You are on page 1of 4
=" — - fa. STRUCTION 408 508 _O) gne claim of agency x 1G Non supply of const; Struetion éraying z ja totmtiy bee Less. For the earth dan Portion the agency hes been at: joxk £2 head up due to et for 8 Be reoo: x supply of drawing to th of draving. Folloving 4 © agonoy, gis te item of work Nos of dpoving SR-T0u1 penh_to agency. ean this office yz. eft main earth dam section and details. ri w= no. 159 at, 2. Left main earth dam pla seotion. aici iocecS244S 5. Left main earth dam sect: fon = 8 on ae B-T000=0-2449(2,) Vide this office Letter no.85u dt. _4. Looation of electric Ieee piezometres e5,0r085 arms = SR-700U-C-2452 Vide this office isttee Bo 881 at. 5, Inatrumentaioy plan and detaile- oR-7000-C-2453 oe 6. Left main earth dam section eae sai e thie offi details. = Re TOW-0-2458 etter no aes - unetuuv-o-24s9 45°98 7. Left main earth dam rip-rep details in ywarparound 8. Left main earth dan seotion @nd special seotion for riverse slope portion. = SReTOUU=C-2460 All nost 411 the drawings for @rth dam have been received tr for work. O.W.0. and handed over to agency DEGLARATION v: A aS PBu! ‘BD Action has beso already taken far deolaretion of work site @ *6 to ueintioned that when over pibited #re- 4"out of place me was any dis’ si out sides the departaent ‘and local adm 8 stration hes taken in hee eee ES QrR By GBH turbance from HH dine SUSTAN AN CONSTRUCTION IN COMPANY Liv ANY LIMITED Pov =TRRAN faces of overflow Peon Sallaries, adits & 40 ALL around eluices. Yridge olab, beam and parapet 0 60 Mpiliway pier and traint, ALI block oute. = es _ oe ee ee ayaa eS 108 125 150 165 200 200 - 165 200 250 - Max. Max, Size of aggregate for wase conarete of 80 mm as chown in the dmuing designed for mate concrete of 150mm max. strength of 4-200 instead o: pave Strength of By150. 2 of aggregate should be we are yet to modive £01 section, training walle en in my of thi ipe shown +t a longex dis Vent not usu provided eo provided a n the down 8 jhe galieries 6 maintain the vent pipes as @ bound to enter into thi vent pipes the tentative gliery Even though, 024 received on 12.12. the rock profile an SR-7000-Ich-5! be modified accord. to required to be ieaueds j Adit in Block Ho, nooees on the down of adit. ds such, No.16 by extending longi face as appro down etream 4. Even though + yen vide drawing ox 7000/Tah/5046, for entice aanes BL reinforceme side due tudinal ach. gan be di details are shown, depending on the dep ese details axe not show. ao per the contmct provieion, as sa upstream 2 Hand down stream 2 % thickness: of ow end non overflow blocks should have 60 as max. size aggregates to avoid formation of honeycomb ani f H-{50 and ness conerst M exoand the waterotopas 40 om and strength of 4-200, ning of concrete in the, a other structures. ne provieion of 300 me aie 21 as showm in the dzav. strean to deep excave: it is suggested that adit should’ instrumentation gallery w easily provided in should be 150,™ ae our prant 1° size of sscreate over— @ should bave @ should max. size spillway vent pips? of 8 size of We bave also pointed out abut 7 at 3000 aw This Mg dans ead” Ssge0r fent pipes ax: tance in 2/3 places in dem, ually at the dead ends. yetem of prov: tream slopes vill allow ‘the rain water to enter into through vent pipes. It will also be very ny article falling down acd chotle the same. daly art was given vide g is required to daing air vent aifficult 90, 4 modified drawing 1° etails around gallery e691 = he reinforcement received onn2’ h of the adit upto th tails of reinforcemen typieal reinforce= nt dmawing not shown. So abso dit is not shown, In the drawing but eae y sizes of the reinforcement rods th of the gallery frow ft th de ad stream BlLopes ing will have no ion cut in front ‘shifted +o block +o the Lack Ho, 16. Llery are the top. of the THE HINDUST, AN CONSTRUCTION company unite 4 a 104 eekkes groutin @TSOnS, Once drqPer*tton as no room 43 lett for mavement imum oLze of the gurpemohines axe piaded in tie gallery: pposes. ‘This in atamacty Should be 2 x 2,5 M for pmewcal n most of the dams, Size of gallery now-@days adopteal Thi Pe. eae detaire of foundation gellery, sump well erails otc. are not otetee? Outlet pipes from the pump house de ised es not yet finalised. These are required to be taevory Delow they comers ttee necessary to deepened the Beery eeteam o® Construction sluices to have continuous rai tted es = emits details of construction sluises were subm. y © our Drawings D/8901/G1, sh. 1/3,2/3 & 3/3 under our Letter No.HIDW/CT/R-3/2135 dtd.3xd April'9i. We are yet to receive approval for the same. For these approval are required urgently in order to manufacture embeded parts of the Gates. Te We are yet to receive drawing showing exeavation details, max, section, Apron details for the over flow section. We have also no drawing for lay out, reinforcement and Gate embedment details xe, for the river sluices, It can be appreciated that these details are urgently required inorder to place orders for manufacturing of the river sluices embedment parts as well as the Getes, so that they are available in time for construction. In Drawing No.SR-7000-ICH-3027 received on 12.12.90, Trap provided at .contraction joints. ‘This enters into the This usually leads to choeking gallery in horizontal position. of the drain in horizontal portion as well as in the elbow and cannot be rectified later on, “@itmdrawing is required to be suitably modified. 9. We are Re to receive instrumentation drawing for the sonorcte dam, 68 per contract, these instruments are resistance type. On enquiry, we find that most of the resistance type 4nstruments do not function properly and go out of order. Most of the reputed firms like A.I.M.I.L eto. suggests use of vibrating wire type instrument which are more reliable. . They are also easily. rectifiable, in case of theft of the wire by extension of the wire with another. e which cannot be done in resistance type - instrument era et xed resistance ineluding the resictange of the wire is initially required to be taken and cannot be modified later on. ‘This will ofcourse change the specification of the instrumentation and will mean extra item of work. Decision in this regard may have to be taken. ‘In the river flow beyond the Aproh, there are out crops This will between Apron of the down stream causeway. lance in the river flow and my endanger the safety The Dam Safety Committee has papaeesed therefore the boulders to the Apron level, wing regarding wired to be ismed so that work can be taken up. ood 4 ware De It vas lea beyond block Roe eee the dam length my pe extended wrap round porti. order to have bett th: slips 98 occured at Shanta arene? deep an oreee so evelt whether & decision tn taken go” iNie center = is Drawi; Bei vea Soa for the earthen dam No, SR-7000-0-245e Fork only above he ponove Starting the up stroam ripraP area is Buby eee 2 210 in betwoen R.D 6.2 to 6.55 im. This Rertne ceaeress 3 filling of reservoir and Repid—Drawdown Pe the unprots 5 uring the construction stage. The safety Betenk a cted dam slope may have to be studied to Ee Noe ew aree It is also seen thet there is no provision eet eee Walle forming bexes in the riprap are® eee ee ea the wap around portion. Whether from the Beappercand@porticn, | Syston 1s BecekSaxy.4n vonetoe peccue 126 Instrumentation details received for the earthen dem shows resistance type instruments. Whether changtng ove to vibrating wire type instrument is being considered. It is, therefore, requested to take decision in this xegafda and drawings are issued immediately. Thanking you, Yours faithfully, for The Hindustan Construction Co.Ltd, Jie Lipa A em ¥M.G, Deshmukh Assistant Geral Manager. Copy tos The Chief Engineer, ; Subarnarekha Multipurpose Pro ject, : Icha-Galudih Complex ‘Adityapur, Jamshedpur. - Te Executive Engineer Copy tor Mtrkai Dam Division I, Icha-Chali ama. @he Executive Engineer, Kharkei Dem Divn.Il Copy to: opy ¥0F JT ona-Chaliama.

You might also like