You are on page 1of 6
i DELIA VENTURE SON BHD Fa ca Fam ®_|_ work menion sraremenr suamssion omen eon as —~al it For jon of Li wer Pactge | Mecanca& Becta tea Wns Ref, No: | DVSE/SMIKPERMAIWMSIMBENG a ‘ovosi2020 | Revision | 0 Date Received By sabmtsion a Shanken ong a) ‘syoarreo oy ‘user rconsutzan ‘cue consuLtaNT ane | name ate ate Designation Designation [APPROVAL STATUS [APPROVAL DATE a 8 © ‘appRovED FoR ‘pPROvED REJECTED oneTuanicel wiTH Consent Cot: Tete ‘e-RE/RA! COW Ca sen Ste SMP Maeem Ha Pried os a= convact — Ha-gaae = R PuEK PEMEINAAN SPIOLA BANARY 30 BULK DARIAN DAN pan yen UAW LAH KEMUDATAN 1 SK MEN, ED. PERMA, ey iemaman, Teena _ : INSTALLATION OF LIGHTNING PROTECTION SYSTEM, ‘Table of Contents 2.0 SCOPE OF WoRK. 2.0 STANDARD & sPeaeATION. 40° equemenr.. 50 19 Sequence oF WoRIS.. oe 4 7A INSTALLATION OF ROOF CONDUCTOR... 4 7.2 INSTALLATION OF DOWN coNDUCTOR, 4 0 SAFETY PLAN =) 2.0 ATTACHMENT. as) | | o GAMA SCUKMAM MR EENON| seu rate {hiN LANREMUOAFAN DISK. MEN KES. PERIL, KEMAMAN, TERENGGANU MECHANICAL 8 ELECTRICAL Merton staremn INSTALLATION OF LIGHTNING PROTECTION SYSTEM. 1.0 OBEcTIVE To define the copger tape installation and preparation works forthe lightning protection system forthe sit installer to perform physical work. This isan essental procedure to {ensue the installation is caried out by the contractor, complying withthe specication, requirement to bein order to delve a quality installation works tothe lent 20 SCOPE OF WORK To install copper tape at roof to form as lightning protection grid, and serves 2s down ‘conductor forthe discharging of lightning to ground by copper rod, ‘To nsal earth chamber for future inspection. 3.0 STANDARD & SPECIFICATION 2) Nett statement 1b) Approved shop drawing }_ Applicable codes and standard 4d) Manufacturer technical data, 40 EQUIPMENT a) Copper Tape ) Copper Rod ©) Copper Tape Sade 4) Copper Test clamp @) Earth Clamp 4) Concrete Earth Chamber 8) Hammer 1) PC Pipe |) Bxothermic Weld Tools 21Page 3 PROIEK PENMBINAAN SEKOLAH BAHARU 20 BILIK DARIAH DAN, pam vane LAIN. LAIN KEMUDAHAN DI SEK. MEN. KEB, PERMA, $04.54, KEMAMAN, TERENGGANU een MECHANICAL & ELECTRICAL INSTALLATION OF LIGHTNING PROTECTION SYSTEM 5.0 PLANNING Before any of the work to be carried out, the following procedure shall be taken to ‘ensure smooth working progress ‘To produce shop drawing for sit instalation ‘To submit sample / catalogue of materia used, To delver material tot, To co-ordinate and inform main contractor of work to commence, Prepare all necessary tools, machinery and manpower Supervisor ta monitor the progress of work [Mtr all work has been done eal for inspection. Submit inspection form. After inspection, i any comments, the remedial wil catied out before closing the formworks for esting 6.0 MANPOWER General ‘The site personnel will study the approved shop drawings and ensure that the installation works are performed accordingly, All the materials to be check and verified according tothe approved materals by the consultant and all the copy of certificate to be forward tothe relevant party. a) Project Manager To responsible for the planning / implementation for the whole project which Includes laise wth the main contractor, consultant and others trade contractor, b) MRE Engineers(Site supervisors To station at site arranging the workers to casied out the work accordingly to the shop drawing. Ualse with the main contractor / 0. for site work arrangement. B1Page PROIEK PEMIBINAAN SEKOLAH BAHARU 30 BILIK DARIAH DAN LAIN LAIN KEMUDAHAN DI-SEK. MEN, KEB. PERMA, 0 KEMAMAN, TERENGGAMU see [MECHANICAL ELECTRICAL saernon statement: INSTALLATION OF LIGHTNING PROTECTION SYSTEM. 7.0 SEQUENCE OF WCRKS 7. INSTALLATION OFROOF CONDUCTOR ‘The routing ofthe copper tape shal be planned to make sure roof conductors shall, bbe coursed along edge of the perimeter of fat roofs; Behind of on top of parapets; and across flator gently sloping roof areas Insta of copper bar saddle along the marked route by direct fing ito the concrete structure. The bracket dane by using aluminium tape shall be provided to avoid the direct contact of copper tape with the metal ooting, Lal ofthe copaer tape and joint it with the proper clamp to ensure the continuity, 72 _ INSTALLATION oF DOWN CONDUCTOR Casted the 50mm PVC Pipe into the structure concrete column as a pathway for down conduct. Installof down conductor and joint it to the roof conductor with proper jin. A tost clamp shall be installed at 2.5 meter height fom FFL. for the ease of olated ‘the earthing pent from the lightning protection system. A capper tape should be lid inbetween Structure Re-bar and Earth chamber to get etter resistance, 73. INSTALLATION OF EARTHING POINT b. 4. 41P age Plant and hammering the earthing rod as indicated as per the shop drawing ‘Test and measure the ground resistive valu, ‘Connect the down conductor tothe earth ro. Place and instal ofthe concrete earth chamber 3 PROIEK PEMBINAAN SEKOLAH BAHARU 30 BILIK DARIAH DAN 4 LAIN LAIN KEMUDAHAN OI SEK, MEN, KEB. PERMA, 00,0 KEMAMAN, TERENGGANU, a MECHARUEAL& ELECTRICAL Merion stareenr INSTALLATION OF LIGHTNING PROTECTION SYSTEM 8.0. SAFETY PLAN The safety measure to carryout any work shall be given most priority to ensure that all workers and working environment ae in good condition, Therefore the following bask safety procedure which shall be provided: 1 Asafety checkst for worker », Too! box meeting tobe conduct every month Site safety meeting with the main contactor 9.0 ATTACHMENT The following forms are provided for proper documentation: 2. REQUEST FOR INSPECTION ELECTRICAL SERVICES CHECKLIST BiPage

You might also like