BOP testing procedures
By DiingFomula.com | February 14.2011 - 1:58 am [0 File Knowladpe, Well Corr
sa Pont Viows:20.955
(11 & Gas simulator
Ics ADC cere PLe Cenc Many
Shor LeaaDaver Tre
| was asked about BOP testing procedures fom my junior staf on the rg. Ths is very simple but important question: therefore, | woul Ike to share wit
you 28 wall about the BOP testing procedure
Note: my reference is based on API RP 53.
Image tom ebeca
Goneral BOP testing procedures
+ Use waterto test 30P', The reason s that water has less compressbily than mud,
ww ilingtormulas.com/bop testing procedures! wt112020 BOP testing procedures - Dring Formulas and Driling Calculations
“Mako up testing assembly and set in ino a walthead prof, Ensure thal the casing valve musl be let opened and there must be personnel monitoring
‘he ull of casing valvo al me while testng, You must ensure that personnel who monitor the oul must slay fr rom te BOP while itis Boing teste,
“The reason behind this sep sto prevent pressure buildup inthe casing Mf he tos plug i leaking,
+ Circulate trough choke ines, choke manifold, standpipe manifold, and valves to ensue that al ines are fll wth water. This practice is for
preventing pressure topping of while testing.
+ Lineup cement unit and rg team shut rams an valves
par each ig specific tasting sequence
+ Pressure tat must be low and high, respectively, andthe pressure shoula be stabilized wih minimum bleed of at least S minutes. Ensure that pressure
recording on a chart is recorded corscly.
“Ensure that any equipment does not passa pressure test requirement must be reported to supervisors.
“Continue pressure testing unt al equipment ested as per each rig spect
+ Rig down testing assembly
‘BOP testing period
Function tes! BOP: Every week, personnel must perform function test SOP alterating between remote panes
eid
pv
MANUFACTURING
eT
ey
LILBOP test There are 3 categories that you should consid for full BOP test
1. Prior to supping the wall: th frst time that BOP is installed onthe wal
2. Aller repairing or aisconnecting of any pressure eealing elements of BOP.
3. As por MMS, you can use BOP for 21 days (9 wosks) befor you noed fo testi again. Or you must fow the local regulations. For examplo, in tho
North Sea, they alow you only 14 days betore next BOP test
High pressure test for RAMS and auxiliary equipment
High prossue testo rated working pressure of RAMS SOP and auxllary equipment OR rated working pressure of your wellhead, Seloct he lower
‘number. For example, you BOP is rated for 10,000 ps and your wallnad is rated fr 8500 ps Your high pressure test forthe RAMS BOP ane ausilary
‘equipment must ba only 6500 pi
‘High pressure test for Annular Proventer
High preseure test should apoly to 70% of rated working pressure of RAMS tost pressure, Select the lower number, For example, you test your ram at
15,000 ps and tho annular working prossute is 6,500 ps. You nod to lost your annular to 3600 psi (70% of ams tosting pressure),
Low pressure test for both annular and RAMs preventer
200 ~300 ps should be appled for a low pressure test andthe period is § minutes
References
‘Cormack, . (2007) An inttoduetion to wel contol cleuatons for lng operations. 18 ed. Texas: Springer
ww ilingtormulas.com/bop testing procedures! ant112020 BOP testing procedures - Dring Formulas and Driling Calculations
{0s80ph martun bonediet 605 4
iy alow test be peromed on al pres test.
oO DritingFormulas.Com DECEMBER
sosseph,
BOP equipment sometimes leaks at ow pressure but seal with high pressure, Therefore we need to ensue thal the BOP component can
seal both low and igh pressure,
Regards,
Shyne.
Reply
Drees ® a
bop tt explained very beauty
Reply
Dr ern nese
“Thanks forthe explanaton,
My BOP stack is 2 double Ram 18K plus the annular, 10 K,CAMERON TL, I have 2 Questions:
| was asked totes the top fixed ram by eloing the botom fixed am and do the pressure test in between, a¢ We dont have plug tester to it
my 5 1/2 DP and cress over isnot avaliable, | cd not accept tis but people were forcing me and said this s normal and We do that f We
have problem with he tes plug
“The choke and killin arrangement is kind of stange to mo, the stack sas bolow:
Pipe ram, variable Blind pipe ram ard annular, so, kl ine i connected tothe bin
‘the VBR ram side outlet, and | have nothing conected below my bottom fixed ram andi want to move choke and kil valves down t have to
cutal the fixed steel pipes coonecte to hydraulic actuated valves, please advise
1 side outlet and the chock ine is connected Below on
Doerr Arse
Mostafa,
Tho frst one: This is potty weld set up. The RAMS aro not design te hold pressure from th top. Ineed more deals about this before!
can say its OK or not. Far now, tis not quite good for me.
“The second one: Ths Set up works for me. Kil ine onthe top isto minimize gas tap in BOP. You don't need to have the line below the
fixed ram. The reason being is f you want to fx the choke or kl lines and valves, you can use the bottom pie ram to shut the well in
while xing the issue with choke an killin.
Rogards,
Shyne.
Fadty 8
| want to ask
How many percent maximum pressure dap fr BOP test in S min ar 10 min?
for example we test 5000 Psi (what isthe maximum pressure drop we can sald the test pass.
Ropards
Faaly
Reply
Derren" T
Facty
You mus gt straight le onthe testing chart. There is no % of pressure drop regarding the BOP testing unless you have agreement
‘madi from your superiso.
www ilingtormulas.com/bop testing procedures! ant112020 BOP testing procedures - Dring Formulas and Driling Calculations
‘Ctumpton, H (2010), Well Conta for Completions and intervention. 1st ad, Texas: Gul Pubishing
‘Grace, R (2003). Blowout and wall control handbook [rscurso slecrénico). 1st ed. Palses Bajos: Gulf Professional Pub.
Grace, Rand Cudd, 8. (1994), Advanced blowout & wal corral. tte, Houston: Gulf Punishing Company.
Watson, Britenham, T. and Mor, P, (2003), Advanced well cantral ated. Richardson, Tex: Society of Patrolaum Engineers
Part for Fisher Well Control Riteco Supply- BOP Stack
Products Drill Pipe, HW, DC, Organization and
‘WS Tubing. BOP Stack.
4 Aco arena cer. rtng
Pumping Solutions Leak Off Test ‘Accumulator What are
-Thermoplastic (Procedures and (Koomey) Jars?
Pumps Caleuation)
‘Share the joy
0
Shares
‘Tagged BOP tein, BOP testing procedures. Bookmark he permalink
Avot ingFermts Som
o Virgin i lane ig sae ols
‘Vow all posts by DailingFormuas.Com -»
«Kk Tolan Caeuaton Batom hole pressure change while pstarming wa contol operation wih
dle’ metho »
16 Responses to BOP testing procedures
oD Kyltwin sucust 19, 2019 Ar 10:48 PM
‘very useful for me, thanks
‘Very good't helps a lot
Could you inform us the Ton miles ealelation for BOP’s run?
Brn
You can simply apply Ton-mie wile running casing but instead of using casing weight, you use BOP + riser weight
ww ilingtormulas.com/bop testing procedures! amt112020 BOP testing procedures - Dring Formulas and Driling Calculations
Bom nee
| would tks to have a procure for rocorifiation ein bop (annular & with rams)18°58 an bas.
‘is there a weltdefined procedure or not test
2.nna ae the tera or contions to perform a hydrostate test?
‘3.509 (annular and rams) they aro tested together or soparaloly?,
Reply
Dror erent
182. Pressure tes! musl be straight line on chart for a specie period which is based on agreement betwe
contractor
‘3: each BOP shoul be tested separataly
nan operator and a ding
Dower re
“THANX FOR EXPLAINING
Reply
Bower ere
“THANX FOR EXPLANING
(OMAR war 30,2016 AT 9:25 Pm
bop testing period
what is (MIMS ) MEAN?
Reply
Doerner teresa
MMS = Minorals Management Service
itp heenclfieldacronyms.com!7name-crectory-searonvalue=mme
Leave a reply
etek Conant (16) Faetooe Comments
‘Your emal adress wi not be pubshed. Required fs are marked
comment
Woe
Post Comment
‘This ste usos Akismet to reduce spam, Leam how your comment datais processed
ww ilingformulas.com/bop testing procedures! sit112020 BOP testing procedures - Dring Formulas and Driling Calculations:
lfelePix.com
Oilfield Acronyms
OILFIELD
ACRONYMS
Over 2,000
Acronyms
A Online
DrillngFormulas.Com on Etec of Frictional Pressure on ECD while Forward Circulation
Recent Comments
DrilngFomulas.Com an Elec of Frictional Pressure on ECD while Forward Cieuaton
DrillngFormulas.Com on What are diferences betwesn Full Opening Safely Valve (TIW valve) and inside BOP vale (Gray Valve)?
Aki on Etec of Frictional Pressure on ECD while Forward Cleuaton
Gary Holmes on Calculate Annular Capacity
_wwwilingformulas.comibop testing procedures!
mm11/2020
ww. crilingformulas.comibop-esting procedures
BOP testing procedures - Dring Formulas and Driling Calculations
amt11/2020
ww. crilingformulas.comibop-esting procedures
BOP testing procedures - Dring Formulas and Driling Calculations
om112020 BOP testing procedures - Dring Formulas and Driling Calculations
Categories
‘Select Category v
Get Driling Formulas Sheet For Free
Free
Driling Formula Spread Sheet
er mngrmn con
|
4
Subscribe to Get Free Calculation Sheet
Search on Drilingformulas.com
Googlecinen st
Wall Control One Page
RE
ww ilingformulas.com/bop testing procedures! ent11/2020 BOP testing procedures - Dring Formulas and Driling Calculations
ww. crilingormulas.comibop-esting procedures som112020 BOP testing procedures - Dring Formulas and Driling Calculations
Ding Formulae and Oring Calustons | Powered by Manta & WordPress,
ww ilingtormulas.com/bop testing procedures! aw