Professional Documents
Culture Documents
52'
12' 12' 12' 12' 4'
6'
7'
CF1
F1
F2
15'
9'
9'
4
3'
MF
3
9'
CF1
30'
F2 F2
12'
8'
CF2 CF2
8'
F1
6'
F2
5'
F2
5'
FOUNDATION PLAN
C D
E F
7' 9'
10'
3'-6"
4'-6"
3'
5
6'
5
7'
9'
3'
3'-6"
4'-6"
3' 4' 3'
3'-6" 3'-6"
18mm@6"c/c 18mm@7"c/c
Both Way 4'-6" 4'-6" Both Way,Both Layer
3'
4'
5
2
8'
6'
15'
9'
1
5'
3'
4
3'
5'
3
18mm@7"c/c 18mm@7"c/c
Both Way,Both Layer Both Way,Both Layer
CF2 Detail Plan
Mat Footing Detail Plan
C D E F
C1 (14x14)
Plinth Level Plinth Level Plinth Level
1'
1'
1'
N.G.L (+0'-0") N.G.L (+0'-0") N.G.L (+0'-0")
C1 (14x14)
5'-6"
5'-6"
5'-6"
18mm@6"c/c 18mm@6"c/c 18mm@7"c/c
Both Way, Both Layer
16"
16"
16"
1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6"
1'
1'
MF(18'x15')
CF2(8'x8' + 5'x5')
5'-6"
5'-6"
18mm@7"c/c
18mm@7"c/c
Both Way, Both Layer
Both Way, Both Layer
18"
16"
52'
12' 12' 12' 12' 4'
5
4.5" Brick Wall
1'
B12x14
3'
3
Earth Filling
30'
4'
12'
1"
24
3"
3"Thick (1:3:6) Lean Concrete
3"Thick Sand Filling
6" Thick Hard Core
2
2'-6"
6'
5 " =1'
Scale : 32
Top Steel : 3-16mm Top Steel : 2-16mm Top Steel : 3-16mm Top Steel : 3-18mm Top Steel : 2-18mm Top Steel : 3-18mm
Bottom Steel : 2-16mm Bottom Steel : 2-16mm Bottom Steel : 2-16mm
Bottom Steel : 3-18mm Bottom Steel : 2-18mm Bottom Steel : 3-18mm
Stirrup : 8mm @4" c/c (Within 2h) Stirrup : 8mm @4" c/c (Within 2h) Stirrup : 8mm @4" c/c (Within 2h)
Stirrup : 8mm @4" c/c (Within 2h) Stirrup : 8mm @4" c/c (Within 2h) Stirrup : 8mm @4" c/c (Within 2h)
Stirrup : 8mm @6" c/c (Outside 2h) Stirrup : 8mm @6" c/c (Outside 2h) Stirrup : 8mm @6" c/c (Outside 2h)
Stirrup : 8mm @4" c/c (Outside 2h) Stirrup : 8mm @4" c/c (Outside 2h) Stirrup : 8mm @4" c/c (Outside 2h)
14"
14"
14"
Top Steel : 3-18mm Top Steel : 3-18mm Top Steel : 3-18mm Top Steel : 5-18mm Top Steel : 3-18mm Top Steel : 5-18mm
Bottom Steel : 5-18mm Bottom Steel : 5-18mm Bottom Steel : 5-18mm
Bottom Steel : 3-18mm Bottom Steel : 3-18mm Bottom Steel : 3-18mm
Torsion Steel : 2-16mm Torsion Steel : 2-16mm Torsion Steel : 2-16mm
Stirrup : 8mm @3" c/c (Within 2h) Stirrup : 8mm @3" c/c (Within 2h) Stirrup : 8mm @3" c/c (Within 2h) Stirrup : 10mm@5" (within 2h) Stirrup : 10mm@5" (within 2h)
Stirrup : 10mm@5" (within 2h)
Stirrup : 8mm @5" c/c (Outside 2h) Stirrup : 8mm @5" c/c (Outside 2h) Stirrup : 8mm @5" c/c (Outside 2h) Stirrup : 10mm@8" (outside 2h) Stirrup : 10mm@8" (outside 2h) Stirrup : 10mm@8" (outside 2h)
14"
Type : C4 Type : PC
Size : C10 x10 Size : C10 x10
10" 10"
10"
10"
C4 C10x10 4-16mm 1.0 1.0 1 loop 8mm@ 4'' c/c 8mm@ 4''c/c
PC C10x10 4-16mm 1.0 1.0 1 loop 8mm@ 4'' c/c 8mm@ 4''c/c Prop Column
Note(1) Column sizes are the same as much as possible for the easy buildability and the recycling of formwork.
Note(2) Numbers of reinforcing steel are not very varied to avoid construction confusion for low high building.
Note(3) Balance steel ratio for columns should be between 1% and 6% (ACI-318-05) for seismic zones, such as Taunggyi = Zone 4 of Myanmar.
Note(4) Strong column sizes are necessary to ensure stiff column-soft beam actions.
Beams schedule
Top Steel Bottom Steel Stirrup minimum
Size Torsion
Left Mid Right Left Mid Right Within 2h Outside 2h clear cover
9x9 3-16mm 2-16mm 3-16mm 2-16mm 2-16mm 2-16mm - 8mm@ 4''c/c 8mm@ 6''c/c 1.0'' (25)
10X12 3-18mm 3-18mm 3-18mm 3-18mm 3-18mm 3-18mm - 8mm@ 3''c/c 8mm@ 5''c/c 1.0'' (25)
10X15 3-18mm 2-18mm 3-18mm 3-18mm 2-18mm 3-18mm - 8mm@ 4''c/c 8mm@4''c/c 1.5'' (30)
12x14 5-18mm 3-18mm 5-18mm 5-18mm 5-18mm 5-18mm 2-16mm 10mm@ 5''c/c 10mm@ 8''c/c 1.5'' (30)
C1 C1 C1 C1 C1 C4
5
9'
C1 C1
4
3'
C1 C1 C1 C4
3
30'
12'
C1 C1 C1 C1
2
6'
C1 C1 C1
1
C1 C1 C1 C1 C1 C4
5
9'
C1 C1
4
3'
C1 C1 C1 C4
3
30'
12'
C1 C1 C1 C1
2
6'
C3 C3 C3
1
C2 C2 C2 C2 C2 C4
5
9'
C2 C2
4
3'
C2 C2 C2 C4
3
30'
12'
C2 C2 C2 C2
2
6'
C3 C3 C3
1
C3 C3 C3 C3 C3 C4
5
9'
C3 C3
4
3'
C3 C3 C3 C4
3
30'
12'
C3 C3 C3 C3
2
6'
C3 C3 C3
1
2'-2.5"
PC PC
C4 C4 C4 C4 PC C4
5
9'
C4 C4
4
3'
C4 C4 PC C4
3
2'
30'
12'
PC C4 C4 C4 PC
2
4'
6'
PC PC PC
1
B12x14
B12x14
B12x14
B12x14
B10x12
9'
B10x15
4
3'
B12x14
B12x14
B12x14
B12x14
B12x14
12'
B12x14 B12x14
2
B12x14
B12x14 B12x14
B12x14
B12x14
6'
1
B10x15 B10x15
4'-5"
B10x15
5
B12x14
B10x15
9'
4
B10x15
3'
3
30'
12'
2
6'
4'
B12x14 B12x14 B12x14 B12x14 B10x12
5
3'
B9x9
B10x15
B12x14
B10x12
B12x14
9'
B12x14
B9x9
B10x15
B12x14 B9x9
4
B9x9
3'
B12x14 B12x14
3
B10x12
B12x14
30'
B12x14
B10x15
B10x15
B12x14
B12x14
12'
B12x14
6'
1
B12x14 B12x14
B10x15
B10x12
B12x14
9'
B12x14
B10x15
B12x14
4
3'
B10x15
3
B10x12
B12x14
B9x9
30'
B12x14
B9x9
B9x9
B12x14
12'
B9x9
7'-1.5"
B10x15
6'
4'
B12x14 B12x14 B9x9
2
B10x15
B12x14
B12x14
6'
1
B12x14 B12x14
B12x14
B12x14
2'-7"
FIRST FLOOR BEAM PLAN
A B C D E F
52'
12' 12' 12' 12' 4'
5'-6"
B10x12
B10x12
B9x9
B10x12
B12x14
9'
B10x12
B12x14
B9x9
7'
4
3'
B12x14 B12x14
3
B12x14 B10x12
30'
B9x9
B10x12
B10x12
B12x14
12'
B10x12
8'
B10x12
B12x14 B12x14
2
B9x9
B10x12
B12x14
6'
1
B10x12 B10x12
B10x12
B10x12
2'-2.5"
B10x12
B10x12
B10x12
B10x12
B12x14
9'
B12x14
4
B9x9
3'
B10x12
30'
B9x9
B10x12
B10x12
B10x12
12'
B12x14
B9x9
B9x9
2
B9x9 B9x9
B12x14
6'
4'
B10x12 B10x12
1
B10x12
B10x12
2'-2.5"
B10x15
B10x15
B10x15
9'
B10x15
4
3'
B10x15
B10x15 B10x15
3
2'
30'
B10x15
B10x15
12'
2
B10x15
4'
6'
4'-5"
LS
9'
4
3'
3
30'
12'
2
6'
2'-1"
2'-1"
2'-1"
CS CS CS CS CS
5
2'-6"
2'-1"
S3 LS
CS S1 S1
9'
S3 CS
S3 S2
7'
4
S3
2'-6"
S3 LS
3'
3
30'
S2
S1
CS S1
12'
S2 CS
2
CS CS
S3
6'
2'-1" CS
1
CS CS
2'-1"
2'-1"
2'-6"
LS
S1 S1 S1
9'
S3
7'
4
2'-6"
LS
3'
3 S2
S1 S1
30'
S2 S2
12'
7'-1.5"
S2 S3
6'
S3
4'
2
S3
6'
1
S3
2'-6"
LS
5'-6" S3
S1 S1
9'
S3
7'
S2 S2
7'
4
LS
2'-6"
3'
3
S3
30'
S2 S1
S1
12'
S2
8'
2
S3
6'
1
S3
2'-2.5"
2'-6"
LS
S1 S1 S1
9'
S3
7'
4
LS
2'-6"
3'
S3
3
2'
S3
30'
S2 S1
12'
S2
S3
S3
6'
4'
1
S3
2'-2.5"
S2
9'
S1
S1
4
3'
3
2'
30'
S1
12'
2
4'
6'
12mm@6"c/c
5
9'
4
3'
3
30'
12'
2
6'
5
9'
12mm@6"c/c 12mm@6"c/c
12mm@8"c/c
4
3'
3
30'
12'
2
6'
5
9'
4
3'
5'
4'
30'
5'
12'
4'
5'
4'
2
6'
5
9'
4
3'
3
30'
12'
2
6'
12mm@8"c/c
12mm@8"c/c 12mm@6"c/c
12' 12'
4' 4' 4'
5 5
S1 S1
4'
9'
9'
12'
12'
4'
4 4
4'
3'
3'
3 3
12mm@6"c/c 12mm@6"c/c
Both Way Both Way
3 4 5
12'
3' 9'
4' 4' 4' 2'-1"
4"
B12x14 12mm@6"c/c 12mm@6"c/c B12x14
Main Steel Distribution Steel
S1 Detail Section
B C
12'
4' 4' 4'
12mm@6"c/c 12mm@6"c/c
B12x14 B12x14
Distribution Steel Main Steel
S1 Detail Section
A B
12'
4'-5"
10 Landing Level
9 7"
Tread = 9 16
3'-
5"
5"
8 3"
Riser = 7 16
B12x14 B10x15
7
Waist = 5"
6
Main Steel 5
6'
12mm@6"c/c
4
2 3'-
5"
1
Distribution Steel
Plinth Level 12mm@8"c/c
B12x14
A B
12'
9" 19
4"
Tread = 9 16 4"
3'-
Extra Bar 18
3"
Riser = 7 16 12mm@6"c/c
B10x15
6" 17
1'-
Waist = 5"
1'-6" 16
15
6'
14
Distribution Steel
13 12mm@8"c/c
4'-5"
4 " 12
3'-
11
B12x14 B10x15
B A
12'
4'-5"
Landing Level 27
5" ' 26
Tread = 1'-016
2.8
25
Riser = 6"
24
Waist = 5" B10x15 B12x14
23
4'
4'
22
21 10mm@8"c/c
'
2.8
20
12mm@6"c/c Mezzanine Floor Level
B10x15
12'
34 2.8
' 5"
33 Tread = 1'-016
12mm@6"c/c
30
29 2.8
'
10mm@8"c/c 28 4'-5"
Landing Level
1'-6
"
1'-6"
B10x15 B12x14
4'
3'-6"
Within 2h
20"
THIRD FLOOR
Within Lo
Splice Length
30"
28"
22"
Within 2h
11'
Within Lo
22"
SECOND FLOOR
Within Lo
28" 24"
22"
Within 2h Within 2h
Splice Length
34"
11'
Within Lo
22"
FIRST FLOOR
Within Lo
28" 24"
22"
Within 2h Within 2h
8'
Within Lo
22"
MEZZANINE
Within Lo
28" 24"
22"
Within 2h Within 2h
Larger of C1 or C2
12'
Lo ≥ Clear Height / 6
6"
18"
So ≤
0.5 x (smaller of C1 or C2)
4"
22"
12"
GROUND FLOOR
28" 24"
Within 2h Within 2h
6'-6"
A B C D E F
12' 12' 12' 12' 4'
d/4
8 x smallest longitudinal bar diameter
So ≤
24 x Hoop bar diameter
12"
Splice Length
So
≤ 2" 5" 5" 5" 5" 26" 5"
ROOF TOP
B10x15 B10x15
B10x15
10'-6"
8'-6"
3'-6"
THIRD FLOOR
B12x14 B10x12
B12x14 B12x14 B12x14
11'
SECOND FLOOR
B12x14 B10x12
B12x14 B12x14 B12x14
11'
FIRST FLOOR
B12x14 B10x12
B12x14 B12x14 B12x14
8'
MEZZANINE
B12x14 B10x12
B12x14 B12x14 B12x14
4'-5"
12'
18"
16"
16"
16"
MF F1 F2 CF1
7' 9' 10'
18'
CROSS-SECTION AT GRID 5
1 2 3 4 5
3'-6"
Third Floor Level
11'
Second Floor Level
11'
First Floor Level
8'
Mezzanine Floor Level
12'
1"Thick (1:2:4) Flooring
12
1"Thick (1:3:6) Concrete
42
6"Thick Sand Filling
Earth Filling
Ground Floor Level
1'
NGL
B12x14 B12x14
5'-6"
CF2 CF1 CF1
16"
6' 6'
13'
CROSS-SECTION AT GRID E
1'-4.4"
2.7"
SPECIFICATION : OWNER
1"
Daw Aye Aye
0.5"
ARCHITECT :
1"
Win Co.ltd
1"
Millimeter Online Class
M&E CONSULTANT
1"
AA Co.ltd
1"
1 storeyed Proposed Staff Quarter
1"
QUARTER 2
SUBJECT
1"
SCALE :
1"
DATE : 4.11.2019
SHEET NO : DWG -
1"
DRAWN BY : Engr U Nyi
REVISION REVISION
1"
REVISION REVISION
REVISION REVISION