PRE HOT WORK CHECKLIST (Permit No. - ) PRE HOT WORK CHECKLIST (Permit No.

) PRE HOT WORK CHECKLIST (Permit No. - ) PRE HOT WORK CHECKLIST (Permit No. - )
Date :- Location :- Date :- Location :- Date :- Location :-

Sr. no. Check Points YES NO or Remarks Sr. no. Check Points YES NO or Remarks Sr. Check Points YES NO or Remarks
N/A N/A no. N/A

1 Valid PTW Obtained 1 Valid PTW Obtained 1 Valid PTW Obtained

2 Gas test done and Gas detector available at work location 2 Gas test done and Gas detector available at work location 2 Gas test done and Gas detector available at work location

3 Proper Fire Blanket Booth prepared 3 Proper Fire Blanket Booth prepared 3 Proper Fire Blanket Booth prepared
4 Area inspected by Supervisor and Housekeeping done 4 Area inspected by Supervisor and Housekeeping done 4 Area inspected by Supervisor and Housekeeping done

5 Removed all flamable materials nearby hot work 5 Removed all flamable materials nearby hot work 5 Removed all flamable materials nearby hot work

6 All electrical equipments are certified(green tag ) and ready to use 6 All electrical equipments are certified(green tag ) and ready to use 6 All electrical equipments are certified(green tag ) and ready to use

7 Fire watcher available with jacket 7 Fire watcher available with jacket 7 Fire watcher available with jacket

8 Proper Body earthing and cable management ensured 8 Proper Body earthing and cable management ensured 8 Proper Body earthing and cable management ensured

9 ELCB is in working condition 9 ELCB is in working condition 9 ELCB is in working condition

10 Fire hose with nozzle & fire extinguisher provided at the location 10 Fire hose with nozzle & fire extinguisher provided at the location 10 Fire hose with nozzle & fire extinguisher provided at the location

11 Proper ventilation and lighting arrangement 11 Proper ventilation and lighting arrangement 11 Proper ventilation and lighting arrangement
ensured ensured ensured
Gas cutting set inspected and checked with soap solution for any Gas cutting set inspected and checked with soap solution for any Gas cutting set inspected and checked with soap solution for any
12 12 12
leaks. leaks. leaks.

13 Scaffolding is certified and having green tag 13 Scaffolding is certified and having green tag 13 Scaffolding is certified and having green tag

14 Loose materials at height are secured 14 Loose materials at height are secured 14 Loose materials at height are secured

15 All necessary PPE's have been provided 15 All necessary PPE's have been provided 15 All necessary PPE's have been provided

Site Engineer Sign. Safety officer sign. Site Engineer Sign. Safety officer sign. Site Engineer Sign. Safety officer sign.

PRE HOT WORK CHECKLIST (Permit No. - ) PRE HOT WORK CHECKLIST (Permit No. - ) PRE HOT WORK CHECKLIST (Permit No. - )
Date :- Location :- Date :- Location :- Date :- Location :-

Sr. no. Check Points YES NO or Remarks Sr. no. Check Points YES NO or Remarks Sr. Check Points YES NO or Remarks
N/A N/A no. N/A

1 Valid PTW Obtained 1 Valid PTW Obtained 1 Valid PTW Obtained

2 Gas test done and Gas detector available at work location 2 Gas test done and Gas detector available at work location 2 Gas test done and Gas detector available at work location

3 Proper Fire Blanket Booth prepared 3 Proper Fire Blanket Booth prepared 3 Proper Fire Blanket Booth prepared

4 Area inspected by Supervisor and Housekeeping done 4 Area inspected by Supervisor and Housekeeping done 4 Area inspected by Supervisor and Housekeeping done

5 Removed all flamable materials near by hot work 5 Removed all flamable materials nearby hot work 5 Removed all flamable materials nearby hot work

6 All electrical equipments are certified(green tag ) and ready to use 6 All electrical equipments are certified(green tag ) and ready to use 6 All electrical equipments are certified(green tag ) and ready to use

7 Fire watcher available with jacket 7 Fire watcher available with jacket 7 Fire watcher available with jacket

8 Proper Body earthing and cable management ensured 8 Proper Body earthing and cable management ensured 8 Proper Body earthing and cable management ensured

9 ELCB is in working condition 9 ELCB is in working condition 9 ELCB is in working condition


10 Fire hose with nozzle & fire extinguisher provided at the location 10 Fire hose with nozzle & fire extinguisher provided at the location 10 Fire hose with nozzle & fire extinguisher provided at the location

11 Proper ventilation and lighting arrangement 11 Proper ventilation and lighting arrangement 11 Proper ventilation and lighting arrangement
ensured ensured ensured
Gas cutting set inspected and checked with soap solution for any Gas cutting set inspected and checked with soap solution for any Gas cutting set inspected and checked with soap solution for any
12 12 12
leaks. leaks. leaks.

13 Scaffolding is certified and having green tag 13 Scaffolding is certified and having green tag 13 Scaffolding is certified and having green tag

14 Loose materials at height are secured 14 Loose materials at height are secured 14 Loose materials at height are secured

15 All necessary PPE's have been provided 15 All necessary PPE's have been provided 15 All necessary PPE's have been provided
Site Engineer Sign. Safety officer sign. Site Engineer Sign. Safety officer sign. Site Engineer Sign. Safety officer sign.