Analysis Results

Scenario: TUBERIA 50MM-75MM


Steady State Analysis
Title:
Project Engineer:
Project Date:
Comments:

AGUA POTABLE CANTINA


jtonyg@hot.
04/06/08
CASMA-CANTINA

Scenario Summary

Label TUBERIA 50MM-


75MM
Physical Alternative DIAMETROS
UNIFORMES
Demand Alternative Base-Average Daily
Initial Settings Alternative Base-Initial Settings
Operational Alternative Base-Operational
Age Alternative Base-Age Alternative
Constituent Alternative Base-Constituent
Trace Alternative Base-Trace Alternative
Fire Flow Alternative Base-Fire Flow
Cost Alternative Base-Cost
User Data Alternative Base-User Data

Liquid Characteristics

Liquid Water at Specific Gravity 1.00


20C(68F)
Kinematic Viscosity 1.0037e-6 m²/s

Network Inventory

Pressure Pipes 22 Number of Tanks 1


Number of Reservoirs 1 - Constant Area: 1
Number of Pressure Junctions 17 - Variable Area: 0
Number of Pumps 1 Number of Valves 0
- Constant Power: 1 - FCV's: 0
- One Point (Design Point): 0 - PBV's: 0
- Standard (3 Point): 0 - PRV's: 0
- Standard Extended: 0 - PSV's: 0
- Custom Extended: 0 - TCV's: 0
- Multiple Point: 0 Number of Spot Elevations 0

Pressure Pipes Inventory

50.0 mm 1,154.00 m 75.0 mm 34.50 m


Total Length 1,188.50 m

Pressure Junctions @ 0.00 hr

Label Elevation Calculated Pressur Pressur Demand


(m) Hydraulic e (m e Head (Calculated)
Grade (m) H2O) (m) (l/s)

7 113.30 124.79 11.47 11.49 0.02


8 114.00 124.79 10.77 10.79 0.02
9 115.41 124.79 9.36 9.38 0.03
10 114.90 124.79 9.87 9.89 0.02
11 114.78 124.79 9.99 10.01 0.02
12 118.00 124.79 6.77 6.79 0.02
13 112.30 124.78 12.46 12.48 0.02
14 112.08 124.78 12.68 12.70 0.02
15 110.75 124.78 14.00 14.03 0.02
16 110.50 124.78 14.25 14.28 0.02

Title: AGUA POTABLE CANTINA Project Engineer: jtonyg@hot.


d:\...\wcad_carrizales_reservorio nu.wcd Company WaterCAD v4.5 [4.5015a]
6/13/2020 6/13/2020 © Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1
Analysis Results
Scenario: TUBERIA 50MM-75MM
Steady State Analysis
Pressure Junctions @ 0.00 hr

Label Elevation Calculated Pressur Pressur Demand


(m) Hydraulic e (m e Head (Calculated)
Grade (m) H2O) (m) (l/s)

18 111.48 124.78 13.27 13.30 0.02


19 112.50 124.78 12.25 12.28 0.02
21 113.20 124.78 11.55 11.58 0.02
22 110.00 124.78 14.75 14.78 0.02
23 111.91 124.78 12.84 12.87 0.02
24 112.95 124.78 11.80 11.83 0.02
26 110.00 124.78 14.75 14.78 0.02

Pumps @ 0.00 hr
Label Control Intake Discharg Discharg Pum Relative Calculate
Status Pump e Pump e (l/s) p Speed d Water
Grade Grade Head Power
(m) (m) (m) (Hp)

PMP-1 On 89.81 136.97 4.85 47.16 1.00 3.000

Reservoirs @ 0.00 hr
Label Calculated Inflow Outflow
Hydraulic (l/s) (l/s)
Grade (m)

R-1 92.72 -4.85 4.85

Tanks @ 0.00 hr
Label Calculated Calculate Pressur Calculate Calculate Inflow Outflow Current
Hydraulic d Level e (m d Percent d Volume (l/s) (l/s) Status
Grade (m) (m) H2O) Full (%) (m³)

T-1 124.80 0.20 0.20 5.9 0.71 4.49 -4.49 Filling

Pressure Pipes @ 0.00 hr


Label Control Discharg Velocity Upstream Downstream Calculate Calculate Pressur Headlos
Status e (l/s) (m/s) Structure Structure Hydraulic d Friction d Minor e Pipe s
Hydraulic Grade Grade (m) Headloss Headloss Headlos Gradien
(m) (m) (m) s (m) t (m/km)

Tub-4 Open 0.35 0.08 124.80 124.79 0.01 0.00 0.01 0.16
Tub-5 Open 0.11 0.06 124.79 124.79 1.54e-3 0.00 1.54e-3 0.13
Tub-6 Open 0.03 0.02 124.79 124.79 1.24e-3 0.00 1.24e-3 0.01
Tub-7 Open 0.06 0.03 124.79 124.79 4.27e-3 0.00 4.27e-3 0.05
Tub-8 Open 0.02 0.01 124.79 124.79 1.77e-4 0.00 1.77e-4 0.01
Tub-9 Open 0.02 0.01 124.79 124.79 3.07e-4 0.00 3.07e-4 0.01
Tub-10 Open 4.85 2.47 92.72 89.81 2.91 0.00 2.91 145.71
Tub-11 Open 4.85 2.47 136.97 124.80 12.17 0.00 12.17 145.71
Tub-12 Open 0.22 0.11 124.79 124.78 0.01 0.00 0.01 0.47
Tub-13 Open 0.10 0.05 124.78 124.78 1.67e-3 0.00 1.67e-3 0.10
Tub-14 Open 0.04 0.02 124.78 124.78 1.05e-3 0.00 1.05e-3 0.02
Tub-15 Open 0.02 0.01 124.78 124.78 1.49e-4 0.00 1.49e-4 0.01
Tub-18 Open 0.05 0.02 124.78 124.78 1.39e-3 0.00 1.39e-3 0.03
Tub-21 Open 0.02 0.01 124.78 124.78 3.63e-4 0.00 3.63e-4 0.01
Tub-22 Open 0.10 0.05 124.78 124.78 3.24e-3 0.00 3.24e-3 0.12
Tub-23 Open 0.05 0.03 124.78 124.78 1.89e-3 0.00 1.89e-3 0.03
Tub-24 Open 3.83e-3 1.95e-3 124.78 124.78 9.3e-6 0.00 9.3e-6 2.39e-4
Tub-25 Open 0.03 0.02 124.78 124.78 5.12e-4 0.00 5.12e-4 0.01
Tub-28 Open 0.02 0.01 124.78 124.78 1.77e-4 0.00 1.77e-4 0.01
Tub-29 Open 0.04 0.02 124.78 124.78 2.08e-3 0.00 2.08e-3 0.02
Tub-30 Open 0.03 0.02 124.78 124.78 1.19e-3 0.00 1.19e-3 0.01
Tub-31 Open 0.03 0.02 124.78 124.78 1.2e-3 0.00 1.2e-3 0.01

Title: AGUA POTABLE CANTINA Project Engineer: jtonyg@hot.


d:\...\wcad_carrizales_reservorio nu.wcd Company WaterCAD v4.5 [4.5015a]
6/13/2020 6/13/2020 © Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 2
Analysis Results
Scenario: TUBERIA 50MM-75MM
Steady State Analysis

Title: AGUA POTABLE CANTINA Project Engineer: jtonyg@hot.


d:\...\wcad_carrizales_reservorio nu.wcd Company WaterCAD v4.5 [4.5015a]