You are on page 1of 11
112020 BOP testing procedures - Dring Formulas and Driling Calculations ‘About This Blog ContactUs Ptvacy Paley MENU bop pressure esting equipment hydro testing a bop test plugs ‘annular pressure a hydraulic test a dling rig BOP testing procedures By DiingFomula.com | February 14.2011 - 1:58 am [0 File Knowladpe, Well Corr sa Pont Viows:20.955 (11 & Gas simulator Ics ADC cere PLe Cenc Many Shor LeaaDaver Tre | was asked about BOP testing procedures fom my junior staf on the rg. Ths is very simple but important question: therefore, | woul Ike to share wit you 28 wall about the BOP testing procedure Note: my reference is based on API RP 53. Image tom ebeca Goneral BOP testing procedures + Use waterto test 30P', The reason s that water has less compressbily than mud, ww ilingtormulas.com/bop testing procedures! wt 112020 BOP testing procedures - Dring Formulas and Driling Calculations “Mako up testing assembly and set in ino a walthead prof, Ensure thal the casing valve musl be let opened and there must be personnel monitoring ‘he ull of casing valvo al me while testng, You must ensure that personnel who monitor the oul must slay fr rom te BOP while itis Boing teste, “The reason behind this sep sto prevent pressure buildup inthe casing Mf he tos plug i leaking, + Circulate trough choke ines, choke manifold, standpipe manifold, and valves to ensue that al ines are fll wth water. This practice is for preventing pressure topping of while testing. + Lineup cement unit and rg team shut rams an valves par each ig specific tasting sequence + Pressure tat must be low and high, respectively, andthe pressure shoula be stabilized wih minimum bleed of at least S minutes. Ensure that pressure recording on a chart is recorded corscly. “Ensure that any equipment does not passa pressure test requirement must be reported to supervisors. “Continue pressure testing unt al equipment ested as per each rig spect + Rig down testing assembly ‘BOP testing period Function tes! BOP: Every week, personnel must perform function test SOP alterating between remote panes eid pv MANUFACTURING eT ey LILBOP test There are 3 categories that you should consid for full BOP test 1. Prior to supping the wall: th frst time that BOP is installed onthe wal 2. Aller repairing or aisconnecting of any pressure eealing elements of BOP. 3. As por MMS, you can use BOP for 21 days (9 wosks) befor you noed fo testi again. Or you must fow the local regulations. For examplo, in tho North Sea, they alow you only 14 days betore next BOP test High pressure test for RAMS and auxiliary equipment High prossue testo rated working pressure of RAMS SOP and auxllary equipment OR rated working pressure of your wellhead, Seloct he lower ‘number. For example, you BOP is rated for 10,000 ps and your wallnad is rated fr 8500 ps Your high pressure test forthe RAMS BOP ane ausilary ‘equipment must ba only 6500 pi ‘High pressure test for Annular Proventer High preseure test should apoly to 70% of rated working pressure of RAMS tost pressure, Select the lower number, For example, you test your ram at 15,000 ps and tho annular working prossute is 6,500 ps. You nod to lost your annular to 3600 psi (70% of ams tosting pressure), Low pressure test for both annular and RAMs preventer 200 ~300 ps should be appled for a low pressure test andthe period is § minutes References ‘Cormack, . (2007) An inttoduetion to wel contol cleuatons for lng operations. 18 ed. Texas: Springer ww ilingtormulas.com/bop testing procedures! ant 112020 BOP testing procedures - Dring Formulas and Driling Calculations {0s80ph martun bonediet 605 4 iy alow test be peromed on al pres test. oO DritingFormulas.Com DECEMBER sosseph, BOP equipment sometimes leaks at ow pressure but seal with high pressure, Therefore we need to ensue thal the BOP component can seal both low and igh pressure, Regards, Shyne. Reply Drees ® a bop tt explained very beauty Reply Dr ern nese “Thanks forthe explanaton, My BOP stack is 2 double Ram 18K plus the annular, 10 K,CAMERON TL, I have 2 Questions: | was asked totes the top fixed ram by eloing the botom fixed am and do the pressure test in between, a¢ We dont have plug tester to it my 5 1/2 DP and cress over isnot avaliable, | cd not accept tis but people were forcing me and said this s normal and We do that f We have problem with he tes plug “The choke and killin arrangement is kind of stange to mo, the stack sas bolow: Pipe ram, variable Blind pipe ram ard annular, so, kl ine i connected tothe bin ‘the VBR ram side outlet, and | have nothing conected below my bottom fixed ram andi want to move choke and kil valves down t have to cutal the fixed steel pipes coonecte to hydraulic actuated valves, please advise 1 side outlet and the chock ine is connected Below on Doerr Arse Mostafa, Tho frst one: This is potty weld set up. The RAMS aro not design te hold pressure from th top. Ineed more deals about this before! can say its OK or not. Far now, tis not quite good for me. “The second one: Ths Set up works for me. Kil ine onthe top isto minimize gas tap in BOP. You don't need to have the line below the fixed ram. The reason being is f you want to fx the choke or kl lines and valves, you can use the bottom pie ram to shut the well in while xing the issue with choke an killin. Rogards, Shyne. Fadty 8 | want to ask How many percent maximum pressure dap fr BOP test in S min ar 10 min? for example we test 5000 Psi (what isthe maximum pressure drop we can sald the test pass. Ropards Faaly Reply Derren" T Facty You mus gt straight le onthe testing chart. There is no % of pressure drop regarding the BOP testing unless you have agreement ‘madi from your superiso. www ilingtormulas.com/bop testing procedures! ant 112020 BOP testing procedures - Dring Formulas and Driling Calculations ‘Ctumpton, H (2010), Well Conta for Completions and intervention. 1st ad, Texas: Gul Pubishing ‘Grace, R (2003). Blowout and wall control handbook [rscurso slecrénico). 1st ed. Palses Bajos: Gulf Professional Pub. Grace, Rand Cudd, 8. (1994), Advanced blowout & wal corral. tte, Houston: Gulf Punishing Company. Watson, Britenham, T. and Mor, P, (2003), Advanced well cantral ated. Richardson, Tex: Society of Patrolaum Engineers Part for Fisher Well Control Riteco Supply- BOP Stack Products Drill Pipe, HW, DC, Organization and ‘WS Tubing. BOP Stack. 4 Aco arena cer. rtng Pumping Solutions Leak Off Test ‘Accumulator What are -Thermoplastic (Procedures and (Koomey) Jars? Pumps Caleuation) ‘Share the joy 0 Shares ‘Tagged BOP tein, BOP testing procedures. Bookmark he permalink Avot ingFermts Som o Virgin i lane ig sae ols ‘Vow all posts by DailingFormuas.Com -» «Kk Tolan Caeuaton Batom hole pressure change while pstarming wa contol operation wih dle’ metho » 16 Responses to BOP testing procedures oD Kyltwin sucust 19, 2019 Ar 10:48 PM ‘very useful for me, thanks ‘Very good't helps a lot Could you inform us the Ton miles ealelation for BOP’s run? Brn You can simply apply Ton-mie wile running casing but instead of using casing weight, you use BOP + riser weight ww ilingtormulas.com/bop testing procedures! amt 112020 BOP testing procedures - Dring Formulas and Driling Calculations Bom nee | would tks to have a procure for rocorifiation ein bop (annular & with rams)18°58 an bas. ‘is there a weltdefined procedure or not test 2.nna ae the tera or contions to perform a hydrostate test? ‘3.509 (annular and rams) they aro tested together or soparaloly?, Reply Dror erent 182. Pressure tes! musl be straight line on chart for a specie period which is based on agreement betwe contractor ‘3: each BOP shoul be tested separataly nan operator and a ding Dower re “THANX FOR EXPLAINING Reply Bower ere “THANX FOR EXPLANING (OMAR war 30,2016 AT 9:25 Pm bop testing period what is (MIMS ) MEAN? Reply Doerner teresa MMS = Minorals Management Service itp heenclfieldacronyms.com!7name-crectory-searonvalue=mme Leave a reply etek Conant (16) Faetooe Comments ‘Your emal adress wi not be pubshed. Required fs are marked comment Woe Post Comment ‘This ste usos Akismet to reduce spam, Leam how your comment datais processed ww ilingformulas.com/bop testing procedures! sit 112020 BOP testing procedures - Dring Formulas and Driling Calculations: lfelePix.com Oilfield Acronyms OILFIELD ACRONYMS Over 2,000 Acronyms A Online DrillngFormulas.Com on Etec of Frictional Pressure on ECD while Forward Circulation Recent Comments DrilngFomulas.Com an Elec of Frictional Pressure on ECD while Forward Cieuaton DrillngFormulas.Com on What are diferences betwesn Full Opening Safely Valve (TIW valve) and inside BOP vale (Gray Valve)? Aki on Etec of Frictional Pressure on ECD while Forward Cleuaton Gary Holmes on Calculate Annular Capacity _wwwilingformulas.comibop testing procedures! mm 11/2020 ww. crilingformulas.comibop-esting procedures BOP testing procedures - Dring Formulas and Driling Calculations amt 11/2020 ww. crilingformulas.comibop-esting procedures BOP testing procedures - Dring Formulas and Driling Calculations om 112020 BOP testing procedures - Dring Formulas and Driling Calculations Categories ‘Select Category v Get Driling Formulas Sheet For Free Free Driling Formula Spread Sheet er mngrmn con | 4 Subscribe to Get Free Calculation Sheet Search on Drilingformulas.com Googlecinen st Wall Control One Page RE ww ilingformulas.com/bop testing procedures! ent 11/2020 BOP testing procedures - Dring Formulas and Driling Calculations ww. crilingormulas.comibop-esting procedures som 112020 BOP testing procedures - Dring Formulas and Driling Calculations Ding Formulae and Oring Calustons | Powered by Manta & WordPress, ww ilingtormulas.com/bop testing procedures! aw

You might also like