You are on page 1of 5
Appendix E Checklist for Temporary Earth-Retaining Structures of WORKS ON, BELOW OR BESIDE THE PUBLIC STREETS (References: LTA Design Criteria (DC), Eurocodes and its Singapore National Annexes) Tem No. Description Remarks The Design Brief on the approach and concepts is attached. The Design Brief addresses all points listed below far geotechnical design and structural design, All Temporary Eart-Retaning Straotures have be designed for removal as per LTA, Design Criteria Chapter 16, a OTECHNICAL, Geotechnical Parameters & Surcharge investigation dat, laboratory test results and other published information (Please state relevant pages in attached calculations). (For e* and 9 the design values should be based on p ploy, The level of the ground and the ground water table had been verified and atached. The surcharge load of 20 kPa in accordance with LTA, Design Criteria has been used 22 Stability Checking 22. Toe-in stably has Been checked to ensure adequate embedment of the retaining wall (Pease state relevant pages in the attached design calculations) (The method in NAVEAC DM-?.2 is one of the ‘acceptable methods. Mobilisation factors should be sed forthe sol parameters, Both drained and tudrained parameters should be used for most sol ‘ppes, excep for marine clay and fusial ela) 222 The stability of the excavation base been chesked against basal heave failure duc to shear failure ofthe soil al the base (This check must be carried ut for excavation in soft ‘lay such asthe marine cla, fluvial clay and peaty clay). 223 The stability of the base has been checked for hydraulic uplift (his check must be carried out ifthe underlying layer {is more permeable than the base of the excavation, su ‘as Old Allium underving the marine clay atthe base of excavation o highly weathered granite underlying the residual soils ofthe Bukit Timah Granite) Code of Practice Tor Works on Public Stele Checklist for Temporary Earth-Retaining Structures of WORKS ON, BELOW OR BESIDE THE PUBLIC STREETS (References: LTA Design Criteria (DC), Eurocodes and its Singapore National Annexes) em No. Description Remarks carried out to justly the sures used for the above stability (Por seepage analysis, attentions should be paid to the permeabiliy values and the boundary conditions in the mode). Analysis of Retaining Walls The sol profile assumed in the analysis matches with the borehole lo. The design has taken into consideration situations where the loading on both sides of the excavation is ot balanced ‘The drainage condition (drained or undrained) assumed for each soil layer matches with the permeability of the layer. (¢, for marine and fluvial clays, undrained condition can be used; and for Mhuvial sand and sandy fil, drained condition should be used For the mixed soils, such as Old Allium and Weathered rocks, Both drained and undrained conditions should be analysed and the worst of swo analyses should be adopted) ‘Ail the stages of excavation considered in the analyses, including the excavation, strut removal & backfilling stages had been checked. Other appropriate edundaney checks had been carried out ~ please state ‘Unplanned excavation has been safely considered for every stage of excavation as per SS EN 1997 CL 9.3. There is no overstessing in the design of the retaining systems, INSTRUMENTATION The monitoring plans are attached and have been provided as per LTA, DC Chapter 19. The alert and suspension levels for the relaining system for cach stage of excavation have been indicated in the attached Drawings. (Allowable values fr struts and retaining wall system should beset atthe allowable capacity ofthe struts or the walls) 32 ‘The review levels are consistent with dhe damage assessment fo adjacent structures and utlies as per LTA, DC Chapter 20, Code of Practice Tor Works on Public Stele 3 Checklist for Temporary Earth-Retaining Structures of WORKS ON, BELOW OR BESIDE THE PUBLIC STREETS (References: LTA Design Criteria (DC), Eurocodes and its Singapore National Annexes) em No. Description Remarks 40 ‘STRUCTURAL, at Shectpiles The sections have been checked for bending moment and shea force, Load factors should be used ifthe {esign i based on Furocodes and its Singapore National Annexes, ‘Where Z profile sheetpile is used, the section modulus (of Z profiles wil have a 13% reduction in section ‘modulus due to 5 deg. of rotation. Tis has been ‘considered inthe design, (Based on CIRIA 95) Traffe Decking The temporary decking system has been designed according to LTA DC Chapter 3 ‘The Drawings ofthe decking beam layout are attached. The span shown on the Drawings forall ‘beams tally with the design calculations The decking panels and beams have been designed as shown in alached calculations (please state pages). The connection details have been adequately designed for theiestectual requirements, Allawance has been ‘made o allow for eceentrcity as per SS EN 1993-1-1 15.3 and SS EN 1993 1-8 Cl. 27. Drawings have boen checked thatthe connection details tally with the design, Sin drawings as per LTA, M&W Specification. Allowance has been made for bending due to self ‘weight and any anticipated imposed loads such as access ways, intermediate strats or staging for materials, 433 “The struts have been designed for accidental loading (eninimum SOKN applied normal othe strut at any point in any direction), “The struts have been designed for eccentric axial Toadings (Based on CIRIA 9S/CIRIA C517) ‘Both flanges of strat are restained (by plates and bats) and these restraints have been designed according 10 SSEN 1995-11 C1, 63, Where second hand structural stesl are used, steel materials and its physical conditions shal be inspected ‘o ensure compliance with the design requirements and BCA BCI requirements, as shown in attached Code of Practice Tor Works on Public Stele 6 Checklist for Temporary Earth-Retaining Structures of WORKS ON, BELOW OR BESIDE THE PUBLIC STREETS (References: LTA Design Criteria (DC), Eurocodes and its Singapore National Annexes) Hem Description Rear Saas (SAS Male FOE. 44 | Supporting Tie Beam The supporting beams have been designed according #0 SS EN 1993-I-1 Cl 53 and 63 45 | Cross Bracing The eross braving designed for forces as por SS EN 1998 C153 and 63. 46 | Comecton Detail The connection details have provided forthe tansfer 451 | cetorces fom sito waler and tothe retaining wall. 1 (Qualified Person for Structural Works) hereby certified that the attached structural plans. and — design calculations prepared by me are/are not* fully in accordance with the above. (QUALIFIED PERSON FOR STRUCTURAL WORKS" STAMP & SIGNATURE) Date Code of Practice Tor Works on Public Stele Appendix F Contractor Category (Workheads/License Types) and Associated Work Type ‘Work Type Description BCA Category or License Type “Asphalt Works CRI4, CWOI, CWO2, excavation, retaining system, ete ‘Connection / Supply Scheme to Development ‘ROT, CWO2 Area/Public Lighting/Traffic Light/HouseHold Consumer Diversion Scheme on request from other Department | CRO7, CWO2 Drainage Work ‘CWOI, CW02, GBI, GB2 Engineering Works within Road Safety Zone eg. deep | CW01, CW02 Improvement Scheme Conversion/Reinforcement/Upgrading Projects ‘RO7, CWO2 Landscaping ‘ROI, CRO7, CRI2, CRI4, CWO, CWO02, MW03 Tane Closure (pls specify reason) ‘CROI to CRIS, CWOT, CWO2, GBI, GB2, ME01, ME02, MEO4 to MEL5, MWO02, MW03, MW04, RWO1, RW02, SY01, SY02, SYO4 to SY12, SY14 Lifting/Hloisting Operation ‘CROT to CRIS, CWOT, CWO2, GBI, GB2, ME01, ME02, MEO4 to ME15, MWO02, MW03, MW04, RWO1, RWO2, SYO1, SY02, SYO4 to SY12, SY14 ‘Manhole/ Valve Chamber maintenance work CROI, CWO, CWO2, MI ME10, ME11, ME12, ME14, MWwo2 Minor Construction Works(with excavation) eg. temporary access, minor A & A, entrance culvert, external work, ete ‘CRO7, CWO, CWO02, GBI, GB2 Minor Construction Works(without excavation) eg. | CROT, CRO7, CWOI, CWO2, GBI, hoarding ete GB ‘New Scheme ‘CRO7, CWO? Pipe Laying & Road Reinstatement ‘CRO7, CWO? Private Sewer Connection ‘CRO7, CWOI, CWO Repair Scheme Replacement/General Repairs ‘CRO, CWO2 Road Marking CRI4, CWOI, CWO Soil Investigation, Improvement & Stabilisation Work CRI2, CWO2, SBGS) Tree Pruning CWOl, CW02, GBI, GB2, MW03 Trial Holes CRI2, CW02, SBIGS Code of Practice Tor Works on Public Stele

You might also like