KEY-PLAN
A
N A
E 455000
E 460000
E 445000
E 450000
E 465000
E 440000
E 435000
N 2045000
N 2040000
E 465000
N 2035000
B B
NOTES / NOTAS
C C
SPECIFICATIONS / ESPECIFICACIONES
D D
REFERENCES / REFERENCIAS
E E
REVISIONS/REVISIONES
REV DATE/FECHA DESCRIPTION/DESCRIPCION DRW. REV. APP.
F F
B 08-APR-19 ISSUED FOR INTERDISCIPLINARY REVIEW AJA HME PMA
C 09-APR-19 ISSUED FOR CLIENT REVIEW AJA HME PMA
0 13-MAY-19 ISSUED FOR CONSTRUCTION AJA HME PMA
1 12-AUG-19 ISSUED FOR CONSTRUCTION. UPGRADE AJA HME PMA
2 10-OCT-19 ISSUED FOR CONSTRUCTION. UPGRADE AJA HME PMA
3 08-JUN-20 ISSUED FOR REVIEW AS BUILT AJA HME MUB
ENGINEERING, DESIGN / INGENIERIA, DISEÑO
NAME / NOMBRE DATE / FECHA
DRAW
DIBUJO
A. JARAMILLO 08-JUN-20
DESIGN
H. MEJÍA 08-JUN-20
DISEÑO
CHEK
G H. MEJÍA 08-JUN-20 G
LEGEND REVISADO
APPROVED M. UBIDIA 08-JUN-20
APROBADO
FOR CONSTRUCTION
ISSUED FOR
EMITIDO PARA
PARA CONSTRUCCIÓN
CLIENT
CLIENTE
DATE SIGN
FECHA FIRMA
PROJECT
PROYECTO
EASTERN GAS PIPELINE PROJECT
BLOCK VALVE STATION 1
DESCRIPTION
DESCRIPCION
H ISOMETRIC 003 BVS1 H