 5. Utility 5. Genset Optr.

6. Autocad Operator 6. Leadman 6. Bulldozer Optr.

7. Safety Officer 7. Vibratory Roller Optr.


8. Project Nurse 8. Dumptruck Optr.

Total 0 0 Total 0 0 Total 0 0

Carpenter NO MH Welder NO MH Labor NO MH


1. Curanto 1. 1.

2. Total 2.

3. 3.
4. Steelman NO MH 4.

5. 1.

Total 0 0 Total 0 0 Total 0 0

Grand Total 0 0

Equipments NO HRS. Equipments NO HRS.


1. Backhoe
2. Mini Loader
3. L-300 FB

Description of Activities Performed Today:

Remarks:

Prepared by: Received by:

Jose P. Maaliw
MEC DAAA
\ NO MH
1. 5 87
Total 5 87