CABINET FIXTURES

DOOR JAMB
bd.ft/man-
fabrication 3 hour
1"x2"x9.184' 1.5306667 bd.ft
0.5102222 man-hour
carpenter
rate 50 hr ₱25.51

FLUSH DOOR
pc/man-
fabrication 0.1 hour
1 pc 10 hrs ₱500.00

DOOR LOCKSET
pc/man-
fabrication 0.25 hour
1 pc 4 hrs ₱200.00
TOTAL ₱725.51 set
₱600.00 set

SCAFFOLDING AND STRIPPING ₱150.00 ln. m

STEEL PAINTING WORKS ₱30.00 sq. m


PAINTING ON WALLS ₱30.00 sq. m
PAINTING ON CEILING ₱70.00 sq. m
PAINTING RETOUCH/FINAL ₱20.00 sq. m
PAINTING (PRIMER) ₱50.00 sq. m
MASONRY PAINTING WORKS ₱80.00 sq. m
SCOPE OF WORK SIZE LABOR unit
PRODUCTIVITY/O
UTPUT
1 LAYING CHB 100 x 400 (4") 98 pcs/tm-day
2 125 x 400 (5") 90 pcs/tm-day
3 150 x 400 (6") 76 pcs/tm-day
4 200 x 400 (8") 61 pcs/tm-day
5 LAYING TILES ON FLOOR AREAS 3x3
6 4x4
7 4 1/4
8
9
10
11
12
13
14
15
16
17
18
19
20
WORK TEAM rate unit COST PER UNIT unit
RATES
1 M, 1 H 720 php/tm-day 7.35 php/pc 7.00 Mason
2 M, 1 H 720 php/tm-day 8.00 php/pc 8.00 Carpenter
3 M, 1 H 720 php/tm-day 9.47 php/pc 9.00 Steelman
4 M, 1 H 720 php/tm-day 11.80 php/pc 11.00 Helper
RATES
400 php/day
400 php/day
400 php/day
320 php/day