DEPARTMENT OF MINING ENGINEERING

Vocational Training Projects – Underground Coal Mining


May 2020

IV Semester 28.05.2020
Practical Training – II
Sl.
Roll No. and Name Topic Description
No.
Steeply inclined Method of extraction, panel layout, cycle of
seam working operations, ventilation layout, haulage layout,
2018112001 level of production, OMS, selection of loading
1
Abbu Suffiyan A. and hauling equipment, support system, strata
monitoring system, drainage layout, pumping
layout
Seam working Statutory provisions, panel layout, cycle of
under surface operations, ventilation layout, haulage layout,
2018112002
2 structures level of production, OMS, manner of extraction,
Adarsh P.P.
selection of loading and hauling equipment,
support system, drainage layout
Bord and Pillar Panel layout, cycle of operations, ventilation
method of layout, haulage layout, level of production,
2018112003
3 working – OMS, drilling and blasting pattern, support
Aravind R.
Development at system, drainage layout, number of faces of
the depth of 350m working
Bord and Pillar Manner of extraction, cycle of operations,
method of ventilation layout, haulage layout, level of
2018112004
4 working – production, OMS, stowing preparatory, stowing
Dinakar S.
Depillaring with specification and layout, drainage layout
sand stowing
Bord and Pillar Panel layout, cycle of operations, ventilation
method of layout, haulage layout, level of production,
2018112005
5 working – OMS, drilling and blasting pattern, support
Dinesh Kumar M.
Development at system, drainage layout, number of faces of
the depth of 550m working
Bord and Pillar Manner of extraction, cycle of operations,
method of ventilation layout, haulage layout at pit top and
2018112006
6 working – bottom layouts, level of production, OMS,
Dinesh Kumar M.B.
Depillaring at the drilling and blasting pattern, number of faces of
depth of 350m working
Bord and Pillar Manner of extraction, cycle of operations,
method of ventilation layout, haulage layout at pit top and
2018112007
7 working – bottom, level of production, OMS, drilling and
Elavarasan K.
Depillaring at the blasting pattern, number of faces of working
depth of 550m
Longwall method Panel layout, cycle of operations, ventilation
of working– layout, haulage layout, level of production,
2018112008
8 Development for OMS, cutting pattern, support system, drainage
Gokul R.
Advancing layout
method
Longwall method Manner of extraction, cycle of operations,
2018112009 of working – ventilation layout, haulage layout, level of
9
Guna S. Extraction for production, OMS, cutting pattern, sequence of
Advancing method marching of support system
Punch Longwall Scope of application, manner of extraction, cycle
method of of operations, ventilation plan, haulage layout,
2018112011
10 working men and materials transportation details, level of
Jayasurya A.
production, OMS, cutting pattern, sequence of
support system
Hydraulic method Statutory provisions, scope of application, panel
of working layout, cycle of operations, ventilation layout,
2018112012 haulage layout, level of production, OMS,
11
Kavin.S manner of extraction, selection of loading and
hauling equipment, support system, drainage
layout, pumping layout
Bord and Pillar Panel layout, cycle of operations, ventilation
method of layout, haulage layout, level of production,
2018112013
12 working – OMS, manner of extraction, selection of loading
Kishore Kannan C.
Depillaring with and hauling equipment, support system, drainage
LHD layout, number of faces of working
Longwall method Selection of Longwall equipment, Manner of
2018112014 of working – transportation Longwall equipment, sequence of
13
Maheshwari G. Preparatory work installation of equipment, sub-station layout,
installation of powerpack
Longwall method Selection of Longwall salvaging equipment,
2018112015 of working – manner of transportation equipment, sequence of
14
Mithun Karthik M. Salvaging work installation of equipment, sub-station layout,
installation of powerpack
Horizon method Scope of application, sequence of development
of working and extraction, panel layout, cycle of operations,
2018112016 ventilation layout, haulage layout, level of
15 Peer Mohamed
production, OMS, selection of loading and
Ibrahim
hauling equipment, support system, drainage
layout
Blasting gallery - Manner of extraction, cycle of operations,
Depillaring ventilation layout, selection of loading and
2018112017
16 hauling equipment, level of production, OMS,
Ramesh Aravind E.
drilling and blasting pattern, number of faces of
working
Contiguous seam Scope of application, sequence of development
working and extraction, panel layout, cycle of operations,
2018112018 ventilation layout, haulage layout, level of
17
Ramkumar S. production, OMS, selection of loading and
hauling equipment, support system, drainage
layout
Longwall method Panel layout, cycle of operations, ventilation
2018112021 of working – layout, haulage layout, level of production,
18
Sathish Kumar T. Development for OMS, cutting pattern, support system, drainage
Retreating method layout
Longwall method Manner of extraction, cycle of operations,
2018112022 of working – ventilation layout, haulage layout, level of
19 Senthamil Selvan
Extraction for production, OMS, cutting pattern, sequence of
N.S.
Retreating method marching of support system
Coal status and Coal demands nation and international level,
policy various Indian coalfields, state-wise coal
production, list of private and public colliers,
2018112023 coal nationalization policy, national energy
20
Siddharthan S. policy, new coal distribution policy, coal vision
2030, statutory agencies and governing bodies
for coal industry, list of scientific institutes and
organizations for coal promotion
Underground coal Statutory provisions, scope of application,
2018112024
21 gassification preparatory works, level of production, pipe
Silambarasan B.
layout, safety measures
Shortwall method Scope of application, panel layout, cycle of
20181102025 of working operations, ventilation layout, haulage layout,
22
Soundararajan R. level of production, OMS, manner of extraction
pattern, support system, drainage layout
Blasting gallery – Panel layout, cycle of operations, ventilation
Development layout, haulage layout, level of production,
20181102026
23 OMS, drilling and blasting pattern, support
Sudhir M.
system, drainage layout, number of faces of
working
Sublevel stowing Scope of application, sequence of development
method of and extraction, panel layout, cycle of operations,
working ventilation layout, haulage layout, level of
20181102027
24 production, OMS, selection of loading and
Suganthan S.
hauling equipment, stowing specification and
layout, drainage layout, number of faces of
working
Sublevel caving Scope of application, sequence of development
method of and extraction, panel layout, cycle of operations,
20181102028 working ventilation layout, haulage layout, level of
25
Tamil Prasanth M. production, OMS, selection of loading and
hauling equipment, support system, drainage
layout, number of faces of working
Grading and Methods of sample collection and sample
analysis of coal locations, classification of samples, sample
20181102029
26 preparation, analysis of coal at laboratory,
Vasanthakumar K.
sizing, GCV analysis, ranking of coal as per
nation and international standards