JENEPONTO 2×135MW (2×125MW NET OUTPUT)
COAL FIRED POWER PLANT
(REF. NO.:50-F02792C)
BASIC DESIGN
GENERAL CATALOGUE
1.0 General
1.1 Cooling water system
1.2 Raw water pretreatment and water distribution system
1.3 Fire fighting system
1.4 Plant water drainage system
1.5 Sanitary sewage treatment system
1.6 Hydraulic Structures and Buildings
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
1.0 General
1.0.1 Design contents
This project is designed to be two units of coal-fired power plant located in
system
1.0.1.9 Structures of plant water drainage system
1.0.1.10 Structures of sanitary sewage treatment station
1.0.1.11 Foundation treatment for hydraulic buildings (structures) in power
plant area
1.0.1.12 Ash yard
1.0.2 Design condition
The aforementioned systems shall be designed based on the following
1
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
the bathymetric studies and hydrological data collection in the future, and
the water system design will be finalized by these studies and reports.
1.0.2.1 Ocean hydrologic data
1) Tide level
HHWL: 2.14m
LLWL: -1.02m
HWL: 1.64m
MSL: 0.088m
LWL: -0.25m
2) Wave:Waiting for information.
There is no long period actual survey wave data around the plant are or
Hasanudin weather station, which is located 68km from the north of the
power plant, the regular wave direction is SE, and the strong wave
2
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
3
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
4) Rainfall
According to the contract document:
Annual rainfall: 2000.0mm
Monthly maximum rainfall: 1062.0mm
Hourly maximum rainfall: 85.0mm
Maximum rainfall for 2 hours: 130.0mm
Rainy Season From October to April
5) Wind
According to the contract document:
Annual maximum wind velocity in 10 min:
17m/s SSW/NNW(2003/2004)
Average wind velocity: 4.8m/s
The prevailing wind direction during the rainy season (from December to
March) is from northwest and for the dry season is from east.
1.0.3 System description and reference drawing list
1.0.3.1 System description list
1) Cooling water system
2) Raw water treatment and water distribution system
3) Fire fighting system
4) Plant water drainage system
5) Sanitary sewage treatment system
6) Reclaimed water system
1.0.3.2 Reference drawing list
1) Cooling water system flow diagram (F02792C-S01-02)
2) Water balance diagram (F02792C-S01-03)
3) CW intake open channel plan drawing (F02792C-S01-04)
6
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
(F02792C-S01-10)
10) Raw water pretreatment and water distribution system elevation flow
diagram (F02792C-S01-11)
11) Raw water pretreatment plant plan (F02792C-S01-12)
12) Multipurpose water pump house plan and section (F02792C-S01-13)
13) Sanitary sewage treatment plant flow diagram (F02792C-S01-14)
14) Reclaimed water system flow diagram (F02792C-S01-15)
15) Coal contaminated wastewater treatment system flow diagram
(F02792C-S01-16)
1.1 Cooling water (hereafter CW) system
1.1.1 Reference DWG. NO.
The relevant references drawing list:
1) Cooling water system flow diagram (F02792C-S01-02)
2) CW intake open channel plan drawing (F02792C-S01-04)
3) CW discharge outfall plan and section drawing (F02792C-S01-05)
4) CW pump house bottom floor plan (F02792C-S01-06)
5) CW pump house operation floor plan (F02792C-S01-07)
6) CW pump house section 1-1 (F02792C-S01-08)
7) General layout of CW pipe outside of turbine house (F02792C-S01-09)
7
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
channel-Outfall
1.1.2.2 Scope
All plant equipment and works necessaries to meet the requirement of CW
been built already at the same time. For this 2×135MW units power
each unit, and the net width of each inlet chamber is about 4m.
2) The top platform elevation will be about +3.50m (preliminary).
3) The steel sluice gate will be installed in front of the bar screen, and the
9
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
for 2×135MW units. And the guiding groove will be installed in each
6mm×6mm.
6) One electric gantry type crane will be installed at the water inlet
the chambers.
1.1.3.6 CW pump house
1) CW pump house will be indoor rectangular type and be combined with
31m×12m.
2) The top platform elevation is about +3.50m (preliminary).
3) Four CW pumps (4×50%) will be installed in the pump house for
each of pump.
4) 1 set of electric bridge crane will be provided, whose capacity is 16/3.2t.
1.1.3.7 CW pipe
1) CW inlet and outlet pipe nominal diameter is 1600mm. The water
(RCCP).
3) The CW pipelines will be underground.
4) Each CW pipeline will be provided with manholes. The maximum
adopted, and the type will be with rectangle cross-section. The bottom
width is 3.0m, and the bottom slope is about 0.002. The whole length of
intercept point with the sea bed will be at the isobaths -1.50m. The
outfall will be trapezium type and the outlet width is 19m. The diffusing
Qty. 4 sets
Capacity 3.2m3/s
Total head 0.176MPa
Pump efficiency ≥85%
Pump speed 425rpm
Min. submersion depth 3m
Diameter of pump suction 1600mm
Diameter of pump discharge connection 1200mm
Motor type Asynchronous
Capacity 800kW
Voltage 6000V
Speed 425rpm
Cooling method By air
2) Steel sluice gate
Type steel sluice gate
Size 2500 mm×2500 mm
Qty. 2 sets of body and 4 sets of guiding grooving
3) Bar screen with trash rake
Type Vertical, bar screen with fixed trash rake
Qty. 4 sets
Width 3.5m
Depth 9.5m
Net distance between bars 100mm
Allowed design water fall 1500mm
4) Travelling band screen
12
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
13
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
14
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
(F02792C-S01-10)
3) Raw water pretreatment and water distribution system elevation flow
diagram (F02792C-S01-11)
4) Raw water pretreatment plant plan (F02792C-S01-12)
5) Multipurpose water pump house plan and section drawing (F02792C-
S01-13)
1.2.2 System function and scope
1.2.2.1 System function
The raw seawater will be delivered to the raw water pretreatment plant
through raw water pipes. After being pretreated, the seawater will be
pumped to the RO system (detail refers to the Chemical Part). 2sets of raw
seawater pumps (2×100%) will also be set in CW pump house, and only for
unit starts up and emergency happens, The raw seawater will be pretreated
by settling basin and filter basin, whose capacity is about 2×160m 3/h. For
increased.
The water distribution system will store and supply the fresh water and
seawater to the plant water system including the RO system (detail to the
Chemical Part), the potable water system, fire fighting water system and
the settling basin and filter basin, the PAC and PAM feed system. The RO
chemical raw water pumps, fresh water reservoir and multipurpose water
CW pump house, the seawater will be pumped to the settling basin through
16
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
raw seawater for the RO system, and which will be located in raw water
and it will be stored the seawater treated by the water pretreatment plant.
beside the reservoir for delivering the seawater after being pretreated to
CW pump house.
5) Dosing room
The dosing room will be built in raw water pretreatment plant area, one set
of flocculant dosing device (PAC device) and one set of coagulant aid
plant and which will be over ground reinforced concrete structure. The
room, control room, MCC room and maintenance area, which dimension is
pumps, 1 set of potable water surge tank, 1×100% fire water pump with
motor, 1×100% diesel driven fire water pump with diesel engine, 2×100%
hand wash basin in the plant building, dormitory area and will also supply
the irrigation and flushing water to the road & green area. Diameter of
main pipe will be DN100. PPR pipe will be provided for indoor part. And
for the outdoor pipe, the material will be SRTP. The potable water pipe will
be installed underground.
9) Reclaimed water system
The wastewater generated in the process of operation shall be collected to
reclaimed water, it can be reused as the water source of the coal handing
system, coal yard, coal jetty and ash yard sprinkling water system. The
be pumped to coal yard, ash yard, ash silos and jetty. The reclaimed water
18
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
pipe is SRTP pipe, and nominal diameter is DN150 or DN100 for main
19
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
Qty. 1 set
Capacity 0~100 l/h
1) Seawater reservoir
Type Semi-underground reinforced concrete structure
Qty 1 set
Capacity 500 m3
2) Fresh water reservoir
Type Over ground reinforced concrete structure
Qty. 2 sets
Capacity 900 m3
3) Potable water reservoir
Type Over ground reinforced concrete structure united to the fresh
water reservoir
Qty. 1 set
Capacity 200 m3
4) Chemical raw water pump
Type Horizontal centrifugal style
Qty. 2 sets (1 operation and 1 standby)
Capacity 147 m3/h
Total head 0.50MPa
Motor type Asynchronous
Capacity 37kW
Voltage 380V
5) Lubricating water pump for CW pump bearing
Type vertical
20
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
21
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
(F02792C-S01-16)
1.4.2 System function and scope
1.4.2.1 System function
The plant water drainage system will collect the drainage water in plant
area.
1.4.2.2 Scope
The system includes sanitary waste water system, emergency oil discharge
drainage system.
1.4.2.3 System description
22
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
size will be DN110 or DN50. Outdoor sanitary waste water pipe will be
FRP pipe with concrete manhole, and gravity flow with slope will be
treatment station.
2) Emergency oil discharge system
Emergency oil drainage will be collected to emergency oil discharge pit
through gravity flow with manhole. The capacity of pit will be about 60t.
Water in emergency oil pit will be discharged by 2 sets sump pump to rain
treat the primeval rainwater in coal yard. The design capacity of coal
contaminated water treatment system for this project is 2×10 m 3/h. Package
the reclaimed water reservoir. The water after being treated by coal
requirement.
1.5.2.2 Scope
The sanitary sewage treatment plant will be a package sewage treatment
The package sewage treatment device will normally operate in two parallel
streams.
Design inlet water quality: BOD5=50~250 mg/l, SS=150~250mg/l.
Design outlet water quality: BOD5≤30 mg/l, SS≤10mg/l.
Treatment flow: emergency overflow pit-cleaning device– regulating
The hydraulic structures and buildings includes INTAKE CHANNEL, INTAKE PIT, CW
24
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
PIPE etc.
All aspect design and decoration of hydraulic buildings shall be in accordance with the
All Valve Wells and Inspect Manholes shall be cast-in-situ RC structure or masonry.
The structures such as ditches, tanks and reservoirs etc. shall be cast-in-situ RC
structure.
The anti-corrosion cement(TYPE-Ⅴ) shall be used for RC structure which is under the
The power plant (2X135MW) shall share intake channel with Jeneponto 2X125MW
Coal Fired Steam Power Plant Project. Intake pit and CW pump house locate in north
and is proximate to the built intake pit and CW pump house of the power plant
(2X125MW). The built intake channel shall be widened and connected to intake pit of
the power plant (2X135MW). Intake Channel shall be formed by the ditch and dike at
north side. The dike shall be consist of soil inside and block stone cover which shall be
provided for slope protection. Intake pit shall be R.C. rectangular caisson. Temporarily
construction cofferdam shall be built to guarantee that dry construction method for the
intake pit , CW pump house and parts of intake channel can be adopted.
CW pump house shall be consisted of pumping room and water intake chamber.
25
JENEPONTO 2×135MW (2×125MW NET OUTPUT) COAL FIRED POWER PLANT
Basic Design Water Supply & Drainage Part
Outlet channel and outfall shall be R.C. structure. Outfall shall be converged into the
sea, the outlet and seabed nearby shall be protected by block stone armour.
26