BIDDING DOCUMENTS FOR EPC/TURNKEY EXECUTION

ARUN-3 HYDRO ELECTRIC PROJECT (4X225MW)


(Single Stage- Two Envelope, E-Tendering DCB Basis)

EM works Document Structure/layout

Invitation for Bids (IFB)

- EM aspect

PART 2 – EMPLOYER’S REQUIREMENTS

Section V.1 Project Profile & Drawings

Section V.2 Scope of Works

Section V.3 Planning, Design, Engineering & General Requirements

Section V.6 Electro-Mechanical Works Requirements

Section V.6.1 General Technical Specification

Section V.6.2 Particular Technical Specification

Section V.6.3 Quality Assurance Technical Requirement ( QA&I responsibility)