A B C D E F

52'
12' 12' 12' 12' 4'

18' 7' 10'

6'
7'
CF1
F1
F2
15'
9'

9'

4
3'

MF
3

9'
CF1
30'

F2 F2
12'

8'

CF2 CF2

8'
F1
6'

F2

5'
F2
5'

FOUNDATION PLAN
C D
E F

7' 9'
10'

3'-6"

4'-6"

3'
5

6'
5
7'

9'

3'
3'-6"

4'-6"
3' 4' 3'
3'-6" 3'-6"
18mm@6"c/c 18mm@7"c/c
Both Way 4'-6" 4'-6" Both Way,Both Layer

F1 Rebar Detail Plan 18mm@6"c/c CF1 Rebar Detail Plan


Both Way
F2 Rebar Detail Plan
A B
E F
18'
8' 3' 12' 3'

3'
4'

5
2
8'
6'

15'
9'
1
5'
3'

4
3'

5'
3
18mm@7"c/c 18mm@7"c/c
Both Way,Both Layer Both Way,Both Layer
CF2 Detail Plan
Mat Footing Detail Plan
C D E F

C1 (14x14)
Plinth Level Plinth Level Plinth Level

1'
1'

1'
N.G.L (+0'-0") N.G.L (+0'-0") N.G.L (+0'-0")

C1 (14x14)

F1 (7'x7') F2 (9'x9') CF1 (10'x6')

5'-6"
5'-6"

5'-6"
18mm@6"c/c 18mm@6"c/c 18mm@7"c/c
Both Way, Both Layer

16"
16"

16"
1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6"

3' 4' 3'


3'-6" 3'-6" 4'-6" 4'-6" 10'
7' 9'
CF1 Detail Section
F1 Detail Section
F2 Detail Section
1 2 A B

Plinth Level Plinth Level

1'
1'

N.G.L (+0'-0") N.G.L (+0'-0")

MF(18'x15')
CF2(8'x8' + 5'x5')
5'-6"
5'-6"

18mm@7"c/c
18mm@7"c/c
Both Way, Both Layer
Both Way, Both Layer
18"
16"

1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6"

3' 6' 4' 3' 12' 3'


13' 18'

CF2 Detail Section MAT Footing Detail Section


3" Thick (1:3:6) Lean Concrete

3" Thick Sand Filling

6" Thick Hard Core


A B C D E F

52'
12' 12' 12' 12' 4'

5
4.5" Brick Wall

3" Thick Plastering


2'-6" 4
9'

1"Thick (1:2:4) Flooring


12
1"Thick (1:3:6) Concrete
42
9"Thick Retaining Wall 6"Thick Sand Filling

1'
B12x14
3'

3
Earth Filling
30'

9" Retaining Wall


X X

4'
12'

1"
24

3"
3"Thick (1:3:6) Lean Concrete
3"Thick Sand Filling
6" Thick Hard Core
2
2'-6"
6'

RETAINING WALL SECTION


1

5 " =1'
Scale : 32

RETAINING WALL PLAN


Type : B9x9 Type : B10x15
Size : 9"x9" Size : 10"x15"

Left Middle Right Left Middle Right

Top Steel : 3-16mm Top Steel : 2-16mm Top Steel : 3-16mm Top Steel : 3-18mm Top Steel : 2-18mm Top Steel : 3-18mm
Bottom Steel : 2-16mm Bottom Steel : 2-16mm Bottom Steel : 2-16mm
Bottom Steel : 3-18mm Bottom Steel : 2-18mm Bottom Steel : 3-18mm
Stirrup : 8mm @4" c/c (Within 2h) Stirrup : 8mm @4" c/c (Within 2h) Stirrup : 8mm @4" c/c (Within 2h)
Stirrup : 8mm @4" c/c (Within 2h) Stirrup : 8mm @4" c/c (Within 2h) Stirrup : 8mm @4" c/c (Within 2h)
Stirrup : 8mm @6" c/c (Outside 2h) Stirrup : 8mm @6" c/c (Outside 2h) Stirrup : 8mm @6" c/c (Outside 2h)
Stirrup : 8mm @4" c/c (Outside 2h) Stirrup : 8mm @4" c/c (Outside 2h) Stirrup : 8mm @4" c/c (Outside 2h)

Type : B10x12 Type : B12x14


Size : 10"x12" Size : 12"x14"

Left Middle Right Left Middle Right

12" 12" 12"

14"

14"
14"
Top Steel : 3-18mm Top Steel : 3-18mm Top Steel : 3-18mm Top Steel : 5-18mm Top Steel : 3-18mm Top Steel : 5-18mm
Bottom Steel : 5-18mm Bottom Steel : 5-18mm Bottom Steel : 5-18mm
Bottom Steel : 3-18mm Bottom Steel : 3-18mm Bottom Steel : 3-18mm
Torsion Steel : 2-16mm Torsion Steel : 2-16mm Torsion Steel : 2-16mm
Stirrup : 8mm @3" c/c (Within 2h) Stirrup : 8mm @3" c/c (Within 2h) Stirrup : 8mm @3" c/c (Within 2h) Stirrup : 10mm@5" (within 2h) Stirrup : 10mm@5" (within 2h)
Stirrup : 10mm@5" (within 2h)
Stirrup : 8mm @5" c/c (Outside 2h) Stirrup : 8mm @5" c/c (Outside 2h) Stirrup : 8mm @5" c/c (Outside 2h) Stirrup : 10mm@8" (outside 2h) Stirrup : 10mm@8" (outside 2h) Stirrup : 10mm@8" (outside 2h)

Type : C1 Type : C2 Type : C3


Size : 14"x14" Size : 14"x14" Size : 12"x12"

14" 14" 12"


12"
14"

14"

Main Steel : 8-18mm Main Steel : 6-18mm Main Steel : 4-18mm


Tie : 10mm@4" (Within Lo) Tie : 10mm@4" (Within Lo) Tie : 10mm@4" (Within Lo)
10mm@6" (Outside Lo) 10mm@6" (Outside Lo) 10mm@6" (Outside Lo)

Type : C4 Type : PC
Size : C10 x10 Size : C10 x10

10" 10"
10"

10"

Main Steel : 4-16mm Main Steel : 4-16mm


Tie : 1-10mm @4"c/c (Within Lo) Tie : 1-10mm @4"c/c (Within Lo)
Tie : 1-10mm @6"c/c (Outside Lo) Tie : 1-10mm @6"c/c (Outside Lo)
Columns schedule
Type Size Main Steel Ratio(%) min: clear cover Ties Tie Spacing Remarks
within Lo Outside Lo
C1 C14x14 8-18mm 1.6 1.5 2 loop 10mm@ 4" c/c 10mm@ 6" c/c
C2 C14x14 6-18mm 1.2 1.5 1 loop + 1cross tie 10mm@ 4" c/c 10mm@ 6" c/c
C3 C12x12 4-18mm 1.1 1.5 1 loop 10mm@ 4" c/c 10mm@ 6" c/c

C4 C10x10 4-16mm 1.0 1.0 1 loop 8mm@ 4'' c/c 8mm@ 4''c/c

PC C10x10 4-16mm 1.0 1.0 1 loop 8mm@ 4'' c/c 8mm@ 4''c/c Prop Column
Note(1) Column sizes are the same as much as possible for the easy buildability and the recycling of formwork.

Note(2) Numbers of reinforcing steel are not very varied to avoid construction confusion for low high building.
Note(3) Balance steel ratio for columns should be between 1% and 6% (ACI-318-05) for seismic zones, such as Taunggyi = Zone 4 of Myanmar.

Note(4) Strong column sizes are necessary to ensure stiff column-soft beam actions.

Beams schedule
Top Steel Bottom Steel Stirrup minimum
Size Torsion
Left Mid Right Left Mid Right Within 2h Outside 2h clear cover
9x9 3-16mm 2-16mm 3-16mm 2-16mm 2-16mm 2-16mm - 8mm@ 4''c/c 8mm@ 6''c/c 1.0'' (25)

10X12 3-18mm 3-18mm 3-18mm 3-18mm 3-18mm 3-18mm - 8mm@ 3''c/c 8mm@ 5''c/c 1.0'' (25)
10X15 3-18mm 2-18mm 3-18mm 3-18mm 2-18mm 3-18mm - 8mm@ 4''c/c 8mm@4''c/c 1.5'' (30)

12x14 5-18mm 3-18mm 5-18mm 5-18mm 5-18mm 5-18mm 2-16mm 10mm@ 5''c/c 10mm@ 8''c/c 1.5'' (30)

Note(1) 3-16mm means 3 numbers of 16 mm(5/8''Ø)main reinforcements (example).


Note(2) Minimum steel ratio for beams should not be less than 200/ fy = 0.004 = 0.4% (ACI-318-05).

Note(3) Minimum of 10mm stirrups are used to prevent torsional moments.


Note(4) Strong column sizes are necessary to ensure stiff column-soft beam actions.

Slabs schedule Footing schedule


Type Thickness Bottom steel Top steel min: cover Remark Type Size Top Steel Bottom Steel Thickness Bottom cover Remarks
Main steel Distribution steel Main steel Distribution steel -
F1 7'-0''x7'-0'' 18mm-6''c/c (both ways) 16" 2'' Depth of
S1 4'' (100) 12mm@6'' c/c 12mm@6'' c/c 12mm@6'' c/c 12mm@6'' c/c 0.75 (20) 2W Foundation is
F2 9'-0''x9'-0'' - 18mm-6''c/c (both ways) 16'' 2''
S2 4'' (100) 12mm@6'' c/c 12mm@8'' c/c 12mm@6'' c/c 12mm@8'' c/c 0.75 (20) 2W 5'-6" from N.G.L.
CF-1 10'-0''x6'-0'' 18mm-7''c/c (both ways) 18mm-7''c/c (both ways) 16'' 2''
S3 4'' (100) 12mm@6'' c/c 12mm@8'' c/c 12mm@6'' c/c 12mm@8'' c/c 0.75 (20) 1W
CF-2 CF8'-8' + 5'-5' 18mm-7''c/c (both ways) 18mm-7''c/c (both ways) 16'' 2''
CS 4'' (100) 12mm@6'' c/c 12mm@6'' c/c 12mm@6'' c/c 12mm@6'' c/c 0.75 (20) Cantilever
MF Mat 18'x15' 18mm-7''c/c (both ways) 18mm-7''c/c (both ways) 18'' 2''
Stair 5'' (125) 12mm@6'' c/c 12mm@8'' c/c 12mm@6'' c/c 12mm@8'' c/c 0.75 (20) -
Note(1) Footing sizes are designed according to the effective soil bearing. (Assumed Qe = 1 ton per ft square)
LS 5'' (125) 12mm@6'' c/c 12mm@8'' c/c 12mm@6'' c/c 12mm@8'' c/c 0.75 (20) - Note(2) Depth may be revised according to site soil profile, SPT>30.
Note(1) Maximum spacing for 2W slabs should not be greater than 2h = 2 x 4'' = 8'' (200mm). Note(3) Centers of Footings and Columns must concide if any other specification is not specified.
Note(2) Please follow the specifications of steel detailing according to CQHP and/or ACI guidelines to prevent punching shear failure of 2 ways slab. Note(4) Lean concrete(1:3:6) must be provided with clear cover 2 in to protect moisture contact.
Note(3) For easy steel fixing (build-ability), rebars are provided the same spacing for both 1W & 2W.
A B C D E F
52'
12' 12' 12' 12' 4'

C1 C1 C1 C1 C1 C4
5
9'

C1 C1
4
3'

C1 C1 C1 C4
3
30'
12'

C1 C1 C1 C1
2
6'

C1 C1 C1
1

COLUMN PLAN (Base to Ground Floor)


A B C D E F
52'
12' 12' 12' 12' 4'

C1 C1 C1 C1 C1 C4
5
9'

C1 C1
4
3'

C1 C1 C1 C4
3
30'
12'

C1 C1 C1 C1
2
6'

C3 C3 C3
1

COLUMN PLAN (Ground Floor to Mezzanine)


A B C D E F
52'
12' 12' 12' 12' 4'

C2 C2 C2 C2 C2 C4
5
9'

C2 C2
4
3'

C2 C2 C2 C4
3
30'
12'

C2 C2 C2 C2
2
6'

C3 C3 C3
1

COLUMN PLAN (Mezzanine to First Floor)


A B C D E F
52'
12' 12' 12' 12' 4'

C3 C3 C3 C3 C3 C4
5
9'

C3 C3
4
3'

C3 C3 C3 C4
3
30'
12'

C3 C3 C3 C3
2
6'

C3 C3 C3
1
2'-2.5"

PC PC

COLUMN PLAN (First Floor to Third Floor)


A B C D E F
52'
12' 12' 12' 12' 4'

C4 C4 C4 C4 PC C4
5
9'

C4 C4
4
3'

C4 C4 PC C4
3
2'
30'
12'

PC C4 C4 C4 PC
2
4'
6'

PC PC PC
1

COLUMN PLAN (Third Floor to Roof)


A B C D E F
52'
12' 12' 12' 12' 4'

B12x14 B12x14 B12x14 B12x14 B10x12


5 B12x14

B12x14

B12x14

B12x14

B12x14

B10x12
9'

B10x15
4
3'

B12x14 B12x14 B12x14


3
B10x12
30'

B12x14

B12x14

B12x14

B12x14

B12x14
12'

B12x14 B12x14
2

B12x14
B12x14 B12x14

B12x14
B12x14
6'

1
B10x15 B10x15

GROUND FLOOR BEAM PLAN


A B C D E F
52'
12' 12' 12' 12' 4'

4'-5"
B10x15
5

B12x14

B10x15
9'

4
B10x15
3'

3
30'
12'

2
6'

TYPICAL LANDING BEAM PLAN


A B C D E F
52'
12' 12' 12' 12' 4'

4'
B12x14 B12x14 B12x14 B12x14 B10x12
5

3'
B9x9

B10x15
B12x14

B10x12
B12x14
9'

B12x14

B9x9
B10x15
B12x14 B9x9
4

B9x9
3'

B12x14 B12x14
3
B10x12
B12x14
30'

B12x14

B10x15

B10x15
B12x14

B12x14
12'

B12x14 B12x14 B9x9


2 B12x14

B12x14
6'

1
B12x14 B12x14

MEZZANINE BEAM PLAN


A B C D E F
52'
12' 12' 12' 12' 4'

B12x14 B12x14 B12x14 B12x14 B10x12


5

B10x15

B10x12
B12x14
9'

B12x14

B10x15
B12x14
4
3'

B12x14 B12x14 B12x14

B10x15
3
B10x12
B12x14

B9x9
30'

B12x14
B9x9
B9x9

B12x14
12'

B9x9
7'-1.5"

B10x15
6'
4'
B12x14 B12x14 B9x9
2

B10x15
B12x14

B12x14
6'

1
B12x14 B12x14
B12x14

B12x14

2'-7"
FIRST FLOOR BEAM PLAN
A B C D E F
52'
12' 12' 12' 12' 4'

B12x14 B12x14 B12x14 B12x14 B10x12


5

5'-6"

B10x12

B10x12
B9x9

B10x12
B12x14
9'

B10x12
B12x14

B9x9
7'
4
3'

B12x14 B12x14
3
B12x14 B10x12
30'

B9x9
B10x12

B10x12

B12x14
12'

B10x12
8'

B10x12
B12x14 B12x14
2
B9x9

B10x12

B12x14
6'

1
B10x12 B10x12
B10x12

B10x12
2'-2.5"

SECOND FLOOR BEAM PLAN


A B C D E F
52'
12' 12' 12' 12' 4'

B12x14 B12x14 B12x14 B12x14 B10x12


5

B10x12

B10x12

B10x12

B10x12
B12x14
9'

B12x14
4
B9x9
3'

B12x14 B12x14 B12x14


3
B9x9
2'

B10x12
30'

B9x9

B10x12

B10x12

B10x12
12'

B12x14
B9x9

B9x9
2
B9x9 B9x9

B12x14
6'

4'
B10x12 B10x12
1
B10x12

B10x12
2'-2.5"

THIRD FLOOR BEAM PLAN


A B C D E F
52'
12' 12' 12' 12' 4'

B10x15 B10x15 B10x15


5
B10x15

B10x15

B10x15

B10x15
9'

B10x15
4
3'

B10x15
B10x15 B10x15
3
2'
30'

B10x15

B10x15
12'

2
B10x15
4'
6'

ROOF BEAM PLAN


A B C D E F
52'
12' 12' 12' 12' 4'

4'-5"

LS
9'

4
3'

3
30'
12'

2
6'

TYPICAL LANDING SLAB PLAN


A B C D E F
52'
12' 12' 12' 12' 4'

2'-1"
2'-1"
2'-1"
CS CS CS CS CS
5

2'-6"
2'-1"
S3 LS

CS S1 S1
9'

S3 CS
S3 S2

7'
4
S3

2'-6"
S3 LS
3'

3
30'

S2
S1
CS S1
12'

S2 CS

2
CS CS
S3
6'

2'-1" CS

1
CS CS

2'-1"
2'-1"

MEZZANINE SLAB PLAN


A B C D E F
52'
12' 12' 12' 12' 4'

2'-6"
LS

S1 S1 S1
9'

S3

7'
4

2'-6"
LS
3'

3 S2
S1 S1
30'

S2 S2
12'

7'-1.5"

S2 S3

6'
S3

4'
2

S3
6'

1
S3

FIRST FLOOR SLAB PLAN 2'-7"


A B C D E F
52'
12' 12' 12' 12' 4'

2'-6"
LS
5'-6" S3
S1 S1
9'

S3

7'
S2 S2

7'
4
LS

2'-6"
3'

3
S3
30'

S2 S1
S1
12'

S2
8'

2
S3
6'

1
S3
2'-2.5"

SECOND FLOOR SLAB PLAN


A B C D E F
52'
12' 12' 12' 12' 4'

2'-6"
LS

S1 S1 S1
9'

S3

7'
4
LS

2'-6"
3'

S3
3
2'

S3
30'

S2 S1
12'

S2
S3

S3
6'

4'

1
S3
2'-2.5"

THIRD FLOOR SLAB PLAN


A B C D E F
52'
12' 12' 12' 12' 4'

S2
9'

S1
S1

4
3'

3
2'
30'

S1
12'

2
4'
6'

ROOF SLAB PLAN


A B C D E F
52'
12' 12' 12' 12' 4'

12mm@6"c/c

5
9'

4
3'

3
30'
12'

2
6'

MEZZANINE FLOOR SLAB PLAN


(Bottom Steel - Main Bar)
A B C D E F
52'
12' 12' 12' 12' 4'

5
9'

12mm@6"c/c 12mm@6"c/c
12mm@8"c/c

4
3'

3
30'
12'

12mm@8"c/c 12mm@8"c/c 12mm@6"c/c

2
6'

MEZZANINE FLOOR SLAB PLAN


(Bottom Steel - Distribution Bar)
A B C D E F
52'
12' 12' 12' 12' 4'

4' 4' 4'


12mm@6"c/c

5
9'

4
3'

5'

4'
30'

5'
12'

4'
5'

4'
2
6'

4' 4' 4'


1

4' 4' 4' 4' 4' 4'

MEZZANINE FLOOR SLAB PLAN


(Top Steel - Main Bar)
A B C D E F
52'
12' 12' 12' 12' 4'

12mm@6"c/c 12mm@6"c/c 12mm@8"c/c

5
9'

4
3'

3
30'
12'

2
6'

12mm@8"c/c

12mm@8"c/c 12mm@6"c/c

MEZZANINE FLOOR SLAB PLAN


(Top Steel - Distribution Bar)
B C B C

12' 12'
4' 4' 4'

5 5
S1 S1

4'
9'

9'
12'

12'
4'
4 4

4'
3'

3'
3 3

12mm@6"c/c 12mm@6"c/c
Both Way Both Way

Bottom Steel Detail Plan Top Steel Detail Plan

3 4 5
12'
3' 9'
4' 4' 4' 2'-1"

4"
B12x14 12mm@6"c/c 12mm@6"c/c B12x14
Main Steel Distribution Steel

S1 Detail Section

B C
12'
4' 4' 4'

12mm@6"c/c 12mm@6"c/c
B12x14 B12x14
Distribution Steel Main Steel
S1 Detail Section
A B

12'

4'-5"

10 Landing Level

9 7"
Tread = 9 16
3'-

5"
5"
8 3"
Riser = 7 16
B12x14 B10x15
7
Waist = 5"
6

Main Steel 5

6'
12mm@6"c/c
4

2 3'-
5"

1
Distribution Steel
Plinth Level 12mm@8"c/c

B12x14
A B

12'

First Floor Level 20

9" 19

4"
Tread = 9 16 4"
3'-
Extra Bar 18
3"
Riser = 7 16 12mm@6"c/c
B10x15
6" 17
1'-
Waist = 5"
1'-6" 16

15
6'

14
Distribution Steel
13 12mm@8"c/c
4'-5"
4 " 12
3'-
11

10 Main Steel Landing Level


12mm@6"c/c
5"

B12x14 B10x15
B A

12'

4'-5"

Landing Level 27

5" ' 26
Tread = 1'-016
2.8
25
Riser = 6"
24
Waist = 5" B10x15 B12x14
23
4'

4'
22

21 10mm@8"c/c
'
2.8
20
12mm@6"c/c Mezzanine Floor Level

B10x15

STAIR DETAIL SECTION


B A

12'

First Floor Level

34 2.8
' 5"
33 Tread = 1'-016

B10x15 32 Riser = 6"


31 Waist = 5"
4'

12mm@6"c/c
30

29 2.8
'
10mm@8"c/c 28 4'-5"

Landing Level

1'-6
"
1'-6"
B10x15 B12x14

4'

STAIR DETAIL SECTION


E/3

3'-6"
Within 2h
20"
THIRD FLOOR

Within Lo

Splice Length
30"
28"

22"
Within 2h

11'
Within Lo
22"
SECOND FLOOR

Within Lo
28" 24"

22"
Within 2h Within 2h

Splice Length
34"

11'
Within Lo
22"
FIRST FLOOR

Within Lo
28" 24"

22"
Within 2h Within 2h

8'
Within Lo
22"
MEZZANINE
Within Lo

28" 24"
22"

Within 2h Within 2h

Larger of C1 or C2

12'
Lo ≥ Clear Height / 6
6"
18"

8 x Longitudinal Bar Diameter


24 x Tie bar diameter
Within Lo

So ≤
0.5 x (smaller of C1 or C2)
4"
22"

12"
GROUND FLOOR

28" 24"
Within 2h Within 2h
6'-6"
A B C D E F
12' 12' 12' 12' 4'

d/4
8 x smallest longitudinal bar diameter
So ≤
24 x Hoop bar diameter
12"
Splice Length
So
≤ 2" 5" 5" 5" 5" 26" 5"

8" 8" 5" 8"


28" S ≤ d/2 28" 28" 26" 28" 28" 28" 28" 28"
Within 2h Within 2h Within 2h Splice Length Within 2h Within 2h Within 2h Within 2h Within 2h
A B C D E F
52'
12' 12' 12' 12' 4'

ROOF TOP

B10x15 B10x15

B10x15

10'-6"

8'-6"

3'-6"
THIRD FLOOR

B12x14 B10x12
B12x14 B12x14 B12x14
11'

SECOND FLOOR

B12x14 B10x12
B12x14 B12x14 B12x14
11'

FIRST FLOOR

B12x14 B10x12
B12x14 B12x14 B12x14
8'

MEZZANINE

B12x14 B10x12
B12x14 B12x14 B12x14

4'-5"
12'

1 21" Thick (1:2:4) Flooring

4 21" Thick (1:3:6) Concrete


6'

6" Thick Sand Filling


GROUND FLOOR
1'

B12x14 B10x12 N.G.L (+0'-0")


B12x14 B12x14 Earth Filling
5'-6"

18"

16"

16"

16"
MF F1 F2 CF1
7' 9' 10'
18'

CROSS-SECTION AT GRID 5
1 2 3 4 5

6' 12' 3' 9'

3'-6"
Third Floor Level

B12x14 B12x14 B12x14

11'
Second Floor Level

B12x14 B12x14 B12x14

11'
First Floor Level

B12x14 B12x14 B12x14

8'
Mezzanine Floor Level

B12x14 B12x14 B12x14

12'
1"Thick (1:2:4) Flooring
12
1"Thick (1:3:6) Concrete
42
6"Thick Sand Filling
Earth Filling
Ground Floor Level

1'
NGL
B12x14 B12x14

5'-6"
CF2 CF1 CF1
16"

6' 6'
13'

CROSS-SECTION AT GRID E
1'-4.4"
2.7"
SPECIFICATION : OWNER

1"
Daw Aye Aye

0.5"
ARCHITECT :

1"
Win Co.ltd

CIVIL & STRUCTURE CONSULTANT

1"
Millimeter Online Class

M&E CONSULTANT

1"
AA Co.ltd

TEXT SIZE = 0.11" PROJECT

1"
1 storeyed Proposed Staff Quarter

STREET Moe Sandar


11.5"

1"
QUARTER 2

TOWNSHIP Hledan, Yangon

SUBJECT

1"
SCALE :

1"
DATE : 4.11.2019

SHEET NO : DWG -

DESIGNED BY : Engr U Aung Aung

1"
DRAWN BY : Engr U Nyi

CHECKED BY : Engr U Aung Aung

REVISION REVISION

1"
REVISION REVISION

REVISION REVISION