You are on page 1of 1

ADVERTISEMENT for Hiring of 3RD PARTY INSPECTION AGENCY

FOR FACTORY ACCEPTANCE TEST OF


500/220/132kV, 750-MVA AUTO TRANSFORMERS at GE FACTORY ISTANBUL, TURKEY

National Transmission and Dispatch Company intends to hire an international independent Inspection
company/individual for witnessing of Factory Acceptance Test of 500-kV transformers at M/s General
Electric factory in Turkey (Istanbul). The Factory Acceptance Test shall be carried out as per contract
specifications. Interested companies/individual are requested to please send their details along with
suitable inspector’s CVs (preferably available in Turkey) to carry out the Factory Acceptance Tests,
maximum by 24th March 2020 to the following Address. The company/individual should have
adequate experience of 500kV Auto Transformer testing.

Chief Engineer EHV-1 (NTDC)


NTDC House, 34-Industrial Area,
Gulberg-III, Lahore - Pakistan
E-mail Address: 1. ceehv1@ntdc.com.pk
2. sohailbajwa@hotmail.com

You might also like