You are on page 1of 2

National Institutional Ranking Framework

Ministry of Human Resource Development


Government of India
Submitted Institute Data for NIRF'2019'
Institute Name: Indian Institute of Science Education & Research Bhopal [IR-O-U-0272]

Sanctioned (Approved) Intake


Academic Year 2017-18 2016-17 2015-16 2014-15 2013-14 2012-13

UG [5 Years Program(s)] 260 200 200 200 150 -

Total Actual Student Strength (Program(s) Offered by Your Institution)


(All programs No. of Male No. of Female Total Students Within State Outside State Outside Economically Socially No. of students No. of students No. of students No. of students
of all years) Students Students (Including male (Including male Country Backward Challenged receiving full receiving full receiving full who are not
& female) & female) (Including male (Including male (SC+ST+OBC tuition fee tuition fee tuition fee receiving full
& female) & female) Including male reimbursement reimbursement reimbursement tuition fee
& female) from the State from Institution from the Private reimbursement
and Central Funds Bodies
Government

UG [5 Years 652 316 968 73 895 0 0 517 0 220 0 297


Program(s)]

Placement & Higher Studies

UG [5 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students Academic Year No. of students No. of students Median salary of No. of students
students intake in the students admitted in admitted through graduating in placed placed selected for Higher
year the year Lateral entry minimum stipulated graduates(Amount in Studies
time Rs.)

2011-12 100 83 2012-13 0 2015-16 65 14 600000(Six lakhs) 43

2012-13 120 115 2013-14 0 2016-17 101 29 700000(Seven lakhs) 56

2013-14 150 148 2014-15 0 2017-18 127 22 800000(Eight Lakhs) 74

Ph.D Student Details


Ph.D (Student pursuing doctoral program till 2017-18; Students admitted in the academic year 2018-19 should not be entered here.)

Total Students

Full Time 383

Part Time 0

No. of Ph.D students graduated (including Integrated Ph.D)

2017-18 2016-17 2015-16

Full Time 40 25 25

Part Time 0 0 0

Financial Resources: Utilised Amount for the Capital expenditure for previous 3 years
Academic Year 2017-18 2016-17 2015-16

Utilised Amount Utilised Amount Utilised Amount

Annual Capital Expenditure on Academic Activities and Resources (excluding expenditure on buildings)

Library 19504000 (one crore ninety five lakh four thousand) 43565059 (four crore thirty five lakh sixty five thousand and fifty 44884815 (four crore forty eight lakh eighty four thousand eight
nine) hundred and fifteen)

New Equipment for Laboratories 63720586 (six crore thirty seven lakh twenty thousand five 112336936 (eleven crore twenty three lakh thirty six thousand 48219796 (four crore eight two lakh nineteen thousand seven
hundred and eighty six) nine hundred and thirty six) hundred and ninety six)

Engineering Workshops 23466000 (two crore thirty four lakh sixty six thousand) 0 (zero) 0 (zero)

Other expenditure on creation of Capital Assets (excluding 18448640 (one crore eighty four lakh forty eight thousand six 612609348 (sixty one crore twenty six lakh nine thousand three 192624354 (nineteen crore twenty six lakh twenty four
expenditure on Land and Building) hundred and forty) hundred and forty eight) thousand three hundred and fifty four)

Financial Resources: Utilised Amount for the Operational expenditure for previous 3 years
Academic Year 2017-18 2016-17 2015-16

Utilised Amount Utilised Amount Utilised Amount

Annual Operational Expenditure

Salaries (Teaching and Non Teaching staff) 272247752 (twenty seven crore twenty two lakh forty seven 136699256 (thirteen crore sixty six lakh ninety nine thousand 136123586 (thirteen crore sixty one lakh twenty three thousand
thousand seven hundred and fifty two) two hundred and fifty six) five hundred and eighty six)

Maintenance of Academic Infrastructure or consumables, 523187290 (fifty two crore thirty one lakh eighty seven 32293257 (three crore twenty two lakh ninety three thuosand 10661329 (one crore six lakh sixty one thousand three hundred
other running expenditures etc.(excluding maintenance of thousand two hundred and ninety) two hundred and fifty seven) and twenty nine)
hostels and allied services)

Seminars/Conferences/Workshops 4247655 (forty two lakh forty seven thousand six hundred and 2008997 (twenty lakh eight thousand nine hundred and ninety 3524840 (thirty five lakh twenty four thousand eight hundred
fifty five) seven) and forty)

PCS Facilities: Facilities of physically challenged students


1. Do your institution buildings have Lifts/Ramps? Yes, more than 80% of the buildings

2. Do your institution have provision for walking aids, includingwheelchairs and transportation from one building to another for Yes
handicapped students?

3. Do your institution buildings have specially designed toilets for handicapped students? Yes, more than 80% of the buildings

You might also like