MGE Comet UPS Operator Training

This training includes the below operations for the UPS.


Below are the steps.
1. Normal operation to Maintenance Bypass
2. Maintenance Bypass to Normal
Operation
UPS Operation: Step 1.
(Normal operation to Maintenance Bypass)
1. Insure there are no alarms present
2. Press and hold the gray inverter off button until the UPS
alarms, during this time the inverter will turn off and
load will shift to static bypass
3. Verify the load has shifted by checking the alarms on
the display
The Critical Load is now on Internal Static Bypass
4. Rotate the SR1 rotary bypass switch from ‘Normal’ to
‘Transfer’
5. Open QF1 Battery breaker(s)
6. Rotate the SR1 rotary bypass switch from ‘Transfer’ to
‘Bypass’ (the logic will power down)
The Critical Load is now on the SR1 rotary bypass switch
UPS Operation: Step 2.
(Maintenance Bypass to Normal Operation)
1. Rotate the SR1 rotary bypass switch from ‘Bypass’
to ‘Transfer’
2. During logic power up the power contactors will
close and the power section will start (the Rectifier
and Inverter will run but the Critical Load is still on
the SR1 rotary bypass switch)
3. Close QF1 Battery breaker(s)
4. The display should indicate ‘Load Protected, Power
Supply OK’
5. Press and hold the gray inverter off button until the
UPS alarms, during this time the inverter will turn off
and load will shift to static bypass
6. Verify the load has shifted by checking the alarms on
the display
7. Rotate the SR1 rotary bypass switch from ‘Transfer’
to ‘Normal’
8. Momentarily press the Green Inverter On button, the
Inverter will start and the system transfer the load to
the Inverter
The Critical Load is now protected by the UPS Inverter