Appendix E
Checklist for Temporary Earth-Retaining Structures of
WORKS ON, BELOW OR BESIDE THE PUBLIC STREETS
(References: LTA Design Criteria (DC), Eurocodes and its Singapore National Annexes)
Tem
No.
Description
Remarks
The Design Brief on the approach and concepts is
attached. The Design Brief addresses all points listed
below far geotechnical design and structural design,
All Temporary Eart-Retaning Straotures have be
designed for removal as per LTA, Design Criteria
Chapter 16,
a
OTECHNICAL,
Geotechnical Parameters & Surcharge
investigation dat, laboratory test results and other
published information (Please state relevant pages in
attached calculations).
(For e* and 9 the design values should be based on p
ploy,
The level of the ground and the ground water table
had been verified and atached. The surcharge load of
20 kPa in accordance with LTA, Design Criteria has
been used
22
Stability Checking
22.
Toe-in stably has Been checked to ensure adequate
embedment of the retaining wall (Pease state
relevant pages in the attached design calculations)
(The method in NAVEAC DM-?.2 is one of the
‘acceptable methods. Mobilisation factors should be
sed forthe sol parameters, Both drained and
tudrained parameters should be used for most sol
‘ppes, excep for marine clay and fusial ela)
222
The stability of the excavation base been chesked
against basal heave failure duc to shear failure ofthe
soil al the base
(This check must be carried ut for excavation in soft
‘lay such asthe marine cla, fluvial clay and peaty
clay).
223
The stability of the base has been checked for hydraulic
uplift
(his check must be carried out ifthe underlying layer
{is more permeable than the base of the excavation, su
‘as Old Allium underving the marine clay atthe base
of excavation o highly weathered granite underlying
the residual soils ofthe Bukit Timah Granite)
Code of Practice Tor Works on Public SteleChecklist for Temporary Earth-Retaining Structures of
WORKS ON, BELOW OR BESIDE THE PUBLIC STREETS
(References: LTA Design Criteria (DC), Eurocodes and its Singapore National Annexes)
em
No.
Description
Remarks
carried out to justly the
sures used for the above stability
(Por seepage analysis, attentions should be paid to
the permeabiliy values and the boundary conditions
in the mode).
Analysis of Retaining Walls
The sol profile assumed in the analysis matches with
the borehole lo.
The design has taken into consideration situations
where the loading on both sides of the excavation is
ot balanced
‘The drainage condition (drained or undrained)
assumed for each soil layer matches with the
permeability of the layer. (¢, for marine and fluvial
clays, undrained condition can be used; and for
Mhuvial sand and sandy fil, drained condition should
be used
For the mixed soils, such as Old Allium and
Weathered rocks, Both drained and undrained
conditions should be analysed and the worst of
swo analyses should be adopted)
‘Ail the stages of excavation considered in the
analyses, including the excavation, strut removal &
backfilling stages had been checked. Other
appropriate edundaney checks had been carried out ~
please state
‘Unplanned excavation has been safely considered for
every stage of excavation as per SS EN 1997 CL 9.3.
There is no overstessing in the design of the
retaining systems,
INSTRUMENTATION
The monitoring plans are attached and have been
provided as per LTA, DC Chapter 19.
The alert and suspension levels for the relaining
system for cach stage of excavation have been
indicated in the attached Drawings.
(Allowable values fr struts and retaining wall system
should beset atthe allowable capacity ofthe struts or
the walls)
32
‘The review levels are consistent with dhe damage
assessment fo adjacent structures and utlies as per
LTA, DC Chapter 20,
Code of Practice Tor Works on Public Stele
3Checklist for Temporary Earth-Retaining Structures of
WORKS ON, BELOW OR BESIDE THE PUBLIC STREETS
(References: LTA Design Criteria (DC), Eurocodes and its Singapore National Annexes)
em
No.
Description
Remarks
40
‘STRUCTURAL,
at
Shectpiles
The sections have been checked for bending moment
and shea force, Load factors should be used ifthe
{esign i based on Furocodes and its Singapore
National Annexes,
‘Where Z profile sheetpile is used, the section modulus
(of Z profiles wil have a 13% reduction in section
‘modulus due to 5 deg. of rotation. Tis has been
‘considered inthe design, (Based on CIRIA 95)
Traffe Decking
The temporary decking system has been designed
according to LTA DC Chapter 3
‘The Drawings ofthe decking beam layout are
attached. The span shown on the Drawings forall
‘beams tally with the design calculations
The decking panels and beams have been designed as
shown in alached calculations (please state pages).
The connection details have been adequately designed
for theiestectual requirements, Allawance has been
‘made o allow for eceentrcity as per SS EN 1993-1-1
15.3 and SS EN 1993 1-8 Cl. 27. Drawings have
boen checked thatthe connection details tally with the
design,
Sin
drawings as per LTA, M&W Specification.
Allowance has been made for bending due to self
‘weight and any anticipated imposed loads such as
access ways, intermediate strats or staging for
materials,
433
“The struts have been designed for accidental loading
(eninimum SOKN applied normal othe strut at any
point in any direction),
“The struts have been designed for eccentric axial
Toadings (Based on CIRIA 9S/CIRIA C517)
‘Both flanges of strat are restained (by plates and bats)
and these restraints have been designed according 10
SSEN 1995-11 C1, 63,
Where second hand structural stesl are used, steel
materials and its physical conditions shal be inspected
‘o ensure compliance with the design requirements
and BCA BCI requirements, as shown in attached
Code of Practice Tor Works on Public Stele
6Checklist for Temporary Earth-Retaining Structures of
WORKS ON, BELOW OR BESIDE THE PUBLIC STREETS
(References: LTA Design Criteria (DC), Eurocodes and its Singapore National Annexes)
Hem Description Rear
Saas (SAS Male FOE.
44 | Supporting Tie Beam
The supporting beams have been designed
according #0 SS EN 1993-I-1 Cl 53 and 63
45 | Cross Bracing
The eross braving designed for forces as por SS EN
1998 C153 and 63.
46 | Comecton Detail
The connection details have provided forthe tansfer
451 | cetorces fom sito waler and tothe retaining wall.
1 (Qualified Person
for Structural Works) hereby certified that the
attached structural plans. and — design
calculations prepared by me are/are not* fully
in accordance with the above.
(QUALIFIED PERSON FOR STRUCTURAL
WORKS" STAMP & SIGNATURE)
Date
Code of Practice Tor Works on Public SteleAppendix F
Contractor Category (Workheads/License Types) and Associated Work Type
‘Work Type Description
BCA Category or License Type
“Asphalt Works
CRI4, CWOI, CWO2,
excavation, retaining system, ete
‘Connection / Supply Scheme to Development ‘ROT, CWO2
Area/Public Lighting/Traffic Light/HouseHold
Consumer
Diversion Scheme on request from other Department | CRO7, CWO2
Drainage Work ‘CWOI, CW02, GBI, GB2
Engineering Works within Road Safety Zone eg. deep | CW01, CW02
Improvement Scheme
Conversion/Reinforcement/Upgrading Projects
‘RO7, CWO2
Landscaping
‘ROI, CRO7, CRI2, CRI4, CWO,
CWO02, MW03
Tane Closure (pls specify reason)
‘CROI to CRIS, CWOT, CWO2,
GBI, GB2, ME01, ME02, MEO4 to
MEL5, MWO02, MW03, MW04,
RWO1, RW02, SY01, SY02, SYO4
to SY12, SY14
Lifting/Hloisting Operation
‘CROT to CRIS, CWOT, CWO2,
GBI, GB2, ME01, ME02, MEO4 to
ME15, MWO02, MW03, MW04,
RWO1, RWO2, SYO1, SY02, SYO4
to SY12, SY14
‘Manhole/ Valve Chamber maintenance work
CROI, CWO, CWO2, MI
ME10, ME11, ME12, ME14,
MWwo2
Minor Construction Works(with excavation) eg.
temporary access, minor A & A, entrance culvert,
external work, ete
‘CRO7, CWO, CWO02, GBI, GB2
Minor Construction Works(without excavation) eg. | CROT, CRO7, CWOI, CWO2, GBI,
hoarding ete GB
‘New Scheme ‘CRO7, CWO?
Pipe Laying & Road Reinstatement ‘CRO7, CWO?
Private Sewer Connection
‘CRO7, CWOI, CWO
Repair Scheme Replacement/General Repairs
‘CRO, CWO2
Road Marking
CRI4, CWOI, CWO
Soil Investigation, Improvement & Stabilisation Work
CRI2, CWO2, SBGS)
Tree Pruning
CWOl, CW02, GBI, GB2, MW03
Trial Holes
CRI2, CW02, SBIGS
Code of Practice Tor Works on Public Stele