You are on page 1of 2

Appendix 2 7

Cost ($ million)
Strategic Year Co-
Agendas of ADB Gov’t finance
Poverty and Drivers TRTA/ Regular ADF
Project/Program Name Sector Targeting of Change Division PDA Total OCR COL Grants Total
2020 Firm
1. Ara Canal Water ANR GI IEG, GEM, SAER 2018 492.0 341.0 0.0 0.0 341.0 151.0 0.0
Productivity ESG, GCD
Improvement Project
(formerly Bihar
Irrigation Project)
2. Uttar Pradesh Power ENE GI IEG, GEM, SAEN 2017 428.6 300.0 0.0 0.0 300.0 128.6 0.0
Distribution ESG, GCD
Improvement Project
3. Uttarakhand ENE GI IEG, ESG, SAEN 2018 250.0 200.0 0.0 0.0 200.0 50.0 0.0
Transmission GCD,
Strengthening and
Distribution
Improvement Project
4. State-Level Public PSM GI IEG, GCD, SAPF 2019 287.5 200.0 0.0 0.0 200.0 87.5 0.0
Sector Management PSD
Program
5. Chhattisgarh Roads TRA GI IEG, ESG, SATC 2019 550.0 350.0 0.0 0.0 350.0 200.0 0.0
Connectivity Project PSD
6. Indore Metro Rail TRA GI IEG, GEM, SATC 2019 609.4 250.0 0.0 0.0 250.0 109.4 250.0a
Project (Phase 1) GCD, PAR
7. Promoting TRA GI IEG, PSD SATC 2019 942.0 490.0 0.0 0.0 490.0 452.0 0.0
Public−Private
Partnership in
Madhya Pradesh
Road Sector Project
8. Second Rural TRA GI IEG, GEM, SATC 280.0 140.0 0.0 0.0 140.0 140.0 0.0
Connectivity ESG, GCD,
Investment Program PSD
(tranche 3)
9. Second South Asia TRA GI IEG, GCD, SATC 2019 285.8 200.0 0.0 0.0 200.0 85.8 0.0
Subregional RCI
Economic
Cooperation Roads
Investment Project
10. Tamil Nadu Industrial TRA GI IEG, PSD SATC 2019 692.0 484.0 0.0 0.0 484.0 208.0 0.0
Connectivity Project
8 Appendix 2

Cost ($ million)
Strategic Year Co-
Agendas of ADB Gov’t finance
Poverty and Drivers TRTA/ Regular ADF
Project/Program Name Sector Targeting of Change Division PDA Total OCR COL Grants Total
11. Gujarat Water WUS GI IEG, GEM, SAUW 2019 285.8 200.0 0.0 0.0 200.0 85.8 0.0
Supply and ESG, GCD
Sewerage Project
and Nyari Zone
Water Supply Project
12. Jharkhand Urban WUS GI IEG, GEM, SAUW 2019 285.8 200.0 0.0 0.0 200.0 85.8 0.0
Infrastructure GCD, ESG
Investment Project
13. Kerala Urban Water WUS TI-H IEG, GEM, SAUW 2019 285.8 200.0 0.0 0.0 200.0 85.8 0.0
Supply Improvement GCD, ESG
Project
Total (2020 Firm) 5,674.7 3,555.0 0.0 0.0 3,555.0 1,869.7 250.0
2020 Standby
1. Construction of ANR GI IEG, GEM, SAER 2018 75.0 60.0 0.0 0.0 60.0 15.0 0.0
Rainwater Harvesting ESG, GCD
Structure and
Construction of Small
Ponds or Jalkunds
Program in
Meghalaya
2. Maharashtra ANR GI IEG, GEM, SAER 2021 142.9 100.0 0.0 0.0 100.0 42.9 0.0
Agribusiness ESG, GCD,
Network Project PSD
3. State-Level Skills EDU GI IEG, GEM, SAHS 2019 142.9 100.0 0.0 0.0 100.0 42.9 0.0
Development Project GCD
4. Meghalaya Power ENE GI IEG, GEM, SAEN 2018 156.3 125.0 0.0 0.0 125.0 31.3 0.0
Project ESG, GCD,
5. Maharashtra Rural TRA GI IEG, GEM, SAER 285.8 200.0 0.0 0.0 200.0 85.8 0.0
Connectivity ESG, GCD,
Improvement Project PSD
Total (2020 802.9 585.0 0.0 0.0 585.0 217.9 0.0
Standby)
2021 Firm
1. Himachal Pradesh ANR GI IEG, GEM, SAER 250.0 200.0 0.0 0.0 200.0 50.0 0.0
Horticulture ESG, GCD,
Development PSD
Project
2. Maharashtra ANR GI IEG, GEM, SAER 2021 142.9 100.0 0.0 0.0 100.0 42.9 0.0
Agribusiness ESG, GCD,
Network Project PSD

You might also like