All the area where pipe insulation was placed and concrete was planned this activity was stopped and some areas where concrete
was poured all such areas were cleared.
2. As per the waterproofing requirement for the roof slab all the works will be carried and completed.
3. Refer to the attached photos of removal of pipe insulation and concrete cleaning for the same area.