The document summarizes cell optimization work done by engineers. It lists 11 cell IDs that were identified as overshooting based on timing advance, call plots, and being among the worst cells. For one of these cells, the a5Threshold1Rsrp parameter value was changed from -119 to -116 on May 20, 2020 in an attempt to improve retainability after one iteration. RF and GSC engineers were involved in the activity.
The document summarizes cell optimization work done by engineers. It lists 11 cell IDs that were identified as overshooting based on timing advance, call plots, and being among the worst cells. For one of these cells, the a5Threshold1Rsrp parameter value was changed from -119 to -116 on May 20, 2020 in an attempt to improve retainability after one iteration. RF and GSC engineers were involved in the activity.
The document summarizes cell optimization work done by engineers. It lists 11 cell IDs that were identified as overshooting based on timing advance, call plots, and being among the worst cells. For one of these cells, the a5Threshold1Rsrp parameter value was changed from -119 to -116 on May 20, 2020 in an attempt to improve retainability after one iteration. RF and GSC engineers were involved in the activity.
Parameter Existing Value New Value Date Iteration Count Target KPI a5Threshold1Rsrp -119 -116 5/20/2020 1 Retainability Activity Type Additional Comment RF ENGINEER GSC ENGINEER Overshooters based on Timing advance ,true call plots ,&Worst cells Fausto Chirag/Arun L BA02383A L BA11192A L SF71857M L BA02030A L SF03031A L SF72014M L BA52644A L SF03268A L SF13159A L BA02015A L BA02016A LBA02383A LBA11192A LSF71857M LBA02030A LSF03031A LSF72014M LBA52644A LSF03268A LSF13159A LBA02015A LBA02016A