You are on page 1of 68

Transmittal No.

02

Project Name: Assuit-CP 118 Transmittal Ref. No. 02


ASF Job No.: 1142/18 PO No. 10002-18 Dated 22/10/2018
From: Omar Adel To. : Eng. Mohamed Mokhtar
Submitted By: Project Manager Company: ElSewedy Electric PSP
Signature: Address: Plot 246, 2nd district, Town Center, 5th Settlement,
New Cairo, Egypt
Date: 22/11/2018 Signature:
Mobile : +201000394725 Date:
No of Pages: 68

Type of Submittal
Drawing Testing Method Statement Warranty
Sample Technical Data Others Specify

Issued For
Approval Action As Built Information
As requested Others Record Construction

Sr# Ref. # Description Specification Remarks


Sec. Clause
1 1 WPS For Approval
2 1 PQR For Approval

NOTES:
Employer

Upper Egypt Electricity Production Company


(UEEPC)

Consultant

Power Generation Engineering and


Services Company
Main Contractor

Elsewedy Electric - PSP

Project

Assiut Supercritical Power Plant


1x650 MW Steam Power Station

0 25/06/2018 First Issue - Issued for Approval M.Saleh Fadi Abu Zeid Ehab ElKomy
Rev. Date Details of revision Created Checked Approved

Scale NTS Size A4 Origin. No. : ASF-QC-WPS&PQR Rev. 00 Contract No. 10077-CP-118

Copyright © ELSEWEDY PSP 2017.


All Rights Reserved. We reserve all
rights in this document and in the Title:
information herein. The reproduction,
disclosure or use of this document or its
Welding Procedures Specification (WPS) & Procedures
contents is forbidden without express Qualification Records (PQR)
written authority.

Originator Document no. Spec No./ Paragraph Ref.

1029-QAA-&MQC070-415006 10077-9-3PS-MV00-00001/1.04

PGESCo Doc. No. Rev. Page

00 1/67

You might also like